Full Scale Program for
Renewable Energy in Egypt
Contents
Evolution of Egypt Needs of Electricity and
its supply mix
Renewable Energy Policy and Targets
Renewable Energy Program Components
Conclusions
Expected Evolution
of Peak Load
Technical Assistance to Reform the Energy Sector “TARES”, EU supported Project; preliminary findings
Impact of Fuel Prices on
Electricity Generation Cost
Fuel is currently supplied to the power sector at different Prices
Local gas supply 3 US$/MMBTU (Currently represent around 70%)
Local Heavy Fuel 8.7 US$/MMBTU (Currently represents around 30%)
Imported gas N.A. (expected range between 12-17 US$/MMBTU)
(will be around 10% as the current deficit)
Fuel Cost US$/MMBTU Cost of kWh
(pt/kWh)
($c/kWh)*
Cost of Fuel per kWh
(pt/kWh) ($c/kWh)*
3 35.2 4.92 21.9 3.06
6 49.8 6.96 36.5 5.1
9 65.2 9.11 51.9 7.25
12 82.5 11.53 69.3 9.96
15 99.9 13.97 86.8 12.14* 1 US$ =7.15 L.E
Advantages of Re
• Cost competitive for electricity generated
from both heavy fuel and imported gas
• Indigence resource
• Price predictability (long term cost effective)
• Environmentally friendly
• Several externalities
Expected Contribution of RE in the
Supply Mix
based on Different Scenarios
Technical Assistance to Reform the Energy Sector “TARES”, EU supported Project; preliminary findings
Sources of Electricity Supply
the Least Cost Scenario
Technical Assistance to Reform the Energy Sector “TARES”, EU supported Project; preliminary findings
Renewable Energy Policy
Making
Program Target
Within the framework of the announced target of
20/20. GoE has announced an interim target for
the first regulatory period (2015-2017) is to
contract 4300 MW of both solar and wind energy,
its breakdown is as follows:
300 MW for small solar systems
2000 MW of Medium and large size of solar
plants
2000 MW of Medium and large size of Wind
plants
Framework for Re
Development Mechanisms
Merchant Re Plants
Power Purchase
Agreement
New& Renewable
Energy Authority (NERA)
Competitive BiddingFeed in Tariff
Renewable Energy Projects
Development Schemes
Transmission
Program Components
Legal Framework: Defines policies and responsibilities
Regulatory Framework: Details the parties commitments
and technical and contractual requirements
Tariff Framework: Defines both tariff structure and values
Contractual Framework: Provides standard templates for
contracts
Supplementary Framework: Contains supporting
mechanisms including; resource assessment, technology
transfer, soft finance funds,…etc
Legal Framework
A presidential Law will be issued to provide the
necessary legal framework. This include:
– Public land Allocation; land allocation and usufruct
rights
– Mechanisms for building RE plants: Statuary,
Competitive Bidding, FiT and merchant as well as
define targets.
– Grid responsibility for priority of dispatch and take or
pay commitment
– Customer responsibilities; Quota and its criteria
– Renewable Energy Trading; definition of the residual
mix, GoC,..etc.
Regulatory Framework
•License the RE suppliers
•Prequalification requirements for developers
and small system integrators.
•Public land allocation procedures
• Dispute Resolution
• Interconnection with the grid
• Grid Code
• Priority on Dispatching
• TPA Right
• Define the residual mix and apply Quota for
Consumers
• Power Purchase requirements (including
take or pay contracts in case the grid is the
off-taker)
• Settlements and GoC regulations
• Issuance of Renewable certificates (GoC)
Procedures for Establishing RE
Projects for Capacities Below 500 kW
Procedures for Establishing RE Projects
for Capacities over 500 kW up to 50 MW
Grid Codes
• It includes all technical requirements and limits for interconnecting and
operation of the Re facilities with the grid. It is normally part of the
general grid codes ((grid and Distribution Codes).
• They include several codes for both Solar and Wind and codes for
different voltages level (Low, Medium, High/Ultra-High voltages)
• They include:
– General requirements
– Disconnection from the grid (voltage, frequency, ,..etc)
– Power quality
– Active power control
– Startup requirements
– Conditions for connection.
– Reactive power control
– Temporary voltage drops
– Grid protection
– Real time data processing
– Verification of electrical Characteristic
16
Tradable Guarantee of
Origin certificates (TGOC)
• In this approach unbundling is carried out between
electricity generation from a production device and its
attribute as renewable.
• Electricity generation will be traded as just electricity, yet
its renewable attribute will be traded through TGOC.
• The owner of the GOC is the owner renewable attribute.
• This system is similar to the Clean Development
Mechanism (CDM), however the TGOC should express the
premium cost for renewable energy above the cost of
generating electricity from conventional sources.
• It is used as a settlement tool for any supplier or consumers
obligations. Also it is used a declaration tool for the use of
Re
Tariff Framework (FiT)
• This include:
• Tariff structure,; tariff adjustment with
technology, site conditions and capacity
• Value of tariff which depends on; financial
terms, investments cost, competitiveness with
other markets, consumers affordability.
• Payment terms
Tariff for Solar Energy
PV tariff structure is flat rate and for 25 years , It has
been classified as follows:
– Installations connected to the low voltage:
– Residential 84.8 pt/kWh*
– Other than residential and up to 200 kW 90.1 pt/kWh*
– From 200 kW up to 500 kW 97.3 pt/kWh**
– Installations connected to the medium voltage
* based on soft loans of 4% interest rate made available by MoF
** based on soft loans of 8% interest rate made available by MoF.
*** Exchange rate for US$ = 7.15 EGP
installations from 500 kW and above including both the medium and high voltage connected installations,
are defined considering international financial terms .
Although payment will be offered in local currency, the Government of Egypt will bear the exchange rate
risk.
Tariff for Solar Energy
PV tariff structure is flat rate and for 25 years, It
has been classified as follows:
– Installations connected to the medium voltage
– From 500 kW up to 20 MW 13.6
US$c/kWh (equivalent
to 97.3 pt/kWh)***
– Installations connected to the high voltage
– From 20 MW up to 50 MW 14.34
US$c/kWh (equivalent to
102.5 pt/kWh)***
*** Exchange rate for US$ = 7.15 EGP
installations from 500 kW and above including both the medium and high voltage connected installations,
are defined considering international financial terms .
Although payment will be offered in local currency, the Government of Egypt will bear the exchange rate
risk.
Tariff for Wind Energy
• For wind energy the tariff
structure is two times
blocks tariff of a total
lifetime 20 years.
• The value of the first
block will be fixed for all
sites, which will be for five
years, while the value of
the second block will be
varied according to the
site specifics.
• Site has been defined by
the full operating hours.
FIT
Years
Ref site
(worst site)
Best site
5 20
Project life time
Wind Tariff
Contractual Framework
• This include the following contracts
– Land Use Agreement (between the plant and the land
owner)
– Interconnection contract ( between the plant and the grid)
– Third Party Access (in case if the transmitter is not the off
taker) (between the plant and the grid “commercial
contract”)
– Commercial contract “Power Purchase Agreement”
(between the plant (supplier) and off-taker)
– In case of biomass plants feed stock supply agreement
(between the feed stock supplier and the plant)
– Implementation Agreement (cross linked Agreement
between All Parties involved in the project (plant,
transmitter, land owner and purchaser)
Land Use Agreement
USUFRUCT AGREEMENT
• It specifies the relation between the land owner
and the plant developer.
• It includes access arrangements
• Payment arrangement (for public land it is
approved to be 2% of the produced energy or its
value).
• Liability clearance of the plant owner
• Terms for dual land use.
• Terms regarding plant demolition
Interconnection Contract
• It is primarily technical contract between the
plant and the transmitter
• It is subjected to the grid code.
• It specifies the point of common coupling
• It specifies the responsibilities of each party
on his side from the “POC”.
• It includes operation requirements and
obligations
Power Purchase Contract
(for FiT and Bidding Projects)
• This Contract is designed to ensure the bankability of the
projects.
• In this contract the following criteria have been considered.
– Take and pay
– Fixed Tariff
– Foreign exchange risk.
– Change in Law
– Force Majeure
– Dispute resolution
– Termination criteria and termination payments
– Sovereign guarantee for the off-taker commitments
– Pre-Notification to the lenders and Step in rights (direct
agreement)
Third Party Access Contract
(Merchant Projects)
• It allows contracting the grid to transmit electricity in
case of merchant projects, where Re plant sells
electricity directly to customers
• It specifies the relation between the plant and the
transmitter in case if the grid is not the off taker.
• It is usually subjected to grid access fee
• It specifies metering requirements
• Conditions of limiting access.
• Methodology for calculating dimmed capacity and
compensations.
Government Guarantees
• The government has committed it self to offer
the necessary government guarantee to back
the PPA for projects with capacities above 500
kW, in case the grid is the off-taker.
• The guarantee template from the MoF
includes guarantee for the project investment
in case of breaching the contract as well as 6
months of payments.
Implementation
Agreements
• It is usually needed to coordinate between the
multi-parties engaged in the project, such as
the direct contract, energy banking in case of
merchant projects, or any other contracts can
be needed to cover the cross linked
responsibilities among the project relevant
parties.
Supplementary Framework
This include:
Soft loans for small projects (4% interest
rates).
Land development and supply with
infrastructure
One stop shop facility
Conclusions
Re is cost effective for almost one third of the
electricity generated in Egypt based on the fuel
supply mix.
Re program is a multi-dimensional program,
which include legal, regulatory, tariff, contractual
and supplementary frameworks.
Setting cost effective targets are necessary to
ensure economical affordability of the program,
this will be based on the Re mix (technologies
and size ranges and best sites).
Thank you for your attention
NRE@idsc.net.eg
sobki54-2@hotmail.com salmawy@link.net

Mais conteúdo relacionado

Mais procurados

Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
Rupesh Bobbili
 
Order No. 1000 and Beyond: Transmission Policy, Renewables and More
Order No. 1000 and Beyond: Transmission Policy, Renewables and MoreOrder No. 1000 and Beyond: Transmission Policy, Renewables and More
Order No. 1000 and Beyond: Transmission Policy, Renewables and More
Carolyn Elefant
 
The electricity act,1910
The electricity act,1910The electricity act,1910
The electricity act,1910
Leo Lukose
 

Mais procurados (20)

Abt meter
Abt meterAbt meter
Abt meter
 
Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003
 
Open access ppt
Open access pptOpen access ppt
Open access ppt
 
Proposed Amendments to Electricity Act, 2003
Proposed Amendments to Electricity Act, 2003Proposed Amendments to Electricity Act, 2003
Proposed Amendments to Electricity Act, 2003
 
Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
 
Mo p electricity rules, 2005
Mo p electricity rules, 2005Mo p electricity rules, 2005
Mo p electricity rules, 2005
 
Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India) Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India)
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Electricity act2003
Electricity act2003Electricity act2003
Electricity act2003
 
Order No. 1000 and Beyond: Transmission Policy, Renewables and More
Order No. 1000 and Beyond: Transmission Policy, Renewables and MoreOrder No. 1000 and Beyond: Transmission Policy, Renewables and More
Order No. 1000 and Beyond: Transmission Policy, Renewables and More
 
Elecact2003
Elecact2003Elecact2003
Elecact2003
 
Presentation on captive power plants
Presentation on captive power plantsPresentation on captive power plants
Presentation on captive power plants
 
Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policy
 
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPAIndian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
 
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
 
PLEXOS applications
PLEXOS applicationsPLEXOS applications
PLEXOS applications
 
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
 
The electricity act,1910
The electricity act,1910The electricity act,1910
The electricity act,1910
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 

Semelhante a Renewable energy

WindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptWindFarmFeasibility (1).ppt
WindFarmFeasibility (1).ppt
ssuserfdb06f
 
Micro Generation And Selling Your Power
Micro Generation And Selling Your PowerMicro Generation And Selling Your Power
Micro Generation And Selling Your Power
Stephen Rowley
 
Tim Stone. 28th January
Tim Stone. 28th JanuaryTim Stone. 28th January
Tim Stone. 28th January
UKTI2014
 
Draft Article - V1
Draft Article - V1Draft Article - V1
Draft Article - V1
Ajay Nanda
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulations
Navajyoti Martha
 

Semelhante a Renewable energy (20)

Connexting Renewables & The Power Purchase Agreement - Tim Foster (Smartest ...
Connexting Renewables & The Power Purchase Agreement  - Tim Foster (Smartest ...Connexting Renewables & The Power Purchase Agreement  - Tim Foster (Smartest ...
Connexting Renewables & The Power Purchase Agreement - Tim Foster (Smartest ...
 
roof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptxroof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptx
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for difference
 
Levellised generic tariff
Levellised generic tariffLevellised generic tariff
Levellised generic tariff
 
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureNet Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
 
WindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptWindFarmFeasibility (1).ppt
WindFarmFeasibility (1).ppt
 
CAPSTONE FINAL VERSION
CAPSTONE FINAL VERSIONCAPSTONE FINAL VERSION
CAPSTONE FINAL VERSION
 
electricity-markets-basil-sharp.ppt
electricity-markets-basil-sharp.pptelectricity-markets-basil-sharp.ppt
electricity-markets-basil-sharp.ppt
 
Micro Generation And Selling Your Power
Micro Generation And Selling Your PowerMicro Generation And Selling Your Power
Micro Generation And Selling Your Power
 
Tim Stone. 28th January
Tim Stone. 28th JanuaryTim Stone. 28th January
Tim Stone. 28th January
 
Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...
Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...
Flora Flygt: Clean Power Plan Impact on Transmisssion Planning, Development a...
 
Overview of the energy sector in zambia case of renewable energy
Overview of the energy sector in zambia   case of renewable energyOverview of the energy sector in zambia   case of renewable energy
Overview of the energy sector in zambia case of renewable energy
 
Deviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptx
Deviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptxDeviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptx
Deviation Settlement Mechanism for Improving Grid Frequency Regime in India.pptx
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power Policy
 
Draft Article - V1
Draft Article - V1Draft Article - V1
Draft Article - V1
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulations
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 
Boo wind power in egypt
Boo wind power in egyptBoo wind power in egypt
Boo wind power in egypt
 
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
 
Grid diagnostic study Philippines - ETP.pdf
Grid diagnostic study Philippines - ETP.pdfGrid diagnostic study Philippines - ETP.pdf
Grid diagnostic study Philippines - ETP.pdf
 

Mais de Roshdy Abdelrassoul (6)

RESEARCH_METHODOLOGY_ppt_1.ppt
RESEARCH_METHODOLOGY_ppt_1.pptRESEARCH_METHODOLOGY_ppt_1.ppt
RESEARCH_METHODOLOGY_ppt_1.ppt
 
lecture1.pptx
lecture1.pptxlecture1.pptx
lecture1.pptx
 
Renewable energy-in-egypt-the-green-opportunity
Renewable energy-in-egypt-the-green-opportunityRenewable energy-in-egypt-the-green-opportunity
Renewable energy-in-egypt-the-green-opportunity
 
211 1022-3-pb
211 1022-3-pb211 1022-3-pb
211 1022-3-pb
 
Azazeel
AzazeelAzazeel
Azazeel
 
Azazeel
AzazeelAzazeel
Azazeel
 

Último

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Último (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Renewable energy

  • 1. Full Scale Program for Renewable Energy in Egypt
  • 2. Contents Evolution of Egypt Needs of Electricity and its supply mix Renewable Energy Policy and Targets Renewable Energy Program Components Conclusions
  • 3. Expected Evolution of Peak Load Technical Assistance to Reform the Energy Sector “TARES”, EU supported Project; preliminary findings
  • 4. Impact of Fuel Prices on Electricity Generation Cost Fuel is currently supplied to the power sector at different Prices Local gas supply 3 US$/MMBTU (Currently represent around 70%) Local Heavy Fuel 8.7 US$/MMBTU (Currently represents around 30%) Imported gas N.A. (expected range between 12-17 US$/MMBTU) (will be around 10% as the current deficit) Fuel Cost US$/MMBTU Cost of kWh (pt/kWh) ($c/kWh)* Cost of Fuel per kWh (pt/kWh) ($c/kWh)* 3 35.2 4.92 21.9 3.06 6 49.8 6.96 36.5 5.1 9 65.2 9.11 51.9 7.25 12 82.5 11.53 69.3 9.96 15 99.9 13.97 86.8 12.14* 1 US$ =7.15 L.E
  • 5. Advantages of Re • Cost competitive for electricity generated from both heavy fuel and imported gas • Indigence resource • Price predictability (long term cost effective) • Environmentally friendly • Several externalities
  • 6. Expected Contribution of RE in the Supply Mix based on Different Scenarios Technical Assistance to Reform the Energy Sector “TARES”, EU supported Project; preliminary findings
  • 7. Sources of Electricity Supply the Least Cost Scenario Technical Assistance to Reform the Energy Sector “TARES”, EU supported Project; preliminary findings
  • 9. Program Target Within the framework of the announced target of 20/20. GoE has announced an interim target for the first regulatory period (2015-2017) is to contract 4300 MW of both solar and wind energy, its breakdown is as follows: 300 MW for small solar systems 2000 MW of Medium and large size of solar plants 2000 MW of Medium and large size of Wind plants
  • 10. Framework for Re Development Mechanisms Merchant Re Plants Power Purchase Agreement New& Renewable Energy Authority (NERA) Competitive BiddingFeed in Tariff Renewable Energy Projects Development Schemes Transmission
  • 11. Program Components Legal Framework: Defines policies and responsibilities Regulatory Framework: Details the parties commitments and technical and contractual requirements Tariff Framework: Defines both tariff structure and values Contractual Framework: Provides standard templates for contracts Supplementary Framework: Contains supporting mechanisms including; resource assessment, technology transfer, soft finance funds,…etc
  • 12. Legal Framework A presidential Law will be issued to provide the necessary legal framework. This include: – Public land Allocation; land allocation and usufruct rights – Mechanisms for building RE plants: Statuary, Competitive Bidding, FiT and merchant as well as define targets. – Grid responsibility for priority of dispatch and take or pay commitment – Customer responsibilities; Quota and its criteria – Renewable Energy Trading; definition of the residual mix, GoC,..etc.
  • 13. Regulatory Framework •License the RE suppliers •Prequalification requirements for developers and small system integrators. •Public land allocation procedures • Dispute Resolution • Interconnection with the grid • Grid Code • Priority on Dispatching • TPA Right • Define the residual mix and apply Quota for Consumers • Power Purchase requirements (including take or pay contracts in case the grid is the off-taker) • Settlements and GoC regulations • Issuance of Renewable certificates (GoC)
  • 14. Procedures for Establishing RE Projects for Capacities Below 500 kW
  • 15. Procedures for Establishing RE Projects for Capacities over 500 kW up to 50 MW
  • 16. Grid Codes • It includes all technical requirements and limits for interconnecting and operation of the Re facilities with the grid. It is normally part of the general grid codes ((grid and Distribution Codes). • They include several codes for both Solar and Wind and codes for different voltages level (Low, Medium, High/Ultra-High voltages) • They include: – General requirements – Disconnection from the grid (voltage, frequency, ,..etc) – Power quality – Active power control – Startup requirements – Conditions for connection. – Reactive power control – Temporary voltage drops – Grid protection – Real time data processing – Verification of electrical Characteristic 16
  • 17. Tradable Guarantee of Origin certificates (TGOC) • In this approach unbundling is carried out between electricity generation from a production device and its attribute as renewable. • Electricity generation will be traded as just electricity, yet its renewable attribute will be traded through TGOC. • The owner of the GOC is the owner renewable attribute. • This system is similar to the Clean Development Mechanism (CDM), however the TGOC should express the premium cost for renewable energy above the cost of generating electricity from conventional sources. • It is used as a settlement tool for any supplier or consumers obligations. Also it is used a declaration tool for the use of Re
  • 18.
  • 19. Tariff Framework (FiT) • This include: • Tariff structure,; tariff adjustment with technology, site conditions and capacity • Value of tariff which depends on; financial terms, investments cost, competitiveness with other markets, consumers affordability. • Payment terms
  • 20. Tariff for Solar Energy PV tariff structure is flat rate and for 25 years , It has been classified as follows: – Installations connected to the low voltage: – Residential 84.8 pt/kWh* – Other than residential and up to 200 kW 90.1 pt/kWh* – From 200 kW up to 500 kW 97.3 pt/kWh** – Installations connected to the medium voltage * based on soft loans of 4% interest rate made available by MoF ** based on soft loans of 8% interest rate made available by MoF. *** Exchange rate for US$ = 7.15 EGP installations from 500 kW and above including both the medium and high voltage connected installations, are defined considering international financial terms . Although payment will be offered in local currency, the Government of Egypt will bear the exchange rate risk.
  • 21. Tariff for Solar Energy PV tariff structure is flat rate and for 25 years, It has been classified as follows: – Installations connected to the medium voltage – From 500 kW up to 20 MW 13.6 US$c/kWh (equivalent to 97.3 pt/kWh)*** – Installations connected to the high voltage – From 20 MW up to 50 MW 14.34 US$c/kWh (equivalent to 102.5 pt/kWh)*** *** Exchange rate for US$ = 7.15 EGP installations from 500 kW and above including both the medium and high voltage connected installations, are defined considering international financial terms . Although payment will be offered in local currency, the Government of Egypt will bear the exchange rate risk.
  • 22. Tariff for Wind Energy • For wind energy the tariff structure is two times blocks tariff of a total lifetime 20 years. • The value of the first block will be fixed for all sites, which will be for five years, while the value of the second block will be varied according to the site specifics. • Site has been defined by the full operating hours. FIT Years Ref site (worst site) Best site 5 20 Project life time
  • 24. Contractual Framework • This include the following contracts – Land Use Agreement (between the plant and the land owner) – Interconnection contract ( between the plant and the grid) – Third Party Access (in case if the transmitter is not the off taker) (between the plant and the grid “commercial contract”) – Commercial contract “Power Purchase Agreement” (between the plant (supplier) and off-taker) – In case of biomass plants feed stock supply agreement (between the feed stock supplier and the plant) – Implementation Agreement (cross linked Agreement between All Parties involved in the project (plant, transmitter, land owner and purchaser)
  • 25. Land Use Agreement USUFRUCT AGREEMENT • It specifies the relation between the land owner and the plant developer. • It includes access arrangements • Payment arrangement (for public land it is approved to be 2% of the produced energy or its value). • Liability clearance of the plant owner • Terms for dual land use. • Terms regarding plant demolition
  • 26. Interconnection Contract • It is primarily technical contract between the plant and the transmitter • It is subjected to the grid code. • It specifies the point of common coupling • It specifies the responsibilities of each party on his side from the “POC”. • It includes operation requirements and obligations
  • 27. Power Purchase Contract (for FiT and Bidding Projects) • This Contract is designed to ensure the bankability of the projects. • In this contract the following criteria have been considered. – Take and pay – Fixed Tariff – Foreign exchange risk. – Change in Law – Force Majeure – Dispute resolution – Termination criteria and termination payments – Sovereign guarantee for the off-taker commitments – Pre-Notification to the lenders and Step in rights (direct agreement)
  • 28. Third Party Access Contract (Merchant Projects) • It allows contracting the grid to transmit electricity in case of merchant projects, where Re plant sells electricity directly to customers • It specifies the relation between the plant and the transmitter in case if the grid is not the off taker. • It is usually subjected to grid access fee • It specifies metering requirements • Conditions of limiting access. • Methodology for calculating dimmed capacity and compensations.
  • 29. Government Guarantees • The government has committed it self to offer the necessary government guarantee to back the PPA for projects with capacities above 500 kW, in case the grid is the off-taker. • The guarantee template from the MoF includes guarantee for the project investment in case of breaching the contract as well as 6 months of payments.
  • 30. Implementation Agreements • It is usually needed to coordinate between the multi-parties engaged in the project, such as the direct contract, energy banking in case of merchant projects, or any other contracts can be needed to cover the cross linked responsibilities among the project relevant parties.
  • 31. Supplementary Framework This include: Soft loans for small projects (4% interest rates). Land development and supply with infrastructure One stop shop facility
  • 32. Conclusions Re is cost effective for almost one third of the electricity generated in Egypt based on the fuel supply mix. Re program is a multi-dimensional program, which include legal, regulatory, tariff, contractual and supplementary frameworks. Setting cost effective targets are necessary to ensure economical affordability of the program, this will be based on the Re mix (technologies and size ranges and best sites).
  • 33. Thank you for your attention NRE@idsc.net.eg sobki54-2@hotmail.com salmawy@link.net