SlideShare uma empresa Scribd logo
1 de 6
CAREER RESUME
NAME: Richard Barker
YEAR OF BIRTH: 1968
QUALIFICATIONS:
• H.N.C Civil Engineering Studies 1989
• O.N.C Civil Engineering Studies 1987
• CITB Site Management Safety Training
• Appointed Persons (Lifting Operations)
• PASMA Training
PROFILE
A technically minded and enthusiastic Manager with 29 years’ experience in the Civil
Engineering industry, on a variety of challenging projects. A team player who has a proactive
approach to delivering projects.
SUMMARY OF EXPERIENCE
Experience gained in many aspects of contract work valued up to £6.5 million in value, on both
traditional and design and build contracts in the UK.
Experience gained mainly in the water industry and includes water and sewage treatment works
& raw and potable pumping mains.
• MWH/Biwater – Senior Site Manager January 2006 - Present
• Galliford Morgan Est Joint Venture – Site Agent June 2005 – December 2005
• Morgan Est Water Division – Sub Agent/Site Agent June 2002 – June 2005
• Miller Civil Engineering – Section Engineer/Sub Agent February 2000 – June 2002
• Mott MacDonald - Project Managers Site
Representative/Resident Engineer
December 1997 – January 2000
• Peter Duffy Limited - Site Agent September 1997 – December 1997
• Yorkshire Pipeline Services (Yorkshire Water) - Site
Agent
May 1996 – September 1997
• Babcock Water Engineering Limited – Assistant Resident
Engineer
June 1992 – June 1994
• Yorkshire Water Engineering Limited - Engineer/Clerk of
Works
June 1990 – June 1992
• Boothferry Borough Council - Technician
• Norton Engineering Alloys Company Limited -
Design/Draughtsman
• Fairbank & Sons Consulting Engineers - Technician
September 1988 – June 1990
February 1988 – September 1988
August 1986 – February 1988
2
CAREER SUMMARY:
MWH/Biwater Treatment Ltd – Senior Site Manager
• Frankley WTW – Severn Trent - £14.0 million
Installation of new lime plant including stripping out of existing M&E plant & existing
equipment in an existing building, installation of new electrical panels, pumps, chemical
dosing & flushing lines within the building. Construction of two new in-situ pumping station,
glass coated steel tanks, lime silos complete with walkways, M&E plant& equipment
associated with lime transfer.
• Kilburn STW – Severn Trent - £6.5 million
Preliminary work & investigations in preparation for Planning Application, preparation of
programmes, schedules, quotations & cost reviews & supervision of construction,
mechanical and electrical installation & commissioning..
The rebuilding of sewage works is in a very sensitive local area adjacent to local residents
unreceptive to the project. The build includes construction of deep Inlet Pumping Station,
Inlet Works, Activated Sludge Plant, 1 no Final Settlement Tank & conversion of 2 no
existing humus tanks to FST, access roads etc.
All work is phased in with the demolition of the existing works whilst maintaining the integrity
of the treatment process.
• Clipstone GAC WTW - £2.7 million
As part of a scheme to remove pesticide levels from the borehole water which feed the site;
Construction & installation of 6 No. GAC absorbers and associated pipework and slab,
access road and site gate to enable GAC tankers to discharge media into vessels a 600m3
buried dirty backwash / conditioning wastewater tank and discharge pumps.
• Newborough STW - £0.5 million
Construction & installation of RBC unit, associated pipework & MCC. Replacement of
pumps & pipework in existing Inlet Pumping Station & removal of existing above ground
ASP.
• Duffield STW – Severn Trent - £0.3 million
Installation of storm tank cleaning system, Flow-meter, MCC control & minor amendments
to the storm overflow system.
• Stoney Stanton STW – Severn Trent - £3.0 million
Construction & installation of Sandfilter units for tertiary treatment of effluent including feed
pumping station. Construction of Chemical Dosing Plant, Works Return Pumping Station,
Washwater Pumping Stations, Floculation Chamber, MCC base & new access road
including culverting of watercourse.
• Measham STW – Severn Trent - £1.5 million
Construction & installation of Sandfilter units for tertiary treatment of effluent including feed
pumping station & weir/overflow chamber.
• Whetstone STW – Severn Trent - £0.8 million
Construction & installation of Chemical Dosing Plant, Odour Control Plant Inlet Works
Screenings removal system & new aeration control system.
• Winwick STW- Severn Trent, - £0.8 million
Construction of sewerage system, RBC & feed pumping station located in the heart of
picturesque village.
• Packington STW - Severn Trent, - £1.2 million
Construction of Deep Bed Filter for tertiary treatment of effluent, including feed pumping
station.
GMJV – Site Agent
• Islesteps – Scottish Water - £0.8 million
Construction of “first time” sewerage scheme in small village including installation of new
sewers by open cut & directional drilling, construction of chambers, pumping station and
reed beds.
3
• Loch Eck – Scottish Water – £6.5 million
Demolition of existing concrete precipitators tanks, construction of new underground
treatment tanks including installation of pipework within existing underground structures,
refurbishment of existing filters within the existing site buildings, installation of new electrics
and control panels & construction of a new steel framed building to house the new
treatment process.
Morgan Est Water Division - Site Agent
• Pocklington – Yorkshire Water, £2.5 million
Design, supply, installation and commissioning of Sandfilter tertiary treatment units, a
chemical dosing system, new inlet works, new outfall pipeline and ancillary works.
• Wanlip Sludge - Severn Trent, £1.5 million
Replacement of existing sludge import facility & DAF thickening plant with new import
station & gravity belt thickeners.
• Wanlip Storm Tank Cleaning – Severn Trent, £1 million
Modifications to existing storm tank cleaning system including removal of scraper bridges,
modifications to existing hoppers, construction of FRC vacuum chamber & installation of
vacuum flushing system.
Morgan Est Water Division - Sub Agent
• Fleckney – Severn Trent
Replacement of granite mineral media with slag media in 3 no existing filter beds.
Construction of a new inlet inlet works.
• Great Glen - Severn Trent
Replacement of mineral media with structured plastic media in existing filter bed &
installation of new distributor to increase treatment capacity including seeding &
commissioning
• Asset Renewals - Severn Trent, £2.5 million
• Branston – New glass coated steel sludge tank & auto de-sludge system including new
pressure main, modifications to existing wet wells.
• Redmile – Installation of auto- de-sludge system & modification to wet well
• Abbots Bromley - New glass coated steel sludge tank with associated feed pipework &
drainage pipework. 2 no GRP Humus tanks with associated feed & drainage pipework,
installation of auto- de-sludge, demolition of existing concrete humus tanks.
• Long Whatton - New glass coated steel sludge tank, auto de-sludge system,
modifications to circular storm tank to increase volume & diversion of storm tank outlet
pipework. Demolition of existing concrete sludge tank & rectangular storm tanks.
• Barton Under Needwood – Replacement of mineral media with structured plastic
media in existing filter bed & installation of new distributor to increase treatment
capacity. Including construction of new distribution chamber with associated pipework
diversions, new recirculation main, modifications to existing pumping station including
new valve chamber, seeding & commissioning the plastic media bed.
Miller Civil Engineering - Section Engineer
• Scarborough Toll House Pumping Station/Emergency Sea Outfall – Yorkshire Water,
£0.4 million
Additional works on a £5 million contract to pump sewage to a new treatment works.
Refurbishment of transfer pumps, refurbishment of course bar screens, installation of flap
valves on emergency overflow sea outfall & construction of concrete wet well walls & wave
deflector walls.
4
• Ripon UWWTW - Yorkshire Water, £3.7 million
Completion & commissioning of upgrade of existing STW to UWWTD standards.
Completion & commissioning of Sludge Treatment Centre for the de-watering & caking of
site produced & imported humus sludge.
• Various Amp 3 - Yorkshire Water £1.5 million
Construction of pumping stations, construction of sludge tanks, pumping mains &
refurbishment of existing pumping stations.
Mott MacDonald - Project Managers Site Representative/Engineer
• Ripon UWWTW - Yorkshire Water £3.7 million
Upgrading of existing STW to UWWTD Standards, new inlet works, storm tanks, pumping
stations, anoxic tanks, RAS/SAS system & associated pipework, connections etc.
A Sludge Treatment Centre was also incorporated into the scheme, imported sludge tanks,
dewatering building, sludge cake silo, new access road etc.
• Felixkirk - Yorkshire Water, £0.2 million
Replacement of existing septic tank & sewer outfall with a HIPAF Biological Aerated Filter
with automated screened storm overflow including sample chamber, new outfall structure,
MCC, new power supply to the site, new 300mm culvert for stream/surface water &
connections to the existing system.
• Cherry Burton STW - Yorkshire Water, £0.5 million
Construction of new Primary & Humus Tanks complete with auto-desludge facility,
replacement of mineral media in existing filter beds with plastic media c/w new distributors.
Decommission of existing RBC & BAF plant, upgrade of access road, and upgrade of power
supply, MCC, RTS & pipework.
• Bryherstone Inn STW - Yorkshire Water, £0.15 million
Replacement of existing RBC & 3No. inlet chamber/primary tank with a HIPAF Biological
Aerated Filter including sample chamber, MCC, RTS & connections to the existing system.
• Killinghall STW - Yorkshire Water, £0.25 million
Installation of new Inlet Screen, 2 No. Tertiary Sand Filter Units & associated pumps,
compressors, MCC, RTS & pipework.
• Ilkley & Ben Rhydding STW - Yorkshire Water, £ 0.5 million
Replacement of existing slag filter media with plastic media, installation of new distributor &
associated works / Reconstruction of existing filter beds
• Richmond STW - Yorkshire Water, £ 0.3 million
Construction of new circular primary tank & associated feed/draw off pipework including
installation of pumps, half bridge scraper, MCC, RTS & connections
• Catterick & Grassington STW - Yorkshire Water, £0.5 million
Construction of new circular secondary tank & associated feed/draw off pipework including
installation of pumps, half bridge scraper, MCC, RTS & connections.
Peter Duffy Limited - Site Agent
• Avesta Water Main Diversion
Supervision of construction of 500 metres of 600mm diameter water main on a busy
commuter route into Sheffield City centre, including pressure testing, chlorination, & the
installation of cathodic protection
Yorkshire Pipeline Services (Yorkshire Water) - Site Agent
• YPS Labour Co-ordination & Site Audit
Agent involved with the co-ordination of labour & sub-contractors throughout the Yorkshire
Area.
• Yorkshire Water - Southern Area
5
Supervision of D & C and statutory contracts in the Sheffield Area.
• Headingley Lane, Leeds - Yorkshire Water, 1.1 million
Joint supervision of fast track pipe laying scheme of 2.2 km constructed on a busy
commuter route into Leeds City centre, in preparation of the proposed Leeds Supertram.
• Harrogate Raw Water - Yorkshire Water
Agent involved in final months of a scheme to provide treated water to remote properties
throughout North Yorkshire.
• Wensleydale Reinforcement - Yorkshire Water
Supervision of construction of 3 km of pipeline at Aysgarth in the Yorkshire Dales National
Park.
• Chellow to Wainstalls - Yorkshire Water
Engineer supervising the fast track construction of 12 km of pipeline as part of the Yorkshire
Water Drought Initiative. Including construction of a break tank & pressure testing under
extreme head.
Babcock Water Engineering Limited - Assistant Resident Engineer
• Naburn Sewage Treatment Works - Yorkshire Water
Assistant Resident Engineer, seconded to White Young Consulting Engineers, supervising
upgrading of existing STW. Including construction of new high level Inlet Works, screens &
grit removal. Also installation of new scrapers & sludge removal system for the primary
settlement tanks.
• Fulford Pumping Station - Yorkshire Water
Supervision of upgrading of pumping station as part of the Naburn Scheme. Including
installation of automatic pneumatic valves & actuators to replace existing hand operated
valves.
Yorkshire Water Engineering Limited - Engineer/Clerk of Works
• Rawcliffe S T W - Yorkshire Water
Clerk of Works supervising installation of Wet Scrubber Odour Control Plant & building,
including associated pipework, covers to tanks & landscaping. Previous involvement
included preparation of drawings both on the drawing board & on MEDUSA C.A.D., bill of
quantities on QUMIC & specification for the tender documents.
• Scarborough Sewage Disposal - Yorkshire Water
Engineer involved in the latter stages of a £30 million scheme for the improvement of
sewage disposal in the coastal resort. Duties included surveys, preparations of tender
drawings & documents, bill of quantities, specifications for the following:
• Knipe Point, - Two pump pumping station & valve chamber to serve small housing
estate
• Injection Pumping Station & Odour Control Units - Two pump pumping station &
valve chamber injecting sewage from an isolated toilet block into pumping main. Two
odour control units & associated chambers & pipework for air valves.
• Northern Outfall Rehabilitation - Repair of existing sewage outfall with GRP Liners, to
act as an emergency outfall for new underground pumping station & long sea outfall.
• Detention Tanks - Overflow to 600mm diameter pumping main for retention of
sewerage during high tide/storm conditions
Boothferry Borough Council - Technician
Norton Engineering Alloys Company Limited - Design/Draughtsman
Fairbank & Sons Consulting Engineers - Technician
5
Supervision of D & C and statutory contracts in the Sheffield Area.
• Headingley Lane, Leeds - Yorkshire Water, 1.1 million
Joint supervision of fast track pipe laying scheme of 2.2 km constructed on a busy
commuter route into Leeds City centre, in preparation of the proposed Leeds Supertram.
• Harrogate Raw Water - Yorkshire Water
Agent involved in final months of a scheme to provide treated water to remote properties
throughout North Yorkshire.
• Wensleydale Reinforcement - Yorkshire Water
Supervision of construction of 3 km of pipeline at Aysgarth in the Yorkshire Dales National
Park.
• Chellow to Wainstalls - Yorkshire Water
Engineer supervising the fast track construction of 12 km of pipeline as part of the Yorkshire
Water Drought Initiative. Including construction of a break tank & pressure testing under
extreme head.
Babcock Water Engineering Limited - Assistant Resident Engineer
• Naburn Sewage Treatment Works - Yorkshire Water
Assistant Resident Engineer, seconded to White Young Consulting Engineers, supervising
upgrading of existing STW. Including construction of new high level Inlet Works, screens &
grit removal. Also installation of new scrapers & sludge removal system for the primary
settlement tanks.
• Fulford Pumping Station - Yorkshire Water
Supervision of upgrading of pumping station as part of the Naburn Scheme. Including
installation of automatic pneumatic valves & actuators to replace existing hand operated
valves.
Yorkshire Water Engineering Limited - Engineer/Clerk of Works
• Rawcliffe S T W - Yorkshire Water
Clerk of Works supervising installation of Wet Scrubber Odour Control Plant & building,
including associated pipework, covers to tanks & landscaping. Previous involvement
included preparation of drawings both on the drawing board & on MEDUSA C.A.D., bill of
quantities on QUMIC & specification for the tender documents.
• Scarborough Sewage Disposal - Yorkshire Water
Engineer involved in the latter stages of a £30 million scheme for the improvement of
sewage disposal in the coastal resort. Duties included surveys, preparations of tender
drawings & documents, bill of quantities, specifications for the following:
• Knipe Point, - Two pump pumping station & valve chamber to serve small housing
estate
• Injection Pumping Station & Odour Control Units - Two pump pumping station &
valve chamber injecting sewage from an isolated toilet block into pumping main. Two
odour control units & associated chambers & pipework for air valves.
• Northern Outfall Rehabilitation - Repair of existing sewage outfall with GRP Liners, to
act as an emergency outfall for new underground pumping station & long sea outfall.
• Detention Tanks - Overflow to 600mm diameter pumping main for retention of
sewerage during high tide/storm conditions
Boothferry Borough Council - Technician
Norton Engineering Alloys Company Limited - Design/Draughtsman
Fairbank & Sons Consulting Engineers - Technician

Mais conteúdo relacionado

Mais procurados

Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Fairfax County
 
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationLittle Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationFairfax County
 
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirSeismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirVladimir Popovic
 
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Fairfax County
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
 
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Fairfax County
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Fairfax County
 
Lakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community MeetingLakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community MeetingFairfax County
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationFairfax County
 
Tour of ww collection system 11 4-2011
Tour of ww collection system 11 4-2011Tour of ww collection system 11 4-2011
Tour of ww collection system 11 4-2011kristinemassey
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectFairfax County
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationFairfax County
 
Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Fairfax County
 
Substantial completion flatlick branch iii stream restoration
Substantial completion   flatlick branch iii stream restorationSubstantial completion   flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restorationFairfax County
 
Spe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsSpe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsFabio Brambilla
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingLakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingFairfax County
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairFairfax County
 

Mais procurados (20)

Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
 
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationLittle Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station Rehabilitation
 
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirSeismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
 
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020
 
Lakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community MeetingLakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community Meeting
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater Consolidation
 
Tour of ww collection system 11 4-2011
Tour of ww collection system 11 4-2011Tour of ww collection system 11 4-2011
Tour of ww collection system 11 4-2011
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013
 
Substantial completion flatlick branch iii stream restoration
Substantial completion   flatlick branch iii stream restorationSubstantial completion   flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restoration
 
Spe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsSpe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wells
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingLakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community Meeting
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 

Destaque

Mechanical Design Portfolio - Mike Ryland
Mechanical Design Portfolio - Mike RylandMechanical Design Portfolio - Mike Ryland
Mechanical Design Portfolio - Mike RylandMike Ryland
 
Client Pitch Presentation = FrenchWeek5
Client Pitch Presentation = FrenchWeek5Client Pitch Presentation = FrenchWeek5
Client Pitch Presentation = FrenchWeek5Abigail French
 
Jordan Porco Foundation Development Presentation
Jordan Porco Foundation Development PresentationJordan Porco Foundation Development Presentation
Jordan Porco Foundation Development PresentationDeirdre Tindall
 
ذرة الكربون مجننانى
ذرة الكربون مجننانى ذرة الكربون مجننانى
ذرة الكربون مجننانى Mohamed Alashram
 
Gioi thieu
Gioi thieuGioi thieu
Gioi thieuiprovn
 
Psychological interventions the good, the bad & the unknown by mark healy
Psychological interventions   the good, the bad & the unknown by mark healyPsychological interventions   the good, the bad & the unknown by mark healy
Psychological interventions the good, the bad & the unknown by mark healyStephen Tierney
 
Introduction of water and wastewater
Introduction of water and wastewaterIntroduction of water and wastewater
Introduction of water and wastewaterNaveen Kumar
 
Sewage Treatment: Overview
Sewage Treatment: OverviewSewage Treatment: Overview
Sewage Treatment: OverviewAkepati S. Reddy
 
Sludge Treatment
Sludge TreatmentSludge Treatment
Sludge TreatmentNiaz Memon
 
Oxidation ponds
Oxidation pondsOxidation ponds
Oxidation pondsAdithya706
 

Destaque (20)

Finishing up
Finishing upFinishing up
Finishing up
 
Economia
EconomiaEconomia
Economia
 
Mechanical Design Portfolio - Mike Ryland
Mechanical Design Portfolio - Mike RylandMechanical Design Portfolio - Mike Ryland
Mechanical Design Portfolio - Mike Ryland
 
Client Pitch Presentation = FrenchWeek5
Client Pitch Presentation = FrenchWeek5Client Pitch Presentation = FrenchWeek5
Client Pitch Presentation = FrenchWeek5
 
Jordan Porco Foundation Development Presentation
Jordan Porco Foundation Development PresentationJordan Porco Foundation Development Presentation
Jordan Porco Foundation Development Presentation
 
ذرة الكربون مجننانى
ذرة الكربون مجننانى ذرة الكربون مجننانى
ذرة الكربون مجننانى
 
Gioi thieu
Gioi thieuGioi thieu
Gioi thieu
 
Psychological interventions the good, the bad & the unknown by mark healy
Psychological interventions   the good, the bad & the unknown by mark healyPsychological interventions   the good, the bad & the unknown by mark healy
Psychological interventions the good, the bad & the unknown by mark healy
 
Ijin belajar..
Ijin belajar..Ijin belajar..
Ijin belajar..
 
Mountains, rivers and lakes
Mountains, rivers and lakesMountains, rivers and lakes
Mountains, rivers and lakes
 
Introduction of water and wastewater
Introduction of water and wastewaterIntroduction of water and wastewater
Introduction of water and wastewater
 
AIR POLLUTION CONTROL L 5
AIR POLLUTION CONTROL L 5AIR POLLUTION CONTROL L 5
AIR POLLUTION CONTROL L 5
 
Sewage Treatment: Overview
Sewage Treatment: OverviewSewage Treatment: Overview
Sewage Treatment: Overview
 
L 28 final
L 28 finalL 28 final
L 28 final
 
AIR POLLUTION CONTROL L 6
AIR POLLUTION CONTROL L 6AIR POLLUTION CONTROL L 6
AIR POLLUTION CONTROL L 6
 
Sludge Treatment
Sludge TreatmentSludge Treatment
Sludge Treatment
 
Miscelleaneous methods
Miscelleaneous methodsMiscelleaneous methods
Miscelleaneous methods
 
Oxidation ponds
Oxidation pondsOxidation ponds
Oxidation ponds
 
Oxidation ponds
Oxidation pondsOxidation ponds
Oxidation ponds
 
L 4 wastewater flow rates
L 4 wastewater flow ratesL 4 wastewater flow rates
L 4 wastewater flow rates
 

Semelhante a Barker.R.CV.

Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectFairfax County
 
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationAttleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationThomasSexton8
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016Charlie Bell
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
T POOLE CV 2015
T POOLE CV 2015T POOLE CV 2015
T POOLE CV 2015tony poole
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsHammerHead Trenchless Equipment
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Fairfax County
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptxAmirShafiq25
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Iain McGregor
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plantRick Nabett
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveFairfax County
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveFairfax County
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water ProjectVladimir Popovic
 
Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Fairfax County
 

Semelhante a Barker.R.CV. (20)

Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
 
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationAttleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
tanajib
tanajibtanajib
tanajib
 
Queen street station tunnel or throat development rodger querns
Queen street station tunnel or throat development  rodger quernsQueen street station tunnel or throat development  rodger querns
Queen street station tunnel or throat development rodger querns
 
attcofinal
attcofinalattcofinal
attcofinal
 
T POOLE CV 2015
T POOLE CV 2015T POOLE CV 2015
T POOLE CV 2015
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2
 
Donnie Belloit_Reume
Donnie Belloit_ReumeDonnie Belloit_Reume
Donnie Belloit_Reume
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plant
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020
 

Barker.R.CV.

  • 1. CAREER RESUME NAME: Richard Barker YEAR OF BIRTH: 1968 QUALIFICATIONS: • H.N.C Civil Engineering Studies 1989 • O.N.C Civil Engineering Studies 1987 • CITB Site Management Safety Training • Appointed Persons (Lifting Operations) • PASMA Training PROFILE A technically minded and enthusiastic Manager with 29 years’ experience in the Civil Engineering industry, on a variety of challenging projects. A team player who has a proactive approach to delivering projects. SUMMARY OF EXPERIENCE Experience gained in many aspects of contract work valued up to £6.5 million in value, on both traditional and design and build contracts in the UK. Experience gained mainly in the water industry and includes water and sewage treatment works & raw and potable pumping mains. • MWH/Biwater – Senior Site Manager January 2006 - Present • Galliford Morgan Est Joint Venture – Site Agent June 2005 – December 2005 • Morgan Est Water Division – Sub Agent/Site Agent June 2002 – June 2005 • Miller Civil Engineering – Section Engineer/Sub Agent February 2000 – June 2002 • Mott MacDonald - Project Managers Site Representative/Resident Engineer December 1997 – January 2000 • Peter Duffy Limited - Site Agent September 1997 – December 1997 • Yorkshire Pipeline Services (Yorkshire Water) - Site Agent May 1996 – September 1997 • Babcock Water Engineering Limited – Assistant Resident Engineer June 1992 – June 1994 • Yorkshire Water Engineering Limited - Engineer/Clerk of Works June 1990 – June 1992 • Boothferry Borough Council - Technician • Norton Engineering Alloys Company Limited - Design/Draughtsman • Fairbank & Sons Consulting Engineers - Technician September 1988 – June 1990 February 1988 – September 1988 August 1986 – February 1988
  • 2. 2 CAREER SUMMARY: MWH/Biwater Treatment Ltd – Senior Site Manager • Frankley WTW – Severn Trent - £14.0 million Installation of new lime plant including stripping out of existing M&E plant & existing equipment in an existing building, installation of new electrical panels, pumps, chemical dosing & flushing lines within the building. Construction of two new in-situ pumping station, glass coated steel tanks, lime silos complete with walkways, M&E plant& equipment associated with lime transfer. • Kilburn STW – Severn Trent - £6.5 million Preliminary work & investigations in preparation for Planning Application, preparation of programmes, schedules, quotations & cost reviews & supervision of construction, mechanical and electrical installation & commissioning.. The rebuilding of sewage works is in a very sensitive local area adjacent to local residents unreceptive to the project. The build includes construction of deep Inlet Pumping Station, Inlet Works, Activated Sludge Plant, 1 no Final Settlement Tank & conversion of 2 no existing humus tanks to FST, access roads etc. All work is phased in with the demolition of the existing works whilst maintaining the integrity of the treatment process. • Clipstone GAC WTW - £2.7 million As part of a scheme to remove pesticide levels from the borehole water which feed the site; Construction & installation of 6 No. GAC absorbers and associated pipework and slab, access road and site gate to enable GAC tankers to discharge media into vessels a 600m3 buried dirty backwash / conditioning wastewater tank and discharge pumps. • Newborough STW - £0.5 million Construction & installation of RBC unit, associated pipework & MCC. Replacement of pumps & pipework in existing Inlet Pumping Station & removal of existing above ground ASP. • Duffield STW – Severn Trent - £0.3 million Installation of storm tank cleaning system, Flow-meter, MCC control & minor amendments to the storm overflow system. • Stoney Stanton STW – Severn Trent - £3.0 million Construction & installation of Sandfilter units for tertiary treatment of effluent including feed pumping station. Construction of Chemical Dosing Plant, Works Return Pumping Station, Washwater Pumping Stations, Floculation Chamber, MCC base & new access road including culverting of watercourse. • Measham STW – Severn Trent - £1.5 million Construction & installation of Sandfilter units for tertiary treatment of effluent including feed pumping station & weir/overflow chamber. • Whetstone STW – Severn Trent - £0.8 million Construction & installation of Chemical Dosing Plant, Odour Control Plant Inlet Works Screenings removal system & new aeration control system. • Winwick STW- Severn Trent, - £0.8 million Construction of sewerage system, RBC & feed pumping station located in the heart of picturesque village. • Packington STW - Severn Trent, - £1.2 million Construction of Deep Bed Filter for tertiary treatment of effluent, including feed pumping station. GMJV – Site Agent • Islesteps – Scottish Water - £0.8 million Construction of “first time” sewerage scheme in small village including installation of new sewers by open cut & directional drilling, construction of chambers, pumping station and reed beds.
  • 3. 3 • Loch Eck – Scottish Water – £6.5 million Demolition of existing concrete precipitators tanks, construction of new underground treatment tanks including installation of pipework within existing underground structures, refurbishment of existing filters within the existing site buildings, installation of new electrics and control panels & construction of a new steel framed building to house the new treatment process. Morgan Est Water Division - Site Agent • Pocklington – Yorkshire Water, £2.5 million Design, supply, installation and commissioning of Sandfilter tertiary treatment units, a chemical dosing system, new inlet works, new outfall pipeline and ancillary works. • Wanlip Sludge - Severn Trent, £1.5 million Replacement of existing sludge import facility & DAF thickening plant with new import station & gravity belt thickeners. • Wanlip Storm Tank Cleaning – Severn Trent, £1 million Modifications to existing storm tank cleaning system including removal of scraper bridges, modifications to existing hoppers, construction of FRC vacuum chamber & installation of vacuum flushing system. Morgan Est Water Division - Sub Agent • Fleckney – Severn Trent Replacement of granite mineral media with slag media in 3 no existing filter beds. Construction of a new inlet inlet works. • Great Glen - Severn Trent Replacement of mineral media with structured plastic media in existing filter bed & installation of new distributor to increase treatment capacity including seeding & commissioning • Asset Renewals - Severn Trent, £2.5 million • Branston – New glass coated steel sludge tank & auto de-sludge system including new pressure main, modifications to existing wet wells. • Redmile – Installation of auto- de-sludge system & modification to wet well • Abbots Bromley - New glass coated steel sludge tank with associated feed pipework & drainage pipework. 2 no GRP Humus tanks with associated feed & drainage pipework, installation of auto- de-sludge, demolition of existing concrete humus tanks. • Long Whatton - New glass coated steel sludge tank, auto de-sludge system, modifications to circular storm tank to increase volume & diversion of storm tank outlet pipework. Demolition of existing concrete sludge tank & rectangular storm tanks. • Barton Under Needwood – Replacement of mineral media with structured plastic media in existing filter bed & installation of new distributor to increase treatment capacity. Including construction of new distribution chamber with associated pipework diversions, new recirculation main, modifications to existing pumping station including new valve chamber, seeding & commissioning the plastic media bed. Miller Civil Engineering - Section Engineer • Scarborough Toll House Pumping Station/Emergency Sea Outfall – Yorkshire Water, £0.4 million Additional works on a £5 million contract to pump sewage to a new treatment works. Refurbishment of transfer pumps, refurbishment of course bar screens, installation of flap valves on emergency overflow sea outfall & construction of concrete wet well walls & wave deflector walls.
  • 4. 4 • Ripon UWWTW - Yorkshire Water, £3.7 million Completion & commissioning of upgrade of existing STW to UWWTD standards. Completion & commissioning of Sludge Treatment Centre for the de-watering & caking of site produced & imported humus sludge. • Various Amp 3 - Yorkshire Water £1.5 million Construction of pumping stations, construction of sludge tanks, pumping mains & refurbishment of existing pumping stations. Mott MacDonald - Project Managers Site Representative/Engineer • Ripon UWWTW - Yorkshire Water £3.7 million Upgrading of existing STW to UWWTD Standards, new inlet works, storm tanks, pumping stations, anoxic tanks, RAS/SAS system & associated pipework, connections etc. A Sludge Treatment Centre was also incorporated into the scheme, imported sludge tanks, dewatering building, sludge cake silo, new access road etc. • Felixkirk - Yorkshire Water, £0.2 million Replacement of existing septic tank & sewer outfall with a HIPAF Biological Aerated Filter with automated screened storm overflow including sample chamber, new outfall structure, MCC, new power supply to the site, new 300mm culvert for stream/surface water & connections to the existing system. • Cherry Burton STW - Yorkshire Water, £0.5 million Construction of new Primary & Humus Tanks complete with auto-desludge facility, replacement of mineral media in existing filter beds with plastic media c/w new distributors. Decommission of existing RBC & BAF plant, upgrade of access road, and upgrade of power supply, MCC, RTS & pipework. • Bryherstone Inn STW - Yorkshire Water, £0.15 million Replacement of existing RBC & 3No. inlet chamber/primary tank with a HIPAF Biological Aerated Filter including sample chamber, MCC, RTS & connections to the existing system. • Killinghall STW - Yorkshire Water, £0.25 million Installation of new Inlet Screen, 2 No. Tertiary Sand Filter Units & associated pumps, compressors, MCC, RTS & pipework. • Ilkley & Ben Rhydding STW - Yorkshire Water, £ 0.5 million Replacement of existing slag filter media with plastic media, installation of new distributor & associated works / Reconstruction of existing filter beds • Richmond STW - Yorkshire Water, £ 0.3 million Construction of new circular primary tank & associated feed/draw off pipework including installation of pumps, half bridge scraper, MCC, RTS & connections • Catterick & Grassington STW - Yorkshire Water, £0.5 million Construction of new circular secondary tank & associated feed/draw off pipework including installation of pumps, half bridge scraper, MCC, RTS & connections. Peter Duffy Limited - Site Agent • Avesta Water Main Diversion Supervision of construction of 500 metres of 600mm diameter water main on a busy commuter route into Sheffield City centre, including pressure testing, chlorination, & the installation of cathodic protection Yorkshire Pipeline Services (Yorkshire Water) - Site Agent • YPS Labour Co-ordination & Site Audit Agent involved with the co-ordination of labour & sub-contractors throughout the Yorkshire Area. • Yorkshire Water - Southern Area
  • 5. 5 Supervision of D & C and statutory contracts in the Sheffield Area. • Headingley Lane, Leeds - Yorkshire Water, 1.1 million Joint supervision of fast track pipe laying scheme of 2.2 km constructed on a busy commuter route into Leeds City centre, in preparation of the proposed Leeds Supertram. • Harrogate Raw Water - Yorkshire Water Agent involved in final months of a scheme to provide treated water to remote properties throughout North Yorkshire. • Wensleydale Reinforcement - Yorkshire Water Supervision of construction of 3 km of pipeline at Aysgarth in the Yorkshire Dales National Park. • Chellow to Wainstalls - Yorkshire Water Engineer supervising the fast track construction of 12 km of pipeline as part of the Yorkshire Water Drought Initiative. Including construction of a break tank & pressure testing under extreme head. Babcock Water Engineering Limited - Assistant Resident Engineer • Naburn Sewage Treatment Works - Yorkshire Water Assistant Resident Engineer, seconded to White Young Consulting Engineers, supervising upgrading of existing STW. Including construction of new high level Inlet Works, screens & grit removal. Also installation of new scrapers & sludge removal system for the primary settlement tanks. • Fulford Pumping Station - Yorkshire Water Supervision of upgrading of pumping station as part of the Naburn Scheme. Including installation of automatic pneumatic valves & actuators to replace existing hand operated valves. Yorkshire Water Engineering Limited - Engineer/Clerk of Works • Rawcliffe S T W - Yorkshire Water Clerk of Works supervising installation of Wet Scrubber Odour Control Plant & building, including associated pipework, covers to tanks & landscaping. Previous involvement included preparation of drawings both on the drawing board & on MEDUSA C.A.D., bill of quantities on QUMIC & specification for the tender documents. • Scarborough Sewage Disposal - Yorkshire Water Engineer involved in the latter stages of a £30 million scheme for the improvement of sewage disposal in the coastal resort. Duties included surveys, preparations of tender drawings & documents, bill of quantities, specifications for the following: • Knipe Point, - Two pump pumping station & valve chamber to serve small housing estate • Injection Pumping Station & Odour Control Units - Two pump pumping station & valve chamber injecting sewage from an isolated toilet block into pumping main. Two odour control units & associated chambers & pipework for air valves. • Northern Outfall Rehabilitation - Repair of existing sewage outfall with GRP Liners, to act as an emergency outfall for new underground pumping station & long sea outfall. • Detention Tanks - Overflow to 600mm diameter pumping main for retention of sewerage during high tide/storm conditions Boothferry Borough Council - Technician Norton Engineering Alloys Company Limited - Design/Draughtsman Fairbank & Sons Consulting Engineers - Technician
  • 6. 5 Supervision of D & C and statutory contracts in the Sheffield Area. • Headingley Lane, Leeds - Yorkshire Water, 1.1 million Joint supervision of fast track pipe laying scheme of 2.2 km constructed on a busy commuter route into Leeds City centre, in preparation of the proposed Leeds Supertram. • Harrogate Raw Water - Yorkshire Water Agent involved in final months of a scheme to provide treated water to remote properties throughout North Yorkshire. • Wensleydale Reinforcement - Yorkshire Water Supervision of construction of 3 km of pipeline at Aysgarth in the Yorkshire Dales National Park. • Chellow to Wainstalls - Yorkshire Water Engineer supervising the fast track construction of 12 km of pipeline as part of the Yorkshire Water Drought Initiative. Including construction of a break tank & pressure testing under extreme head. Babcock Water Engineering Limited - Assistant Resident Engineer • Naburn Sewage Treatment Works - Yorkshire Water Assistant Resident Engineer, seconded to White Young Consulting Engineers, supervising upgrading of existing STW. Including construction of new high level Inlet Works, screens & grit removal. Also installation of new scrapers & sludge removal system for the primary settlement tanks. • Fulford Pumping Station - Yorkshire Water Supervision of upgrading of pumping station as part of the Naburn Scheme. Including installation of automatic pneumatic valves & actuators to replace existing hand operated valves. Yorkshire Water Engineering Limited - Engineer/Clerk of Works • Rawcliffe S T W - Yorkshire Water Clerk of Works supervising installation of Wet Scrubber Odour Control Plant & building, including associated pipework, covers to tanks & landscaping. Previous involvement included preparation of drawings both on the drawing board & on MEDUSA C.A.D., bill of quantities on QUMIC & specification for the tender documents. • Scarborough Sewage Disposal - Yorkshire Water Engineer involved in the latter stages of a £30 million scheme for the improvement of sewage disposal in the coastal resort. Duties included surveys, preparations of tender drawings & documents, bill of quantities, specifications for the following: • Knipe Point, - Two pump pumping station & valve chamber to serve small housing estate • Injection Pumping Station & Odour Control Units - Two pump pumping station & valve chamber injecting sewage from an isolated toilet block into pumping main. Two odour control units & associated chambers & pipework for air valves. • Northern Outfall Rehabilitation - Repair of existing sewage outfall with GRP Liners, to act as an emergency outfall for new underground pumping station & long sea outfall. • Detention Tanks - Overflow to 600mm diameter pumping main for retention of sewerage during high tide/storm conditions Boothferry Borough Council - Technician Norton Engineering Alloys Company Limited - Design/Draughtsman Fairbank & Sons Consulting Engineers - Technician