2. BACKGROUND OF THE PROJECT
The Project is being constructed on river Parbati in Distt. Kullu
of Himachal Pradesh.
The Project is spread across 120 Km in 03 different valleys i.e.
Manikaran (Dam Complex), Garsa (TBM and Store) & Sainj
(Power House)
As per DPR sanctioned manpower for Project -1200 employees
Sanctioned strength of Project vide Corporate Office sanction
order no. PIE/16/2011 dated 31.03.2011 is 344. The breakup of
sanctioned manpower is as below:
Executive -150; Supervisor – 51; Workmen – 143
3.
4. BACKGROUND OF THE PROJECT
Due to excessive distance between the project
components, same manpower can not be utilised at
different locations and separate establishment has to be
maintained at all the locations.
Sufficient manpower in Security, technical and non-
technical trades in workmen cadre is not available in the
Project to meet the requirement of all the locations.
5. OUTSOURCED MANPOWER AT PHEP-II
S. N. Name of
Contractor/Works
Locations Shift No. of
manpower
1. M/s M.S. Service
Limited/R&M
Manikaran, Sheela
& Barshaini
Round
the clock
27
2. M/s A.K. Hospitality
Services/R&M
Nagwain, Jhiri &
Bhuntar
Round
the clock
49
3. M/s Ashwani
Kumar/R&M
Garsa & Sheelagarh Day time 13
4. M/s OMR Construction
Service Limited/R&M
and Survey
Sainj, Maniakaran,
Shimla &
Chandigarh
Round
the clock
74
5. M/s J.K.
Seth/Electrical
maintenance
All components of
the project
Round
the clock
31
6. M/s Shine Power Pvt.
Ltd./Maint. of Comm.
facilities
All components of
the project
Day time 6
6. OUTSOURCED MANPOWER
DEPLOYED AT PHEP-II
S.
No.
Name of
Contractor/Works
Locations Shift No. of
manpower
7. M/s Padam Computer
Systems/Maint. of IT
facilities
All components
of the project
Day
time
3
8. M/s HP Ex-Serviceman
Corporation/Security
All components
of the project &
Shimla
Round
the
clock
106
9. M/s Arya Construction
Company/Road
maintenance
All components
of the Project in
Sainj area
Day
time
9
10. M/s Punjab Ex.
Servicemen Corporation /
Security
Chandigarh Round
the
clock
14
Total 332
7. R & M AND UPKEEPING OF VARIOUS
ESTABLISHMENT OF THE PROJECT
S.
No.
Name & Address of
the Contractor
Detail work
No. of
workers
1.
M/s M.S. Service
Private Ltd., SCO-1,
1st floor, Himunda
Commercial
Complex, Sai Road,
Baddi, Distt.-Solan
(HP) 173205
•Up keeping of offices, residential building,
transit camp, guest house, herbal park and other
garden at Dam Complex ,Manikaran.
•Upkeeping services in View Point Building at
Barshani and
•Canteen services in HRT Adit -I at Sheela.
27
2.
M/s A. K. Hospitality
Services, Village
Bella Post Office-
Drahal The-
Joginder Nagar
Distt. Mandi (HP)
•Up keeping of E-Spl., Executive & Non-
Executive Field Hostel/Transit camp Nagwain,
Jhiri & Bhuntar and VIP Guest House,
Nagwain
•Toilet drains, offices and surrounding area of
residential and non residential building, Nagwain
• Maintenance of lawns and front side of Office
building near Overhead water tank behind C type
quarter and in front of D-Type Qtrs. and
providing assistance for routine Repair &
maintenance works at Township Complex,
Nagwain.
49
8. R & M AND UP KEEPING OF VARIOUS
ESTABLISHMENT OF PROJECT
S.
No.
Name & Address
of the Contractor
Detail work
No. of
workers
employed
3.
M/s Ashwani
Kumar, Govt.
Contractor, Vill.-
Thrass, PO-Hurla,
Distt.-Kullu (HP)
•Upkeeping of Toilets, drains, and
surrounding area of residential and
non-residential building and R & M of
Staff canteens, Garsa, Adit-II and
HP Police mess, Sheelagarh
13
4.
M/s OMR
Construction
Company Private
Limited, 157/1,
Sainj, Tehsil-Sainj,
Kullu (HP)
•Up keeping of Toilets, drains and
surrounding area of all quarters,
office and providing catering services
in Executive and Non Executive Field
Hostel at Township Complex, Sainj
(Lower and Upper Bench)
32
Review Status:
The works are essential to facilitate employees in residential/transit camps/offices
located at various locations of the Project. Distance between these locations is
such that the same manpower can not be utilised at two different places.
9. SURVEY WORKS
S.
No.
Name & Address
of the Contractor
Detail work
No. of
workers
employed
1.
M/s O.M.R.
Construction Co.
Pvt. Ltd., 157/1,
Sainj, Distt.-Kullu
(HP)-175134
Providing Assistance in day to day
Survey works of the Project 3
2.
M/s O.M.R.
Construction Co.
Pvt. Ltd., 157/1,
Sainj, Distt.-Kullu
Providing gauge and discharge data
recording at G&D site Tosh,
Ghatigarh bridge site, Jhuni, Manihar
and Pancha Nallah and silt anlaysis
7
Review Status:
• As the Project is under construction so, manpower is deployed to lend
assistance for survey works of all components of the Project in 3 valleys
and shall be terminated after completion of construction work.
• The G&D sites(6No.) are essential to monitor flow of water.
10. ELECTRICAL, IT& COMMUNICATION
S. No.
Name & Address of the
Contractor
Detail work
No. of
workers
employed
1.
M/s J.K. Seth, Electrical
Govt. Contractor, Akhra
Bazar, Kullu (HP)
Providing Annual Repair and Maintenance of
Electrical Installation,HT/LT distribution and
transmission lines and operation of DG Sets
installed at Nagwain, Manikaran ,Sainj and
Garsa
31
2.
M/s Shine Power Pvt. Ltd. Providing repair and maintenance services of
Telephone lines/exchange for various locations
of the Project
6
3.
M/s Padam Computers
Systems, INC (PCSI),
Near Chowk, Mandi (HP)
Annual Maintenance Contract of Computers
and Peripherals of various locations of the
Project
3
Review Status:
1. Manpower deployed round the clock for Project (Locations covered-Sainj, Nagwain,
Garsa, Sheelagarh office & police post, Power house, Sainj township, Manikaran)
2. Manpower deployed to maintain Telephone lines, MPLS, ILL, VSAT etc. at Sainj
Office, Suind PH, Raila Surge Shaft site, Jiwa Nallah Trench Weir, Garsa Office,
HRT site Sheelagrh, Hurla Nallah, Dam complex Manikaran & Barshaini etc.
3. Minimum manpower deployed to maintain Computers, printers and its peripherals
along with networking equipments at all sites (Nagwain, Sainj, Suind, Garsa,
Manikaran & Sheelagarh etc.)
11. SECURITY
S. No.
Name & Address of the
Contractor
Detail work
No. of
workers
employed
1
M/s HP Ex-Serviceman
Corporation, Hamirpur
(HP)
Deployment of Security
Agency/ Guards for various
locations of the Project
100
DEPLOYMENT OF GUARDS:
1. Store Complex Somaropa: 6 No.
2. Manikaran Township: 6 No.
3. Dam Complex: 6 Nos.
4. Shilla Magazine: 6 Nos.
5. Mechanical/Store/Office at Garsa: 4 Nos.
6. Cement & Steel Store, Ninunallah: 6 Nos.
7. Sheelagarh Store: 3 Nos.
8. Nagwain Complex: 22 Nos.
9. Sainj Township: 19 Nos.
10.Cement Store: 6 Nos.
11.Explosive magazine: 6 Nos.
12.Jiwa nallah: 3 Nos.
13.Power House: 7 Nos.
12. SECURITY
Review Status:
Security Personnel have been deployed at various locations as above to
guard the Project establishments round the clock. Their deployment can be
reviewed after deployment of CISF/IRBN or commissioning of the project
whichever is earlier.
13. OTHER WORKS
S.
No.
Name & Address of
the Contractor
Detail work
No. of
workers
employed
1.
M/s Arya Construction
Company
Maintenance of existing road
from Power House to Surge
Shaft, Adit-IV, Adit-V, Magazine
and Fire Fighting tank road
near Power House of PHEP-II,
Sainj.
9
Review Status:
The above manpower has been deployed on Power House
to Surge Shaft road (23 Km long) in Sainj area. The major
contractor M/S Gammon has completed its work and
handed over the road to NHPC.
14. LO SHIMLA & CHANDIGARH
S.
No.
Name & Address of the
Contractor
Detail work
No. of
workers
employed
1.
M/s OMR Construction
Company Private Limited,
157/1, Sainj, Tehsil-Sainj,
Kullu (HP)
Up keeping of NHPC Guest House at Hira
Nagar, and Liasion Office, Shimla including
Service of sweeping, cooking, washing, work
supervising, waiter & helper and part time
sweeper at LO and Executive Guest House at
Shimla
11
2.
M/s HP Ex-Serviceman
Corporation, Hamirpur
Deployment of Security Agency/ Guards at
Shimla 6
3.
M/S OMR Const. Company
Private Ltd
Upkeeping of VIP Guest House, Executive
Guest House, Field Hostel and Transit Camp at
Sec 35A, 42A, 43A, and VIP Guest House at
Sec 35A, Chandigarh.
21
4.
M/s Punjab Ex. Servicemen
Corporation ,S.C.O. No. 89-
90, Sec. 34A, Chandigarh
Deployment of Security Guards at Residential
colonies at Sec-42A and Sec-43A, VIP Guest
House at Sec 35A and NHPC Office Building at
Sec-31A, Chandigarh.
14
Review Status:
The above manpower is bare minimum and has been deployed round the
clock for R&M and Security of various offices, Guest houses & other
establishments at Shimla & Chandigarh