11. Customer Complaint For Month December
Sr no. Customer Name Part Name Complaint Details
1 Valeo NRG8 Heat Sink Dia 7.25 to 0.1 mm Found Observ size
Customer Complaint For Month January
Sr no. Customer Name Part Name Complaint Details
1 Valeo NRG8 Front BKT Tapping Missing
2 Rotex Auto Mech RTX 1000 Body Pad Height Found Variation
3 Tata Ficaso Isolator Die.5.1 GO Not Pass
Customer Complaint For Month February
Sr no. Customer Name Part Name Complaint Details
1 Raychem HC 7 Black Mark & Blow Holes
2 Raychem 100 x 100 x81 Base Concentrycity Not Ok
3 Raychem 100 x 100 x81 Base Wall Mounting Hole Not OK
4 Tata Ficaso Q 5 Pivot Height Not Ok
5 Valeo FG 11 Rear BKT Side Core Thikness Oversize
6 Valeo VW Rear ID Oversize
23. 3 Major breakdown April-2023
SR. NO. Problem Action
1 VMC-5 : Oil leakage issue & Pallet Change prob.
Change all broken pipe (4.0nos ) and both proxy (NPN NO 8.0mm
)changed also
2 VMC 13: Spindle Run out ( up to 0.2 mm to 300mm length ) issue. Remove Spindle Assy. And taper regrinding & fitted.
3 VMC 16 : Hydraulic drop prob. when job clamping. Hydraulic power pack changed and set hydraulic pressure also.
4
5
6
7
31. BREAKDOWN DISCRIPTION AND THEIR ANALYSIS Month-April
MACHINE NO. DATE PARTICULARS BD HRS. ACTION PLAN RESPONSIBILITY STATUS
MACHINE NO. 09- 650T LK 21-04-2023 Pump coupling shaft found broken 66 Coupling shaft replaced mr. Ugale closed
MACHINE NO. 09- 650T LK 07-04-2023 Die height gear jam and die height hydraulic motor not working. 18
Die height motor repair and manifold block
changed
mr. Ugale closed
MACHINE NO. 09- 650T LK 24-04-2023 High pressure pump cartridge problem 51 cartridge Replaced mr. Ugale closed
MACHINE NO. 09- 650T LK 12-04-2023 Injection side oil leakage 29 Seal changed mr. Ugale closed
MACHINE NO. 04- 500T LK Metal shortage 95.5 To be started central melting furnace Mr. Kunal open
700T LK Metal shortage 82.9 Need to arrange one seperate melting furnace Mr. ugale/kunal open
Plot no. 11 13-04-2023 cooling tower problem 9.5 Cooling tower motor assembly work Mr. ugale closed
580T LK 29-04-2023 Silicarb furnace coil failed 44
coil not available so, using stand by furnace and
coil purchasing under process.
Mr. ugale open
MACHINE NO. 04- 500T LK 05-04-2023 machine stopped due to virgin metal not available 18 Metal Purchase. Mr. Sutar closed
pdc-03-500T LK 05-04-2023 IP not act 6 IP valve sensor corrected Mr. ugale closed
Pdc-01-400T LK 11-04-2023 Nrg8 rear casting stucked issue frequently 8 Die transfer on pdc-7 Mr. kunal closed
Pdc-05- 160T LK 28-04-2023 Furnace body short. 15 Cover opened and corrected Mr. Ugale/ kunal closed
32. Machine wise die change occurrences
PDC 5-LK 160T PDC 7-LK 280T
PDC 01- LK
400T
PDC 03- LK
500T
PDC 6-LK 280T 580T PDC 9- LK 650T
PDC 04- LK
500T
700T
OCCURENECE 18 13 12 11 9 9 8 7 4
0
2
4
6
8
10
12
14
16
18
20
NOS.
OCCURENECE
NO. OF PLANNED DIE CHANGE 91 NOS
DIE CHANGE BD HOURS 177 HOURS
AVERAGE TIME OF DIE CHANGE 1.94 HOUR
33. Machine maintenance
16%
DMT
13%
PDC ( minor
stopage and
motion loss)
13%
Power fail
12%
Metal Shortage
19%
Planned changes
16%
manpower
shortage
11%
DEPARTMENT WISE B/D HOURS.
DEPT. WISE BD'S
DEPT.
Machine
maintenance
DMT
PDC ( minor stopage and
motion loss)
Power fail
Metal
Shortage
Planned
changes
manpower
shortage
BD HOURS 178 151.7 146 141 222 177 122
34. CORRECTIVE ACTION REPORT FOR NO ACHIEVING OF QUALITY
OBJECTIVE
Form No: AT/MR/F19
Rev No: 00
Rev Date: 01.04.2017
Date : 06-05-2023
Department : pdc Process Owner : kunal kumar
Months / Quarter : month of APRIL.-2023
Objective Name (Non achieving) : 1) target OEE / productivity-75%/ 85%
2) actual OEE / productivity- 71.3% / 87.1%
Immediate action taken :
1)pdc-09(TOYO-650T)- High pump pressure cartridge change.
2) pdc-09(toyo-650T)- Main pump coupling shaft replaced.
3) pdc-05- furnace issue corrected.
4) 580T LK- stand by furnace using.
Responsibility :
mr. Ugale
Target Date :
06-05-2023
Root Cause :
1)pdc-09(TOYO-650T)- High pump pressure cartridge issue.
2) pdc-09(toyo-650T)- Main pump coupling shaft broken.
3) Pdc-05- furnace body short.
4) 580T LK- furnace coil failed.
Corrective action : Responsibility :
1)pdc-09(TOYO-650T)- High pump pressure cartridge replaced. mr. ugale
2) pdc-09(TOYO-650T)- Main pump coupling shaft replaced
3) Pdc-05- furnace corrected. By replacing coil.
4)580T LK- coil failed and using stand by furnace.
Target Date :
06-05-2023
Verification : Mr. Kunal kumar.
Effectiveness
1) pdc-09 Running ok.
2) pdc-09 Running ok.
3) PDC-05-Furnace running ok.
4) 580T LK- using stand by furnace.
Verified By:
Kunal kumar
Date:06-05-2023
Corrective action is found effective / not effective- All corrective action found effective.Except 580T Silicarb furnace coil replacement pending due to un availability of coil.
Date : 06-05-2023
41. Non Compliance Action Plan April
2023
NON COMPLIANCE ACTION PLAN
Sr No ISSUES ACTION RESPONSIBILITY TARGET DATE REMARKS
1 NO MAN POWER NEW CONTRACTOR / AND NEEM CONTRACTOR EMPLOYEE TO BE SEARCH Mr. Shashikant Sir 28.04.2023 IN PROCESS
2 NO LOAD 3 DAYS STOCK OF EACH MATERIAL Mr.Parag Hole 28.04.2023 IN PROCESS
3 SETTING TIME NUMBER OF SET UP REDUCED Mr. Yogesh Deore 10.02.2023 COMPLETED