SlideShare uma empresa Scribd logo
1 de 4
Robert Contreras
10405 Valle Fertil • El Paso, Texas 79927
915-667-2907 • rcontreras@utep.edu
BUILDING MAINTANCE/PROJECTS
ASSISTANT TECHNICAL TRADES SUPERVISOR
Supervise, plan, assign, inspect, instruct and coordinate the work of assigned maintenance personnel who
maintain, repair, construct, and renovate building systems, building hardware, to include major projects such as,
preventive maintenance program for roofing, converting/remodeling labs/classrooms and other buildings as
assigned.
PROFESSIONAL EXPERIENCE
The University of Texas at El Paso, Facilities Services Department • 1988-Present
UTEP is a four-year state university, and is a component institution of the University of Texas System.
Bldg Main/Projects Division • 2010-Present
Supervise and coordinate the work assigned for the Preventive Maintenance program of 1.4 million sq. ft. of
commercial roofing for the entire university. Administer the data, perform analysis and inspections, trouble-
shooting (use moisture detector equipment/TRAMEX/EPDM//FOAM /BUR) for roofs. Provide trainings for
maintenance personnel and the contractor. Emergency Respond Team for flooding and roofing concerns.
• Cost Management-Work within proper parameters to meet budget goals. Estimate best-value and best-cost
factors for projects.
• Productivity/Organization-Coordinate work, plan and utilize time to complete projects incorporating software
and PMI techniques to improve the productivity.
Notable Accomplishments
• Goal Zero reportable accidents
• Outstanding job of managing my project budgets. Many times completing jobs under budget.
• Negotiated with contractors for the delivery of best value.
• Follow up with my clients and stakeholders. Delivery of the product as close to their expectations
as possible.
• Assured that my contactors and I complied with UTEPs safety policies.
• Miner Village (13 units) Exterior Painting
• FFA Roof: Coating system recoating to roofs
• Kelly Hall: replace Roof
• Fac. Service & P&C Conference rooms renovations
• Sun Bowl Stadium: Repair & Secure High Mist Pole Lights
• Seamon Hall: Repair damage roof/no cost to UTEP
• 40 major projects completed total cost to UTEP ($240,000.00) Savings of $300,000.00
• Roof leaks have drop and no flooding issues due to better control.
Assistant Technical Trades Supervisor: 2004-2010
Supervised, planned, assigned, inspected, instructed and coordinated the work of 25 maintenance
personnel multi-trade shops.
• Assisted in the supervision and management of approx. 25 multi task, multi- trade shop personnel.
• Prioritized, scheduled, and planned preventative maintenance for buildings and building and
equipment systems.
resume
• Estimated labor, parts and material costs for repairs,, maintenance, construction and new work for
shop accomplishment and for contract support.
ROBERT CONTRERAS • Page 2
• Coordinated operation and maintenance activities to ensure optimum utilization of resources to
meet customer and university requirements.
• Studied production schedules and estimated worker hour requirement for completion of job
assignment.
• Established performance standards and tracks productivity.
• Adjusted work procedures to meet production schedules. Suggested changes in personnel
assignments, working conditions and use of equipment o increase efficiency of work crew.
• Developed and implanted a quality control program to assure that proper methods were used
and standards were met.
• Inspected completed installations and repairs for conformance with specifications safety
standards.
• Provided training and orientation to new employees and ongoing developmental trainf for shop
employees.
• Reviewed manufacturers’ service manuals, equipment usage schedules, and records of
maintenance problems to determine optimum frequency of preventive maintenance.
• Studied production and operation schedules and conferred with other staff and with
maintenance supervisors to determine when planned maintenance would least interfere with
operation of establishment t0 coordinate activities of individual shops.
• Purchased and controlled shop supplies, machinery, tools, and equipment
• Implemented and enforced university policies, procedures and safety regulations.
• Analyzed and resolves work problems, implement measures to improve production methods
and top motivate workers.
• Completed required administrative paperwork, maintained timecards and attendance reports.
• Knowledge of all Microsoft Office software and able to learn and use institutional software
systems
• Complied with all State AND University policies
• Other duties as assigned.
• Supervisory Responsibilities: Carried out supervisory responsibilities in accordance with the
organization’s policies and applicable laws.
Maintenance Supervisor – 1998-2004
Supervised and participated in the repair and Preventive Maintenance of electrical, mechanical utilities,
building systems and also in carpentry.
• Evaluated, directed, scheduled and inspected work for preventive maintenance personne.
• Assisted superiors in planning and estimating repair work to be completed.
• Prepared and submitted reports.
• Maintained and kept inventory of tool room and welding shop.
• Team Leader for contracted work.
• Additional work that was required in the area of emergency power generation, carpentry, and
plumbing maintenance and repair.
Carpenter II – 1988-1998
resume
Assistant to Foreman Shop preparing detailed estimates of time and materials required for assigned jobs
and responsible for using power and hand tools in the construction, maintenance and repair of structures,
equipment and carpentry.
• Take over as lead in absence of Shop Foreman.
ROBERT CONTRERAS • Page 3 •
• Performed general finish carpentry and cabinet work in the alteration, repair and maintenance of
floors, roofs, walls, stairways, doors, windows and other structures.
• Operated power saws, planers, joiners and hand tools
• Repaired and build tables, benches, cabinets, furniture, bookshelves, desks, counters and other
wooden equipment
• Laid Formica, tile and other coverings
• Selected materials as necessary for the job.
• Performed preventive maintenance actions on All of the above
• Supported the mission of the University and perform other related duties as required.
Notable Accomplishments
• Renovation of room for new Electron Microscope 1990
• Preparation and delivery of exhibits for the El Paso Festival 1989
• Successful completion of “Blueprint Reading for Construction 1989
• Employee of the Month – December 1988
Contractor/Self-Employed: 1983-1988
Remodeling, room additions i.e. kitchens, restrooms, and garage enclosures
• Job estimates, drafting plans
• Supervision of all labor and sub-contractors.
• Performed all surveying, concrete pouring/laying, rough and finish carpentry, roofing, drywall and
painting.
• Cabinet building, repairs & installation.
• Floor and wall covering work.
EDUCATION
Bel Air High School – Graduated May 1977
EPCC -1984 & 1986 Basic Drafting
PROFESSIONAL DEVELOPMENT
EXPO Roofing @New Orleans - 2010
Project Manager-BridgeCap Professional Training Servicies- May 2013
Training within Industry - November 2012
QPR for Suicide Prevention - October 2012
OSHA 500 June 2012
Superviosr’s Toolkit - February 2011
The Basics of Facilities Management - May 2008
resume
SIKA Sarnafil (Green Roofing Education) - May 2008
Management Develpment Program - May 1997
META AHERA Asbestos Worker Recertification - March 1995
Asbestos Abatement Worker - July 1995
Blueprint Reading & Construction March 1989
ROBERT CONTRERAS • Page 4 •
resume

Mais conteúdo relacionado

Mais procurados

Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation newWadeLim
 
Clayton Fillyaw Resume 4-2016
Clayton Fillyaw Resume 4-2016Clayton Fillyaw Resume 4-2016
Clayton Fillyaw Resume 4-2016Clayton Fillyaw
 
Chris_Chambers_Facilities
Chris_Chambers_FacilitiesChris_Chambers_Facilities
Chris_Chambers_FacilitiesChris Chambers
 
David meloy resume 2013
David meloy   resume 2013David meloy   resume 2013
David meloy resume 2013David Meloy
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation newWadeLim
 
Lori Green's Resume
Lori Green's ResumeLori Green's Resume
Lori Green's ResumeLori Green
 
Rick VanOverbeke Resume (1)
Rick VanOverbeke Resume (1)Rick VanOverbeke Resume (1)
Rick VanOverbeke Resume (1)Rick VanOverbeke
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
 
DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16Don Castaldo
 
Tv sr resume sept 2015
Tv sr resume sept 2015Tv sr resume sept 2015
Tv sr resume sept 2015Tim Vasquez
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain
 
Stuart Reiter safety resume 4-2015
Stuart Reiter safety resume 4-2015Stuart Reiter safety resume 4-2015
Stuart Reiter safety resume 4-2015Stuart Reiter
 
David Smart's current resume
David Smart's current resumeDavid Smart's current resume
David Smart's current resumeDavid Smart
 
Jeffrey a talley (resume 03-2016)
Jeffrey a talley (resume 03-2016)Jeffrey a talley (resume 03-2016)
Jeffrey a talley (resume 03-2016)Jeffrey Talley
 
Severin- Resume 5-29-15
Severin-  Resume 5-29-15Severin-  Resume 5-29-15
Severin- Resume 5-29-15Pat Severin
 

Mais procurados (20)

Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 
Clayton Fillyaw Resume 4-2016
Clayton Fillyaw Resume 4-2016Clayton Fillyaw Resume 4-2016
Clayton Fillyaw Resume 4-2016
 
Chris_Chambers_Facilities
Chris_Chambers_FacilitiesChris_Chambers_Facilities
Chris_Chambers_Facilities
 
Resume Bob 6
Resume Bob 6Resume Bob 6
Resume Bob 6
 
David meloy resume 2013
David meloy   resume 2013David meloy   resume 2013
David meloy resume 2013
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 
Lori Green's Resume
Lori Green's ResumeLori Green's Resume
Lori Green's Resume
 
Rick VanOverbeke Resume (1)
Rick VanOverbeke Resume (1)Rick VanOverbeke Resume (1)
Rick VanOverbeke Resume (1)
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16
 
Tv sr resume sept 2015
Tv sr resume sept 2015Tv sr resume sept 2015
Tv sr resume sept 2015
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical Engineer
 
Resume April 2015
Resume April 2015Resume April 2015
Resume April 2015
 
RobertSHiltnerResume
RobertSHiltnerResumeRobertSHiltnerResume
RobertSHiltnerResume
 
Stuart Reiter safety resume 4-2015
Stuart Reiter safety resume 4-2015Stuart Reiter safety resume 4-2015
Stuart Reiter safety resume 4-2015
 
David Smart's current resume
David Smart's current resumeDavid Smart's current resume
David Smart's current resume
 
Jeffrey a talley (resume 03-2016)
Jeffrey a talley (resume 03-2016)Jeffrey a talley (resume 03-2016)
Jeffrey a talley (resume 03-2016)
 
Severin- Resume 5-29-15
Severin-  Resume 5-29-15Severin-  Resume 5-29-15
Severin- Resume 5-29-15
 

Destaque

Thermetrics Brochure 4 pp
Thermetrics Brochure 4 ppThermetrics Brochure 4 pp
Thermetrics Brochure 4 ppKevin Bengston
 
Cara pengobatan parkinson pada lansia
Cara pengobatan parkinson pada lansiaCara pengobatan parkinson pada lansia
Cara pengobatan parkinson pada lansiacomelcomel95
 
Gost r 53868 2010
Gost r 53868 2010Gost r 53868 2010
Gost r 53868 2010Raphael254
 
Management and productivity 1
Management and productivity 1Management and productivity 1
Management and productivity 1Jill McCrum
 
Ecdemy - Powering eBusiness and eCommerce education in India
Ecdemy - Powering eBusiness and eCommerce education in IndiaEcdemy - Powering eBusiness and eCommerce education in India
Ecdemy - Powering eBusiness and eCommerce education in IndiaBharat Chopra
 
Dispatch coordinator perfomance appraisal 2
Dispatch coordinator perfomance appraisal 2Dispatch coordinator perfomance appraisal 2
Dispatch coordinator perfomance appraisal 2tonychoper4804
 
Автоматизация управления проектами на объекте строительства
Автоматизация управления проектами на объекте строительстваАвтоматизация управления проектами на объекте строительства
Автоматизация управления проектами на объекте строительстваКостя Бочкарёв
 

Destaque (12)

How to Use Captifire for List Building
How to Use Captifire for List BuildingHow to Use Captifire for List Building
How to Use Captifire for List Building
 
Thermetrics Brochure 4 pp
Thermetrics Brochure 4 ppThermetrics Brochure 4 pp
Thermetrics Brochure 4 pp
 
A NEW WPA
A NEW WPAA NEW WPA
A NEW WPA
 
Wifi analyzer
Wifi analyzerWifi analyzer
Wifi analyzer
 
Cara pengobatan parkinson pada lansia
Cara pengobatan parkinson pada lansiaCara pengobatan parkinson pada lansia
Cara pengobatan parkinson pada lansia
 
Gost r 53868 2010
Gost r 53868 2010Gost r 53868 2010
Gost r 53868 2010
 
Management and productivity 1
Management and productivity 1Management and productivity 1
Management and productivity 1
 
Ecdemy - Powering eBusiness and eCommerce education in India
Ecdemy - Powering eBusiness and eCommerce education in IndiaEcdemy - Powering eBusiness and eCommerce education in India
Ecdemy - Powering eBusiness and eCommerce education in India
 
pacotes peru
pacotes perupacotes peru
pacotes peru
 
Dispatch coordinator perfomance appraisal 2
Dispatch coordinator perfomance appraisal 2Dispatch coordinator perfomance appraisal 2
Dispatch coordinator perfomance appraisal 2
 
Автоматизация управления проектами на объекте строительства
Автоматизация управления проектами на объекте строительстваАвтоматизация управления проектами на объекте строительства
Автоматизация управления проектами на объекте строительства
 
Interlock fabrics
Interlock fabricsInterlock fabrics
Interlock fabrics
 

Semelhante a Robert Contreras' Resume Highlighting Maintenance Experience

Semelhante a Robert Contreras' Resume Highlighting Maintenance Experience (20)

Resume2015
Resume2015Resume2015
Resume2015
 
GOEFF STEBBINS RESUME
GOEFF STEBBINS RESUMEGOEFF STEBBINS RESUME
GOEFF STEBBINS RESUME
 
summery (work)
summery (work)summery (work)
summery (work)
 
summery (work)
summery (work)summery (work)
summery (work)
 
Ogunwale Oluwakayode CV-3(1)
Ogunwale Oluwakayode CV-3(1)Ogunwale Oluwakayode CV-3(1)
Ogunwale Oluwakayode CV-3(1)
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 
Resume 06212015
Resume 06212015Resume 06212015
Resume 06212015
 
JackmcdowellCV
JackmcdowellCVJackmcdowellCV
JackmcdowellCV
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
QNFS_Rajasekhar Murugaiyan REV 1
QNFS_Rajasekhar Murugaiyan REV 1QNFS_Rajasekhar Murugaiyan REV 1
QNFS_Rajasekhar Murugaiyan REV 1
 
Kris anderson 2016 resume docx
Kris anderson 2016 resume docxKris anderson 2016 resume docx
Kris anderson 2016 resume docx
 
William Cooper Resume Rev
William Cooper Resume RevWilliam Cooper Resume Rev
William Cooper Resume Rev
 
Sop 001-001test
Sop 001-001testSop 001-001test
Sop 001-001test
 
KevinHaddow-CV
KevinHaddow-CVKevinHaddow-CV
KevinHaddow-CV
 
Marwan Presentation 1
Marwan Presentation 1Marwan Presentation 1
Marwan Presentation 1
 
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latest
 
Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume A
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Raghu CV 30_12_15
Raghu CV 30_12_15Raghu CV 30_12_15
Raghu CV 30_12_15
 
Vikas cv
Vikas cvVikas cv
Vikas cv
 

Robert Contreras' Resume Highlighting Maintenance Experience

  • 1. Robert Contreras 10405 Valle Fertil • El Paso, Texas 79927 915-667-2907 • rcontreras@utep.edu BUILDING MAINTANCE/PROJECTS ASSISTANT TECHNICAL TRADES SUPERVISOR Supervise, plan, assign, inspect, instruct and coordinate the work of assigned maintenance personnel who maintain, repair, construct, and renovate building systems, building hardware, to include major projects such as, preventive maintenance program for roofing, converting/remodeling labs/classrooms and other buildings as assigned. PROFESSIONAL EXPERIENCE The University of Texas at El Paso, Facilities Services Department • 1988-Present UTEP is a four-year state university, and is a component institution of the University of Texas System. Bldg Main/Projects Division • 2010-Present Supervise and coordinate the work assigned for the Preventive Maintenance program of 1.4 million sq. ft. of commercial roofing for the entire university. Administer the data, perform analysis and inspections, trouble- shooting (use moisture detector equipment/TRAMEX/EPDM//FOAM /BUR) for roofs. Provide trainings for maintenance personnel and the contractor. Emergency Respond Team for flooding and roofing concerns. • Cost Management-Work within proper parameters to meet budget goals. Estimate best-value and best-cost factors for projects. • Productivity/Organization-Coordinate work, plan and utilize time to complete projects incorporating software and PMI techniques to improve the productivity. Notable Accomplishments • Goal Zero reportable accidents • Outstanding job of managing my project budgets. Many times completing jobs under budget. • Negotiated with contractors for the delivery of best value. • Follow up with my clients and stakeholders. Delivery of the product as close to their expectations as possible. • Assured that my contactors and I complied with UTEPs safety policies. • Miner Village (13 units) Exterior Painting • FFA Roof: Coating system recoating to roofs • Kelly Hall: replace Roof • Fac. Service & P&C Conference rooms renovations • Sun Bowl Stadium: Repair & Secure High Mist Pole Lights • Seamon Hall: Repair damage roof/no cost to UTEP • 40 major projects completed total cost to UTEP ($240,000.00) Savings of $300,000.00 • Roof leaks have drop and no flooding issues due to better control. Assistant Technical Trades Supervisor: 2004-2010 Supervised, planned, assigned, inspected, instructed and coordinated the work of 25 maintenance personnel multi-trade shops. • Assisted in the supervision and management of approx. 25 multi task, multi- trade shop personnel. • Prioritized, scheduled, and planned preventative maintenance for buildings and building and equipment systems. resume
  • 2. • Estimated labor, parts and material costs for repairs,, maintenance, construction and new work for shop accomplishment and for contract support. ROBERT CONTRERAS • Page 2 • Coordinated operation and maintenance activities to ensure optimum utilization of resources to meet customer and university requirements. • Studied production schedules and estimated worker hour requirement for completion of job assignment. • Established performance standards and tracks productivity. • Adjusted work procedures to meet production schedules. Suggested changes in personnel assignments, working conditions and use of equipment o increase efficiency of work crew. • Developed and implanted a quality control program to assure that proper methods were used and standards were met. • Inspected completed installations and repairs for conformance with specifications safety standards. • Provided training and orientation to new employees and ongoing developmental trainf for shop employees. • Reviewed manufacturers’ service manuals, equipment usage schedules, and records of maintenance problems to determine optimum frequency of preventive maintenance. • Studied production and operation schedules and conferred with other staff and with maintenance supervisors to determine when planned maintenance would least interfere with operation of establishment t0 coordinate activities of individual shops. • Purchased and controlled shop supplies, machinery, tools, and equipment • Implemented and enforced university policies, procedures and safety regulations. • Analyzed and resolves work problems, implement measures to improve production methods and top motivate workers. • Completed required administrative paperwork, maintained timecards and attendance reports. • Knowledge of all Microsoft Office software and able to learn and use institutional software systems • Complied with all State AND University policies • Other duties as assigned. • Supervisory Responsibilities: Carried out supervisory responsibilities in accordance with the organization’s policies and applicable laws. Maintenance Supervisor – 1998-2004 Supervised and participated in the repair and Preventive Maintenance of electrical, mechanical utilities, building systems and also in carpentry. • Evaluated, directed, scheduled and inspected work for preventive maintenance personne. • Assisted superiors in planning and estimating repair work to be completed. • Prepared and submitted reports. • Maintained and kept inventory of tool room and welding shop. • Team Leader for contracted work. • Additional work that was required in the area of emergency power generation, carpentry, and plumbing maintenance and repair. Carpenter II – 1988-1998 resume
  • 3. Assistant to Foreman Shop preparing detailed estimates of time and materials required for assigned jobs and responsible for using power and hand tools in the construction, maintenance and repair of structures, equipment and carpentry. • Take over as lead in absence of Shop Foreman. ROBERT CONTRERAS • Page 3 • • Performed general finish carpentry and cabinet work in the alteration, repair and maintenance of floors, roofs, walls, stairways, doors, windows and other structures. • Operated power saws, planers, joiners and hand tools • Repaired and build tables, benches, cabinets, furniture, bookshelves, desks, counters and other wooden equipment • Laid Formica, tile and other coverings • Selected materials as necessary for the job. • Performed preventive maintenance actions on All of the above • Supported the mission of the University and perform other related duties as required. Notable Accomplishments • Renovation of room for new Electron Microscope 1990 • Preparation and delivery of exhibits for the El Paso Festival 1989 • Successful completion of “Blueprint Reading for Construction 1989 • Employee of the Month – December 1988 Contractor/Self-Employed: 1983-1988 Remodeling, room additions i.e. kitchens, restrooms, and garage enclosures • Job estimates, drafting plans • Supervision of all labor and sub-contractors. • Performed all surveying, concrete pouring/laying, rough and finish carpentry, roofing, drywall and painting. • Cabinet building, repairs & installation. • Floor and wall covering work. EDUCATION Bel Air High School – Graduated May 1977 EPCC -1984 & 1986 Basic Drafting PROFESSIONAL DEVELOPMENT EXPO Roofing @New Orleans - 2010 Project Manager-BridgeCap Professional Training Servicies- May 2013 Training within Industry - November 2012 QPR for Suicide Prevention - October 2012 OSHA 500 June 2012 Superviosr’s Toolkit - February 2011 The Basics of Facilities Management - May 2008 resume
  • 4. SIKA Sarnafil (Green Roofing Education) - May 2008 Management Develpment Program - May 1997 META AHERA Asbestos Worker Recertification - March 1995 Asbestos Abatement Worker - July 1995 Blueprint Reading & Construction March 1989 ROBERT CONTRERAS • Page 4 • resume