SlideShare uma empresa Scribd logo
1 de 34
TOTAL
PRODUCTIVE
MAINTENANCE
(TPM)
Richard B. Magbatoc
OBJECTIVES
• Define Total Productive Maintenance
• Identify the Objectives of Total Productive
Maintenance
• Describe the Pillars of Total Productive Maintenance
• Give examples of calculations on the factors of Total
Productive Maintenance
INTRODUCTION
• Total productive maintenance (TPM) originated in Japan in 1971
as a method for improved machine availability through better
utilization of maintenance and production resources.
• TPM is a maintenance process developed for improving
productivity by making processes more reliable and less
wasteful.TPM is an extension of TQM(Total Quality
Management)
WHY TPM ?
• Avoid wastage in a quickly changing economic environment.
• Producing goods without reducing product quality.
• Reduce cost.
• Produce a low batch quantity at the earliest possible time.
• Goods send to the customers must be non defective.
WHAT IS TPM?
• Strategy of TPM is to change the attitude from “I use, You
maintain” to “I use, I maintain”.
• Think about how to Increase production and reduced cost by
reducing or eliminating loss, and this is the TPM.
OBJECTIVES OF TPM
• Improving the effectiveness of machines.
• Improving the efficiency, reliability and effectiveness of
maintenance of machine.
• Scheduling maintenance for avoiding early maintenance.
• Involving operation team also in smaller scale maintenance,
such as machine checklist inspection before starting and after
closing the machines.
• Arrangement of training for amending the skills of employees.
PILLARS OF TPM
PILLAR 1 – AUTONOMOUS
MAINTENANCE
• A collaborative team activity involving production, maintenance, and
engineering.
• Maintaining Basic conditions on shop floor & in Machines.
• All over participation through TPM Circles.
• Example: 5 S’, JISHU HOZEN ( Autonomous maintenance ), etc.,
• An approach that
• Develops operating and maintenance skills
• Strengthens communication and cooperation
PILLAR 2 – FOCUSED
IMPROVEMENT
• Improvement on every one’s activity.
• Improvement is to eliminate Production losses and cost
reduction.
• Improvement in Reliability, Maintainability, and cost.
PILLAR 3 – PLANNED
MAINTENANCE
• Logical analysis “Real causes for real counter measures”.
• Focus on Prevention.
• It is aimed to have trouble free machines and equipments
producing defect free products for total customer satisfaction.
• Example: Preventive Maintenance, Breakdown Maintenance,
etc.,
PILLAR 4 – QUALITY
MAINTENANCE
• Developing perfect machine for perfect Quality.
• Eliminating In – Process defects and custom
complaints.
• Policy :
• Defect free conditions and control of equipments.
• QM activities to support quality assurance.
• Focus of prevention of defects at source
• Focus on POKA-YOKE. ( fool proof system )
• In-line detection and segregation of defects.
• Effective implementation of operator quality
assurance.
PILLAR 5 – EDUCATION &
TRAINING
• Skills development for uniformity of work practices on machines.
• Skills for Zero defects, Zero breakdowns & Zero accidents.
• Multi Skilled employees in all departments.
• Four Levels of Skills
• Level 1: Lack both theoretical and practical ability (needs to be taught)
• Level 2: Knows theory but not in practice
• Level 3: Has mastered practice but not theory
• Level 4: Mastered both practice and theory
PILLAR 6 – DEVELOPMENT
MANAGEMENT
• Developing machines for “high equipment effectiveness”.
• Quick process for developing new products.
• Example: KAIZEN
• Kaizen Policy :
• Practice concepts of zero losses in every sphere of activity.
• Relentless pursuit to achieve cost reduction targets in all
resources.
• Relentless pursuit to improve over all plant equipment
effectiveness.
• Extensive use of PM analysis as a tool for eliminating losses.
• Focus of easy handling of operators.
PILLAR 7 – SAFETY, HEALTH &
ENVIRONMENT
• Zero accidents and Zero hazards at works.
• Zero Pollution at Plant and Environment.
PILLAR 8 – OFFICE TPM
• Office TPM must be followed to improve productivity, efficiency in the
administrative functions and identify and eliminate losses.
• This includes analyzing processes and procedures towards increased office
automation.
• Plans & Guidelines:
• Providing awareness about office TPM to all support departments
• Helping them to identify P, Q, C, D, S, M in each function in relation to
plant performance (Production, Quality, Cost, Delivery, Safety, Morale)
• Identify the scope for improvement in each function
• Collect relevant data
• Help them to solve problems in their circles
AVAILABILITY
• Calculation: Availability = Available Time / Scheduled Time
• Example:
• A given Work Center is scheduled to run for an 8 hour (480 minute) shift.
• The normal shift includes a scheduled 30 minute break when the Work Center
is expected to be down.
• The Work Center experiences 60 minutes of unscheduled downtime.
• Scheduled Time = 480 min – 30 min break = 450 Min
• Available Time = 450 min Scheduled – 60 min Unscheduled Downtime = 390 Min
• Availability = 390 Avail Min / 450 Scheduled Min = 87%
PERFORMANCE
• Calculation: Performance = (Parts Produced * Ideal Cycle Time) / Available Time
• Example:
• A given Work Center is scheduled to run for an 8 hour (480 minute) shift with a 30
minute scheduled break.
• Available Time = 450 Min Sched – 60 Min Unsched Downtime = 390 Minutes
• The Standard Rate for the part being produced is 40 Units/Hour or 1.5 Minutes/Unit
• The Work Center produces 242 Total Units during the shift. Note: The basis is Total
Units, not Good Units. The Performance metric does not penalize for Quality.
• Time to Produce Parts = 242 Units * 1.5 Minutes/Unit = 363 Minutes
• Performance = 363 Minutes / 390 Minutes = 93.0%
QUALITY
• Calculation: Quality = Good Units / Units Started
• Example:
• A given Work Center produces 230 Good Units during a shift.
• 242 Units were started in order to produce the 230 Good Units.
• Quality = 230 Good Units / 242 Units Started = 95.0%
TOTAL EFFECTIVE EQUIPMENT
PERFORMANCE
• OEE = Availability x Performance x Quality
• Calculation: TEEP = Loading x OEE
• Example:
• A given Work Center experiences…
• OEE of 34.0%
• Work Center Loading is 71.4%
• TEEP = 71.4% Loading x 34.0% OEE = 24.3%
LOADING
• Loading = Scheduled Time / Calendar Time
• Example:
• A given Work Center is scheduled to run 5 Days per Week, 24
Hours per Day.
• For a given week, the Total Calendar Time is 7 Days at 24
Hours.
• Loading = (5 days x 24 hours) / (7 days x 24 hours) = 71.4%
DIRECT BENEFITS OF TPM
• Increase productivity and OPE ( Overall Plant Efficiency ) by 1.5
or 2 times.
• Rectify customer complaints.
• Reduce the manufacturing cost by 30%.
• Satisfy the customers needs by 100 % ( Delivering the right
quantity at the right time, in the required quality. )
• Reduce accidents.
• Follow pollution control measures.
INDIRECT BENEFITS OF TPM
• Higher confidence level among the employees.
• Keep the work place clean, neat and attractive.
• Favorable change in the attitude of the operators.
• Achieve goals by working as team.
• Horizontal deployment of a new concept in all areas
of the
organization.
• Share knowledge and experience.
• The workers get a feeling of owning the machine.
DIFFICULTIES FACED IN TPM
IMPLEMENTATION
• Sufficient resources like people, money, time, etc. and assistance are not
provided.
• TPM is not a “quick fix” approach, it involve cultural change to the ways to
do the things.
• Incomplete understanding of the methodology and philosophy by middle
management.
• Many people treat it just another “program of the month” without paying any
focus and also doubt about its effectiveness.
• Workers show strong resistance to any change
• Many people considered TPM activities as additional work or threat.
REFERENCES
• SASIDHARAN M, TPM
• https://www.reliableplant.com/Read/26210/tpm-lean-
implement#:~:text=Total%20productive%20maintenance%20(TPM)%20is,and%20th
e%20quality%20of%20systems.
• https://www.fiixsoftware.com/maintenance-strategies/total-productive-maintenance/
• https://www.google.com/search?q=total+productive+maintenance&source=lnms&tb
m=isch&sa=X&ved=2ahUKEwjz_bXCg93wAhVP7GEKHQhHDWAQ_AUoAXoECA
EQAw&biw=1536&bih=754&dpr=1.25#imgrc=4k1rZA7yDi6I9M
THANK YOU.

Mais conteúdo relacionado

Semelhante a Total Productive Maintenance_Magbatoc.pptx

lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountsSabaKhalid48
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th semGuddu Ali
 
EngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptxEngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptxshayanzafar2
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceManishaHalai1
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfHimanshuGupta26467
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th semChetan Kumar
 
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMsshoaib1
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerSamantha Abalos
 
Total quantity management
Total quantity management Total quantity management
Total quantity management Ravi kumar
 
QUALITY CONTROL TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL  TOTAL QUALITY CONTROL.pptxQUALITY CONTROL  TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL TOTAL QUALITY CONTROL.pptxSamitBisal
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14ranviry49
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)Ankur Kumar
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdfmihirpatel306953
 

Semelhante a Total Productive Maintenance_Magbatoc.pptx (20)

Tpm
TpmTpm
Tpm
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
 
Method Study
Method Study Method Study
Method Study
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th sem
 
EngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptxEngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptx
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdf
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th sem
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
 
FUSION BROCHURE_ENG_Final_20160224_kvz(2)
FUSION BROCHURE_ENG_Final_20160224_kvz(2)FUSION BROCHURE_ENG_Final_20160224_kvz(2)
FUSION BROCHURE_ENG_Final_20160224_kvz(2)
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 Reviewer
 
Total quantity management
Total quantity management Total quantity management
Total quantity management
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Just in Time
Just in TimeJust in Time
Just in Time
 
QUALITY CONTROL TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL  TOTAL QUALITY CONTROL.pptxQUALITY CONTROL  TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL TOTAL QUALITY CONTROL.pptx
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdf
 

Mais de RichardMagbatoc1

DM_s2023_008-RPMS-PPST.pptx
DM_s2023_008-RPMS-PPST.pptxDM_s2023_008-RPMS-PPST.pptx
DM_s2023_008-RPMS-PPST.pptxRichardMagbatoc1
 
Principles for Managing Ethics in Public Service.pptx
Principles for Managing Ethics in Public Service.pptxPrinciples for Managing Ethics in Public Service.pptx
Principles for Managing Ethics in Public Service.pptxRichardMagbatoc1
 
2-HR AGREEMENT FORM APRIL 2023.docx
2-HR AGREEMENT FORM APRIL 2023.docx2-HR AGREEMENT FORM APRIL 2023.docx
2-HR AGREEMENT FORM APRIL 2023.docxRichardMagbatoc1
 
Kepler Parents Follow-Ups.pptx
Kepler Parents Follow-Ups.pptxKepler Parents Follow-Ups.pptx
Kepler Parents Follow-Ups.pptxRichardMagbatoc1
 
School Calendar 2023-2024 (Q1).pptx
School Calendar 2023-2024 (Q1).pptxSchool Calendar 2023-2024 (Q1).pptx
School Calendar 2023-2024 (Q1).pptxRichardMagbatoc1
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxRichardMagbatoc1
 
HISTORY OF TOTAL QUALITY MANAGEMENT AND THE DEMING PHILOSOPHY_RICHARD MAGBATO...
HISTORY OF TOTAL QUALITY MANAGEMENT AND THE DEMING PHILOSOPHY_RICHARD MAGBATO...HISTORY OF TOTAL QUALITY MANAGEMENT AND THE DEMING PHILOSOPHY_RICHARD MAGBATO...
HISTORY OF TOTAL QUALITY MANAGEMENT AND THE DEMING PHILOSOPHY_RICHARD MAGBATO...RichardMagbatoc1
 
Evaluation-Results-of-2nd-Quarter-PTC-and-3rd-Quarter-Calendar-of-Activities....
Evaluation-Results-of-2nd-Quarter-PTC-and-3rd-Quarter-Calendar-of-Activities....Evaluation-Results-of-2nd-Quarter-PTC-and-3rd-Quarter-Calendar-of-Activities....
Evaluation-Results-of-2nd-Quarter-PTC-and-3rd-Quarter-Calendar-of-Activities....RichardMagbatoc1
 
Strategies Standards as Related to Change.pptx
Strategies Standards as Related to Change.pptxStrategies Standards as Related to Change.pptx
Strategies Standards as Related to Change.pptxRichardMagbatoc1
 
Decision Making Strategies Standards as Related to Change_Magbatoc.pptx
Decision Making Strategies Standards as Related to Change_Magbatoc.pptxDecision Making Strategies Standards as Related to Change_Magbatoc.pptx
Decision Making Strategies Standards as Related to Change_Magbatoc.pptxRichardMagbatoc1
 

Mais de RichardMagbatoc1 (15)

Ratio Analysis.pptx
Ratio Analysis.pptxRatio Analysis.pptx
Ratio Analysis.pptx
 
School-MOOE.pptx
School-MOOE.pptxSchool-MOOE.pptx
School-MOOE.pptx
 
DM_s2023_008-RPMS-PPST.pptx
DM_s2023_008-RPMS-PPST.pptxDM_s2023_008-RPMS-PPST.pptx
DM_s2023_008-RPMS-PPST.pptx
 
GAD 2023.pptx
GAD 2023.pptxGAD 2023.pptx
GAD 2023.pptx
 
Principles for Managing Ethics in Public Service.pptx
Principles for Managing Ethics in Public Service.pptxPrinciples for Managing Ethics in Public Service.pptx
Principles for Managing Ethics in Public Service.pptx
 
Honors 2nd Quarter.pptx
Honors 2nd Quarter.pptxHonors 2nd Quarter.pptx
Honors 2nd Quarter.pptx
 
2-HR AGREEMENT FORM APRIL 2023.docx
2-HR AGREEMENT FORM APRIL 2023.docx2-HR AGREEMENT FORM APRIL 2023.docx
2-HR AGREEMENT FORM APRIL 2023.docx
 
Kepler Parents Follow-Ups.pptx
Kepler Parents Follow-Ups.pptxKepler Parents Follow-Ups.pptx
Kepler Parents Follow-Ups.pptx
 
School Calendar 2023-2024 (Q1).pptx
School Calendar 2023-2024 (Q1).pptxSchool Calendar 2023-2024 (Q1).pptx
School Calendar 2023-2024 (Q1).pptx
 
Faculty Meeting.pptx
Faculty Meeting.pptxFaculty Meeting.pptx
Faculty Meeting.pptx
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
 
HISTORY OF TOTAL QUALITY MANAGEMENT AND THE DEMING PHILOSOPHY_RICHARD MAGBATO...
HISTORY OF TOTAL QUALITY MANAGEMENT AND THE DEMING PHILOSOPHY_RICHARD MAGBATO...HISTORY OF TOTAL QUALITY MANAGEMENT AND THE DEMING PHILOSOPHY_RICHARD MAGBATO...
HISTORY OF TOTAL QUALITY MANAGEMENT AND THE DEMING PHILOSOPHY_RICHARD MAGBATO...
 
Evaluation-Results-of-2nd-Quarter-PTC-and-3rd-Quarter-Calendar-of-Activities....
Evaluation-Results-of-2nd-Quarter-PTC-and-3rd-Quarter-Calendar-of-Activities....Evaluation-Results-of-2nd-Quarter-PTC-and-3rd-Quarter-Calendar-of-Activities....
Evaluation-Results-of-2nd-Quarter-PTC-and-3rd-Quarter-Calendar-of-Activities....
 
Strategies Standards as Related to Change.pptx
Strategies Standards as Related to Change.pptxStrategies Standards as Related to Change.pptx
Strategies Standards as Related to Change.pptx
 
Decision Making Strategies Standards as Related to Change_Magbatoc.pptx
Decision Making Strategies Standards as Related to Change_Magbatoc.pptxDecision Making Strategies Standards as Related to Change_Magbatoc.pptx
Decision Making Strategies Standards as Related to Change_Magbatoc.pptx
 

Último

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 

Último (20)

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 

Total Productive Maintenance_Magbatoc.pptx

  • 2.
  • 3. OBJECTIVES • Define Total Productive Maintenance • Identify the Objectives of Total Productive Maintenance • Describe the Pillars of Total Productive Maintenance • Give examples of calculations on the factors of Total Productive Maintenance
  • 4.
  • 5. INTRODUCTION • Total productive maintenance (TPM) originated in Japan in 1971 as a method for improved machine availability through better utilization of maintenance and production resources. • TPM is a maintenance process developed for improving productivity by making processes more reliable and less wasteful.TPM is an extension of TQM(Total Quality Management)
  • 6. WHY TPM ? • Avoid wastage in a quickly changing economic environment. • Producing goods without reducing product quality. • Reduce cost. • Produce a low batch quantity at the earliest possible time. • Goods send to the customers must be non defective.
  • 7.
  • 8.
  • 9. WHAT IS TPM? • Strategy of TPM is to change the attitude from “I use, You maintain” to “I use, I maintain”. • Think about how to Increase production and reduced cost by reducing or eliminating loss, and this is the TPM.
  • 10. OBJECTIVES OF TPM • Improving the effectiveness of machines. • Improving the efficiency, reliability and effectiveness of maintenance of machine. • Scheduling maintenance for avoiding early maintenance. • Involving operation team also in smaller scale maintenance, such as machine checklist inspection before starting and after closing the machines. • Arrangement of training for amending the skills of employees.
  • 12.
  • 13. PILLAR 1 – AUTONOMOUS MAINTENANCE • A collaborative team activity involving production, maintenance, and engineering. • Maintaining Basic conditions on shop floor & in Machines. • All over participation through TPM Circles. • Example: 5 S’, JISHU HOZEN ( Autonomous maintenance ), etc., • An approach that • Develops operating and maintenance skills • Strengthens communication and cooperation
  • 14.
  • 15. PILLAR 2 – FOCUSED IMPROVEMENT • Improvement on every one’s activity. • Improvement is to eliminate Production losses and cost reduction. • Improvement in Reliability, Maintainability, and cost.
  • 16. PILLAR 3 – PLANNED MAINTENANCE • Logical analysis “Real causes for real counter measures”. • Focus on Prevention. • It is aimed to have trouble free machines and equipments producing defect free products for total customer satisfaction. • Example: Preventive Maintenance, Breakdown Maintenance, etc.,
  • 17. PILLAR 4 – QUALITY MAINTENANCE • Developing perfect machine for perfect Quality. • Eliminating In – Process defects and custom complaints. • Policy : • Defect free conditions and control of equipments. • QM activities to support quality assurance. • Focus of prevention of defects at source • Focus on POKA-YOKE. ( fool proof system ) • In-line detection and segregation of defects. • Effective implementation of operator quality assurance.
  • 18.
  • 19. PILLAR 5 – EDUCATION & TRAINING • Skills development for uniformity of work practices on machines. • Skills for Zero defects, Zero breakdowns & Zero accidents. • Multi Skilled employees in all departments. • Four Levels of Skills • Level 1: Lack both theoretical and practical ability (needs to be taught) • Level 2: Knows theory but not in practice • Level 3: Has mastered practice but not theory • Level 4: Mastered both practice and theory
  • 20. PILLAR 6 – DEVELOPMENT MANAGEMENT • Developing machines for “high equipment effectiveness”. • Quick process for developing new products. • Example: KAIZEN • Kaizen Policy : • Practice concepts of zero losses in every sphere of activity. • Relentless pursuit to achieve cost reduction targets in all resources. • Relentless pursuit to improve over all plant equipment effectiveness. • Extensive use of PM analysis as a tool for eliminating losses. • Focus of easy handling of operators.
  • 21.
  • 22. PILLAR 7 – SAFETY, HEALTH & ENVIRONMENT • Zero accidents and Zero hazards at works. • Zero Pollution at Plant and Environment.
  • 23. PILLAR 8 – OFFICE TPM • Office TPM must be followed to improve productivity, efficiency in the administrative functions and identify and eliminate losses. • This includes analyzing processes and procedures towards increased office automation. • Plans & Guidelines: • Providing awareness about office TPM to all support departments • Helping them to identify P, Q, C, D, S, M in each function in relation to plant performance (Production, Quality, Cost, Delivery, Safety, Morale) • Identify the scope for improvement in each function • Collect relevant data • Help them to solve problems in their circles
  • 24. AVAILABILITY • Calculation: Availability = Available Time / Scheduled Time • Example: • A given Work Center is scheduled to run for an 8 hour (480 minute) shift. • The normal shift includes a scheduled 30 minute break when the Work Center is expected to be down. • The Work Center experiences 60 minutes of unscheduled downtime. • Scheduled Time = 480 min – 30 min break = 450 Min • Available Time = 450 min Scheduled – 60 min Unscheduled Downtime = 390 Min • Availability = 390 Avail Min / 450 Scheduled Min = 87%
  • 25. PERFORMANCE • Calculation: Performance = (Parts Produced * Ideal Cycle Time) / Available Time • Example: • A given Work Center is scheduled to run for an 8 hour (480 minute) shift with a 30 minute scheduled break. • Available Time = 450 Min Sched – 60 Min Unsched Downtime = 390 Minutes • The Standard Rate for the part being produced is 40 Units/Hour or 1.5 Minutes/Unit • The Work Center produces 242 Total Units during the shift. Note: The basis is Total Units, not Good Units. The Performance metric does not penalize for Quality. • Time to Produce Parts = 242 Units * 1.5 Minutes/Unit = 363 Minutes • Performance = 363 Minutes / 390 Minutes = 93.0%
  • 26. QUALITY • Calculation: Quality = Good Units / Units Started • Example: • A given Work Center produces 230 Good Units during a shift. • 242 Units were started in order to produce the 230 Good Units. • Quality = 230 Good Units / 242 Units Started = 95.0%
  • 27. TOTAL EFFECTIVE EQUIPMENT PERFORMANCE • OEE = Availability x Performance x Quality • Calculation: TEEP = Loading x OEE • Example: • A given Work Center experiences… • OEE of 34.0% • Work Center Loading is 71.4% • TEEP = 71.4% Loading x 34.0% OEE = 24.3%
  • 28. LOADING • Loading = Scheduled Time / Calendar Time • Example: • A given Work Center is scheduled to run 5 Days per Week, 24 Hours per Day. • For a given week, the Total Calendar Time is 7 Days at 24 Hours. • Loading = (5 days x 24 hours) / (7 days x 24 hours) = 71.4%
  • 29. DIRECT BENEFITS OF TPM • Increase productivity and OPE ( Overall Plant Efficiency ) by 1.5 or 2 times. • Rectify customer complaints. • Reduce the manufacturing cost by 30%. • Satisfy the customers needs by 100 % ( Delivering the right quantity at the right time, in the required quality. ) • Reduce accidents. • Follow pollution control measures.
  • 30. INDIRECT BENEFITS OF TPM • Higher confidence level among the employees. • Keep the work place clean, neat and attractive. • Favorable change in the attitude of the operators. • Achieve goals by working as team. • Horizontal deployment of a new concept in all areas of the organization. • Share knowledge and experience. • The workers get a feeling of owning the machine.
  • 31. DIFFICULTIES FACED IN TPM IMPLEMENTATION • Sufficient resources like people, money, time, etc. and assistance are not provided. • TPM is not a “quick fix” approach, it involve cultural change to the ways to do the things. • Incomplete understanding of the methodology and philosophy by middle management. • Many people treat it just another “program of the month” without paying any focus and also doubt about its effectiveness. • Workers show strong resistance to any change • Many people considered TPM activities as additional work or threat.
  • 32.
  • 33. REFERENCES • SASIDHARAN M, TPM • https://www.reliableplant.com/Read/26210/tpm-lean- implement#:~:text=Total%20productive%20maintenance%20(TPM)%20is,and%20th e%20quality%20of%20systems. • https://www.fiixsoftware.com/maintenance-strategies/total-productive-maintenance/ • https://www.google.com/search?q=total+productive+maintenance&source=lnms&tb m=isch&sa=X&ved=2ahUKEwjz_bXCg93wAhVP7GEKHQhHDWAQ_AUoAXoECA EQAw&biw=1536&bih=754&dpr=1.25#imgrc=4k1rZA7yDi6I9M