Rod Pump
System Performance
And Evaluation
MELEIHA OIL FILD – AGIBA PETROLEUM COMPANY
Agenda
System performance
A. Failure Analysis
(Problem Nature – Reasons – AGIBA Application)
B. Troubleshooting
(Physical Indicators – Common techniques – Common mistakes )
Gas Interference
PROBLEM NATURE
• Gas separated and accumulated inside the pump reducing the volumetric efficiency and in the
worst case the well stops pumping due to gas lock.
PROBLEM REASONS
• High GOR or foamy fluids .
• Poor gas venting while production.
Real Gas Interference card from Well S-66
Gas interfernce..cont.
Remedial Action
- Increasing the compression ratio by the following Modifications to Standard
Pumps:-
• Longer stroke length, close valve spacing & spaced low (w/o tagging) at well site
• High comp. standing valve cage
- Improve gas venting through annulus .
- Install pump below perforations to allow for gravity separation
- Install gas anchor ( separator ) .
- Use vsp (variable slippage pump ) .
GAS ANCHOR ( SEPARATOR ) VARIABLE SLIPPAGE PUMP
• In Agiba applications some of the NE wells, SE, Zarif, Faras and Ramel fields are the highest gas to oil ratio
(GOR) wells (over 300 SCF/STB). In 1988 Agiba ran poor-poy type gas separator tests for two of the SE wells.
They did not show any significant improvements and this technique had some limitations:
1. It was not effective for wells producing over 300 BOPD.
2. It Impedes possible wire-line operations in the well in which it is used
Pump Intake setting below perforations
• Seating the pump intake below the perforations is the most
efficient technique if the well conditions allow it.
AGIBA applies the process for some of the Meleiha wells (M-8,
SE-6) as a trials and it was proved to be very efficient most of the
Faras, Raml and Zarif field wells.
Application of the technique created the following advantages:
• Increased pump submergance which resulted in more
production.
• Created a natural gas-separation, which improved the pumps
mechanical performance.
limitations to this technique:
Not recommended for sandy wells where pump-sticking problem
arise.
Fluid pound
PROBLEM NATURE :
Incomplete pump fillage creates a hammering effect for S.R.
PROBLEM REASONS :
• Insufficient pump intake pressure .
• pump intake restriction .
CAUSES SEVERE PROBLEMS LIKE :
• Pumping unit base vibration ( loosens the bolts ).
• Gear box teeth damage .
• S.R. Premature fatigue failure S.R. Premature fatigue failure .
• Rod unscrew from bottom .
• Rod buckling and excessive TBG. Wear
Fluid pound..cont’
Remedial Action
• Re-optimize the pumping parameters ( S.L. , SPM & P.S. ) .
• Use pump off controller to match pumping rate with the Actual well productivity .
• check pump intake for restriction ( this could be Considered in case of pounding at higher dynamic level) .
• increase pump submergence if possible .
Fluid pound..cont’
In Agiba Applications, The reservoir is a depletion drive type and the fast decline in reservoir
pressure was affecting the pump intake pressure. Therefore, the gas and fluid pounding problem
became a serious issue and the decrease in the dynamic fluid level consequently increased the
peak polished rod load due to increasing the net lift.
Split traveling valve cage
from fluid pound
Fractured nickel-carbide standing valve
seat from fluid pound
Scale deposition
PROBLEM NATURE AND REASONS
• It was observed that scale formation problems started to appear in some of the Meleiha and
Raml field wells. Chemical analysis showed that it was the calcium carbonate (CaCO3) type. Such
scale precipitates in the upper part of the tubing (surface down to about 300 ft). Presence of
scale restricted operations during pulling and running of the subsurface pump. In some cases it
created stuck pumps and then a work over was needed.
• The reasons for this problem are as follows: -
1. Pressure drop at the wellhead (below 100 psi).
2. High formation water production.
3. High temperature (over 120 F).
Scale deposition..cont’
• To prevent scale formation inside the well, it was found that increasing the wellhead pressure
to 150 psi would significantly improve the situation.
STUCK STANDING VALVE DUE TO SCALE
Sucker Rod Failures..cont’
A – TENSILE FAILURE :
• It appears as a bottle neck shape due to rod elongation when using improper rod type or creates
excessive tension to free stuck pump ,(actual applied loads tension to free stuck pump exceeds the
allowable loads ) .
B–CORROSION FAILURE :
• The rod is parted due to area reduction as a result of corrosion ( chemical reaction between steel
and CO2 , H2S OR ACID .
C – FATIGUE ( MECHANICAL ) FAILURE :
• It originates from a local increase in stress as small, progressive stress cracks that advance, upon each
applied load, with the action of fluctuating or cyclic stresses to rupture, or final shear tear.
SUCH TYPE IS CONSIDERED THE MOST COMMON TYPE WORLD WIDE .
Caused by Improper make-up, severe fluid pounding , manufacturer defects ,using old rods without
inspection , pump tagging down .
Sucker Rod Failures..cont’
D - ROD BUCKLING TENDENCY :
• Buckling tendency happens due to compression loads in the down stroke (the rod should be kept
under tension in all conditions ).
PROBLEMS RELATED TO BUCKLING :
• Excessive rod and tubing wear .
• sucker rod failure or unscrew .
• valve rod and valve rod guide damage .
Reasons :
• severe fluid pounding .
• excessive rod speed ( exceeds free fall speed ) .
• heavy viscous oil .
• improper rod string design .
• pump tagging .
Sucker Rod Failures..cont’
ROD BUCKLING TROUBLESHOOTING :
• Eliminate pounding and optimize speed specially in heavy viscous wells
• Use sinker & stabilizer bars to centralize rods and keep in tension .
• Never keep pump strongly tagging down .
CORROSION TROUBLESHOOTING :
• Use corrosion resistant rod type .
• use corrosion inhibitor
MAX TENSILE TROUBLESHOOTING :
• Better rod type selection during the initial design .
• Never exceed the allowable rod load rating during trials to free stuck pump .
FATIGUE TROUBLESHOOTING :
• Re-optimize the well pumping parameters to minimize fluid pounding .
Sucker Rod Failures..cont’
TENSILE FAILURE
FATIGUE
Valve rod guide damage
Due to buckling
Heavy Oil
• Characteristics of Aghar Field Heavy Oil
- API 10-17
• PCP Vs. S/R System in Aghar Field
- Limited ability to increase the PCP parameters
- Limited well accessibility
• Applying S/R Systems in heavy oil wells
- Small Pumping Units
- Slow pumping rate Real Viscous oil problem from Well AG 4-13
Sand Production
PROBLEM NATURE
• When Producing Sand Up through your Production Tubing, Separation Will occur. The Heavier, More
Abrasive Sand, Will Settle Back On Top Of The Rod Pump. The Smaller, Less Abrasive Sand Will Stay
Suspended, And Be Lifted To The Surface. The heavier sand will brake up to small pieces and be carried
between the plunger and barrel.
PROBLEM REASON
• The sand particles will work their way between the Barrel and the plunger, causing abrasion cuts ,
commonly known as “sand cutting”.
• Sand Friction causes rod buckling resulting in failures.
Sand Production..cont’
• Two origins in AGIBA
- Formation sands/fines
- Hydraulic fractured Wells sands / propants
• Effect of sand on the total production system
- Sand friction cause rod buckling
- Abrasion/wear for the plunger “Sand Cut”
Wear of Plunger caused by sand production
Sand Cuts
Sand Production..cont’
Remedial Actions
• Using Top Hold Down pumps
• High Clearance Pumps
• Sand screens
- Through TBG Screens
- TBG Screens
• Re-completion
Stuck pumps
In AGIBA application stuck pumps which existed
only in the Bottom Hold-Down type. This BHD
creates the possibility of sand & debris
accumulating in the dead area between the
pump and the tubing wall.
Such problems was overcome by introducing the
Top Hold-Down pump instead of bottom hold
down.
Tubing Wear
PROBLEM NATURE
Tubing failures had longitudinal cracks with an average length of 10 ft. and all the cracks were in
the lower part of the tubing ( up to 500 ft above the pump seating nipple). This tubing interval
was located against the sinker bar portion of the sucker rod string.
• IT IS CONSIDERED AS ONE OF THE COMMON PROBLEMS OF S.R. System world-wide .
TBG. Wear due to rod buckling
TBG. Wear ..cont’
PROBLEM REASONS :
• Rod buckling (high speed , insuffecient sinker bar , fluid pounding , pump
tagging down ) .
• Tubing buckling (unanchored tubing or apply insufficient tension ) .
• Use sucker rod system in crooked holes .
• Free water production (represents the main critical reason Since it increases
mutual friction between rods and tubing ) .
• Presence of corrosive fluids ( enhances the erosion corrosion effect )
TBG. Wear ..cont’
HOW TO MINIMIZE TUBING WEARS AND CRACKS :
• Eliminate all reasons of rod buckling .
• Apply proper tension for tbg. String ( use KTH hanger ) .
• Use rod guides or wheel guides to centralize rods inside tubing .
• Use anti-friction couplings and blast joints in the hot spots .
• Apply corrosion inhibition programs .
• Minimize pumping speed .
WELL
NO. OF W/O DUE
TO TBG LEAK
per year
M-29 3
M-42 3
A-6 3
A-46 3
NE-36 3
M-43 3
M-57 3
A-4 5
NE-14 3
NE-25 3
SE-4 3
E-1X 3
N.NADA-8 3
FALAK-11 3
M-14 3
A-41 3
WELLS FREQUENTLY SUFFERED FROM TBG LEAK
NE-32 2
NE-43 2
M-SW-2 2
SE-20 2
FALAK-7 2
A-37 2
Z-27 2
M-33 2
M-50 4
M-18 4
M-34 4
M-37 4
M-47 4
M-52 3
A-25 3
Z-15 3
M-49 3
• The main problem lead to workover jobs in AGIBA is the tubing leak , which appears in
the form of longitudinal cracks as 2 ft length × 2cm width, caused by contineous friction
between sucker rod and internal tubing wall , especially at the last ten joints ( 300 ft )
right above the pump.
Rod Guides
Spiral metal guides were tested in AGIBA fields. The
experience proved that it was not an effective solution for
this condition due to the following difficulties:
a. It required fixed regular schedules for round trips to
replace the worn-out guides.
b. The installing of rod guides created much more
friction, which increased the loads and stresses in the
sucker rod string and the possibility of rod failure.
Due to high loads, there was no way to increase pumping
parameters in order to increase production.
- Valve rod guide worn-out
Due to buckling
- Metal to Metal contact
- High friction
Hollow Pump
WELL
PERIOD BETWEEN LAST W/O
& FIRST TBG LEAK
M-14 8 MONTHS
M-37 1 YEAR
M-47 7 MONTHS
A-4 11 MONTHS
A-5 6 MONTHS
A-34 9 MONTHS
FIELD TRIALS (HOLLOW PUMP)
Hollow sucker rod has hole in the middle
The smaller passage and the faster flow velocity can avoid the sand
deposit efficiently while use hollow sucker rod in the sand well.
WELL Rate W/C
PERIOD BETWEEN LAST
W/O & FIRST TBG LEAK
E - 1X 215 45 9 MONTHS
M - 37 80 55 6 MONTHS
- Using of roller guide or wheel guide , to eliminate direct contact between sucker rods and internal tubing wall.
- Applying of a KTH flange gives more tension for tubing with slips to prevent tubing buckling.
Rod Pump
Trouble Shooting
Physical Trouble Shooting Indicators
- Pressure Gages
- Hot Flow Lines
- Hot Polished Rod Load
- Sounds at the Well
- Equipment Vibrations
- Fluid on the Ground
- Ground Shakes
Well Head Temperature As A Relation Of Production Rate
(GOR From Zero Up To 100 Scf/Stb)
Well head temperature, oF
Productionrate,bpd
Zero water cut
Zero up to %water cut
up to %water cut
up to %water cut
common Techniques for Trouble Shooting
- Has Well’s Production Changed?
- Can the Pump Pressure up the Tubing?
- Is the Pumping Unit Running?
- Is there a noticeable Leak?
- Is fluid going into the tank?
- Has the Fluid Level Changed?
Not Recommended
- Why are not we tagging?
- Put on hand and Pump 24 hrs/day.
- Increase SPM in Order to maintain Production.
- Increase SPM because there is a Fluid Level Above the Pump.
- Pull the Well, because no Fluid in the Tank.

Mais conteúdo relacionado

Mais procurados

Well head and christmas tress 2019.
Well head and christmas tress 2019.Well head and christmas tress 2019.
Well head and christmas tress 2019.Vihar Pothukuchi
 
Well control and blowout preventer
Well control  and blowout preventerWell control  and blowout preventer
Well control and blowout preventerShamim Akram
 
Electric submersible pump(esp)
Electric submersible pump(esp)Electric submersible pump(esp)
Electric submersible pump(esp)Win Nyunt Aung
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellheadElsayed Amer
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)danperth
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technologyjosepazv
 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production FacilitiesInGu Lee
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)nguyen_uptorcem
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentationamrhaggag
 
13 artificial-lift
13 artificial-lift13 artificial-lift
13 artificial-liftjuanca0106
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...tmhsweb
 
Artificial lift methods in production
Artificial lift methods in productionArtificial lift methods in production
Artificial lift methods in productionFarida Ismayilova
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 

Mais procurados (20)

Well head and christmas tress 2019.
Well head and christmas tress 2019.Well head and christmas tress 2019.
Well head and christmas tress 2019.
 
Artificial Lift Selection Criterion
Artificial Lift Selection CriterionArtificial Lift Selection Criterion
Artificial Lift Selection Criterion
 
Well control and blowout preventer
Well control  and blowout preventerWell control  and blowout preventer
Well control and blowout preventer
 
Electric submersible pump(esp)
Electric submersible pump(esp)Electric submersible pump(esp)
Electric submersible pump(esp)
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
 
Artificial lift method
Artificial lift methodArtificial lift method
Artificial lift method
 
well control (1)
 well control (1) well control (1)
well control (1)
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technology
 
Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 
Wellhead
WellheadWellhead
Wellhead
 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production Facilities
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
13 artificial-lift
13 artificial-lift13 artificial-lift
13 artificial-lift
 
Wellheads and Flow Lines.pdf
Wellheads and Flow Lines.pdfWellheads and Flow Lines.pdf
Wellheads and Flow Lines.pdf
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
 
Artificial lift methods in production
Artificial lift methods in productionArtificial lift methods in production
Artificial lift methods in production
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 

Semelhante a Managing Downhole Failures in a Rod Pumped Well

Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdfTinaMarey
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Manohar Tatwawadi
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfAZLANAiyub
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Paint pump for wood industry
Paint pump for wood industryPaint pump for wood industry
Paint pump for wood industryVu Nguyen
 
10 Ways to murder your pump.pdf
10 Ways to murder your pump.pdf10 Ways to murder your pump.pdf
10 Ways to murder your pump.pdfKetanBhore
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxodiliagilby
 
BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326Danny Flett
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfLokmanDridah
 
FSA Knowledge Series -- Gas Seal (demo)
FSA Knowledge Series  -- Gas Seal (demo)FSA Knowledge Series  -- Gas Seal (demo)
FSA Knowledge Series -- Gas Seal (demo)MMCOslides
 
Chapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfChapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfAbdallahTayea99
 
Know all about Pump cavitation & how to prevent it !
Know all about Pump cavitation & how to prevent it !Know all about Pump cavitation & how to prevent it !
Know all about Pump cavitation & how to prevent it !GulfCenter
 
Steam Reforming - Common Problems
Steam Reforming - Common ProblemsSteam Reforming - Common Problems
Steam Reforming - Common ProblemsGerard B. Hawkins
 
3_Artificial_lift_systems.ppt
3_Artificial_lift_systems.ppt3_Artificial_lift_systems.ppt
3_Artificial_lift_systems.pptathifaputricaesar
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER) Arez Luqman
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementingKamel Elsayed
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfIsmailKatun1
 

Semelhante a Managing Downhole Failures in a Rod Pumped Well (20)

Thermoplastic Liners
Thermoplastic LinersThermoplastic Liners
Thermoplastic Liners
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Paint pump for wood industry
Paint pump for wood industryPaint pump for wood industry
Paint pump for wood industry
 
10 Ways to murder your pump.pdf
10 Ways to murder your pump.pdf10 Ways to murder your pump.pdf
10 Ways to murder your pump.pdf
 
Mechanical seals
Mechanical sealsMechanical seals
Mechanical seals
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
 
Boiler feed pump operation.pptx
Boiler feed pump operation.pptxBoiler feed pump operation.pptx
Boiler feed pump operation.pptx
 
FSA Knowledge Series -- Gas Seal (demo)
FSA Knowledge Series  -- Gas Seal (demo)FSA Knowledge Series  -- Gas Seal (demo)
FSA Knowledge Series -- Gas Seal (demo)
 
Chapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfChapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdf
 
Know all about Pump cavitation & how to prevent it !
Know all about Pump cavitation & how to prevent it !Know all about Pump cavitation & how to prevent it !
Know all about Pump cavitation & how to prevent it !
 
Steam Reforming - Common Problems
Steam Reforming - Common ProblemsSteam Reforming - Common Problems
Steam Reforming - Common Problems
 
3_Artificial_lift_systems.ppt
3_Artificial_lift_systems.ppt3_Artificial_lift_systems.ppt
3_Artificial_lift_systems.ppt
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementing
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdf
 

Mais de Ramez Abdalla, M.Sc

Introduction to fluid flow through a porous medium
Introduction to fluid flow through a porous medium Introduction to fluid flow through a porous medium
Introduction to fluid flow through a porous medium Ramez Abdalla, M.Sc
 
Introduction to Reservoir Fluids Courese
Introduction to Reservoir Fluids CoureseIntroduction to Reservoir Fluids Courese
Introduction to Reservoir Fluids CoureseRamez Abdalla, M.Sc
 
AUTOMATIC WELL FAILURE ANALYSIS FOR THE SUCKER ROD PUMPING SYSTEMS USING MACH...
AUTOMATIC WELL FAILURE ANALYSIS FOR THE SUCKER ROD PUMPING SYSTEMS USING MACH...AUTOMATIC WELL FAILURE ANALYSIS FOR THE SUCKER ROD PUMPING SYSTEMS USING MACH...
AUTOMATIC WELL FAILURE ANALYSIS FOR THE SUCKER ROD PUMPING SYSTEMS USING MACH...Ramez Abdalla, M.Sc
 
Artificial Intelligence Applications in Petroleum Engineering - Part I
Artificial Intelligence Applications in Petroleum Engineering - Part IArtificial Intelligence Applications in Petroleum Engineering - Part I
Artificial Intelligence Applications in Petroleum Engineering - Part IRamez Abdalla, M.Sc
 
Diagnosis of Rod Pump Downhole Problems using Artificial Neural Networks (ANN)
Diagnosis of Rod Pump Downhole Problems using Artificial Neural Networks (ANN)Diagnosis of Rod Pump Downhole Problems using Artificial Neural Networks (ANN)
Diagnosis of Rod Pump Downhole Problems using Artificial Neural Networks (ANN)Ramez Abdalla, M.Sc
 

Mais de Ramez Abdalla, M.Sc (7)

Introduction to fluid flow through a porous medium
Introduction to fluid flow through a porous medium Introduction to fluid flow through a porous medium
Introduction to fluid flow through a porous medium
 
Introduction to Reservoir Fluids Courese
Introduction to Reservoir Fluids CoureseIntroduction to Reservoir Fluids Courese
Introduction to Reservoir Fluids Courese
 
AUTOMATIC WELL FAILURE ANALYSIS FOR THE SUCKER ROD PUMPING SYSTEMS USING MACH...
AUTOMATIC WELL FAILURE ANALYSIS FOR THE SUCKER ROD PUMPING SYSTEMS USING MACH...AUTOMATIC WELL FAILURE ANALYSIS FOR THE SUCKER ROD PUMPING SYSTEMS USING MACH...
AUTOMATIC WELL FAILURE ANALYSIS FOR THE SUCKER ROD PUMPING SYSTEMS USING MACH...
 
Artificial Intelligence Applications in Petroleum Engineering - Part I
Artificial Intelligence Applications in Petroleum Engineering - Part IArtificial Intelligence Applications in Petroleum Engineering - Part I
Artificial Intelligence Applications in Petroleum Engineering - Part I
 
Born To Lead
Born To LeadBorn To Lead
Born To Lead
 
Diagnosis of Rod Pump Downhole Problems using Artificial Neural Networks (ANN)
Diagnosis of Rod Pump Downhole Problems using Artificial Neural Networks (ANN)Diagnosis of Rod Pump Downhole Problems using Artificial Neural Networks (ANN)
Diagnosis of Rod Pump Downhole Problems using Artificial Neural Networks (ANN)
 
The solvent & surfactant model
The solvent & surfactant modelThe solvent & surfactant model
The solvent & surfactant model
 

Último

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Último (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

Managing Downhole Failures in a Rod Pumped Well

  • 1. Rod Pump System Performance And Evaluation MELEIHA OIL FILD – AGIBA PETROLEUM COMPANY
  • 2. Agenda System performance A. Failure Analysis (Problem Nature – Reasons – AGIBA Application) B. Troubleshooting (Physical Indicators – Common techniques – Common mistakes )
  • 3. Gas Interference PROBLEM NATURE • Gas separated and accumulated inside the pump reducing the volumetric efficiency and in the worst case the well stops pumping due to gas lock. PROBLEM REASONS • High GOR or foamy fluids . • Poor gas venting while production. Real Gas Interference card from Well S-66
  • 4. Gas interfernce..cont. Remedial Action - Increasing the compression ratio by the following Modifications to Standard Pumps:- • Longer stroke length, close valve spacing & spaced low (w/o tagging) at well site • High comp. standing valve cage - Improve gas venting through annulus . - Install pump below perforations to allow for gravity separation - Install gas anchor ( separator ) . - Use vsp (variable slippage pump ) .
  • 5. GAS ANCHOR ( SEPARATOR ) VARIABLE SLIPPAGE PUMP
  • 6. • In Agiba applications some of the NE wells, SE, Zarif, Faras and Ramel fields are the highest gas to oil ratio (GOR) wells (over 300 SCF/STB). In 1988 Agiba ran poor-poy type gas separator tests for two of the SE wells. They did not show any significant improvements and this technique had some limitations: 1. It was not effective for wells producing over 300 BOPD. 2. It Impedes possible wire-line operations in the well in which it is used Pump Intake setting below perforations • Seating the pump intake below the perforations is the most efficient technique if the well conditions allow it. AGIBA applies the process for some of the Meleiha wells (M-8, SE-6) as a trials and it was proved to be very efficient most of the Faras, Raml and Zarif field wells. Application of the technique created the following advantages: • Increased pump submergance which resulted in more production. • Created a natural gas-separation, which improved the pumps mechanical performance. limitations to this technique: Not recommended for sandy wells where pump-sticking problem arise.
  • 7. Fluid pound PROBLEM NATURE : Incomplete pump fillage creates a hammering effect for S.R. PROBLEM REASONS : • Insufficient pump intake pressure . • pump intake restriction . CAUSES SEVERE PROBLEMS LIKE : • Pumping unit base vibration ( loosens the bolts ). • Gear box teeth damage . • S.R. Premature fatigue failure S.R. Premature fatigue failure . • Rod unscrew from bottom . • Rod buckling and excessive TBG. Wear
  • 8. Fluid pound..cont’ Remedial Action • Re-optimize the pumping parameters ( S.L. , SPM & P.S. ) . • Use pump off controller to match pumping rate with the Actual well productivity . • check pump intake for restriction ( this could be Considered in case of pounding at higher dynamic level) . • increase pump submergence if possible .
  • 9. Fluid pound..cont’ In Agiba Applications, The reservoir is a depletion drive type and the fast decline in reservoir pressure was affecting the pump intake pressure. Therefore, the gas and fluid pounding problem became a serious issue and the decrease in the dynamic fluid level consequently increased the peak polished rod load due to increasing the net lift. Split traveling valve cage from fluid pound Fractured nickel-carbide standing valve seat from fluid pound
  • 10. Scale deposition PROBLEM NATURE AND REASONS • It was observed that scale formation problems started to appear in some of the Meleiha and Raml field wells. Chemical analysis showed that it was the calcium carbonate (CaCO3) type. Such scale precipitates in the upper part of the tubing (surface down to about 300 ft). Presence of scale restricted operations during pulling and running of the subsurface pump. In some cases it created stuck pumps and then a work over was needed. • The reasons for this problem are as follows: - 1. Pressure drop at the wellhead (below 100 psi). 2. High formation water production. 3. High temperature (over 120 F).
  • 11. Scale deposition..cont’ • To prevent scale formation inside the well, it was found that increasing the wellhead pressure to 150 psi would significantly improve the situation. STUCK STANDING VALVE DUE TO SCALE
  • 12. Sucker Rod Failures..cont’ A – TENSILE FAILURE : • It appears as a bottle neck shape due to rod elongation when using improper rod type or creates excessive tension to free stuck pump ,(actual applied loads tension to free stuck pump exceeds the allowable loads ) . B–CORROSION FAILURE : • The rod is parted due to area reduction as a result of corrosion ( chemical reaction between steel and CO2 , H2S OR ACID . C – FATIGUE ( MECHANICAL ) FAILURE : • It originates from a local increase in stress as small, progressive stress cracks that advance, upon each applied load, with the action of fluctuating or cyclic stresses to rupture, or final shear tear. SUCH TYPE IS CONSIDERED THE MOST COMMON TYPE WORLD WIDE . Caused by Improper make-up, severe fluid pounding , manufacturer defects ,using old rods without inspection , pump tagging down .
  • 13. Sucker Rod Failures..cont’ D - ROD BUCKLING TENDENCY : • Buckling tendency happens due to compression loads in the down stroke (the rod should be kept under tension in all conditions ). PROBLEMS RELATED TO BUCKLING : • Excessive rod and tubing wear . • sucker rod failure or unscrew . • valve rod and valve rod guide damage . Reasons : • severe fluid pounding . • excessive rod speed ( exceeds free fall speed ) . • heavy viscous oil . • improper rod string design . • pump tagging .
  • 14. Sucker Rod Failures..cont’ ROD BUCKLING TROUBLESHOOTING : • Eliminate pounding and optimize speed specially in heavy viscous wells • Use sinker & stabilizer bars to centralize rods and keep in tension . • Never keep pump strongly tagging down . CORROSION TROUBLESHOOTING : • Use corrosion resistant rod type . • use corrosion inhibitor MAX TENSILE TROUBLESHOOTING : • Better rod type selection during the initial design . • Never exceed the allowable rod load rating during trials to free stuck pump . FATIGUE TROUBLESHOOTING : • Re-optimize the well pumping parameters to minimize fluid pounding .
  • 15. Sucker Rod Failures..cont’ TENSILE FAILURE FATIGUE Valve rod guide damage Due to buckling
  • 16. Heavy Oil • Characteristics of Aghar Field Heavy Oil - API 10-17 • PCP Vs. S/R System in Aghar Field - Limited ability to increase the PCP parameters - Limited well accessibility • Applying S/R Systems in heavy oil wells - Small Pumping Units - Slow pumping rate Real Viscous oil problem from Well AG 4-13
  • 17. Sand Production PROBLEM NATURE • When Producing Sand Up through your Production Tubing, Separation Will occur. The Heavier, More Abrasive Sand, Will Settle Back On Top Of The Rod Pump. The Smaller, Less Abrasive Sand Will Stay Suspended, And Be Lifted To The Surface. The heavier sand will brake up to small pieces and be carried between the plunger and barrel. PROBLEM REASON • The sand particles will work their way between the Barrel and the plunger, causing abrasion cuts , commonly known as “sand cutting”. • Sand Friction causes rod buckling resulting in failures.
  • 18. Sand Production..cont’ • Two origins in AGIBA - Formation sands/fines - Hydraulic fractured Wells sands / propants • Effect of sand on the total production system - Sand friction cause rod buckling - Abrasion/wear for the plunger “Sand Cut” Wear of Plunger caused by sand production Sand Cuts
  • 19. Sand Production..cont’ Remedial Actions • Using Top Hold Down pumps • High Clearance Pumps • Sand screens - Through TBG Screens - TBG Screens • Re-completion
  • 20. Stuck pumps In AGIBA application stuck pumps which existed only in the Bottom Hold-Down type. This BHD creates the possibility of sand & debris accumulating in the dead area between the pump and the tubing wall. Such problems was overcome by introducing the Top Hold-Down pump instead of bottom hold down.
  • 21. Tubing Wear PROBLEM NATURE Tubing failures had longitudinal cracks with an average length of 10 ft. and all the cracks were in the lower part of the tubing ( up to 500 ft above the pump seating nipple). This tubing interval was located against the sinker bar portion of the sucker rod string. • IT IS CONSIDERED AS ONE OF THE COMMON PROBLEMS OF S.R. System world-wide . TBG. Wear due to rod buckling
  • 22. TBG. Wear ..cont’ PROBLEM REASONS : • Rod buckling (high speed , insuffecient sinker bar , fluid pounding , pump tagging down ) . • Tubing buckling (unanchored tubing or apply insufficient tension ) . • Use sucker rod system in crooked holes . • Free water production (represents the main critical reason Since it increases mutual friction between rods and tubing ) . • Presence of corrosive fluids ( enhances the erosion corrosion effect )
  • 23. TBG. Wear ..cont’ HOW TO MINIMIZE TUBING WEARS AND CRACKS : • Eliminate all reasons of rod buckling . • Apply proper tension for tbg. String ( use KTH hanger ) . • Use rod guides or wheel guides to centralize rods inside tubing . • Use anti-friction couplings and blast joints in the hot spots . • Apply corrosion inhibition programs . • Minimize pumping speed .
  • 24. WELL NO. OF W/O DUE TO TBG LEAK per year M-29 3 M-42 3 A-6 3 A-46 3 NE-36 3 M-43 3 M-57 3 A-4 5 NE-14 3 NE-25 3 SE-4 3 E-1X 3 N.NADA-8 3 FALAK-11 3 M-14 3 A-41 3 WELLS FREQUENTLY SUFFERED FROM TBG LEAK NE-32 2 NE-43 2 M-SW-2 2 SE-20 2 FALAK-7 2 A-37 2 Z-27 2 M-33 2 M-50 4 M-18 4 M-34 4 M-37 4 M-47 4 M-52 3 A-25 3 Z-15 3 M-49 3 • The main problem lead to workover jobs in AGIBA is the tubing leak , which appears in the form of longitudinal cracks as 2 ft length × 2cm width, caused by contineous friction between sucker rod and internal tubing wall , especially at the last ten joints ( 300 ft ) right above the pump.
  • 25. Rod Guides Spiral metal guides were tested in AGIBA fields. The experience proved that it was not an effective solution for this condition due to the following difficulties: a. It required fixed regular schedules for round trips to replace the worn-out guides. b. The installing of rod guides created much more friction, which increased the loads and stresses in the sucker rod string and the possibility of rod failure. Due to high loads, there was no way to increase pumping parameters in order to increase production. - Valve rod guide worn-out Due to buckling - Metal to Metal contact - High friction
  • 26. Hollow Pump WELL PERIOD BETWEEN LAST W/O & FIRST TBG LEAK M-14 8 MONTHS M-37 1 YEAR M-47 7 MONTHS A-4 11 MONTHS A-5 6 MONTHS A-34 9 MONTHS FIELD TRIALS (HOLLOW PUMP) Hollow sucker rod has hole in the middle The smaller passage and the faster flow velocity can avoid the sand deposit efficiently while use hollow sucker rod in the sand well.
  • 27. WELL Rate W/C PERIOD BETWEEN LAST W/O & FIRST TBG LEAK E - 1X 215 45 9 MONTHS M - 37 80 55 6 MONTHS - Using of roller guide or wheel guide , to eliminate direct contact between sucker rods and internal tubing wall. - Applying of a KTH flange gives more tension for tubing with slips to prevent tubing buckling.
  • 29. Physical Trouble Shooting Indicators - Pressure Gages - Hot Flow Lines - Hot Polished Rod Load - Sounds at the Well - Equipment Vibrations - Fluid on the Ground - Ground Shakes
  • 30. Well Head Temperature As A Relation Of Production Rate (GOR From Zero Up To 100 Scf/Stb) Well head temperature, oF Productionrate,bpd Zero water cut Zero up to %water cut up to %water cut up to %water cut
  • 31. common Techniques for Trouble Shooting - Has Well’s Production Changed? - Can the Pump Pressure up the Tubing? - Is the Pumping Unit Running? - Is there a noticeable Leak? - Is fluid going into the tank? - Has the Fluid Level Changed?
  • 32. Not Recommended - Why are not we tagging? - Put on hand and Pump 24 hrs/day. - Increase SPM in Order to maintain Production. - Increase SPM because there is a Fluid Level Above the Pump. - Pull the Well, because no Fluid in the Tank.