TESTING,
MAINTENANCE &
PROTECTION OF
DISTRIBUTION
TRANSFORMERS
WHAT IS A TRANSFORMER?


TRANSFORMER IS A
STATIC DEVICE WHICH
TRANSFORMS A.C.
ELECTRICAL POWER
FROM ONE VOLTAGE
TO ANOTHER VOLTAGE
KEEPING THE
FREQUENCY SAME BY
ELECTROMAGNETIC
INDUCTION.
TYPES OF TRANSFORMER
BY APPLICATION















1. DISTRIBUTION TRANSFORMER
2.POWER TRANSFORMER
3.CURRENT TRANSFORMER
4.POTENTIAL TRANSFORMER
5.FURNACE TRANSFORMER
6.BOOSTER TRANSFORMER
7.RECTIFIER TRANSFORMER
8.LOCOMOTIVE TRANSFORMER
9.MINING TRANSFORMER
10.PHASE SHIFTING TRANSFORMER
11.WELDING TRANSFORMER
12.HIGH VOLTAGE TESTING/SC TESTING TRF.
13.GROUNDING TRANSFORMERS
14.CONVERTER TRANSFORMER
DISTRIBUTION TRANSFORMER
TRANSFORMER WHICH IS USED FOR
THE PURPOSE OF DISTRIBUTION OF
POWER.
 11KV/433V is the standard voltage rating.
 STANDARD KVA ratings are
25,63,100,160,200,250,315,400,500,630,750 ,
1000 , 1250,1500,2000,2500 KVA.
IS-2026 is the NATIONAL I S STANDARD.

MAIN FEATURES






OUTDOOR,OIL COOLED, 3 PHASE,50HZ
PRIMARY IS DELTA CONNECTED AND
SECONDARY IS STAR CONNECTED.
NATURALY COOLED (ONAN TYPE).
AMONGST ALL THE TYPES OF
TRANSFORMERS THIS IS THE MOST
REQUIRED AND MOST USED TYPE.
PARTS OF TRANSFORMER















MAIN TANK
RADIATORS
CONSERVATOR
EXPLOSION VENT
LIFTING LUGS
AIR RELEASE PLUG
OIL LEVEL INDICATOR
TAP CHANGER
WHEELS
HV/LV BUSHINGS
FILTER VALVES
OIL FILLING PLUG
DRAIN PLUG
CABLE BOX
TESTING OF TRANSFORMER














TESTING IS CARRIED OUT AS PER IS-2026.
ROUTINE , TYPE TESTS & SPECIAL TESTS
ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB)
1.Measurement of winding resistance
2.Measurement of insulation resistance
3.Seperate source voltage withstand test (High Voltage tests on HV & LV)
4.Induced Over voltage Withstand test (DVDF test)
5.Measurement of voltage ratio
6.Measurement of NO LOAD LOSS & current.
7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION)
8.Vector Group Verification
9.Oil BDV test.
10.Tests on OLTC (if Attached)
TYPE TESTS




1.
2.

THESE TESTS ARE CARRIED OUT
ONLY ON ONE TRANSFORMER OF
THE LOT.
All routine tests
Additionally following tests are included in
type tests
Lightening Impulse test.
Temperature rise test
SPECIAL TESTS









Additional Impulse test
Short circuit test
Measurement of zero Phase sequence
Impedance test.
Measurement of acoustic noise level.
Measurement of harmonics of the no load
current.
Magnetic balance test.
ROUTINE TESTS
1.Measurement of winding resistance
This test measures the resistance of the HV & LV
winding. The values of resistance should be
balance for all three phases and should match
the designed values.
Equipment used : Digital resistance meter.

ROUTINE TESTS


2.Measurement of insulation resistance
Measures the insulation resistance of HV & LV
windings with respect to earth (body) and
between LV & HV winding.
INSULATION TESTER OR MEGGER IS
USED.
Recommended Values are
2000Mohms for HV & 500 Mohms for LV.
ROUTINE TESTS


3.Seperate source voltage withstand test (High Voltage tests on
HV & LV)- This test checks the insulation property between
Primary to earth, Secondary to earth and between Primary &
Secondary.

HV high voltage test : LV winding connected together and earthed.
HV winding connected together and given 28 KV ( for 11KV
transformer) for 1 minute.
LV high Voltage test : HV winding connected together and earthed.
LV winding connected together and given 3 KV for 1 minute.
Equipment used : High Voltage tester ( 100KV & 3KV)
ROUTINE TESTS


4.Induced Over voltage Withstand test (DVDF test)This test checks the inter turn insulation.
For a 11KV/433V transformer,866 Volts are applied at
the 433V winding with the help of a Generator for 1
minute. This induces 22KV on 11KV side. The
frequency of the 866V supply is also increased to
100HZ.
Equipment used : MOTOR GENERATOR SET
ROUTINE TESTS
5.Measurement of voltage ratio
This test measures the voltage ratio as per the customer’s
requirement.
V1/V2 = N1/N2
The voltage ratio is equal to the turns ratio in a
transformer. Using this principle, the turns ratio is
measured with the help of a turns ratio meter. If it is
correct , then the voltage ratio is assumed to be correct.
Equipment used : Turns Ratiometer

ROUTINE TESTS
6.Measurement of NO LOAD LOSS & current.
The iron losses and no load current are measured in
this test. The 433V winding is charged at 433V supply
& the 11KV winding is left open .The power consumed
by the transformer at no load is the no load loss in the
transformer.
Effect of actual frequency must be taken into account.
Equipment used : Wattmeters or power analyser.

ROUTINE TESTS
7.Measurement of LOAD LOSS &
IMPEDENCE.(EFFICIENCY &
REGULATION)
This test measures the power consumed by the
transformer when the 433V winding is short
circuited and The rated current is passed
through the 11KV winding.
Equipment used : Wattmeters or power analyser.

ROUTINE TESTS
8.Vector Group Verification test
This test verifies the Dyn-11 vector group of a
distribution transformer.


Equipment used : voltmeter.
ROUTINE TESTS
Oil BDV TEST.
Oil breakdown voltage is checked as per IS-335.
100 mm L X 70 mm B X 80 mm Ht. glass pot.
500ml Oil sample.
Spherical electrodes with gap of 2.5 mm
Recommended value : 60KV
Equipment used : OIL BDV TEST SET.

TYPE TESTS
LIGHTENING IMPULSE TEST
All the dielectric tests check the insulation level of the job.
Impulse generator is used to produce the specified voltage impulse
wave of 1.2/50 micro seconds wave
One impulse of a reduced voltage between 50 to 75% of the full
test voltage and subsequent three impulses at full voltage.
For a three phase transformer, impulse is carried out on all three
phases in succession.
The voltage is applied on each of the line terminal in succession,
keeping the other terminals earthed.
The current and voltage wave shapes are recorded on the
oscilloscope and any distortion in the wave shape is the criteria
for failure.

SPECIAL TEST
Short circuit withstand ability test.
This tests measures the ability of the transformer to withstand the mechanical
and thermal stresses caused by the external short circuit.
HV terminals are connected to the supply bus of the testing plant. The LV is
short circuited. The testing plant parameters are such adjusted to give the
rated short circuit current.
Supply is made on and closed after specified duration of short circuit. The record
of current wave form is noted.
There should not be any mechanical distortion, fire to the transformer during
this test. Similarly no wave form distortion. The transformer should also
withstand the routine tests after the short circuit test.
The reactance of the winding measured before and after the S.C. test should not
vary beyond the limits stated in the IS2026.

MAINTENANCE OF
TRANSFORMER


Transformer is the heart of any power system.
Hence preventive maintenance is always cost
effective and time saving. Any failure to the
transformer can extremely affect the whole
functioning of the organization.
MAINTENANCE PROCEDURE

1.
2.

3.

OIL :
Oil level checking. Leakages to be attended.
Oil BDV & acidity checking at regular
intervals. If acidity is between 0.5 to 1mg
KOH, oil should be kept under observation.
BDV, Color and smell of oil are indicative.
MAINTENANCE PROCEDURE
1.

2.






Sludge, dust, dirt ,moisture can be removed by
filtration.
Oil when topped up shall be of the same make. It
may lead to sludge formation and acidic contents.
Insulation resistance of the transformer should be
checked once in 6 months.
Megger values along with oil values indicate the
condition of transformer.
Periodic Dissolved Gas Analysis can be carried out.
MAINTENANCE
BUSHINGS
Bushings should be cleaned and inspected for any
cracks.
Dust & dirt deposition, Salt or chemical
deposition, cement or acid fumes depositions
should be carefully noted and rectified.

MAINTENANCE







Periodic checking of any loose connections of the
terminations of HV & LV side.
Breather examination. Dehydration of Silica gel if
necessary.
Explosion vent diaphragm examination.
Conservator to be cleaned from inside after every three
years.
Regular inspection of OIL & WINDING
TEMPERATURE METER readings.
Cleanliness in the Substation yard with all nets, vines,
shrubs removed.
PROTECTION OF
TRANSFORMERS








The best way of protecting a transformer is to
have good preventive maintenance schedule.
Oil Temperature Indicators.
Winding Temperature indicators.
Buchholz Relay.
Magnetic Oil level Gauge.
Explosion Vent.
PROTECTION OF
TRANSFORMERS








HT fuse & D.O. fuse.
LT circuit breaker.
HT Circuit breaker with Over load, Earth Fault
relay tripping.
Oil Surge Relay for OLTC.
PRV for OLTC.
HORN GAPS & Lightening Arrestor.
Breather.
FAILURES & CAUSES











Insufficient Oil level.
Seepage of water in oil.
Prolonged Over loading.
Single Phase loading.
Unbalanced loading.
Faulty Termination (Improper sized lugs etc)
Power Theft.
Prolonged Short Circuit.
Faulty operation of tap changer switch.
Lack of installation checks.
FAILURES & CAUSES


Faulty design

Poor Workmanship
Improper formation of core.
Improper core bolt insulation.
Burr to the lamination blades
Improper brazing of joints.
Burr /sharp edges to the winding conductor.
Incomplete drying.
Bad insulation covering.
Insufficient cooling ducts in the winding.

FAILURES & CAUSES





Bad Quality of raw material.
Transit damaged transformers.
After failure , transformer is removed and
replaced with new/repaired one without
removing the cause of failure which results in
immediate or short time failure.

Mais conteúdo relacionado

Mais procurados

Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
Rohit Dave
 

Mais procurados (20)

Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformer
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV Switchgear
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
Transformer vector group_test_conditions
Transformer vector group_test_conditionsTransformer vector group_test_conditions
Transformer vector group_test_conditions
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sight
 
Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformer
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
Lightning impulse test in precise
Lightning impulse test in  preciseLightning impulse test in  precise
Lightning impulse test in precise
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work ppt
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 

Destaque

Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and Testing
GPTraining
 
Performances of distribution transformer installed in metallic enclosures
Performances of  distribution transformer installed in metallic enclosuresPerformances of  distribution transformer installed in metallic enclosures
Performances of distribution transformer installed in metallic enclosures
nehakardam
 
Maitenance of transformer
Maitenance of transformerMaitenance of transformer
Maitenance of transformer
Rohit Dave
 
Peco distribution-transformer
Peco distribution-transformerPeco distribution-transformer
Peco distribution-transformer
comsats
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
Suresh Patil
 

Destaque (20)

Transformers
TransformersTransformers
Transformers
 
Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and Testing
 
Performances of distribution transformer installed in metallic enclosures
Performances of  distribution transformer installed in metallic enclosuresPerformances of  distribution transformer installed in metallic enclosures
Performances of distribution transformer installed in metallic enclosures
 
transformer protection from over heating
transformer protection from over heatingtransformer protection from over heating
transformer protection from over heating
 
Differential protection
Differential protectionDifferential protection
Differential protection
 
Maitenance of transformer
Maitenance of transformerMaitenance of transformer
Maitenance of transformer
 
0 Presentation1
0 Presentation10 Presentation1
0 Presentation1
 
SDMyers Carilec Transformer Maintenance and Reliability
SDMyers Carilec Transformer Maintenance and ReliabilitySDMyers Carilec Transformer Maintenance and Reliability
SDMyers Carilec Transformer Maintenance and Reliability
 
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ IndiaPlanning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
 
Peco distribution-transformer
Peco distribution-transformerPeco distribution-transformer
Peco distribution-transformer
 
Distribution transformer
Distribution transformerDistribution transformer
Distribution transformer
 
Comparison of conductor material
Comparison of conductor materialComparison of conductor material
Comparison of conductor material
 
Conductor size considerations_for_station_class_arresters
Conductor size considerations_for_station_class_arrestersConductor size considerations_for_station_class_arresters
Conductor size considerations_for_station_class_arresters
 
Conductor types and sizes
Conductor types and sizesConductor types and sizes
Conductor types and sizes
 
Resistor and conductor
Resistor and conductor Resistor and conductor
Resistor and conductor
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Protection of transformer
Protection of transformerProtection of transformer
Protection of transformer
 
Transmission system
Transmission systemTransmission system
Transmission system
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
 

Semelhante a Testing,maintenance&protection

REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
RAJPRASAD RS
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
RAJKIRANR3
 

Semelhante a Testing,maintenance&protection (20)

TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
tcee-161003100321.pptx
tcee-161003100321.pptxtcee-161003100321.pptx
tcee-161003100321.pptx
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjar
 
Transformers pptxx.ppt
Transformers pptxx.pptTransformers pptxx.ppt
Transformers pptxx.ppt
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
Testing of transformer.pptx
Testing of transformer.pptxTesting of transformer.pptx
Testing of transformer.pptx
 
Transformer ppt.
Transformer ppt.Transformer ppt.
Transformer ppt.
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
transformers.ppt
transformers.ppttransformers.ppt
transformers.ppt
 
TRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptxTRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptx
 
220kv grid wapda town lahore
220kv grid wapda town lahore220kv grid wapda town lahore
220kv grid wapda town lahore
 
Power-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfPower-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdf
 
MSC SOW
MSC SOWMSC SOW
MSC SOW
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformer
 
Testing of cb
Testing of cbTesting of cb
Testing of cb
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 

Último

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Último (20)

Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 

Testing,maintenance&protection

  • 2. WHAT IS A TRANSFORMER?  TRANSFORMER IS A STATIC DEVICE WHICH TRANSFORMS A.C. ELECTRICAL POWER FROM ONE VOLTAGE TO ANOTHER VOLTAGE KEEPING THE FREQUENCY SAME BY ELECTROMAGNETIC INDUCTION.
  • 3. TYPES OF TRANSFORMER BY APPLICATION               1. DISTRIBUTION TRANSFORMER 2.POWER TRANSFORMER 3.CURRENT TRANSFORMER 4.POTENTIAL TRANSFORMER 5.FURNACE TRANSFORMER 6.BOOSTER TRANSFORMER 7.RECTIFIER TRANSFORMER 8.LOCOMOTIVE TRANSFORMER 9.MINING TRANSFORMER 10.PHASE SHIFTING TRANSFORMER 11.WELDING TRANSFORMER 12.HIGH VOLTAGE TESTING/SC TESTING TRF. 13.GROUNDING TRANSFORMERS 14.CONVERTER TRANSFORMER
  • 4. DISTRIBUTION TRANSFORMER TRANSFORMER WHICH IS USED FOR THE PURPOSE OF DISTRIBUTION OF POWER.  11KV/433V is the standard voltage rating.  STANDARD KVA ratings are 25,63,100,160,200,250,315,400,500,630,750 , 1000 , 1250,1500,2000,2500 KVA. IS-2026 is the NATIONAL I S STANDARD. 
  • 5. MAIN FEATURES     OUTDOOR,OIL COOLED, 3 PHASE,50HZ PRIMARY IS DELTA CONNECTED AND SECONDARY IS STAR CONNECTED. NATURALY COOLED (ONAN TYPE). AMONGST ALL THE TYPES OF TRANSFORMERS THIS IS THE MOST REQUIRED AND MOST USED TYPE.
  • 6. PARTS OF TRANSFORMER               MAIN TANK RADIATORS CONSERVATOR EXPLOSION VENT LIFTING LUGS AIR RELEASE PLUG OIL LEVEL INDICATOR TAP CHANGER WHEELS HV/LV BUSHINGS FILTER VALVES OIL FILLING PLUG DRAIN PLUG CABLE BOX
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. TESTING OF TRANSFORMER              TESTING IS CARRIED OUT AS PER IS-2026. ROUTINE , TYPE TESTS & SPECIAL TESTS ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB) 1.Measurement of winding resistance 2.Measurement of insulation resistance 3.Seperate source voltage withstand test (High Voltage tests on HV & LV) 4.Induced Over voltage Withstand test (DVDF test) 5.Measurement of voltage ratio 6.Measurement of NO LOAD LOSS & current. 7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION) 8.Vector Group Verification 9.Oil BDV test. 10.Tests on OLTC (if Attached)
  • 19. TYPE TESTS   1. 2. THESE TESTS ARE CARRIED OUT ONLY ON ONE TRANSFORMER OF THE LOT. All routine tests Additionally following tests are included in type tests Lightening Impulse test. Temperature rise test
  • 20. SPECIAL TESTS       Additional Impulse test Short circuit test Measurement of zero Phase sequence Impedance test. Measurement of acoustic noise level. Measurement of harmonics of the no load current. Magnetic balance test.
  • 21. ROUTINE TESTS 1.Measurement of winding resistance This test measures the resistance of the HV & LV winding. The values of resistance should be balance for all three phases and should match the designed values. Equipment used : Digital resistance meter. 
  • 22. ROUTINE TESTS  2.Measurement of insulation resistance Measures the insulation resistance of HV & LV windings with respect to earth (body) and between LV & HV winding. INSULATION TESTER OR MEGGER IS USED. Recommended Values are 2000Mohms for HV & 500 Mohms for LV.
  • 23. ROUTINE TESTS  3.Seperate source voltage withstand test (High Voltage tests on HV & LV)- This test checks the insulation property between Primary to earth, Secondary to earth and between Primary & Secondary. HV high voltage test : LV winding connected together and earthed. HV winding connected together and given 28 KV ( for 11KV transformer) for 1 minute. LV high Voltage test : HV winding connected together and earthed. LV winding connected together and given 3 KV for 1 minute. Equipment used : High Voltage tester ( 100KV & 3KV)
  • 24.
  • 25. ROUTINE TESTS  4.Induced Over voltage Withstand test (DVDF test)This test checks the inter turn insulation. For a 11KV/433V transformer,866 Volts are applied at the 433V winding with the help of a Generator for 1 minute. This induces 22KV on 11KV side. The frequency of the 866V supply is also increased to 100HZ. Equipment used : MOTOR GENERATOR SET
  • 26.
  • 27. ROUTINE TESTS 5.Measurement of voltage ratio This test measures the voltage ratio as per the customer’s requirement. V1/V2 = N1/N2 The voltage ratio is equal to the turns ratio in a transformer. Using this principle, the turns ratio is measured with the help of a turns ratio meter. If it is correct , then the voltage ratio is assumed to be correct. Equipment used : Turns Ratiometer 
  • 28. ROUTINE TESTS 6.Measurement of NO LOAD LOSS & current. The iron losses and no load current are measured in this test. The 433V winding is charged at 433V supply & the 11KV winding is left open .The power consumed by the transformer at no load is the no load loss in the transformer. Effect of actual frequency must be taken into account. Equipment used : Wattmeters or power analyser. 
  • 29.
  • 30. ROUTINE TESTS 7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION) This test measures the power consumed by the transformer when the 433V winding is short circuited and The rated current is passed through the 11KV winding. Equipment used : Wattmeters or power analyser. 
  • 31.
  • 32. ROUTINE TESTS 8.Vector Group Verification test This test verifies the Dyn-11 vector group of a distribution transformer.  Equipment used : voltmeter.
  • 33.
  • 34. ROUTINE TESTS Oil BDV TEST. Oil breakdown voltage is checked as per IS-335. 100 mm L X 70 mm B X 80 mm Ht. glass pot. 500ml Oil sample. Spherical electrodes with gap of 2.5 mm Recommended value : 60KV Equipment used : OIL BDV TEST SET. 
  • 35. TYPE TESTS LIGHTENING IMPULSE TEST All the dielectric tests check the insulation level of the job. Impulse generator is used to produce the specified voltage impulse wave of 1.2/50 micro seconds wave One impulse of a reduced voltage between 50 to 75% of the full test voltage and subsequent three impulses at full voltage. For a three phase transformer, impulse is carried out on all three phases in succession. The voltage is applied on each of the line terminal in succession, keeping the other terminals earthed. The current and voltage wave shapes are recorded on the oscilloscope and any distortion in the wave shape is the criteria for failure. 
  • 36.
  • 37. SPECIAL TEST Short circuit withstand ability test. This tests measures the ability of the transformer to withstand the mechanical and thermal stresses caused by the external short circuit. HV terminals are connected to the supply bus of the testing plant. The LV is short circuited. The testing plant parameters are such adjusted to give the rated short circuit current. Supply is made on and closed after specified duration of short circuit. The record of current wave form is noted. There should not be any mechanical distortion, fire to the transformer during this test. Similarly no wave form distortion. The transformer should also withstand the routine tests after the short circuit test. The reactance of the winding measured before and after the S.C. test should not vary beyond the limits stated in the IS2026. 
  • 38. MAINTENANCE OF TRANSFORMER  Transformer is the heart of any power system. Hence preventive maintenance is always cost effective and time saving. Any failure to the transformer can extremely affect the whole functioning of the organization.
  • 39. MAINTENANCE PROCEDURE  1. 2. 3. OIL : Oil level checking. Leakages to be attended. Oil BDV & acidity checking at regular intervals. If acidity is between 0.5 to 1mg KOH, oil should be kept under observation. BDV, Color and smell of oil are indicative.
  • 40. MAINTENANCE PROCEDURE 1. 2.    Sludge, dust, dirt ,moisture can be removed by filtration. Oil when topped up shall be of the same make. It may lead to sludge formation and acidic contents. Insulation resistance of the transformer should be checked once in 6 months. Megger values along with oil values indicate the condition of transformer. Periodic Dissolved Gas Analysis can be carried out.
  • 41. MAINTENANCE BUSHINGS Bushings should be cleaned and inspected for any cracks. Dust & dirt deposition, Salt or chemical deposition, cement or acid fumes depositions should be carefully noted and rectified. 
  • 42. MAINTENANCE       Periodic checking of any loose connections of the terminations of HV & LV side. Breather examination. Dehydration of Silica gel if necessary. Explosion vent diaphragm examination. Conservator to be cleaned from inside after every three years. Regular inspection of OIL & WINDING TEMPERATURE METER readings. Cleanliness in the Substation yard with all nets, vines, shrubs removed.
  • 43. PROTECTION OF TRANSFORMERS       The best way of protecting a transformer is to have good preventive maintenance schedule. Oil Temperature Indicators. Winding Temperature indicators. Buchholz Relay. Magnetic Oil level Gauge. Explosion Vent.
  • 44. PROTECTION OF TRANSFORMERS        HT fuse & D.O. fuse. LT circuit breaker. HT Circuit breaker with Over load, Earth Fault relay tripping. Oil Surge Relay for OLTC. PRV for OLTC. HORN GAPS & Lightening Arrestor. Breather.
  • 45. FAILURES & CAUSES           Insufficient Oil level. Seepage of water in oil. Prolonged Over loading. Single Phase loading. Unbalanced loading. Faulty Termination (Improper sized lugs etc) Power Theft. Prolonged Short Circuit. Faulty operation of tap changer switch. Lack of installation checks.
  • 46. FAILURES & CAUSES  Faulty design Poor Workmanship Improper formation of core. Improper core bolt insulation. Burr to the lamination blades Improper brazing of joints. Burr /sharp edges to the winding conductor. Incomplete drying. Bad insulation covering. Insufficient cooling ducts in the winding. 
  • 47. FAILURES & CAUSES    Bad Quality of raw material. Transit damaged transformers. After failure , transformer is removed and replaced with new/repaired one without removing the cause of failure which results in immediate or short time failure.