1. CAREER RESUME
NAME: Richard Barker
YEAR OF BIRTH: 1968
QUALIFICATIONS:
• H.N.C Civil Engineering Studies 1989
• O.N.C Civil Engineering Studies 1987
• CITB Site Management Safety Training
• Appointed Persons (Lifting Operations)
• PASMA Training
PROFILE
A technically minded and enthusiastic Manager with 29 years’ experience in the Civil
Engineering industry, on a variety of challenging projects. A team player who has a proactive
approach to delivering projects.
SUMMARY OF EXPERIENCE
Experience gained in many aspects of contract work valued up to £6.5 million in value, on both
traditional and design and build contracts in the UK.
Experience gained mainly in the water industry and includes water and sewage treatment works
& raw and potable pumping mains.
• MWH/Biwater – Senior Site Manager January 2006 - Present
• Galliford Morgan Est Joint Venture – Site Agent June 2005 – December 2005
• Morgan Est Water Division – Sub Agent/Site Agent June 2002 – June 2005
• Miller Civil Engineering – Section Engineer/Sub Agent February 2000 – June 2002
• Mott MacDonald - Project Managers Site
Representative/Resident Engineer
December 1997 – January 2000
• Peter Duffy Limited - Site Agent September 1997 – December 1997
• Yorkshire Pipeline Services (Yorkshire Water) - Site
Agent
May 1996 – September 1997
• Babcock Water Engineering Limited – Assistant Resident
Engineer
June 1992 – June 1994
• Yorkshire Water Engineering Limited - Engineer/Clerk of
Works
June 1990 – June 1992
• Boothferry Borough Council - Technician
• Norton Engineering Alloys Company Limited -
Design/Draughtsman
• Fairbank & Sons Consulting Engineers - Technician
September 1988 – June 1990
February 1988 – September 1988
August 1986 – February 1988
2. 2
CAREER SUMMARY:
MWH/Biwater Treatment Ltd – Senior Site Manager
• Frankley WTW – Severn Trent - £14.0 million
Installation of new lime plant including stripping out of existing M&E plant & existing
equipment in an existing building, installation of new electrical panels, pumps, chemical
dosing & flushing lines within the building. Construction of two new in-situ pumping station,
glass coated steel tanks, lime silos complete with walkways, M&E plant& equipment
associated with lime transfer.
• Kilburn STW – Severn Trent - £6.5 million
Preliminary work & investigations in preparation for Planning Application, preparation of
programmes, schedules, quotations & cost reviews & supervision of construction,
mechanical and electrical installation & commissioning..
The rebuilding of sewage works is in a very sensitive local area adjacent to local residents
unreceptive to the project. The build includes construction of deep Inlet Pumping Station,
Inlet Works, Activated Sludge Plant, 1 no Final Settlement Tank & conversion of 2 no
existing humus tanks to FST, access roads etc.
All work is phased in with the demolition of the existing works whilst maintaining the integrity
of the treatment process.
• Clipstone GAC WTW - £2.7 million
As part of a scheme to remove pesticide levels from the borehole water which feed the site;
Construction & installation of 6 No. GAC absorbers and associated pipework and slab,
access road and site gate to enable GAC tankers to discharge media into vessels a 600m3
buried dirty backwash / conditioning wastewater tank and discharge pumps.
• Newborough STW - £0.5 million
Construction & installation of RBC unit, associated pipework & MCC. Replacement of
pumps & pipework in existing Inlet Pumping Station & removal of existing above ground
ASP.
• Duffield STW – Severn Trent - £0.3 million
Installation of storm tank cleaning system, Flow-meter, MCC control & minor amendments
to the storm overflow system.
• Stoney Stanton STW – Severn Trent - £3.0 million
Construction & installation of Sandfilter units for tertiary treatment of effluent including feed
pumping station. Construction of Chemical Dosing Plant, Works Return Pumping Station,
Washwater Pumping Stations, Floculation Chamber, MCC base & new access road
including culverting of watercourse.
• Measham STW – Severn Trent - £1.5 million
Construction & installation of Sandfilter units for tertiary treatment of effluent including feed
pumping station & weir/overflow chamber.
• Whetstone STW – Severn Trent - £0.8 million
Construction & installation of Chemical Dosing Plant, Odour Control Plant Inlet Works
Screenings removal system & new aeration control system.
• Winwick STW- Severn Trent, - £0.8 million
Construction of sewerage system, RBC & feed pumping station located in the heart of
picturesque village.
• Packington STW - Severn Trent, - £1.2 million
Construction of Deep Bed Filter for tertiary treatment of effluent, including feed pumping
station.
GMJV – Site Agent
• Islesteps – Scottish Water - £0.8 million
Construction of “first time” sewerage scheme in small village including installation of new
sewers by open cut & directional drilling, construction of chambers, pumping station and
reed beds.
3. 3
• Loch Eck – Scottish Water – £6.5 million
Demolition of existing concrete precipitators tanks, construction of new underground
treatment tanks including installation of pipework within existing underground structures,
refurbishment of existing filters within the existing site buildings, installation of new electrics
and control panels & construction of a new steel framed building to house the new
treatment process.
Morgan Est Water Division - Site Agent
• Pocklington – Yorkshire Water, £2.5 million
Design, supply, installation and commissioning of Sandfilter tertiary treatment units, a
chemical dosing system, new inlet works, new outfall pipeline and ancillary works.
• Wanlip Sludge - Severn Trent, £1.5 million
Replacement of existing sludge import facility & DAF thickening plant with new import
station & gravity belt thickeners.
• Wanlip Storm Tank Cleaning – Severn Trent, £1 million
Modifications to existing storm tank cleaning system including removal of scraper bridges,
modifications to existing hoppers, construction of FRC vacuum chamber & installation of
vacuum flushing system.
Morgan Est Water Division - Sub Agent
• Fleckney – Severn Trent
Replacement of granite mineral media with slag media in 3 no existing filter beds.
Construction of a new inlet inlet works.
• Great Glen - Severn Trent
Replacement of mineral media with structured plastic media in existing filter bed &
installation of new distributor to increase treatment capacity including seeding &
commissioning
• Asset Renewals - Severn Trent, £2.5 million
• Branston – New glass coated steel sludge tank & auto de-sludge system including new
pressure main, modifications to existing wet wells.
• Redmile – Installation of auto- de-sludge system & modification to wet well
• Abbots Bromley - New glass coated steel sludge tank with associated feed pipework &
drainage pipework. 2 no GRP Humus tanks with associated feed & drainage pipework,
installation of auto- de-sludge, demolition of existing concrete humus tanks.
• Long Whatton - New glass coated steel sludge tank, auto de-sludge system,
modifications to circular storm tank to increase volume & diversion of storm tank outlet
pipework. Demolition of existing concrete sludge tank & rectangular storm tanks.
• Barton Under Needwood – Replacement of mineral media with structured plastic
media in existing filter bed & installation of new distributor to increase treatment
capacity. Including construction of new distribution chamber with associated pipework
diversions, new recirculation main, modifications to existing pumping station including
new valve chamber, seeding & commissioning the plastic media bed.
Miller Civil Engineering - Section Engineer
• Scarborough Toll House Pumping Station/Emergency Sea Outfall – Yorkshire Water,
£0.4 million
Additional works on a £5 million contract to pump sewage to a new treatment works.
Refurbishment of transfer pumps, refurbishment of course bar screens, installation of flap
valves on emergency overflow sea outfall & construction of concrete wet well walls & wave
deflector walls.
4. 4
• Ripon UWWTW - Yorkshire Water, £3.7 million
Completion & commissioning of upgrade of existing STW to UWWTD standards.
Completion & commissioning of Sludge Treatment Centre for the de-watering & caking of
site produced & imported humus sludge.
• Various Amp 3 - Yorkshire Water £1.5 million
Construction of pumping stations, construction of sludge tanks, pumping mains &
refurbishment of existing pumping stations.
Mott MacDonald - Project Managers Site Representative/Engineer
• Ripon UWWTW - Yorkshire Water £3.7 million
Upgrading of existing STW to UWWTD Standards, new inlet works, storm tanks, pumping
stations, anoxic tanks, RAS/SAS system & associated pipework, connections etc.
A Sludge Treatment Centre was also incorporated into the scheme, imported sludge tanks,
dewatering building, sludge cake silo, new access road etc.
• Felixkirk - Yorkshire Water, £0.2 million
Replacement of existing septic tank & sewer outfall with a HIPAF Biological Aerated Filter
with automated screened storm overflow including sample chamber, new outfall structure,
MCC, new power supply to the site, new 300mm culvert for stream/surface water &
connections to the existing system.
• Cherry Burton STW - Yorkshire Water, £0.5 million
Construction of new Primary & Humus Tanks complete with auto-desludge facility,
replacement of mineral media in existing filter beds with plastic media c/w new distributors.
Decommission of existing RBC & BAF plant, upgrade of access road, and upgrade of power
supply, MCC, RTS & pipework.
• Bryherstone Inn STW - Yorkshire Water, £0.15 million
Replacement of existing RBC & 3No. inlet chamber/primary tank with a HIPAF Biological
Aerated Filter including sample chamber, MCC, RTS & connections to the existing system.
• Killinghall STW - Yorkshire Water, £0.25 million
Installation of new Inlet Screen, 2 No. Tertiary Sand Filter Units & associated pumps,
compressors, MCC, RTS & pipework.
• Ilkley & Ben Rhydding STW - Yorkshire Water, £ 0.5 million
Replacement of existing slag filter media with plastic media, installation of new distributor &
associated works / Reconstruction of existing filter beds
• Richmond STW - Yorkshire Water, £ 0.3 million
Construction of new circular primary tank & associated feed/draw off pipework including
installation of pumps, half bridge scraper, MCC, RTS & connections
• Catterick & Grassington STW - Yorkshire Water, £0.5 million
Construction of new circular secondary tank & associated feed/draw off pipework including
installation of pumps, half bridge scraper, MCC, RTS & connections.
Peter Duffy Limited - Site Agent
• Avesta Water Main Diversion
Supervision of construction of 500 metres of 600mm diameter water main on a busy
commuter route into Sheffield City centre, including pressure testing, chlorination, & the
installation of cathodic protection
Yorkshire Pipeline Services (Yorkshire Water) - Site Agent
• YPS Labour Co-ordination & Site Audit
Agent involved with the co-ordination of labour & sub-contractors throughout the Yorkshire
Area.
• Yorkshire Water - Southern Area
5. 5
Supervision of D & C and statutory contracts in the Sheffield Area.
• Headingley Lane, Leeds - Yorkshire Water, 1.1 million
Joint supervision of fast track pipe laying scheme of 2.2 km constructed on a busy
commuter route into Leeds City centre, in preparation of the proposed Leeds Supertram.
• Harrogate Raw Water - Yorkshire Water
Agent involved in final months of a scheme to provide treated water to remote properties
throughout North Yorkshire.
• Wensleydale Reinforcement - Yorkshire Water
Supervision of construction of 3 km of pipeline at Aysgarth in the Yorkshire Dales National
Park.
• Chellow to Wainstalls - Yorkshire Water
Engineer supervising the fast track construction of 12 km of pipeline as part of the Yorkshire
Water Drought Initiative. Including construction of a break tank & pressure testing under
extreme head.
Babcock Water Engineering Limited - Assistant Resident Engineer
• Naburn Sewage Treatment Works - Yorkshire Water
Assistant Resident Engineer, seconded to White Young Consulting Engineers, supervising
upgrading of existing STW. Including construction of new high level Inlet Works, screens &
grit removal. Also installation of new scrapers & sludge removal system for the primary
settlement tanks.
• Fulford Pumping Station - Yorkshire Water
Supervision of upgrading of pumping station as part of the Naburn Scheme. Including
installation of automatic pneumatic valves & actuators to replace existing hand operated
valves.
Yorkshire Water Engineering Limited - Engineer/Clerk of Works
• Rawcliffe S T W - Yorkshire Water
Clerk of Works supervising installation of Wet Scrubber Odour Control Plant & building,
including associated pipework, covers to tanks & landscaping. Previous involvement
included preparation of drawings both on the drawing board & on MEDUSA C.A.D., bill of
quantities on QUMIC & specification for the tender documents.
• Scarborough Sewage Disposal - Yorkshire Water
Engineer involved in the latter stages of a £30 million scheme for the improvement of
sewage disposal in the coastal resort. Duties included surveys, preparations of tender
drawings & documents, bill of quantities, specifications for the following:
• Knipe Point, - Two pump pumping station & valve chamber to serve small housing
estate
• Injection Pumping Station & Odour Control Units - Two pump pumping station &
valve chamber injecting sewage from an isolated toilet block into pumping main. Two
odour control units & associated chambers & pipework for air valves.
• Northern Outfall Rehabilitation - Repair of existing sewage outfall with GRP Liners, to
act as an emergency outfall for new underground pumping station & long sea outfall.
• Detention Tanks - Overflow to 600mm diameter pumping main for retention of
sewerage during high tide/storm conditions
Boothferry Borough Council - Technician
Norton Engineering Alloys Company Limited - Design/Draughtsman
Fairbank & Sons Consulting Engineers - Technician
6. 5
Supervision of D & C and statutory contracts in the Sheffield Area.
• Headingley Lane, Leeds - Yorkshire Water, 1.1 million
Joint supervision of fast track pipe laying scheme of 2.2 km constructed on a busy
commuter route into Leeds City centre, in preparation of the proposed Leeds Supertram.
• Harrogate Raw Water - Yorkshire Water
Agent involved in final months of a scheme to provide treated water to remote properties
throughout North Yorkshire.
• Wensleydale Reinforcement - Yorkshire Water
Supervision of construction of 3 km of pipeline at Aysgarth in the Yorkshire Dales National
Park.
• Chellow to Wainstalls - Yorkshire Water
Engineer supervising the fast track construction of 12 km of pipeline as part of the Yorkshire
Water Drought Initiative. Including construction of a break tank & pressure testing under
extreme head.
Babcock Water Engineering Limited - Assistant Resident Engineer
• Naburn Sewage Treatment Works - Yorkshire Water
Assistant Resident Engineer, seconded to White Young Consulting Engineers, supervising
upgrading of existing STW. Including construction of new high level Inlet Works, screens &
grit removal. Also installation of new scrapers & sludge removal system for the primary
settlement tanks.
• Fulford Pumping Station - Yorkshire Water
Supervision of upgrading of pumping station as part of the Naburn Scheme. Including
installation of automatic pneumatic valves & actuators to replace existing hand operated
valves.
Yorkshire Water Engineering Limited - Engineer/Clerk of Works
• Rawcliffe S T W - Yorkshire Water
Clerk of Works supervising installation of Wet Scrubber Odour Control Plant & building,
including associated pipework, covers to tanks & landscaping. Previous involvement
included preparation of drawings both on the drawing board & on MEDUSA C.A.D., bill of
quantities on QUMIC & specification for the tender documents.
• Scarborough Sewage Disposal - Yorkshire Water
Engineer involved in the latter stages of a £30 million scheme for the improvement of
sewage disposal in the coastal resort. Duties included surveys, preparations of tender
drawings & documents, bill of quantities, specifications for the following:
• Knipe Point, - Two pump pumping station & valve chamber to serve small housing
estate
• Injection Pumping Station & Odour Control Units - Two pump pumping station &
valve chamber injecting sewage from an isolated toilet block into pumping main. Two
odour control units & associated chambers & pipework for air valves.
• Northern Outfall Rehabilitation - Repair of existing sewage outfall with GRP Liners, to
act as an emergency outfall for new underground pumping station & long sea outfall.
• Detention Tanks - Overflow to 600mm diameter pumping main for retention of
sewerage during high tide/storm conditions
Boothferry Borough Council - Technician
Norton Engineering Alloys Company Limited - Design/Draughtsman
Fairbank & Sons Consulting Engineers - Technician