SlideShare uma empresa Scribd logo
1 de 1
Baixar para ler offline
8
8
9
7
11
8
10
8
7
5
9 9
7 7 7
5
6
6
7
5
12
12
12
BEARING=N 83° 17' 34" W
PROPOSED PARKING
PR
O
PO
SED
PA
R
K
IN
G
PROPOSED PARKING
PROPOSED DRIVE
2 STORY
10,164 S.F. EACH FLOOR
20,328 S.F. TOTAL
2 STORY
10,164 S.F. EACH FLOOR
20,328 S.F. TOTAL
1 STORY
6,264 S.F.
1 STORY
6,264 S.F.
VAN
DRAINAGE R.O.W.
126,323 S.F.
WOODROW BEAN - TRANSMOUNTAIN ROAD
PEDESTRIAN COURTYARD
BLUFFCREEKSTREET
DUMPSTER
35' DRIVE
N 82° 28' 07" W
50.00'
S 67° 22' 03" W
49.53'
N
37°28'07"W
35.28'
CHORD=561.26'
CHORD LENGTH=269.95'
RADIUS=532.00'
N00°00'00"W289.01'
ARC DATA
S00°00'00"E327.61'
S 83° 51' 06" E 106.76' S 82° 49' 17" E 90.55'
S 86° 15' 18" E 113.11'
49.14'
S 58° 58' 19" E
S 87° 09' 54" E 95.40' S 89° 39' 23" E 87.18' N 83° 54' 35" E 70.06' S 89° 44' 17" E 70.46'
BLDG. BBLDG. A
BLDG. D BLDG. C
PLAN NORTH
PROPOSED SITE DEVELOPMENT PLAN
SCALE: 1" = 30' - 0" DATE ISSUED:
SHEET NAME:
REVISIONS:
NO: DATE: REFERENCE:
SEAL:
A-1
PROPOSED
SITE
DEVELOPMENT
PLAN
11/22/2016
1
N
R2DESIGNGROUPINC.
5736WALDORFDRIVE
ELPASO,TEXAS79924
915-820-4454
PROPOSEDSITEDEVELOPMENTPLAN
1751TRANSMOUNTAINROAD
ELPASO,TEXAS79930
PROPERTY ADDRESS:
1751 TRANS MOUNTAIN ROAD, EL PASO, TEXAS 79930
ZONING:
C-3 C
A PORTION OF TRACT 10A, BLOCK 1, LOT 1, CONTAINING 200,135 S.F., NELLIE
D. MUNDY SURVEY NO. 239, CITY OF EL PASO, EL PASO COUNTY, TEXAS
LEGAL DESCRIPTION:
OFFICE & RESEARCH SERVICES - EL PASO MUNICODE 4.00
4.10 OFFICE/ MEDICAL - 1/ 288 G.F.A.
53,184 G.F.A. / 288 = 184 PARKING SPACES REQUIRED
ACCESSIBLE SPACES REQUIRED: 6 / 1 OF WHICH VAN ACCESSIBLE
TOTAL PROVIDED: 185 PARKING SPACES, 6 ACCESSIBLE, 1 VAN
6 BICYCLE SPACES REQUIRED
PARKING CALCULATIONS:
PROJECT INFORMATION
TOTAL DEVELOPMENT STRUCTURE SQUARE FOOTAGE: 53,184 G.F.A.
53,184 G.F.A. X 15% = 7,978 S.F. OF REQUIRED LANDSCAPE
TOTAL PROVIDED LANDSCAPING @ FRONTAGE: 12,425 S.F.
LANDSCAPE CALCULATIONS:
TYPE II-B CONSTRUCTION (NON-CUMBUSTIBLE) UNSPRINKLED
OCCUPANCY:
B - BUSINESS
OCCUPANCIES ALLOWED:
AMBULATORY CARE FACILITIES
CLINIC, OUTPATIENT
LABORATORIES: TESTING & RESEARCH
PROFESSIONAL SERVICES: DENTISTS, PHYSICIANS
BUILDING STORIES ABOVE GRADE ALLOWED:
3 STORIES ALLOWED
BUILDING HEIGHT ALLOWED:
55' HT. ALLOWED
BUILDING AREA ALLOWED:
23,000 S.F. ALLOWED EACH FLOOR
ALLOWABLE BUILDING: (TYP.)
BUILDING A:
2 STORIES ABOVE GRADE
10,164 S.F. EACH FLOOR - TOTAL: 20,328 S.F.
35'-0" HEIGHT
BUILDING B:
2 STORIES ABOVE GRADE
10,164 S.F. EACH FLOOR - TOTAL: 20,328 S.F.
35'-0" HEIGHT
BUILDING C:
1 STORY ABOVE GRADE
6,264 S.F.
25'-0" HEIGHT
BUILDING D:
1 STORY ABOVE GRADE
6,264 S.F.
25'-0" HEIGHT
TOTAL BUILDING BUILDING AREA:
53,184 G.F.A.
SPECIFIC BUILDING INFORMATION:

Mais conteúdo relacionado

Destaque

Reis e profetas - aula 1
Reis e profetas  - aula 1Reis e profetas  - aula 1
Reis e profetas - aula 1Moisés Sampaio
 
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE SystemsBAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE SystemsAVEVA Group plc
 
Philippine Constitution Article 1
Philippine Constitution Article 1Philippine Constitution Article 1
Philippine Constitution Article 1Ellen Khay Boñon
 
Top 100 general knowledge question answers 2
Top 100 general knowledge question answers 2Top 100 general knowledge question answers 2
Top 100 general knowledge question answers 2letsguru guru
 
APM Conference Manchester: What have military aircraft done for the Northwest...
APM Conference Manchester: What have military aircraft done for the Northwest...APM Conference Manchester: What have military aircraft done for the Northwest...
APM Conference Manchester: What have military aircraft done for the Northwest...Association for Project Management
 
Diseño y calculo de las instalaciones de agua potable y agua servidas en una ...
Diseño y calculo de las instalaciones de agua potable y agua servidas en una ...Diseño y calculo de las instalaciones de agua potable y agua servidas en una ...
Diseño y calculo de las instalaciones de agua potable y agua servidas en una ...Barcelona S.C.
 
Mission Ready PLM
Mission Ready PLMMission Ready PLM
Mission Ready PLMAras
 
00 1 preparação_exame_nacional_2017
00 1 preparação_exame_nacional_201700 1 preparação_exame_nacional_2017
00 1 preparação_exame_nacional_2017Vítor Santos
 
Mil Pac Solutions Overview
Mil Pac Solutions OverviewMil Pac Solutions Overview
Mil Pac Solutions Overviewbrianaldridge
 
Financial Analysis of BAE Systems and Rolls Royce
Financial Analysis of BAE Systems and Rolls Royce Financial Analysis of BAE Systems and Rolls Royce
Financial Analysis of BAE Systems and Rolls Royce Aanchal Saxena
 
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...pzulueta
 
BAE Tactical Vehicles Overview
BAE Tactical Vehicles OverviewBAE Tactical Vehicles Overview
BAE Tactical Vehicles OverviewJerry Lee Davis
 
Continuous deployment
Continuous deploymentContinuous deployment
Continuous deploymentDaniel
 

Destaque (20)

SOLUÇÕES - EXERCÍCIOS
SOLUÇÕES - EXERCÍCIOSSOLUÇÕES - EXERCÍCIOS
SOLUÇÕES - EXERCÍCIOS
 
Unitats,desenes i centenes
Unitats,desenes i centenesUnitats,desenes i centenes
Unitats,desenes i centenes
 
Gestion chantier MCA-
Gestion chantier MCA-Gestion chantier MCA-
Gestion chantier MCA-
 
Reis e profetas - aula 1
Reis e profetas  - aula 1Reis e profetas  - aula 1
Reis e profetas - aula 1
 
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE SystemsBAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
 
Philippine Constitution Article 1
Philippine Constitution Article 1Philippine Constitution Article 1
Philippine Constitution Article 1
 
Funciones exponenciales
Funciones exponencialesFunciones exponenciales
Funciones exponenciales
 
Top 100 general knowledge question answers 2
Top 100 general knowledge question answers 2Top 100 general knowledge question answers 2
Top 100 general knowledge question answers 2
 
BAE
BAEBAE
BAE
 
APM Conference Manchester: What have military aircraft done for the Northwest...
APM Conference Manchester: What have military aircraft done for the Northwest...APM Conference Manchester: What have military aircraft done for the Northwest...
APM Conference Manchester: What have military aircraft done for the Northwest...
 
Diseño y calculo de las instalaciones de agua potable y agua servidas en una ...
Diseño y calculo de las instalaciones de agua potable y agua servidas en una ...Diseño y calculo de las instalaciones de agua potable y agua servidas en una ...
Diseño y calculo de las instalaciones de agua potable y agua servidas en una ...
 
Mission Ready PLM
Mission Ready PLMMission Ready PLM
Mission Ready PLM
 
00 1 preparação_exame_nacional_2017
00 1 preparação_exame_nacional_201700 1 preparação_exame_nacional_2017
00 1 preparação_exame_nacional_2017
 
Mil Pac Solutions Overview
Mil Pac Solutions OverviewMil Pac Solutions Overview
Mil Pac Solutions Overview
 
Financial Analysis of BAE Systems and Rolls Royce
Financial Analysis of BAE Systems and Rolls Royce Financial Analysis of BAE Systems and Rolls Royce
Financial Analysis of BAE Systems and Rolls Royce
 
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
 
Optimizing the image analyst's workflow for the United States Air Force
Optimizing the image analyst's workflow for the United States Air ForceOptimizing the image analyst's workflow for the United States Air Force
Optimizing the image analyst's workflow for the United States Air Force
 
BAE Tactical Vehicles Overview
BAE Tactical Vehicles OverviewBAE Tactical Vehicles Overview
BAE Tactical Vehicles Overview
 
Function in C program
Function in C programFunction in C program
Function in C program
 
Continuous deployment
Continuous deploymentContinuous deployment
Continuous deployment
 

Semelhante a Proposed site development plan

Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
Design of Kalinga Film Studio at Bhubaneswar
Design of Kalinga Film Studio at BhubaneswarDesign of Kalinga Film Studio at Bhubaneswar
Design of Kalinga Film Studio at Bhubaneswaralwayslogo
 
Fire Plan Drawings Gujranwala
Fire Plan Drawings GujranwalaFire Plan Drawings Gujranwala
Fire Plan Drawings GujranwalaHafizYaseen2
 
326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptxmohdsuriamohdsuhaimi
 
Culdesac Tempe - Planned Area Agreement
Culdesac Tempe - Planned Area AgreementCuldesac Tempe - Planned Area Agreement
Culdesac Tempe - Planned Area AgreementLava Sunder
 
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...Apex Realty Solutions
 
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...Apex Realty Solutions
 
Southland colonial pedestrianoverpass_tre0003-g_11x17plans
Southland colonial pedestrianoverpass_tre0003-g_11x17plansSouthland colonial pedestrianoverpass_tre0003-g_11x17plans
Southland colonial pedestrianoverpass_tre0003-g_11x17plansBrendan O'Connor
 
PCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptxPCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptxEngrMahmud3
 
Final Specification Of Salvin Princess DP2 Vessel 123
Final Specification Of Salvin Princess DP2 Vessel 123Final Specification Of Salvin Princess DP2 Vessel 123
Final Specification Of Salvin Princess DP2 Vessel 123Jimmy James
 
Hampton hotels architecture
Hampton hotels architectureHampton hotels architecture
Hampton hotels architecturePavan Modh
 
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAIT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAalwayslogo
 

Semelhante a Proposed site development plan (20)

Wells & Pumps Project Report
Wells & Pumps Project ReportWells & Pumps Project Report
Wells & Pumps Project Report
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
Sony hospital
Sony hospitalSony hospital
Sony hospital
 
Portfolio 2016
Portfolio 2016Portfolio 2016
Portfolio 2016
 
LA FLORESTA
LA FLORESTALA FLORESTA
LA FLORESTA
 
Design of Kalinga Film Studio at Bhubaneswar
Design of Kalinga Film Studio at BhubaneswarDesign of Kalinga Film Studio at Bhubaneswar
Design of Kalinga Film Studio at Bhubaneswar
 
Fire Plan Drawings Gujranwala
Fire Plan Drawings GujranwalaFire Plan Drawings Gujranwala
Fire Plan Drawings Gujranwala
 
326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx
 
Culdesac Tempe - Planned Area Agreement
Culdesac Tempe - Planned Area AgreementCuldesac Tempe - Planned Area Agreement
Culdesac Tempe - Planned Area Agreement
 
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
 
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
Curo One Serviced suites Apartments 12% Assured Returns New Chandigarh@921688...
 
Southland colonial pedestrianoverpass_tre0003-g_11x17plans
Southland colonial pedestrianoverpass_tre0003-g_11x17plansSouthland colonial pedestrianoverpass_tre0003-g_11x17plans
Southland colonial pedestrianoverpass_tre0003-g_11x17plans
 
Master Planning
Master PlanningMaster Planning
Master Planning
 
Fire Protection Sample
Fire Protection SampleFire Protection Sample
Fire Protection Sample
 
PCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptxPCT Presentation 08.09.2020.pptx
PCT Presentation 08.09.2020.pptx
 
Final Specification Of Salvin Princess DP2 Vessel 123
Final Specification Of Salvin Princess DP2 Vessel 123Final Specification Of Salvin Princess DP2 Vessel 123
Final Specification Of Salvin Princess DP2 Vessel 123
 
Hampton hotels architecture
Hampton hotels architectureHampton hotels architecture
Hampton hotels architecture
 
CCAC Transcript
CCAC TranscriptCCAC Transcript
CCAC Transcript
 
Truss Plan Timber.pdf
Truss Plan Timber.pdfTruss Plan Timber.pdf
Truss Plan Timber.pdf
 
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAIT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
 

Proposed site development plan

  • 1. 8 8 9 7 11 8 10 8 7 5 9 9 7 7 7 5 6 6 7 5 12 12 12 BEARING=N 83° 17' 34" W PROPOSED PARKING PR O PO SED PA R K IN G PROPOSED PARKING PROPOSED DRIVE 2 STORY 10,164 S.F. EACH FLOOR 20,328 S.F. TOTAL 2 STORY 10,164 S.F. EACH FLOOR 20,328 S.F. TOTAL 1 STORY 6,264 S.F. 1 STORY 6,264 S.F. VAN DRAINAGE R.O.W. 126,323 S.F. WOODROW BEAN - TRANSMOUNTAIN ROAD PEDESTRIAN COURTYARD BLUFFCREEKSTREET DUMPSTER 35' DRIVE N 82° 28' 07" W 50.00' S 67° 22' 03" W 49.53' N 37°28'07"W 35.28' CHORD=561.26' CHORD LENGTH=269.95' RADIUS=532.00' N00°00'00"W289.01' ARC DATA S00°00'00"E327.61' S 83° 51' 06" E 106.76' S 82° 49' 17" E 90.55' S 86° 15' 18" E 113.11' 49.14' S 58° 58' 19" E S 87° 09' 54" E 95.40' S 89° 39' 23" E 87.18' N 83° 54' 35" E 70.06' S 89° 44' 17" E 70.46' BLDG. BBLDG. A BLDG. D BLDG. C PLAN NORTH PROPOSED SITE DEVELOPMENT PLAN SCALE: 1" = 30' - 0" DATE ISSUED: SHEET NAME: REVISIONS: NO: DATE: REFERENCE: SEAL: A-1 PROPOSED SITE DEVELOPMENT PLAN 11/22/2016 1 N R2DESIGNGROUPINC. 5736WALDORFDRIVE ELPASO,TEXAS79924 915-820-4454 PROPOSEDSITEDEVELOPMENTPLAN 1751TRANSMOUNTAINROAD ELPASO,TEXAS79930 PROPERTY ADDRESS: 1751 TRANS MOUNTAIN ROAD, EL PASO, TEXAS 79930 ZONING: C-3 C A PORTION OF TRACT 10A, BLOCK 1, LOT 1, CONTAINING 200,135 S.F., NELLIE D. MUNDY SURVEY NO. 239, CITY OF EL PASO, EL PASO COUNTY, TEXAS LEGAL DESCRIPTION: OFFICE & RESEARCH SERVICES - EL PASO MUNICODE 4.00 4.10 OFFICE/ MEDICAL - 1/ 288 G.F.A. 53,184 G.F.A. / 288 = 184 PARKING SPACES REQUIRED ACCESSIBLE SPACES REQUIRED: 6 / 1 OF WHICH VAN ACCESSIBLE TOTAL PROVIDED: 185 PARKING SPACES, 6 ACCESSIBLE, 1 VAN 6 BICYCLE SPACES REQUIRED PARKING CALCULATIONS: PROJECT INFORMATION TOTAL DEVELOPMENT STRUCTURE SQUARE FOOTAGE: 53,184 G.F.A. 53,184 G.F.A. X 15% = 7,978 S.F. OF REQUIRED LANDSCAPE TOTAL PROVIDED LANDSCAPING @ FRONTAGE: 12,425 S.F. LANDSCAPE CALCULATIONS: TYPE II-B CONSTRUCTION (NON-CUMBUSTIBLE) UNSPRINKLED OCCUPANCY: B - BUSINESS OCCUPANCIES ALLOWED: AMBULATORY CARE FACILITIES CLINIC, OUTPATIENT LABORATORIES: TESTING & RESEARCH PROFESSIONAL SERVICES: DENTISTS, PHYSICIANS BUILDING STORIES ABOVE GRADE ALLOWED: 3 STORIES ALLOWED BUILDING HEIGHT ALLOWED: 55' HT. ALLOWED BUILDING AREA ALLOWED: 23,000 S.F. ALLOWED EACH FLOOR ALLOWABLE BUILDING: (TYP.) BUILDING A: 2 STORIES ABOVE GRADE 10,164 S.F. EACH FLOOR - TOTAL: 20,328 S.F. 35'-0" HEIGHT BUILDING B: 2 STORIES ABOVE GRADE 10,164 S.F. EACH FLOOR - TOTAL: 20,328 S.F. 35'-0" HEIGHT BUILDING C: 1 STORY ABOVE GRADE 6,264 S.F. 25'-0" HEIGHT BUILDING D: 1 STORY ABOVE GRADE 6,264 S.F. 25'-0" HEIGHT TOTAL BUILDING BUILDING AREA: 53,184 G.F.A. SPECIFIC BUILDING INFORMATION: