Course: Manufacturing Systems 2
CUPE 304
Topic: Flexible Manufacturing
Systems
Learning Objectives
By the end of the lecture students should be able to:
• Define Flexible Manufacturing Systems
• Identify components of a FMS
• Explain the different types of flexibility
• Solve an operational problem in FMS
Definition
 FMS consists of a group of processing
workstations interconnected by means of an
automated material handling and storage system
and controlled by integrated computer control
system.
Components of FMS
Workstations
• Load/Unload Stations; Machining Stations; Other
processing Stations- Punching, shearing, welding;
Assembly Station
• Material handling and storage
systems
• Primary handling system establishes the basic
layout of the FMS and is responsible for moving work
parts between stations in the system
• Secondary handling system consists of transfer
devices, automatic pallet changing, and similar
mechanisms located at the workstations
• Computer control system
• uses a distributed computer system that is
interfaced with all workstations in the system, as well
as with the material handling system and other
hardware components
1
2
3
4
Workstations
• Machining centres
• Load and unload stations
• Assembly workstations
• Inspection stations
• Forging stations
• Sheet metal processing, etc.
Automated Material Handling and
Storage system
• Random and independent movement of work
parts between workstations
• Handling of a variety of work part
• Temporary storage
• Convenient access for loading and unloading
of work parts
• Compatible with computer control
Computer Control System
• Control of each workstation
• Distribution of control instruction to
workstation
• Production control
• Shuttle control
• Work handling system and monitoring
• System performance monitoring and
reporting
The range of operations and part styles
Basic
Flexibilities
Machine flexibility
Material handling flexibility
Expansion flexibility
Product flexibility
Volume flexibility
System
Flexibilities
Program Flexibility
Production Flexibility
Aggregate
Flexibilities
Ability to transport different parts easily
Ability to produce parts in high and low
quantities
Ease with which the system can be
Expanded to increase total production
Ease with which new products can be
introduced
Ease of generating programs for new
machine sequences
The range or universe of part styles that
Can be produced on the system
Types and Tests of Manufacturing
Flexibility
Levels of flexibility
Dedicated FMS
• Designed to produce a limited variety of part
styles
• Complete universe of parts to be made on the
system is known in advance
Random-order
FMS
• Part family is large
• Substantial variations in part configurations
• New part designs introduced into the system and
engineering changes in parts currently produced
FMS in real life
• Employees at
Chrysler Group
LLC’
s Toluca
(Mexico) Assembly
Plant marry the
engine with the
body of an all-new
Fiat 500
Advantages of FMS
• Reduced work in process
• Increased machine
utilization
• Better management control
• Reduced direct and indirect
labor
• Reduced manufacturing
lead-time
• Consistent and better quality
• Reduced inventory
Disadvantages of FMS
• Expensive, costing millions
of dollars
• Substantial pre-planning
activity
• Limited ability to adapt to
changes in product
• Technological problems of
exact component positioning
and precise timing
necessary to process a
component.
• Benefit of employee
suggestion lost
How You Can Use FMS
• To reduce set up and queue times
• Improve efficiency
• Reduce time for product completion
• Utilize human workers better
• Improve product routing
• Produce a variety of Items under one roof
• Improve product quality
• Serve a variety of vendors simultaneously
• Produce more product more quickly
FMS Layouts
• Progressive Layout:
• Best for producing a variety of parts
• Closed Loop Layout:
• Parts can skip stations for flexibility
• Used for large part sizes
• Best for long process times
FMS Layouts Continued
• Ladder Layout:
• Parts can be sent to any machine in any sequence
• Parts not limited to part families
• Open Field Layout:
• Most complex FMS layout
• Includes several support stations
Operational Problem in FMS
• Problems can arise in manufacturing set up
when there are a few orders to be processed ,
and there are machines and tool combinations
to be considered.
• E.g Machine A Tool slots A1,A2,A3
• Machine B Tool slots B1,B2,B3
Example
Consider the set of parts shown in Table 1. (note the
two orders exist for part type a with different due
dates) Three machines of type A and one of type B
are available. Machines are setup once each day
and are normally available 12 hrs per day. Both
machine types can hold two tools. Determine the
parts to be produced in one day’s production.
Example
Unit Processing Time(hrs)
Part Type Order size Due Date Machine
type A
Machine Type B Tools
a 5 0 0.1 0.3 A1,B2
b 10 1 1.2 0.0 A2
c 25 1 0.7 0.4 A3,B4
d 10 1 0.1 0.2 A1,B2
e 4 2 0.3 0.2 A5,B3
a 10 4 0.3 0.2 A1,B2
Table 1: Part Data
Solution
-First consider constraints
-constraints available
• Due Dates
• Available Machine hours
• Available Tool slots
Solution cont………
• Consider the job with the earliest due date
first
• Available machine hrs
Machine A= 3machines x 12hrs
Machine B= 1 machine x 2hrs
Tool slots availability
Machine A = 2 slots x 3 machines
Machine B = 2slots x 1 machine
Solution cont…..
Time Assigned Tools Assigned
Step Assigned
Parts
A B A B
1 a 0.5 1.5 A1 B2
2 a, b 12.5 1.5 A1, A2 B2
3
4
5
5
Complete Solution
Time Assigned Tools Assigned
Step Assigned
Parts
A B A B
1 a 0.5 1.5 A1 B2
2 a, b 12.5 1.5 A1, A2 B2
3 a, b, c 30.0 11.5 A1, A2, A3 B2, B4
4 a, b, c, d
(2/10)
30.2 11.9 A1, A2, A3 B2, B4
5
6
Therefore, parts which can be produced in a 12hr production day
a,b,c and 2/10 of D
Practice Exercise
A machining operation requires bending, cutting and
welding operations. There are three bending machines,
one cutting machine and two welding machines available.
Each machine is available 8hrs per shift and there are two
shifts in a day. Each machine can hold two tool slots.
Table below shows the parts that are to be processed,
select the number of parts that can be processed in one
day [20]
Practice Exercise
Unit Processing Time(hrs)
Part Type Order size Due Date BENDING CUTTING WELDING tools
A 5 0 0.1 0.3 0.4 A1,B2
B 10 1 1.2 0.0 0.1 A2,B1
C 25 1 0.7 0.4 0.3 A3,B4
D 10 1 0.1 0.2 0.5 A1,B2
E 4 2 0.3 0.2 0.15 A5,B3
A 10 4 0.3 0.2 0.2 A1,B2
Conclusion
• FMS is an integrated system that is cable of
caring out several operations.
• Operational problems in FMS can be solved
considering the available constraints

Mais conteúdo relacionado

Semelhante a FMS 1.pptx

Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)jntuhcej
 
Shruti word document pdf
Shruti word document pdfShruti word document pdf
Shruti word document pdfshruti nimse
 
Flexible manufacturing syatem
Flexible manufacturing syatemFlexible manufacturing syatem
Flexible manufacturing syatemDobariya Gautam
 
Flexible Manufacturing System (FMS)
Flexible Manufacturing System  (FMS)Flexible Manufacturing System  (FMS)
Flexible Manufacturing System (FMS)Prasanna3804
 
Flexible manufacturing system - Computer aided manufacturing
Flexible manufacturing system - Computer aided manufacturingFlexible manufacturing system - Computer aided manufacturing
Flexible manufacturing system - Computer aided manufacturingsajan gohel
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems Nityanand Yadav
 
Introduction to Flexible Manufacturing System (FMS)
Introduction to Flexible Manufacturing System (FMS)Introduction to Flexible Manufacturing System (FMS)
Introduction to Flexible Manufacturing System (FMS)VADLAJAGADEESHWARAAC
 
Lecture on Production management- Plant layout
Lecture on Production management- Plant layoutLecture on Production management- Plant layout
Lecture on Production management- Plant layoutSujeet TAMBE
 
Flexible Manufacturing System, Advantages and DIsadvantages of FMS
Flexible Manufacturing System, Advantages and DIsadvantages of FMSFlexible Manufacturing System, Advantages and DIsadvantages of FMS
Flexible Manufacturing System, Advantages and DIsadvantages of FMSRajivB10
 
flexiblemanufacturingsystemfinal-140930090437-phpapp02 (1) (1).pptx
flexiblemanufacturingsystemfinal-140930090437-phpapp02 (1) (1).pptxflexiblemanufacturingsystemfinal-140930090437-phpapp02 (1) (1).pptx
flexiblemanufacturingsystemfinal-140930090437-phpapp02 (1) (1).pptxRAMESHCHANDRANE
 
flexible manufacturing system
flexible manufacturing systemflexible manufacturing system
flexible manufacturing systemPAARTH GUPTA
 
plant layout.pptx
plant layout.pptxplant layout.pptx
plant layout.pptxsuryapatelq
 
plant layout.pptx
plant layout.pptxplant layout.pptx
plant layout.pptxsuryapatelq
 

Semelhante a FMS 1.pptx (20)

FMS.pdf
FMS.pdfFMS.pdf
FMS.pdf
 
Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)
 
Shruti word document pdf
Shruti word document pdfShruti word document pdf
Shruti word document pdf
 
plant layout
plant layoutplant layout
plant layout
 
Flexible manufacturing syatem
Flexible manufacturing syatemFlexible manufacturing syatem
Flexible manufacturing syatem
 
Flexible Manufacturing System (FMS)
Flexible Manufacturing System  (FMS)Flexible Manufacturing System  (FMS)
Flexible Manufacturing System (FMS)
 
Flexible manufacturing system - Computer aided manufacturing
Flexible manufacturing system - Computer aided manufacturingFlexible manufacturing system - Computer aided manufacturing
Flexible manufacturing system - Computer aided manufacturing
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
 
Introduction to Flexible Manufacturing System (FMS)
Introduction to Flexible Manufacturing System (FMS)Introduction to Flexible Manufacturing System (FMS)
Introduction to Flexible Manufacturing System (FMS)
 
Lecture on Production management- Plant layout
Lecture on Production management- Plant layoutLecture on Production management- Plant layout
Lecture on Production management- Plant layout
 
Fms
FmsFms
Fms
 
Facility Layout,PPT.pptx
Facility Layout,PPT.pptxFacility Layout,PPT.pptx
Facility Layout,PPT.pptx
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Flexible Manufacturing System, Advantages and DIsadvantages of FMS
Flexible Manufacturing System, Advantages and DIsadvantages of FMSFlexible Manufacturing System, Advantages and DIsadvantages of FMS
Flexible Manufacturing System, Advantages and DIsadvantages of FMS
 
flexiblemanufacturingsystemfinal-140930090437-phpapp02 (1) (1).pptx
flexiblemanufacturingsystemfinal-140930090437-phpapp02 (1) (1).pptxflexiblemanufacturingsystemfinal-140930090437-phpapp02 (1) (1).pptx
flexiblemanufacturingsystemfinal-140930090437-phpapp02 (1) (1).pptx
 
Flexible Manufacturing System.
Flexible Manufacturing System.Flexible Manufacturing System.
Flexible Manufacturing System.
 
flexible manufacturing system
flexible manufacturing systemflexible manufacturing system
flexible manufacturing system
 
plant layout.pptx
plant layout.pptxplant layout.pptx
plant layout.pptx
 
plant layout.pptx
plant layout.pptxplant layout.pptx
plant layout.pptx
 

Último

RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5T.D. Shashikala
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AISheetal Jain
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1T.D. Shashikala
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
solid state electronics ktu module 5 slides
solid state electronics ktu module 5 slidessolid state electronics ktu module 5 slides
solid state electronics ktu module 5 slidesARUN AV
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Low rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbineLow rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbineAftabkhan575376
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfJNTUA
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdfKamal Acharya
 
Lect_Z_Transform_Main_digital_image_processing.pptx
Lect_Z_Transform_Main_digital_image_processing.pptxLect_Z_Transform_Main_digital_image_processing.pptx
Lect_Z_Transform_Main_digital_image_processing.pptxMonirHossain707319
 
Intelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsIntelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsSheetal Jain
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxalijaker017
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdfKamal Acharya
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxRashidFaridChishti
 
ANSI(ST)-III_Manufacturing-I_05052020.pdf
ANSI(ST)-III_Manufacturing-I_05052020.pdfANSI(ST)-III_Manufacturing-I_05052020.pdf
ANSI(ST)-III_Manufacturing-I_05052020.pdfBertinKamsipa1
 

Último (20)

RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
solid state electronics ktu module 5 slides
solid state electronics ktu module 5 slidessolid state electronics ktu module 5 slides
solid state electronics ktu module 5 slides
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Low rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbineLow rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbine
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Lect_Z_Transform_Main_digital_image_processing.pptx
Lect_Z_Transform_Main_digital_image_processing.pptxLect_Z_Transform_Main_digital_image_processing.pptx
Lect_Z_Transform_Main_digital_image_processing.pptx
 
Intelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsIntelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent Acts
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
ANSI(ST)-III_Manufacturing-I_05052020.pdf
ANSI(ST)-III_Manufacturing-I_05052020.pdfANSI(ST)-III_Manufacturing-I_05052020.pdf
ANSI(ST)-III_Manufacturing-I_05052020.pdf
 

FMS 1.pptx

  • 1. Course: Manufacturing Systems 2 CUPE 304 Topic: Flexible Manufacturing Systems
  • 2. Learning Objectives By the end of the lecture students should be able to: • Define Flexible Manufacturing Systems • Identify components of a FMS • Explain the different types of flexibility • Solve an operational problem in FMS
  • 3. Definition  FMS consists of a group of processing workstations interconnected by means of an automated material handling and storage system and controlled by integrated computer control system.
  • 4. Components of FMS Workstations • Load/Unload Stations; Machining Stations; Other processing Stations- Punching, shearing, welding; Assembly Station • Material handling and storage systems • Primary handling system establishes the basic layout of the FMS and is responsible for moving work parts between stations in the system • Secondary handling system consists of transfer devices, automatic pallet changing, and similar mechanisms located at the workstations • Computer control system • uses a distributed computer system that is interfaced with all workstations in the system, as well as with the material handling system and other hardware components 1 2 3 4
  • 5. Workstations • Machining centres • Load and unload stations • Assembly workstations • Inspection stations • Forging stations • Sheet metal processing, etc.
  • 6. Automated Material Handling and Storage system • Random and independent movement of work parts between workstations • Handling of a variety of work part • Temporary storage • Convenient access for loading and unloading of work parts • Compatible with computer control
  • 7. Computer Control System • Control of each workstation • Distribution of control instruction to workstation • Production control • Shuttle control • Work handling system and monitoring • System performance monitoring and reporting
  • 8. The range of operations and part styles Basic Flexibilities Machine flexibility Material handling flexibility Expansion flexibility Product flexibility Volume flexibility System Flexibilities Program Flexibility Production Flexibility Aggregate Flexibilities Ability to transport different parts easily Ability to produce parts in high and low quantities Ease with which the system can be Expanded to increase total production Ease with which new products can be introduced Ease of generating programs for new machine sequences The range or universe of part styles that Can be produced on the system Types and Tests of Manufacturing Flexibility
  • 9. Levels of flexibility Dedicated FMS • Designed to produce a limited variety of part styles • Complete universe of parts to be made on the system is known in advance Random-order FMS • Part family is large • Substantial variations in part configurations • New part designs introduced into the system and engineering changes in parts currently produced
  • 10. FMS in real life • Employees at Chrysler Group LLC’ s Toluca (Mexico) Assembly Plant marry the engine with the body of an all-new Fiat 500
  • 11. Advantages of FMS • Reduced work in process • Increased machine utilization • Better management control • Reduced direct and indirect labor • Reduced manufacturing lead-time • Consistent and better quality • Reduced inventory Disadvantages of FMS • Expensive, costing millions of dollars • Substantial pre-planning activity • Limited ability to adapt to changes in product • Technological problems of exact component positioning and precise timing necessary to process a component. • Benefit of employee suggestion lost
  • 12. How You Can Use FMS • To reduce set up and queue times • Improve efficiency • Reduce time for product completion • Utilize human workers better • Improve product routing • Produce a variety of Items under one roof • Improve product quality • Serve a variety of vendors simultaneously • Produce more product more quickly
  • 13. FMS Layouts • Progressive Layout: • Best for producing a variety of parts • Closed Loop Layout: • Parts can skip stations for flexibility • Used for large part sizes • Best for long process times
  • 14. FMS Layouts Continued • Ladder Layout: • Parts can be sent to any machine in any sequence • Parts not limited to part families • Open Field Layout: • Most complex FMS layout • Includes several support stations
  • 15. Operational Problem in FMS • Problems can arise in manufacturing set up when there are a few orders to be processed , and there are machines and tool combinations to be considered. • E.g Machine A Tool slots A1,A2,A3 • Machine B Tool slots B1,B2,B3
  • 16. Example Consider the set of parts shown in Table 1. (note the two orders exist for part type a with different due dates) Three machines of type A and one of type B are available. Machines are setup once each day and are normally available 12 hrs per day. Both machine types can hold two tools. Determine the parts to be produced in one day’s production.
  • 17. Example Unit Processing Time(hrs) Part Type Order size Due Date Machine type A Machine Type B Tools a 5 0 0.1 0.3 A1,B2 b 10 1 1.2 0.0 A2 c 25 1 0.7 0.4 A3,B4 d 10 1 0.1 0.2 A1,B2 e 4 2 0.3 0.2 A5,B3 a 10 4 0.3 0.2 A1,B2 Table 1: Part Data
  • 18. Solution -First consider constraints -constraints available • Due Dates • Available Machine hours • Available Tool slots
  • 19. Solution cont……… • Consider the job with the earliest due date first • Available machine hrs Machine A= 3machines x 12hrs Machine B= 1 machine x 2hrs Tool slots availability Machine A = 2 slots x 3 machines Machine B = 2slots x 1 machine
  • 20. Solution cont….. Time Assigned Tools Assigned Step Assigned Parts A B A B 1 a 0.5 1.5 A1 B2 2 a, b 12.5 1.5 A1, A2 B2 3 4 5 5
  • 21. Complete Solution Time Assigned Tools Assigned Step Assigned Parts A B A B 1 a 0.5 1.5 A1 B2 2 a, b 12.5 1.5 A1, A2 B2 3 a, b, c 30.0 11.5 A1, A2, A3 B2, B4 4 a, b, c, d (2/10) 30.2 11.9 A1, A2, A3 B2, B4 5 6 Therefore, parts which can be produced in a 12hr production day a,b,c and 2/10 of D
  • 22. Practice Exercise A machining operation requires bending, cutting and welding operations. There are three bending machines, one cutting machine and two welding machines available. Each machine is available 8hrs per shift and there are two shifts in a day. Each machine can hold two tool slots. Table below shows the parts that are to be processed, select the number of parts that can be processed in one day [20]
  • 23. Practice Exercise Unit Processing Time(hrs) Part Type Order size Due Date BENDING CUTTING WELDING tools A 5 0 0.1 0.3 0.4 A1,B2 B 10 1 1.2 0.0 0.1 A2,B1 C 25 1 0.7 0.4 0.3 A3,B4 D 10 1 0.1 0.2 0.5 A1,B2 E 4 2 0.3 0.2 0.15 A5,B3 A 10 4 0.3 0.2 0.2 A1,B2
  • 24. Conclusion • FMS is an integrated system that is cable of caring out several operations. • Operational problems in FMS can be solved considering the available constraints