CONTENTS:
 SUBSTATIONS
 BUSBAR
 TRANSFORMER
CURRENTTRANSFORMER
POTENTIALTRANSFORMER
DISTRUBUTIONTRANSFORMER
 INSULATORS
 PROTECTIVERELAY
 CIRCUITBREAKER
 CAPACITORBANK
 METERING AND
INDICATING
INSTRUMENT
 LIGHTENING
ARRESTORS
 LINE ISOLATOR
 SINGLELINEDIAGRAM
 SUBSTATION
A Station is a subsidiary station of an electricity generation,
transmission,& distribution system where voltage is transformed
to high to low or the reverse using transformers.
A substation generally have switching, protection, &
control equipment & one or more transformers.
 CONSTRUCTIONAL FEATURESOF 33/11KV
SHIRBHAVISANGOLA,
In this substation the power is coming from two lines
namely
440V SHIRBHAVI
 33/11 KV Yard
 BUS BAR
 A Bus bar is a conducting bar that
carries heavy currents to supply
several electric circuits.
 Bus bar is made from ‘Cu’ and ‘Al’.
TYPES OF BUS BAR-
 Main Bus Bar
 Auxiliary Bus Bar
 One Bus Bar is Main Bus Bar
and another is Auxiliary Bus
Bar.
 TRANSFORMER
 A Transformer is a static device that transfers Electrical energy
from one Electrical circuit to another Electrical circuit by means of
a common Magnetic Circuit.
TRANSFORMER USED IN GSS
 DISTRIBUTION X-MER
 C.T.
 P.T.
ding
)
 DISTRUBUTIONTRANSFORMER
 To step-down the voltage and
transfer power from one A.C
voltage to another A.C Voltage at
same frequency.
MAIN PARTS
OFPOWER
TRANSFORMER-
Winding(H.V winding , I.V winding)
Core
 Tap changer
Conservator Tank
 Buchholz Relay
 Dehydrating Breather
Oil Temperature Indicator
 CURRENT TRANSFORMER
 Current Transformer:- A C.Tis
used to step down current
for measurement, control
and protection.
 Current Transformer is an
instrument transformer used
to protection & Metering of
high values of current.
 POTENTIAL TRANSFORMER
 Potential Transformer:- Potential Transformer are Instrument
Transformer. A P.T is used to step down voltage for
measurement, control and protection.
 INSULATORS
 transmission lines, In order to
avoid current leakage to the Earth,
 through the supporting structure
provide to the
conductor of overhead
insulators are used.
 PROTECTIVE RELAYS
 A protective relay is a device
that detects the fault and
initiates the operation of the
C.B. to isolate the defective
element from the rest of the
system
 The relay detects the abnormal
condition in the electrical circuit
by constantly measuring the
electrical quantities, which are
different under normal and fault
conditions.
 There are several metering and indicating Instrument (e.g.
Ammeters, Voltmeters, energy meter, etc.) installed in a
Substation to maintain which over the circuit quantities.
 The instrument transformers are invariably used with them
for satisfactory operation.
 Metering and Indicating Instruments
 CIRCUIT BREAKER
 A Circuit Breaker is an automatically or
manually operated electrical switch
designed to protect an electrical circuit
from damage caused by overload
or short circuit.
TYPES OF CIRCUIT BREAKER-
which is used in 33/11kv substation
 oil circuit breaker
 Capacitor banks are used to
improve the quality of the
electrical supply and the
efficient operation of the
power system.
 Studies show that a flat
voltage profile on the
system can significantly
reduce line losses.
 CAPACITOR BANK
 ISOLATING SWITCH
 In Sub-Station, it is often
desired to disconnect a part of
the system for general
maintenance and repairs. This
is accomplished by an
isolating switch or isolator
 isolator Switches are operate
only when the line is which
they are connected carry no
load.
 LIGHTENING ARRESTORS
 Lightening arrestors with earth
switch lightening arrestors after
the current transformer are used
so as to protect it from
lightening i.e. from high
voltage entering into it.
 This lightening arrestor has an
earth switch, which can directly
earth the lightening.
 lightening. The arrestor works
at 30° to 45° angel of the
lightening making a cone
 LINE ISOLATOR
 The line isolators are used to isolate
the high voltage flow through the
line into the bus. This isolator
prevents the instruments to get
damaged
 It also allows the only need of
voltage and rest is earthed by itself
 Insulators are used in electrical
equipment to support and separate
electrical conductors without
allowing current through
themselves.
 Single line diagram
Thankyou

Mais conteúdo relacionado

Mais procurados

Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
Md Irshad Ahmad
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Nageswar Rao
 

Mais procurados (20)

33kv substation
33kv substation33kv substation
33kv substation
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devices
 
Electrical Isolators, It's types, types based on location and tap changer
Electrical Isolators, It's types, types based on location and tap changerElectrical Isolators, It's types, types based on location and tap changer
Electrical Isolators, It's types, types based on location and tap changer
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Faults on Power System
Faults on Power SystemFaults on Power System
Faults on Power System
 
substation internship report
substation internship report substation internship report
substation internship report
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
132 kv
132 kv132 kv
132 kv
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
Capacitor bank and improvement of power factor
Capacitor bank and improvement of power factorCapacitor bank and improvement of power factor
Capacitor bank and improvement of power factor
 

Semelhante a PPT ON 33/11KV SUBSTATION

Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
VSRAGHU
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
monga786
 
powergrid presentation
powergrid presentationpowergrid presentation
powergrid presentation
Akriti Gupta
 

Semelhante a PPT ON 33/11KV SUBSTATION (20)

Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
ELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEFELECTRIC SUB-STATION IN BRIEF
ELECTRIC SUB-STATION IN BRIEF
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
Substation equipment and its function 2
Substation equipment and its function 2Substation equipment and its function 2
Substation equipment and its function 2
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Summer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptxSummer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptx
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
 
Power Corporation ppt
Power Corporation pptPower Corporation ppt
Power Corporation ppt
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
 
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaPPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
 
powergrid presentation
powergrid presentationpowergrid presentation
powergrid presentation
 
Summer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptxSummer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptx
 

Último

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 

PPT ON 33/11KV SUBSTATION

  • 1. A PRESENTATION ON SUMMER TRAINING FROM SHIRBHAVI, SANGOLA 33/11 KV SUB-STATION PRESENTED BY: PHADTARE RAVI DATTATRYA ROLL NO.- 21 SUBMITTED TO : MR.PATIL J. B ( PROF. EE DEPT)
  • 2. CONTENTS:  SUBSTATIONS  BUSBAR  TRANSFORMER CURRENTTRANSFORMER POTENTIALTRANSFORMER DISTRUBUTIONTRANSFORMER  INSULATORS  PROTECTIVERELAY  CIRCUITBREAKER  CAPACITORBANK  METERING AND INDICATING INSTRUMENT  LIGHTENING ARRESTORS  LINE ISOLATOR  SINGLELINEDIAGRAM
  • 3.  SUBSTATION A Station is a subsidiary station of an electricity generation, transmission,& distribution system where voltage is transformed to high to low or the reverse using transformers. A substation generally have switching, protection, & control equipment & one or more transformers.  CONSTRUCTIONAL FEATURESOF 33/11KV SHIRBHAVISANGOLA, In this substation the power is coming from two lines namely 440V SHIRBHAVI
  • 5.  BUS BAR  A Bus bar is a conducting bar that carries heavy currents to supply several electric circuits.  Bus bar is made from ‘Cu’ and ‘Al’. TYPES OF BUS BAR-  Main Bus Bar  Auxiliary Bus Bar  One Bus Bar is Main Bus Bar and another is Auxiliary Bus Bar.
  • 6.  TRANSFORMER  A Transformer is a static device that transfers Electrical energy from one Electrical circuit to another Electrical circuit by means of a common Magnetic Circuit. TRANSFORMER USED IN GSS  DISTRIBUTION X-MER  C.T.  P.T.
  • 7. ding )  DISTRUBUTIONTRANSFORMER  To step-down the voltage and transfer power from one A.C voltage to another A.C Voltage at same frequency. MAIN PARTS OFPOWER TRANSFORMER- Winding(H.V winding , I.V winding) Core  Tap changer Conservator Tank  Buchholz Relay  Dehydrating Breather Oil Temperature Indicator
  • 8.  CURRENT TRANSFORMER  Current Transformer:- A C.Tis used to step down current for measurement, control and protection.  Current Transformer is an instrument transformer used to protection & Metering of high values of current.
  • 9.  POTENTIAL TRANSFORMER  Potential Transformer:- Potential Transformer are Instrument Transformer. A P.T is used to step down voltage for measurement, control and protection.
  • 10.  INSULATORS  transmission lines, In order to avoid current leakage to the Earth,  through the supporting structure provide to the conductor of overhead insulators are used.
  • 11.  PROTECTIVE RELAYS  A protective relay is a device that detects the fault and initiates the operation of the C.B. to isolate the defective element from the rest of the system  The relay detects the abnormal condition in the electrical circuit by constantly measuring the electrical quantities, which are different under normal and fault conditions.
  • 12.  There are several metering and indicating Instrument (e.g. Ammeters, Voltmeters, energy meter, etc.) installed in a Substation to maintain which over the circuit quantities.  The instrument transformers are invariably used with them for satisfactory operation.  Metering and Indicating Instruments
  • 13.  CIRCUIT BREAKER  A Circuit Breaker is an automatically or manually operated electrical switch designed to protect an electrical circuit from damage caused by overload or short circuit. TYPES OF CIRCUIT BREAKER- which is used in 33/11kv substation  oil circuit breaker
  • 14.  Capacitor banks are used to improve the quality of the electrical supply and the efficient operation of the power system.  Studies show that a flat voltage profile on the system can significantly reduce line losses.  CAPACITOR BANK
  • 15.  ISOLATING SWITCH  In Sub-Station, it is often desired to disconnect a part of the system for general maintenance and repairs. This is accomplished by an isolating switch or isolator  isolator Switches are operate only when the line is which they are connected carry no load.
  • 16.  LIGHTENING ARRESTORS  Lightening arrestors with earth switch lightening arrestors after the current transformer are used so as to protect it from lightening i.e. from high voltage entering into it.  This lightening arrestor has an earth switch, which can directly earth the lightening.  lightening. The arrestor works at 30° to 45° angel of the lightening making a cone
  • 17.  LINE ISOLATOR  The line isolators are used to isolate the high voltage flow through the line into the bus. This isolator prevents the instruments to get damaged  It also allows the only need of voltage and rest is earthed by itself  Insulators are used in electrical equipment to support and separate electrical conductors without allowing current through themselves.
  • 18.  Single line diagram