MANAGEMENT REVIEW MEETING
TEAM MEMBERS
MR .GOPAL PINGALI
510
851
790
983
1045 1035
738
675 680 680
631 618
562
421
494
644
849
993
1008
560
587
474
629
527
574
550
82
58
81
86
95
97
76
87
70
93
83
93
98
0
20
40
60
80
100
120
0
200
400
600
800
1000
1200
Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23
Month wise Sales - Plan v/s Actual -Value In Lakhs
Sales Plan (Rs Lakhs) Sales Actual (Rs Lakhs) Compliance %
Part
Actual
Schedule
Dispatched
Qty
Pending Qty % Remark
EKI
B.H 440 19000 16792 2208 88%
As per Customer Req
SPIDER 440 19000 18070 930 95%
B.H 550 17000 16112 888 95%
SPIDER 550 17000 14946 2054 88%
B.H 460 VIVACE 7000 6426 574 92%
SPIDER 460 VIVACE 7000 6110 890 87%
B.H 550 VIVACE 1600 1998 -398 125%
SPIDER 550 VIVACE 1600 1686
-86 105%
TATA FICOSA
X451 LH 6000 5597 403 93%
As per Customer Req
X451 RH 6000 5535 465 92%
Q502 LH 6000 5156 844 86%
Q502 RH 6000 5104 896 85%
Pivot 12000 9306 2694 78%
Isolator Tub Insert 15000 12244 2756 82%
Cable Mounting Bracket 15000 11418 3582 76%
Reasons For Sales Loss April 2023
Part Actual Schedule Dispatched Qty Pending Qty % Remark
VALEO
NRG8 Front Bracket 25000 20751 4249 83%
NRG8 Rear Bracket 25000 20884 4116 84%
NRG8 Heat sink 25000 21168 3832 85%
TD Front Bracket 3500 3016 484 86%
TD Rear Bracket 3500 3194 306 91%
FG 11 KIA Front
Bracket 1000 686 314 69%
FG 11 KIA Rear
Bracket 1000 976 24 98%
VW Front Bracket 0 100 -100 -
VW Rear Bracket 6000 6020 -20 100%
TG 9 Front Bracket 1500 934 566 62%
TG 9 Rear Bracket 1500 174 1326 12%
MT FRONT
BRACKET M/C TSL
12-3 1000 420 580 42%
MG Hector CVT
Front Bracket 1000 1698 -698 170%
Reasons For Sales Loss April 2023
Reasons For Sales Loss April 2023
Part Actual Schedule Dispatched Qty Pending Qty % Remark
RPG
100x100x81 Base 311 20 291 7%
122x120x81 Lid 1788 1446 342 423%
122x120x81base 204 1569 -594 -264%
150X65X40 lid 193 0 193 0
160x100x81 Base 551 398 153 260%
230x200x110 Base 744 410 334 123%
260x160x90 base 2039 -969 -210%
260x160x90 lid 1220 -1220 -100
280x180x100 Base 100 0 100 0
280x180x100 Lid 500 500 0 -
360x160x90 Base 241 0 241 0
360x160x90 Lid 60 0 60 0
LVET 16 945 -445 -212%
Reasons For Sales Loss April 2023
Part Actual Schedule Dispatched Qty Pending Qty % Remark
AGS
PDC M/C Not available
Projector Lamp- coated 7000 5123 2377 46%
Reflector 7000 5300 2200 42%
DTLB-01 3000 1946 1464 75%
DTHB-02 3000 3000 500 17%
KTLB-05 500 0 500 #DIV/0!
KTHB-06 500 0 500 #DIV/0!
Projector Lamp- coated 7000 4623 2377 51%
Reflector 7000 4800 2200 46%
DTLB-01 3000 1536 1464 95%
KBR
KBR-part no.1121 3000 3600 -41 83%
KBR-part no.1122 3000 1000 2000 33%
NALES
Cover 150(QTF) 1788 1006 -181 56%
Cover 175(QTF) 712 0 712 0
Piston 125(QTF) 630 630 890 100%
Piston 150(QTF) 1701 378 2074 22%
Piston 200(QTF) 545 141 404 26%
Piston 250(QTF) 500 80 359 16%
Piston 175(QTF) 1000 0 1000 0
Praguna
70 W 3000 2662 338 89%
100 W 3000 1501 1499 50%
ROTX
Body positioner RTX-1000 1000 120 880 12%
SHAKTIPUMP
Schedule revised
verbally
Heat Sink For SIMHA2 3500 2278 1712 65%
QUALITY
421
494
644
849
993
1008
560
587
474
629
527
574
550
26 28 27 27 33
17 22
58
39
88 85
55 52
6.3
5.8
4.2
3.2 3.4
1.7
3.9
9.8
8.3
14.0
16.1
9.6 9.5
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
0
200
400
600
800
1000
1200
Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23
Month wise - Rejection w.r.to Sales -Value In Lakhs
Sales Actual (Rs Lakhs) Rejection (Rs Lakhs) % Rejection
587
474
629
527
546 550
5 7 6 6 10 6
1 4 7 8 7 7
52
28
75 71
11 13
10 12 9 11 11 11
0
100
200
300
400
500
600
700
Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23
Department Wise Rejection w.r.t Sales – Value In Lakhs
Sales Actual PDC Machine Shop Final Quality % Rejection
3 3
2
1
3 3
2
5
1
3
6 6
4
0
1
2
3
4
5
6
7
Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23
1 2 3 4 5 6 7 8 9 10 11 12 13
MonthWise Customer Complaint
No. of Customer complaints Status
Customer Complaint For Month December
Sr no. Customer Name Part Name Complaint Details
1 Valeo NRG8 Heat Sink Dia 7.25 to 0.1 mm Found Observ size
Customer Complaint For Month January
Sr no. Customer Name Part Name Complaint Details
1 Valeo NRG8 Front BKT Tapping Missing
2 Rotex Auto Mech RTX 1000 Body Pad Height Found Variation
3 Tata Ficaso Isolator Die.5.1 GO Not Pass
Customer Complaint For Month February
Sr no. Customer Name Part Name Complaint Details
1 Raychem HC 7 Black Mark & Blow Holes
2 Raychem 100 x 100 x81 Base Concentrycity Not Ok
3 Raychem 100 x 100 x81 Base Wall Mounting Hole Not OK
4 Tata Ficaso Q 5 Pivot Height Not Ok
5 Valeo FG 11 Rear BKT Side Core Thikness Oversize
6 Valeo VW Rear ID Oversize
421
494
644
849
993
1008
560
587
474
629
527
574
550
9 10 11 9 14 16 21 9
30
3 9 8 12
2.2
2.1
1.8
1.0
1.4
1.6
3.7
1.5
6.4
0.5
1.6
1.4
2.2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0
200
400
600
800
1000
1200
Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23
Month wise - RTV w.r.to Sales –Value In Lakhs
Sales Actual (Rs Lakhs) RTV (Rs Lakhs) RTV %
421
494
644
849
993
1008
560
587
474
629
527
574
550
26 28 27 27 33
17 22
58
39
88 85
55 52
6.3
5.8
4.2
3.2 3.4
1.7
3.9
9.8
8.3
14.0
16.1
9.6 9.5
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
0
200
400
600
800
1000
1200
Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23
Month wise - Rejection w.r.to Sales -Value In Lakhs
Sales Actual (Rs Lakhs) Rejection (Rs Lakhs) % Rejection
421
494
644
849
993
1008
560
587
474
629
527
574
550
216
251 247 238
305
254
286
194
313
282
378
326
253
51 51
38
28
31
25
51
33
66
45
72
57
46
0
10
20
30
40
50
60
70
80
0
200
400
600
800
1000
1200
Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23
Month wise Inventory (WIP+FG) % - w.r.to Sales –Value In Lakhs
Sales Actual (Rs Lakhs) Inventory (Rs Lakhs) Inventory % Of Sales
62 66 65
7 7 7
47 50 50
69 64
72
51 49
43
16 20 19
11 11 11
9 10 9
11 10 9
9 8 9
474
629
527
0
200
400
600
800
0
20
40
60
80
Dec-22 Jan-23 Feb-23
Sales
In
Lakhs
Manpower
In
No
Dec-22 Jan-23 Feb-23
1) PDC 62 66 65
2) SHOTBLASTING 7 7 7
3) FETTLING 47 50 50
3) M/SHOP 69 64 72
4) QUALITY 51 49 43
5) DISPATCH 16 20 19
6) TOOLROOM 11 11 11
7) DIEMAINTANCE 9 10 9
8) STORE 11 10 9
9) HOUSEKEEPING 9 8 9
SALES ACTUAL 474 629 527
Department Wise Manpower Utilized Against Sales – Manpower In Numbers & Sales In
Lakhs
MAINTENANCE
5.5
29
7
4.6
7 7.2
29.2
30
33
29
30
27.9
1.7 2 1.9 2.1
0.31
3.0
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23
Energy Consumption Plot wise -Value In Lakhs
Plot No 09 Plot No 10 Plot No 12
0.00.0
1.0
0.0
3.0
1.0
0.0
3.0
1.5
2.42.0
0.0
2.5
3.0
2.0
0.00.0
3.0 3.0
0.0
7.3
10.6
2.02.0
1.0
0.00.00.0
4.0
0.0
0.0
2.0
4.0
6.0
8.0
10.0
12.0
MTTR ( APRIL-23)
2.25
MTTR In HOURS OF MACHINE SHOP APRIL-23
0.0
0.0
670.0
0.0
334.0
670.0
0.0
333.0
334.0
0.0
333.5
0.0
333.5
333.0
334.0
0.0
0.0
333.0
333.0
0.0
216.0
213.0
670.0
334.0
670.0
0.0
0.0
0.0
668.0
0.0
0.0
100.0
200.0
300.0
400.0
500.0
600.0
700.0
800.0
MTBF ( APRIL.-23 )
MTBF APRIL .-23 MACHINE SHOP In
75.0
0.3
0.0
0.8
0.3
0.0
0.8
0.4
0.0
0.7
0.0
0.7
0.8
0.5
0.0 0.0
0.8 0.8
0.0
3.2
4.7
0.3
0.5
0.3
0.0 0.0 0.0
0.5
0.0 0.0 0.0
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
3/3/2023
3/4/2023
3/5/2023
3/6/2023
3/7/2023
3/8/2023
3/9/2023
3/10/2023
3/11/2023
3/12/2023
3/13/2023
3/14/2023
3/15/2023
3/16/2023
3/17/2023
3/18/2023
3/19/2023
3/20/2023
3/21/2023
3/22/2023
3/23/2023
3/24/2023
3/25/2023
3/26/2023
3/27/2023
3/28/2023
3/29/2023
3/30/2023
3/31/2023
4/1/2023
4/2/2023
Breakdown % ( APRIL-23 )
2.25
Breakdown % OF MACHINE SHOP
17
8
2 2
48
2 3 4
0
12
2 2 3
0 0 0 0 0 0 0 0
3 4
0 0 0 0 1
0
10
20
30
40
50
60
Machine wise Break down Hrs (APRIL-23)
1.41 1.405
1.112
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
Feb-23 Mar-23 APRIL
Month Wise Breakdown Percentage %
2.25
3 Major breakdown April-2023
SR. NO. Problem Action
1 VMC-5 : Oil leakage issue & Pallet Change prob.
Change all broken pipe (4.0nos ) and both proxy (NPN NO 8.0mm
)changed also
2 VMC 13: Spindle Run out ( up to 0.2 mm to 300mm length ) issue. Remove Spindle Assy. And taper regrinding & fitted.
3 VMC 16 : Hydraulic drop prob. when job clamping. Hydraulic power pack changed and set hydraulic pressure also.
4
5
6
7
OBJECTIVES MEASURABLE SHEET :- 2023-24
Format No:
AT/MR/F08
Rev No./ Date :
01 / 01.04.2019
Issue Date :
01.04.2017
Sr.NO Dept.
Respon
sible
Objectives
Unit Of
Measurement
Frequency Criteria
Bench
mark 2022-
23
Target
2023-24
Months
Jan-23 Feb-23 Mar-23 Apr-23 YTD.
1
Producti
on
(PDC)
Mr.
Kunal
Productivity PDC. % Monthly 5% Increase 84.38% 85.00% 82.6% 67.1% 76.5% 87.1 77.93%
OEE (PDC) % Monthly 5% Increase 74.99% 75.00% 71.4% 71.7% 68.4% 71.8% 70.83
Consumable Cost Rs/Kg Monthly
20%
reduction
1.53 1.40 1.17 1.15 1.20 1.40 1.23
Overall In-house
PPM (Casting)
PPM Monthly
10%
reduction
59708 50000 127000 #DIV/0!
No. of
Improvement
Projects
Nos. Quarterly
100%
increase
1.25 2 2 1 1.5
DATE WISE OEE
DATE 1 2 3 4 5 7 8 9 10 11 12 14 15 16 17 18 19 21 22 23 24 25 26 28 29 30
TARGET 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75
OEE 66 84 70 82 63 87 70 65 71 67 61 93 72 81 70 80 70 88 76 74 79 71 69 67 66 74
66
84
70
82
63
87
70
65
71
67
61
93
72
81
70
80
70
88
76 74
79
71 69 67.2 66.39
74.07
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATEWISE OEE
TARGET OEE
TARGET OEE-75%
AVERAGE OEE-71.8%
DATEWISE PRODUCTIVITY
DATE 1 2 3 4 5 7 8 9 10 11 12 14 15 16 17 18 19 21 22 23 24 25 26 28 29 30
TARGET 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85
PRODUCTIVI
TY
85 97 86 89 92 95 84 80 88 88 86 95 89 89 86 90 91 92 86 83 93 91 88 69 88 76
85
97
86
89 92
95
84
80
88 88 86
95
89 89 86
90 91 92
86 83
93 91 88
69
88
76
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
DATEWISE PRODUCTIVITY
TARGET PRODUCTIVITY
AVERAGE:-87.1
TARGET:- 85
PDC 6-LK 280T PDC 5-LK 160T PDC 01- LK 400T 580T PDC 7-LK 280T PDC 03- LK 500T PDC 04- LK 500T 700T PDC 9- LK 650T
PLAN 38302 41322 30930 31038 36941 34310 12867 28600 17600
ACTUAL 33898 36424 26885 26514 30928 27618 10046 20694 8268
COMPLIENCE% 89 88 87 85 84 80 78 72 47
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
NOS.
MACHINEWISE PLANVS ACTUAL MONTH OF APRIL-23
75.6
74.2
69 68.7 68.5
67.4
64.3
52.5
31.5
PDC 6-LK 280T PDC 5-LK 160T 580T PDC 7-LK 280T PDC 03- LK 500T PDC 01- LK 400T 700T PDC 9- LK 650T PDC 04- LK 500T
MACHINEWISE OEE
OEE
248035
199955
214575
317056
332482
317227
235339
285205 282088
274741 271923
350357
303150
MONTHWISE PRODUCTION QTY 2022-2023
QTY
BREAKDOWN DISCRIPTION AND THEIR ANALYSIS Month-April
MACHINE NO. DATE PARTICULARS BD HRS. ACTION PLAN RESPONSIBILITY STATUS
MACHINE NO. 09- 650T LK 21-04-2023 Pump coupling shaft found broken 66 Coupling shaft replaced mr. Ugale closed
MACHINE NO. 09- 650T LK 07-04-2023 Die height gear jam and die height hydraulic motor not working. 18
Die height motor repair and manifold block
changed
mr. Ugale closed
MACHINE NO. 09- 650T LK 24-04-2023 High pressure pump cartridge problem 51 cartridge Replaced mr. Ugale closed
MACHINE NO. 09- 650T LK 12-04-2023 Injection side oil leakage 29 Seal changed mr. Ugale closed
MACHINE NO. 04- 500T LK Metal shortage 95.5 To be started central melting furnace Mr. Kunal open
700T LK Metal shortage 82.9 Need to arrange one seperate melting furnace Mr. ugale/kunal open
Plot no. 11 13-04-2023 cooling tower problem 9.5 Cooling tower motor assembly work Mr. ugale closed
580T LK 29-04-2023 Silicarb furnace coil failed 44
coil not available so, using stand by furnace and
coil purchasing under process.
Mr. ugale open
MACHINE NO. 04- 500T LK 05-04-2023 machine stopped due to virgin metal not available 18 Metal Purchase. Mr. Sutar closed
pdc-03-500T LK 05-04-2023 IP not act 6 IP valve sensor corrected Mr. ugale closed
Pdc-01-400T LK 11-04-2023 Nrg8 rear casting stucked issue frequently 8 Die transfer on pdc-7 Mr. kunal closed
Pdc-05- 160T LK 28-04-2023 Furnace body short. 15 Cover opened and corrected Mr. Ugale/ kunal closed
Machine wise die change occurrences
PDC 5-LK 160T PDC 7-LK 280T
PDC 01- LK
400T
PDC 03- LK
500T
PDC 6-LK 280T 580T PDC 9- LK 650T
PDC 04- LK
500T
700T
OCCURENECE 18 13 12 11 9 9 8 7 4
0
2
4
6
8
10
12
14
16
18
20
NOS.
OCCURENECE
NO. OF PLANNED DIE CHANGE 91 NOS
DIE CHANGE BD HOURS 177 HOURS
AVERAGE TIME OF DIE CHANGE 1.94 HOUR
Machine maintenance
16%
DMT
13%
PDC ( minor
stopage and
motion loss)
13%
Power fail
12%
Metal Shortage
19%
Planned changes
16%
manpower
shortage
11%
DEPARTMENT WISE B/D HOURS.
DEPT. WISE BD'S
DEPT.
Machine
maintenance
DMT
PDC ( minor stopage and
motion loss)
Power fail
Metal
Shortage
Planned
changes
manpower
shortage
BD HOURS 178 151.7 146 141 222 177 122
CORRECTIVE ACTION REPORT FOR NO ACHIEVING OF QUALITY
OBJECTIVE
Form No: AT/MR/F19
Rev No: 00
Rev Date: 01.04.2017
Date : 06-05-2023
Department : pdc Process Owner : kunal kumar
Months / Quarter : month of APRIL.-2023
Objective Name (Non achieving) : 1) target OEE / productivity-75%/ 85%
2) actual OEE / productivity- 71.3% / 87.1%
Immediate action taken :
1)pdc-09(TOYO-650T)- High pump pressure cartridge change.
2) pdc-09(toyo-650T)- Main pump coupling shaft replaced.
3) pdc-05- furnace issue corrected.
4) 580T LK- stand by furnace using.
Responsibility :
mr. Ugale
Target Date :
06-05-2023
Root Cause :
1)pdc-09(TOYO-650T)- High pump pressure cartridge issue.
2) pdc-09(toyo-650T)- Main pump coupling shaft broken.
3) Pdc-05- furnace body short.
4) 580T LK- furnace coil failed.
Corrective action : Responsibility :
1)pdc-09(TOYO-650T)- High pump pressure cartridge replaced. mr. ugale
2) pdc-09(TOYO-650T)- Main pump coupling shaft replaced
3) Pdc-05- furnace corrected. By replacing coil.
4)580T LK- coil failed and using stand by furnace.
Target Date :
06-05-2023
Verification : Mr. Kunal kumar.
Effectiveness
1) pdc-09 Running ok.
2) pdc-09 Running ok.
3) PDC-05-Furnace running ok.
4) 580T LK- using stand by furnace.
Verified By:
Kunal kumar
Date:06-05-2023
Corrective action is found effective / not effective- All corrective action found effective.Except 580T Silicarb furnace coil replacement pending due to un availability of coil.
Date : 06-05-2023
MACHINE SHOP
OVERALL EQUIPMENT EFFICIENCY OF CNC
FORMATE NO : AT/ PROD/F07
REV NO : 00
ISSUE DATE: 01.04.2017
Total Drag Links
Produced
Total Tie Rods
Produced
Sr.
No.
Name of
Machine
Qty of
Machine
No of
Shift
Planne
d hours
POWER OFF SETTING QUALITY MANT.
NO LOAD /
NO
MATERIAL
NO plan NO Operator MAFG.
Total
down
time
Total
Hours
Utilized
Availabilit
y
Performance Quality OEE % Remark
1 CNC 1 1 2 358 12 11 2 36 87 22 15 4 188 170 65% 82% 97% 51.54%
2 CNC 2 1 2 358 11 23 0 19 41 22 91 7 213 146 64% 75% 95% 45.35%
3 CNC 3 1 2 358 3 6 5 7 57 22 82 3 185 173 66% 73.5% 96.12% 43.24%
4 CNC 4 1 2 358 3 1 11 5 83 11 200 0 314 44 48% 79.3% 96.77% 36.67%
5 CNC 5 1 2 358 0 0 12 8 78 22 188 14 321 38 47% 80.3% 97.43% 36.78%
6 CNC 6 1 2 358 0 0 0 0 0 0 1 0 1 357 67% 67.8% 97.13% 43.98%
7 CNC 7 1 2 358 0 3 4 0 75 33 302 0 417 -59 34% 87.7% 94.51% 28.51%
8 CNC 8 1 2 358 0 0 0 0 0 0 0 0 0 358 76% 80.9% 97.13% 60.06%
9 CNC 9 1 2 358 3 0 0 12 134 33 92 1 275 83 53% 89.9% 95.83% 45.49%
Average of Plant 43.51%
57.80% 79.49% 96.42%
OVERAL EQUIPMENT EFFICIENCY OF VMC FORMATE NO:-AT/PROD/F07
Total Drag Links
Produced REV NO:00
Total Tie Rods
Produced ISSUE DATE:-01.04.2017
Sr.
No.
Name of
Machine
Qty of
Machine
No of
Shift
Planned
hours
POWER OFF SETTING QUALITY MANT.
NO LOAD / NO
MATERIAL
NO plan NO Operator MAFG.
Total
down
time
Total
Hours
Utilized
Availability Performance Quality OEE % Remark
1 VMC 1 1 1 179 2 37 17 145 59 33 141 12 444 -265 30% 72% 94% 20.34%
2 VMC 2 1 3 538 2 58 7 19 15 0 52 1 154 384 70% 47% 93% 30.25%
3 VMC 3 1 0 0 2 79 13 2 34 11 48 1 190 -190 66% 64.9% 93.63% 36.67%
4 VMC 4 1 2 358 0 17 11 80 124 33 174 12 450 -92 30% 76.9% 94.06% 21.36%
5 VMC 5 1 2 358 2 27 1 107 23 0 31 1 192 166 65% 77.5% 98.33% 49.61%
6 VMC 6 1 2 358 0 0 0 0 0 0 0 0 0 358 86% 48.5% 98.19% 40.93%
7 VMC 7 1 2 358 2 64 6 22 109 22 97 1 322 36 47% 63.1% 94.62% 28.01%
8 VMC 8 1 2 358 2 7 1 1 32 33 60 13 147 211 72% 77.2% 86.34% 47.81%
9 VMC 9 1 2 358 0 11 0 1 145 44 218 12 430 -72 32% 81.3% 98.41% 25.93%
10 VMC 10 1 2 358 3 21 0 22 23 11 29 14 122 236 75% 53.2% 96.50% 38.31%
11 VMC 11 1 2 358 2 18 6 7 17 22 72 12 154 204 70% 57.0% 97.35% 38.84%
12 VMC 12 1 2 358 0 14 7 24 191 33 184 12 463 -105 28% 82.9% 94.95% 21.71%
13 VMC 13 1 1 179 0 0 0 0 0 0 0 0 0 179 67% 58.2% 96.05% 37.32%
14 VMC 14 1 2 358 2 84 0 4 20 0 22 2 134 224 83% 88.4% 95.40% 69.74%
15 VMC 15 1 1 179 0 5 0 0 44 0 66 1 116 63 60% 64.8% 98.24% 38.44%
16 VMC 16 1 1 179 1 2 0 0 25 11 15 12 66 114 86% 98.8% 99.80% 85.19%
17 VMC 17 1 1 179 1 0 0 0 1 0 11 0 13 166 76% 92.3% 99.90% 68.43%
18 VMC 18 1 2 358 0 7 3 6 13 11 129 12 179.5 491.5 67.0% 54.6% 96.7% 30.40%
Average of Plant 41.11%
61.58% 70.81% 95.87%
31 42 20
260
441 450
60 36 71
199
145
439
259
616
874
0 0
264
665
13511347
37 66
112
0
200
400
600
800
1000
1200
1400
1600
Feb-23
Mar-23
Apr-23
Feb-23
Mar-23
Apr-23
Feb-23
Mar-23
Apr-23
Feb-23
Mar-23
Apr-23
Feb-23
Mar-23
Apr-23
Feb-23
Mar-23
Apr-23
Feb-23
Mar-23
Apr-23
Feb-23
Mar-23
Apr-23
POWER OFF SETTING QUALITY MAINT. NO LOAD NO PLAN NO OPRT. MAFG.
VMC MONTH WISE MAJOR LOSSES COMPARISION
0
100
200
300
400
500
600
700
800
900
1000
POWER OFF SETTING QUALITY MANT. NO LOAD / NO
MATERIAL
NO plan NO Operator MAFG.
31 44 34
87
554
165
971
29
MAJOR LOSSES OF CNC-APRIL
Series1 Series2
20
450
71
439
874
264
1347
112
0
200
400
600
800
1000
1200
1400
1600
POWER OFF SETTING QUALITY MANT. NO LOAD / NO
MATERIAL
NO plan NO Operator MAFG.
MAJOR LOSSES OF VMC
Series1 Series2
MAJOR LOSSES OFVMC –APRIL-2023:-
Non Compliance Action Plan April
2023
NON COMPLIANCE ACTION PLAN
Sr No ISSUES ACTION RESPONSIBILITY TARGET DATE REMARKS
1 NO MAN POWER NEW CONTRACTOR / AND NEEM CONTRACTOR EMPLOYEE TO BE SEARCH Mr. Shashikant Sir 28.04.2023 IN PROCESS
2 NO LOAD 3 DAYS STOCK OF EACH MATERIAL Mr.Parag Hole 28.04.2023 IN PROCESS
3 SETTING TIME NUMBER OF SET UP REDUCED Mr. Yogesh Deore 10.02.2023 COMPLETED
9
1
8
0
1
2
3
4
5
6
7
8
9
10
No Of Calls Raised No Of Calls Open No Of Calls Closed
SAP B1 SOFTCORE SOLUTION SUPPORT CALL STATUS OF APRIL MONTH
0.86 5.33
25.77
2.89
11.04
0.76 0.19 1.23
197.58
0
50
100
150
200
250
CHEMICAL CONSUMABLE DRILL,TAPP,
CUTTER, INSERTS
OIL PACKING PISTON,SLEEVE
ADPATOR,NIPPLE
STATIONERY ELECTRICAL RMC & RMC-
SHAFT
STOCK STATEMENT OF APRIL MONTHVALUE IN LAKHS
5
3
26
2 2 1 0.4
2
2.4
4
18
1
10
0.9 0.3
7
1.9
5
32
1.2
3
0.7 0.2
10
0
5
10
15
20
25
30
35
Month Wise Consumable List – Value In Lakhs
Dec-22 Jan-23 Feb-23
Thank You

Mais conteúdo relacionado

Semelhante a MRM APRIL 2023.pptx

Semelhante a MRM APRIL 2023.pptx (20)

Review W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptxReview W24 & Plan Week 25 2022 MUM_BAS.pptx
Review W24 & Plan Week 25 2022 MUM_BAS.pptx
 
Harmonic shgshf 2uh_lw_catalog
Harmonic shgshf 2uh_lw_catalogHarmonic shgshf 2uh_lw_catalog
Harmonic shgshf 2uh_lw_catalog
 
Improving the design of indian spectrum auctions
Improving the design of indian spectrum auctionsImproving the design of indian spectrum auctions
Improving the design of indian spectrum auctions
 
Revenues
RevenuesRevenues
Revenues
 
Monthly Review April-2023.pptx
Monthly Review April-2023.pptxMonthly Review April-2023.pptx
Monthly Review April-2023.pptx
 
Shimpo able vral_catalog
Shimpo able vral_catalogShimpo able vral_catalog
Shimpo able vral_catalog
 
P33_Nal_Comercial.pdf
P33_Nal_Comercial.pdfP33_Nal_Comercial.pdf
P33_Nal_Comercial.pdf
 
Vendas por Marca
Vendas por MarcaVendas por Marca
Vendas por Marca
 
Venda por modelos OUT 2016
Venda por modelos OUT 2016Venda por modelos OUT 2016
Venda por modelos OUT 2016
 
DCPT_Template 2016
DCPT_Template 2016DCPT_Template 2016
DCPT_Template 2016
 
Generator availability till 09-August - Updated.pptx
Generator availability till 09-August - Updated.pptxGenerator availability till 09-August - Updated.pptx
Generator availability till 09-August - Updated.pptx
 
catalog
catalogcatalog
catalog
 
catalog
catalogcatalog
catalog
 
2017_10_31_BIF_Spectrum_Presentation_Revised_071117.pptx
2017_10_31_BIF_Spectrum_Presentation_Revised_071117.pptx2017_10_31_BIF_Spectrum_Presentation_Revised_071117.pptx
2017_10_31_BIF_Spectrum_Presentation_Revised_071117.pptx
 
P33TotalNal.pdf
P33TotalNal.pdfP33TotalNal.pdf
P33TotalNal.pdf
 
P33TotalNal.pdf
P33TotalNal.pdfP33TotalNal.pdf
P33TotalNal.pdf
 
P33TotalNal.pdf
P33TotalNal.pdfP33TotalNal.pdf
P33TotalNal.pdf
 
ecoprobm 247540 Algorithm Investment Report
ecoprobm 247540 Algorithm Investment Reportecoprobm 247540 Algorithm Investment Report
ecoprobm 247540 Algorithm Investment Report
 
APC in thermal power plant
APC in thermal power plant APC in thermal power plant
APC in thermal power plant
 
Equity Research Report Ways2Capital 03 August 2015
Equity Research Report Ways2Capital 03 August 2015Equity Research Report Ways2Capital 03 August 2015
Equity Research Report Ways2Capital 03 August 2015
 

Último

UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptDineshKumar4165
 
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESUNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESDineshKumar4165
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样umasea
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制miwhjk
 
2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 series2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 seriesdatazaky
 
办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书zdzoqco
 
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
15 Disadvantages of Automated Farming: Balancing Efficiency with Environment ...
15 Disadvantages of Automated Farming: Balancing Efficiency with Environment ...15 Disadvantages of Automated Farming: Balancing Efficiency with Environment ...
15 Disadvantages of Automated Farming: Balancing Efficiency with Environment ...CIOWomenMagazine
 
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一fjjwgk
 
Equity & Freight Electrification by Jose Miguel Acosta Cordova
Equity & Freight Electrification by Jose Miguel Acosta CordovaEquity & Freight Electrification by Jose Miguel Acosta Cordova
Equity & Freight Electrification by Jose Miguel Acosta CordovaForth
 
suspensionretardersystem-220726153321-060937ae.pptx
suspensionretardersystem-220726153321-060937ae.pptxsuspensionretardersystem-220726153321-060937ae.pptx
suspensionretardersystem-220726153321-060937ae.pptxbasant11731
 
Not Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsNot Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsFifth Gear Automotive
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxDineshKumar4165
 
Independent Andheri Call Girls 9833363713
Independent Andheri Call Girls 9833363713Independent Andheri Call Girls 9833363713
Independent Andheri Call Girls 9833363713Komal Khan
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样whjjkkk
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERDineshKumar4165
 
call girls in G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证jjrehjwj11gg
 

Último (20)

UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESUNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
定制(MSVU毕业证书)圣文森山大学毕业证毕业证成绩单原版一比一定制
 
2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 series2.2 CLSS hydraulic Pumps on komatsu pc200 series
2.2 CLSS hydraulic Pumps on komatsu pc200 series
 
办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书
 
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
15 Disadvantages of Automated Farming: Balancing Efficiency with Environment ...
15 Disadvantages of Automated Farming: Balancing Efficiency with Environment ...15 Disadvantages of Automated Farming: Balancing Efficiency with Environment ...
15 Disadvantages of Automated Farming: Balancing Efficiency with Environment ...
 
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
 
Equity & Freight Electrification by Jose Miguel Acosta Cordova
Equity & Freight Electrification by Jose Miguel Acosta CordovaEquity & Freight Electrification by Jose Miguel Acosta Cordova
Equity & Freight Electrification by Jose Miguel Acosta Cordova
 
suspensionretardersystem-220726153321-060937ae.pptx
suspensionretardersystem-220726153321-060937ae.pptxsuspensionretardersystem-220726153321-060937ae.pptx
suspensionretardersystem-220726153321-060937ae.pptx
 
Not Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsNot Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These Symptoms
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
 
Independent Andheri Call Girls 9833363713
Independent Andheri Call Girls 9833363713Independent Andheri Call Girls 9833363713
Independent Andheri Call Girls 9833363713
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
 
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
 
call girls in G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in G.T.B. Nagar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
 

MRM APRIL 2023.pptx

  • 1. MANAGEMENT REVIEW MEETING TEAM MEMBERS MR .GOPAL PINGALI
  • 2. 510 851 790 983 1045 1035 738 675 680 680 631 618 562 421 494 644 849 993 1008 560 587 474 629 527 574 550 82 58 81 86 95 97 76 87 70 93 83 93 98 0 20 40 60 80 100 120 0 200 400 600 800 1000 1200 Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23 Month wise Sales - Plan v/s Actual -Value In Lakhs Sales Plan (Rs Lakhs) Sales Actual (Rs Lakhs) Compliance %
  • 3. Part Actual Schedule Dispatched Qty Pending Qty % Remark EKI B.H 440 19000 16792 2208 88% As per Customer Req SPIDER 440 19000 18070 930 95% B.H 550 17000 16112 888 95% SPIDER 550 17000 14946 2054 88% B.H 460 VIVACE 7000 6426 574 92% SPIDER 460 VIVACE 7000 6110 890 87% B.H 550 VIVACE 1600 1998 -398 125% SPIDER 550 VIVACE 1600 1686 -86 105% TATA FICOSA X451 LH 6000 5597 403 93% As per Customer Req X451 RH 6000 5535 465 92% Q502 LH 6000 5156 844 86% Q502 RH 6000 5104 896 85% Pivot 12000 9306 2694 78% Isolator Tub Insert 15000 12244 2756 82% Cable Mounting Bracket 15000 11418 3582 76% Reasons For Sales Loss April 2023
  • 4. Part Actual Schedule Dispatched Qty Pending Qty % Remark VALEO NRG8 Front Bracket 25000 20751 4249 83% NRG8 Rear Bracket 25000 20884 4116 84% NRG8 Heat sink 25000 21168 3832 85% TD Front Bracket 3500 3016 484 86% TD Rear Bracket 3500 3194 306 91% FG 11 KIA Front Bracket 1000 686 314 69% FG 11 KIA Rear Bracket 1000 976 24 98% VW Front Bracket 0 100 -100 - VW Rear Bracket 6000 6020 -20 100% TG 9 Front Bracket 1500 934 566 62% TG 9 Rear Bracket 1500 174 1326 12% MT FRONT BRACKET M/C TSL 12-3 1000 420 580 42% MG Hector CVT Front Bracket 1000 1698 -698 170% Reasons For Sales Loss April 2023
  • 5. Reasons For Sales Loss April 2023 Part Actual Schedule Dispatched Qty Pending Qty % Remark RPG 100x100x81 Base 311 20 291 7% 122x120x81 Lid 1788 1446 342 423% 122x120x81base 204 1569 -594 -264% 150X65X40 lid 193 0 193 0 160x100x81 Base 551 398 153 260% 230x200x110 Base 744 410 334 123% 260x160x90 base 2039 -969 -210% 260x160x90 lid 1220 -1220 -100 280x180x100 Base 100 0 100 0 280x180x100 Lid 500 500 0 - 360x160x90 Base 241 0 241 0 360x160x90 Lid 60 0 60 0 LVET 16 945 -445 -212%
  • 6. Reasons For Sales Loss April 2023 Part Actual Schedule Dispatched Qty Pending Qty % Remark AGS PDC M/C Not available Projector Lamp- coated 7000 5123 2377 46% Reflector 7000 5300 2200 42% DTLB-01 3000 1946 1464 75% DTHB-02 3000 3000 500 17% KTLB-05 500 0 500 #DIV/0! KTHB-06 500 0 500 #DIV/0! Projector Lamp- coated 7000 4623 2377 51% Reflector 7000 4800 2200 46% DTLB-01 3000 1536 1464 95% KBR KBR-part no.1121 3000 3600 -41 83% KBR-part no.1122 3000 1000 2000 33% NALES Cover 150(QTF) 1788 1006 -181 56% Cover 175(QTF) 712 0 712 0 Piston 125(QTF) 630 630 890 100% Piston 150(QTF) 1701 378 2074 22% Piston 200(QTF) 545 141 404 26% Piston 250(QTF) 500 80 359 16% Piston 175(QTF) 1000 0 1000 0 Praguna 70 W 3000 2662 338 89% 100 W 3000 1501 1499 50% ROTX Body positioner RTX-1000 1000 120 880 12% SHAKTIPUMP Schedule revised verbally Heat Sink For SIMHA2 3500 2278 1712 65%
  • 8. 421 494 644 849 993 1008 560 587 474 629 527 574 550 26 28 27 27 33 17 22 58 39 88 85 55 52 6.3 5.8 4.2 3.2 3.4 1.7 3.9 9.8 8.3 14.0 16.1 9.6 9.5 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 0 200 400 600 800 1000 1200 Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23 Month wise - Rejection w.r.to Sales -Value In Lakhs Sales Actual (Rs Lakhs) Rejection (Rs Lakhs) % Rejection
  • 9. 587 474 629 527 546 550 5 7 6 6 10 6 1 4 7 8 7 7 52 28 75 71 11 13 10 12 9 11 11 11 0 100 200 300 400 500 600 700 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 Department Wise Rejection w.r.t Sales – Value In Lakhs Sales Actual PDC Machine Shop Final Quality % Rejection
  • 10. 3 3 2 1 3 3 2 5 1 3 6 6 4 0 1 2 3 4 5 6 7 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 1 2 3 4 5 6 7 8 9 10 11 12 13 MonthWise Customer Complaint No. of Customer complaints Status
  • 11. Customer Complaint For Month December Sr no. Customer Name Part Name Complaint Details 1 Valeo NRG8 Heat Sink Dia 7.25 to 0.1 mm Found Observ size Customer Complaint For Month January Sr no. Customer Name Part Name Complaint Details 1 Valeo NRG8 Front BKT Tapping Missing 2 Rotex Auto Mech RTX 1000 Body Pad Height Found Variation 3 Tata Ficaso Isolator Die.5.1 GO Not Pass Customer Complaint For Month February Sr no. Customer Name Part Name Complaint Details 1 Raychem HC 7 Black Mark & Blow Holes 2 Raychem 100 x 100 x81 Base Concentrycity Not Ok 3 Raychem 100 x 100 x81 Base Wall Mounting Hole Not OK 4 Tata Ficaso Q 5 Pivot Height Not Ok 5 Valeo FG 11 Rear BKT Side Core Thikness Oversize 6 Valeo VW Rear ID Oversize
  • 12. 421 494 644 849 993 1008 560 587 474 629 527 574 550 9 10 11 9 14 16 21 9 30 3 9 8 12 2.2 2.1 1.8 1.0 1.4 1.6 3.7 1.5 6.4 0.5 1.6 1.4 2.2 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 0 200 400 600 800 1000 1200 Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23 Month wise - RTV w.r.to Sales –Value In Lakhs Sales Actual (Rs Lakhs) RTV (Rs Lakhs) RTV %
  • 13. 421 494 644 849 993 1008 560 587 474 629 527 574 550 26 28 27 27 33 17 22 58 39 88 85 55 52 6.3 5.8 4.2 3.2 3.4 1.7 3.9 9.8 8.3 14.0 16.1 9.6 9.5 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 0 200 400 600 800 1000 1200 Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23 Month wise - Rejection w.r.to Sales -Value In Lakhs Sales Actual (Rs Lakhs) Rejection (Rs Lakhs) % Rejection
  • 14. 421 494 644 849 993 1008 560 587 474 629 527 574 550 216 251 247 238 305 254 286 194 313 282 378 326 253 51 51 38 28 31 25 51 33 66 45 72 57 46 0 10 20 30 40 50 60 70 80 0 200 400 600 800 1000 1200 Apr/22 May/22 Jun/22 Jul/22 Aug/22 Sep/22 Oct/22 Nov/22 Dec/22 Jan/23 Feb/23 Mar/23 Apr/23 Month wise Inventory (WIP+FG) % - w.r.to Sales –Value In Lakhs Sales Actual (Rs Lakhs) Inventory (Rs Lakhs) Inventory % Of Sales
  • 15. 62 66 65 7 7 7 47 50 50 69 64 72 51 49 43 16 20 19 11 11 11 9 10 9 11 10 9 9 8 9 474 629 527 0 200 400 600 800 0 20 40 60 80 Dec-22 Jan-23 Feb-23 Sales In Lakhs Manpower In No Dec-22 Jan-23 Feb-23 1) PDC 62 66 65 2) SHOTBLASTING 7 7 7 3) FETTLING 47 50 50 3) M/SHOP 69 64 72 4) QUALITY 51 49 43 5) DISPATCH 16 20 19 6) TOOLROOM 11 11 11 7) DIEMAINTANCE 9 10 9 8) STORE 11 10 9 9) HOUSEKEEPING 9 8 9 SALES ACTUAL 474 629 527 Department Wise Manpower Utilized Against Sales – Manpower In Numbers & Sales In Lakhs
  • 17. 5.5 29 7 4.6 7 7.2 29.2 30 33 29 30 27.9 1.7 2 1.9 2.1 0.31 3.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 Energy Consumption Plot wise -Value In Lakhs Plot No 09 Plot No 10 Plot No 12
  • 20. 0.3 0.0 0.8 0.3 0.0 0.8 0.4 0.0 0.7 0.0 0.7 0.8 0.5 0.0 0.0 0.8 0.8 0.0 3.2 4.7 0.3 0.5 0.3 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 3/3/2023 3/4/2023 3/5/2023 3/6/2023 3/7/2023 3/8/2023 3/9/2023 3/10/2023 3/11/2023 3/12/2023 3/13/2023 3/14/2023 3/15/2023 3/16/2023 3/17/2023 3/18/2023 3/19/2023 3/20/2023 3/21/2023 3/22/2023 3/23/2023 3/24/2023 3/25/2023 3/26/2023 3/27/2023 3/28/2023 3/29/2023 3/30/2023 3/31/2023 4/1/2023 4/2/2023 Breakdown % ( APRIL-23 ) 2.25 Breakdown % OF MACHINE SHOP
  • 21. 17 8 2 2 48 2 3 4 0 12 2 2 3 0 0 0 0 0 0 0 0 3 4 0 0 0 0 1 0 10 20 30 40 50 60 Machine wise Break down Hrs (APRIL-23)
  • 23. 3 Major breakdown April-2023 SR. NO. Problem Action 1 VMC-5 : Oil leakage issue & Pallet Change prob. Change all broken pipe (4.0nos ) and both proxy (NPN NO 8.0mm )changed also 2 VMC 13: Spindle Run out ( up to 0.2 mm to 300mm length ) issue. Remove Spindle Assy. And taper regrinding & fitted. 3 VMC 16 : Hydraulic drop prob. when job clamping. Hydraulic power pack changed and set hydraulic pressure also. 4 5 6 7
  • 24.
  • 25. OBJECTIVES MEASURABLE SHEET :- 2023-24 Format No: AT/MR/F08 Rev No./ Date : 01 / 01.04.2019 Issue Date : 01.04.2017 Sr.NO Dept. Respon sible Objectives Unit Of Measurement Frequency Criteria Bench mark 2022- 23 Target 2023-24 Months Jan-23 Feb-23 Mar-23 Apr-23 YTD. 1 Producti on (PDC) Mr. Kunal Productivity PDC. % Monthly 5% Increase 84.38% 85.00% 82.6% 67.1% 76.5% 87.1 77.93% OEE (PDC) % Monthly 5% Increase 74.99% 75.00% 71.4% 71.7% 68.4% 71.8% 70.83 Consumable Cost Rs/Kg Monthly 20% reduction 1.53 1.40 1.17 1.15 1.20 1.40 1.23 Overall In-house PPM (Casting) PPM Monthly 10% reduction 59708 50000 127000 #DIV/0! No. of Improvement Projects Nos. Quarterly 100% increase 1.25 2 2 1 1.5
  • 26. DATE WISE OEE DATE 1 2 3 4 5 7 8 9 10 11 12 14 15 16 17 18 19 21 22 23 24 25 26 28 29 30 TARGET 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 OEE 66 84 70 82 63 87 70 65 71 67 61 93 72 81 70 80 70 88 76 74 79 71 69 67 66 74 66 84 70 82 63 87 70 65 71 67 61 93 72 81 70 80 70 88 76 74 79 71 69 67.2 66.39 74.07 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 DATEWISE OEE TARGET OEE TARGET OEE-75% AVERAGE OEE-71.8%
  • 27. DATEWISE PRODUCTIVITY DATE 1 2 3 4 5 7 8 9 10 11 12 14 15 16 17 18 19 21 22 23 24 25 26 28 29 30 TARGET 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 PRODUCTIVI TY 85 97 86 89 92 95 84 80 88 88 86 95 89 89 86 90 91 92 86 83 93 91 88 69 88 76 85 97 86 89 92 95 84 80 88 88 86 95 89 89 86 90 91 92 86 83 93 91 88 69 88 76 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 DATEWISE PRODUCTIVITY TARGET PRODUCTIVITY AVERAGE:-87.1 TARGET:- 85
  • 28. PDC 6-LK 280T PDC 5-LK 160T PDC 01- LK 400T 580T PDC 7-LK 280T PDC 03- LK 500T PDC 04- LK 500T 700T PDC 9- LK 650T PLAN 38302 41322 30930 31038 36941 34310 12867 28600 17600 ACTUAL 33898 36424 26885 26514 30928 27618 10046 20694 8268 COMPLIENCE% 89 88 87 85 84 80 78 72 47 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 NOS. MACHINEWISE PLANVS ACTUAL MONTH OF APRIL-23
  • 29. 75.6 74.2 69 68.7 68.5 67.4 64.3 52.5 31.5 PDC 6-LK 280T PDC 5-LK 160T 580T PDC 7-LK 280T PDC 03- LK 500T PDC 01- LK 400T 700T PDC 9- LK 650T PDC 04- LK 500T MACHINEWISE OEE OEE
  • 31. BREAKDOWN DISCRIPTION AND THEIR ANALYSIS Month-April MACHINE NO. DATE PARTICULARS BD HRS. ACTION PLAN RESPONSIBILITY STATUS MACHINE NO. 09- 650T LK 21-04-2023 Pump coupling shaft found broken 66 Coupling shaft replaced mr. Ugale closed MACHINE NO. 09- 650T LK 07-04-2023 Die height gear jam and die height hydraulic motor not working. 18 Die height motor repair and manifold block changed mr. Ugale closed MACHINE NO. 09- 650T LK 24-04-2023 High pressure pump cartridge problem 51 cartridge Replaced mr. Ugale closed MACHINE NO. 09- 650T LK 12-04-2023 Injection side oil leakage 29 Seal changed mr. Ugale closed MACHINE NO. 04- 500T LK Metal shortage 95.5 To be started central melting furnace Mr. Kunal open 700T LK Metal shortage 82.9 Need to arrange one seperate melting furnace Mr. ugale/kunal open Plot no. 11 13-04-2023 cooling tower problem 9.5 Cooling tower motor assembly work Mr. ugale closed 580T LK 29-04-2023 Silicarb furnace coil failed 44 coil not available so, using stand by furnace and coil purchasing under process. Mr. ugale open MACHINE NO. 04- 500T LK 05-04-2023 machine stopped due to virgin metal not available 18 Metal Purchase. Mr. Sutar closed pdc-03-500T LK 05-04-2023 IP not act 6 IP valve sensor corrected Mr. ugale closed Pdc-01-400T LK 11-04-2023 Nrg8 rear casting stucked issue frequently 8 Die transfer on pdc-7 Mr. kunal closed Pdc-05- 160T LK 28-04-2023 Furnace body short. 15 Cover opened and corrected Mr. Ugale/ kunal closed
  • 32. Machine wise die change occurrences PDC 5-LK 160T PDC 7-LK 280T PDC 01- LK 400T PDC 03- LK 500T PDC 6-LK 280T 580T PDC 9- LK 650T PDC 04- LK 500T 700T OCCURENECE 18 13 12 11 9 9 8 7 4 0 2 4 6 8 10 12 14 16 18 20 NOS. OCCURENECE NO. OF PLANNED DIE CHANGE 91 NOS DIE CHANGE BD HOURS 177 HOURS AVERAGE TIME OF DIE CHANGE 1.94 HOUR
  • 33. Machine maintenance 16% DMT 13% PDC ( minor stopage and motion loss) 13% Power fail 12% Metal Shortage 19% Planned changes 16% manpower shortage 11% DEPARTMENT WISE B/D HOURS. DEPT. WISE BD'S DEPT. Machine maintenance DMT PDC ( minor stopage and motion loss) Power fail Metal Shortage Planned changes manpower shortage BD HOURS 178 151.7 146 141 222 177 122
  • 34. CORRECTIVE ACTION REPORT FOR NO ACHIEVING OF QUALITY OBJECTIVE Form No: AT/MR/F19 Rev No: 00 Rev Date: 01.04.2017 Date : 06-05-2023 Department : pdc Process Owner : kunal kumar Months / Quarter : month of APRIL.-2023 Objective Name (Non achieving) : 1) target OEE / productivity-75%/ 85% 2) actual OEE / productivity- 71.3% / 87.1% Immediate action taken : 1)pdc-09(TOYO-650T)- High pump pressure cartridge change. 2) pdc-09(toyo-650T)- Main pump coupling shaft replaced. 3) pdc-05- furnace issue corrected. 4) 580T LK- stand by furnace using. Responsibility : mr. Ugale Target Date : 06-05-2023 Root Cause : 1)pdc-09(TOYO-650T)- High pump pressure cartridge issue. 2) pdc-09(toyo-650T)- Main pump coupling shaft broken. 3) Pdc-05- furnace body short. 4) 580T LK- furnace coil failed. Corrective action : Responsibility : 1)pdc-09(TOYO-650T)- High pump pressure cartridge replaced. mr. ugale 2) pdc-09(TOYO-650T)- Main pump coupling shaft replaced 3) Pdc-05- furnace corrected. By replacing coil. 4)580T LK- coil failed and using stand by furnace. Target Date : 06-05-2023 Verification : Mr. Kunal kumar. Effectiveness 1) pdc-09 Running ok. 2) pdc-09 Running ok. 3) PDC-05-Furnace running ok. 4) 580T LK- using stand by furnace. Verified By: Kunal kumar Date:06-05-2023 Corrective action is found effective / not effective- All corrective action found effective.Except 580T Silicarb furnace coil replacement pending due to un availability of coil. Date : 06-05-2023
  • 36. OVERALL EQUIPMENT EFFICIENCY OF CNC FORMATE NO : AT/ PROD/F07 REV NO : 00 ISSUE DATE: 01.04.2017 Total Drag Links Produced Total Tie Rods Produced Sr. No. Name of Machine Qty of Machine No of Shift Planne d hours POWER OFF SETTING QUALITY MANT. NO LOAD / NO MATERIAL NO plan NO Operator MAFG. Total down time Total Hours Utilized Availabilit y Performance Quality OEE % Remark 1 CNC 1 1 2 358 12 11 2 36 87 22 15 4 188 170 65% 82% 97% 51.54% 2 CNC 2 1 2 358 11 23 0 19 41 22 91 7 213 146 64% 75% 95% 45.35% 3 CNC 3 1 2 358 3 6 5 7 57 22 82 3 185 173 66% 73.5% 96.12% 43.24% 4 CNC 4 1 2 358 3 1 11 5 83 11 200 0 314 44 48% 79.3% 96.77% 36.67% 5 CNC 5 1 2 358 0 0 12 8 78 22 188 14 321 38 47% 80.3% 97.43% 36.78% 6 CNC 6 1 2 358 0 0 0 0 0 0 1 0 1 357 67% 67.8% 97.13% 43.98% 7 CNC 7 1 2 358 0 3 4 0 75 33 302 0 417 -59 34% 87.7% 94.51% 28.51% 8 CNC 8 1 2 358 0 0 0 0 0 0 0 0 0 358 76% 80.9% 97.13% 60.06% 9 CNC 9 1 2 358 3 0 0 12 134 33 92 1 275 83 53% 89.9% 95.83% 45.49% Average of Plant 43.51% 57.80% 79.49% 96.42%
  • 37. OVERAL EQUIPMENT EFFICIENCY OF VMC FORMATE NO:-AT/PROD/F07 Total Drag Links Produced REV NO:00 Total Tie Rods Produced ISSUE DATE:-01.04.2017 Sr. No. Name of Machine Qty of Machine No of Shift Planned hours POWER OFF SETTING QUALITY MANT. NO LOAD / NO MATERIAL NO plan NO Operator MAFG. Total down time Total Hours Utilized Availability Performance Quality OEE % Remark 1 VMC 1 1 1 179 2 37 17 145 59 33 141 12 444 -265 30% 72% 94% 20.34% 2 VMC 2 1 3 538 2 58 7 19 15 0 52 1 154 384 70% 47% 93% 30.25% 3 VMC 3 1 0 0 2 79 13 2 34 11 48 1 190 -190 66% 64.9% 93.63% 36.67% 4 VMC 4 1 2 358 0 17 11 80 124 33 174 12 450 -92 30% 76.9% 94.06% 21.36% 5 VMC 5 1 2 358 2 27 1 107 23 0 31 1 192 166 65% 77.5% 98.33% 49.61% 6 VMC 6 1 2 358 0 0 0 0 0 0 0 0 0 358 86% 48.5% 98.19% 40.93% 7 VMC 7 1 2 358 2 64 6 22 109 22 97 1 322 36 47% 63.1% 94.62% 28.01% 8 VMC 8 1 2 358 2 7 1 1 32 33 60 13 147 211 72% 77.2% 86.34% 47.81% 9 VMC 9 1 2 358 0 11 0 1 145 44 218 12 430 -72 32% 81.3% 98.41% 25.93% 10 VMC 10 1 2 358 3 21 0 22 23 11 29 14 122 236 75% 53.2% 96.50% 38.31% 11 VMC 11 1 2 358 2 18 6 7 17 22 72 12 154 204 70% 57.0% 97.35% 38.84% 12 VMC 12 1 2 358 0 14 7 24 191 33 184 12 463 -105 28% 82.9% 94.95% 21.71% 13 VMC 13 1 1 179 0 0 0 0 0 0 0 0 0 179 67% 58.2% 96.05% 37.32% 14 VMC 14 1 2 358 2 84 0 4 20 0 22 2 134 224 83% 88.4% 95.40% 69.74% 15 VMC 15 1 1 179 0 5 0 0 44 0 66 1 116 63 60% 64.8% 98.24% 38.44% 16 VMC 16 1 1 179 1 2 0 0 25 11 15 12 66 114 86% 98.8% 99.80% 85.19% 17 VMC 17 1 1 179 1 0 0 0 1 0 11 0 13 166 76% 92.3% 99.90% 68.43% 18 VMC 18 1 2 358 0 7 3 6 13 11 129 12 179.5 491.5 67.0% 54.6% 96.7% 30.40% Average of Plant 41.11% 61.58% 70.81% 95.87%
  • 38. 31 42 20 260 441 450 60 36 71 199 145 439 259 616 874 0 0 264 665 13511347 37 66 112 0 200 400 600 800 1000 1200 1400 1600 Feb-23 Mar-23 Apr-23 Feb-23 Mar-23 Apr-23 Feb-23 Mar-23 Apr-23 Feb-23 Mar-23 Apr-23 Feb-23 Mar-23 Apr-23 Feb-23 Mar-23 Apr-23 Feb-23 Mar-23 Apr-23 Feb-23 Mar-23 Apr-23 POWER OFF SETTING QUALITY MAINT. NO LOAD NO PLAN NO OPRT. MAFG. VMC MONTH WISE MAJOR LOSSES COMPARISION
  • 39. 0 100 200 300 400 500 600 700 800 900 1000 POWER OFF SETTING QUALITY MANT. NO LOAD / NO MATERIAL NO plan NO Operator MAFG. 31 44 34 87 554 165 971 29 MAJOR LOSSES OF CNC-APRIL Series1 Series2
  • 40. 20 450 71 439 874 264 1347 112 0 200 400 600 800 1000 1200 1400 1600 POWER OFF SETTING QUALITY MANT. NO LOAD / NO MATERIAL NO plan NO Operator MAFG. MAJOR LOSSES OF VMC Series1 Series2 MAJOR LOSSES OFVMC –APRIL-2023:-
  • 41. Non Compliance Action Plan April 2023 NON COMPLIANCE ACTION PLAN Sr No ISSUES ACTION RESPONSIBILITY TARGET DATE REMARKS 1 NO MAN POWER NEW CONTRACTOR / AND NEEM CONTRACTOR EMPLOYEE TO BE SEARCH Mr. Shashikant Sir 28.04.2023 IN PROCESS 2 NO LOAD 3 DAYS STOCK OF EACH MATERIAL Mr.Parag Hole 28.04.2023 IN PROCESS 3 SETTING TIME NUMBER OF SET UP REDUCED Mr. Yogesh Deore 10.02.2023 COMPLETED
  • 42. 9 1 8 0 1 2 3 4 5 6 7 8 9 10 No Of Calls Raised No Of Calls Open No Of Calls Closed SAP B1 SOFTCORE SOLUTION SUPPORT CALL STATUS OF APRIL MONTH
  • 43. 0.86 5.33 25.77 2.89 11.04 0.76 0.19 1.23 197.58 0 50 100 150 200 250 CHEMICAL CONSUMABLE DRILL,TAPP, CUTTER, INSERTS OIL PACKING PISTON,SLEEVE ADPATOR,NIPPLE STATIONERY ELECTRICAL RMC & RMC- SHAFT STOCK STATEMENT OF APRIL MONTHVALUE IN LAKHS
  • 44. 5 3 26 2 2 1 0.4 2 2.4 4 18 1 10 0.9 0.3 7 1.9 5 32 1.2 3 0.7 0.2 10 0 5 10 15 20 25 30 35 Month Wise Consumable List – Value In Lakhs Dec-22 Jan-23 Feb-23