SlideShare uma empresa Scribd logo
1 de 19
Baixar para ler offline
Prepared by Sri G.V.N.Murali Krishna, Accounts Officer,
Rajahmundry Circle, Rajahmundry
HAND BOOK ON MAINTENACE OF ACCOUNTS AND REGISTERS AND
RECORDS RELATING TO WORKS
1. Division Cash book:
2. Cheque Book Register
3. Cheques drawn register:

As seen from the Cheques drawn
register it is observed that all the
cheques were issued on the last date
of a month and accounts obtained for
the same month.

It is suggested to

issue cheques in a phased manner so
as to avoid to complications.
It is observed that many numbers of
cheques were cancelled.

The DFO is

requested to preserve all the cancelled
cheques under attestation explaining
the reasons and produce the same to
audit.
3. AR Ledger:

Whenever, AR advance issued to FSO
/ Dy. ROs, the FSO / Dy. RO has to
necessarily write the cash book.

If

the payment is directly made by the
Forest Range Officer, he has to write
the cash book.
As seen from the AR ledger it is
observed that the date(s) of issue of
cheque (s) are not being written. It is
suggested

to

mention

date

and

cheque number for each cheque and
also to show the work recoveries at
the end of the month.
It is further observed that the AR
ledger at Range level are not being
maintained which should be insisted
up on.
4. Fund Application Register:

The register is maintained.

All the

fund applications must be filed in the
respective
produce

month’s
them

account

to

the

audit

and
for

verification.
1. Whenever, funds are advanced to Forest Range Officers,
proceedings along with a copy fund applications for which
the amounts were sanctioned and under what head of
service the expenditure has to be booked have to be sent to
Forest Range Officers.
booking

of

This mitigates all the problems in

expenditure

which

should

be

scrupulously

followed in future
5. Bill War Register:

A Register for the bills paid to the
Contractors has to be maintained in
the following proforma.
The deductions like FSD, IT, VAT,
CESS etc., are to be immediately paid
to the respective departments and/or
obtain call deposits in the name of
contractors so as to release them to
the respective contractors after the
defect liability period is over.
Otherwise
spent

for

the

the

amount

works

will

under

be
the
impression
available

that
under

the

amount

CAMPA

and

is
the

payments to the contractors would be
held up.
6. Security/Call Deposit Register:

After conversion of EMD and FSD in
the shape of Security/Call deposits,
the details can be written a Register
so as to release/forfeit the deposits as
the case may be after the defect
liability period is over. The PCCF, AP,
Hyd

Ref.

no.

6665/10-CAMPA,

dt.21.04.11 issued detailed guidelines
and

a

proforma

is

prescribed

maintain call deposit register.
Accounts

Officer,

IA,

to
The

Rajahmundry

designed a proforma in continuation of
the proforma prescribed by the PCCF,
AP, Hyderabad.

The following is the

proforma and it has to be maintained

Due date for
completion

Actual date
of
completion

EMD
collected
@2.5%

7

8

9

13

14

15

16

17

Remarks

of
Orders
DFO

12

liability

11

Defect
period

10

Signature of the
contractor

of
Date
agreement
6

Amount
released/forfeit
ed

Agreement
amount
5

the

Works
entrusted
on
nomination/
tender
4

Remarks/report
of the FRO after
liability
defect
period

Name of the
work
3

Balance
(EMD+FSD)

S.O.no
2
released
FSD
with final bill
@5%

1
FSD collection
@ 7.5%/ 3%

Sl. no

by contractor/work wise.

18
TENDERS:
NOMINATION:
No work should be entrusted on Nomination without prior
approval of the competent authority.
Notices are being sent to the Registered Contractors to execute the
works. But in the past, it was seen that nobody come forward to take up
the

works

Conservator

on
of

nomination,
Forests

permission
to

execute

is

being

the

accorded

works

by

under

the
Petty

Contract/Departmental method from the panel of Registered Contractors.
The Divisional Forest Officers are executing the works by giving work
order to a Registered Contractor by limiting the work bills to Rs.20,000/out of the estimate sanctioned. As such, the entire expenditure was
incurred by paying the estimated amounts to a 5-6 persons called as
petty contractors under departmental method.

The work of extraction

and transportation on each estimate is ranging from Rs.4-5 and this work
is being executed by 4-5 persons by way of petty contract agreement by
splitting the work and voucher to the eligibility purview of a Section
Officer.
As per the guidelines issued by the Prl. Chief Conservator of Forests
in Manual of Instructions on Forest Works, the Schedule contract method
which is otherwise called as Petty contract system is in use mainly in
Forest Department for works costing not more than Rs.5,000/-.

The

Divisional Forest Officer executing the works in piece meal by a work
order duly deducting Income Tax from the Contractors; this is not either
Schedule Contract Method or Piece Work Contract Method for in Piece
Work Contract method the value of the work is not more than one lakh
and EMD and FSD has to be collected.
More over the work has to be executed from the panel of Registered
Contractors of Forest Department.
With

regard

to

transportation

of

bamboo

or

timber,

the

transportation work is also being taken up with petty contract agreement
and as such the contractor need not have any vehicle and no specific
conditions were mentioned in the petty contract agreement. If the
transporter / petty contractor commits any unlawful activities or indulged
any breach of trust, as per the existing contract form no action could
initiated against them and as it is not properly recorded in which vehicle
the transportation was made and to whom the payment is made and who
is the actual owner of the vehicle.

The whole issue has to be examined

in letter and spirit and detailed instructions/guidance may please be
issued.
EMD:
The Earnest Money Deposit given in the shape of DDs should be converted
into call deposits and enter into Security deposit Register.

And 5% of deposit

shall be refunded to the Contractor along with the Final Bill after initial
observation and the remaining 5% deposit shall be refunded after the defect
liability period is over. There is delay in conversion of Security deposit in the
shape of call deposits which should be avoided.

The EMDs collected and refunded should be taken into Cash
Accounts of Division Office in the respective months and this can
be
FSD:
Further Security Deposit at 7.5% from the Contractor from each Running
Bill in case of the Contractor appointed on Tender and in case of Nomination, 3%
of the FSD shall be collected. The amount so collected shall be converted in the
shape of call deposits and enter in the Security Deposit Register.
And 5% of FSD shall be refunded to the Contractor along with the Final
Bill after initial observation and the remaining 5% deposit shall be refunded after
the defect liability period is over.

There is delay in conversion of Security

deposit in the shape of call deposits which should be avoided.
7. Register of Contractors:
It is observed from the list of cheques
drawn register payments were made
to the contractors who are appointed
on nomination were other than the
contractors registered in the Division.
It is stated that those were appointed
as contractors in other divisions of
Rajahmundry

circle.

The

DFO

is

requested to entrust the works on
nomination

only

to

the

registered

contractors.
No work should be entrusted to
the contractor on nomination without
prior approval of the Conservator of
Forests. Even the works entrusted on
nomination

agreement

should

be

entered and filed in the division.
8. Tender notices issued:

The tender notices issued in a year
should be in chronological order by
issuing a number to the notice and
specifically note I / II Call.

9. Register of Tenders schedules sold: The register is to be updated. The
cost of tender schedules received was
not remitted into CAMPA account. It
should

be

done

immediately.

The

EMDs so collected from the successful
bidder along with the balance EMD
should be converted as call deposit
and entered in the Security Deposit
Register.

It

should

be

done

immediately.
10. Register of tenders received:

The register is to be updated and all
the columns should be filled in with
the attestation of DFO.

11. Communication charges register : Instead of giving Rs.500/- as
communication charges to the
executive subordinates, the DFO has
obtained CUG telephone numbers and
given to the staff. The payments are
being made at division office. It is
however requested to update the
register and watch the payments
regularly.
12. Filing of TCS (Income tax) Return:
The quarterly return for tax collection has to be filed on 15 th July,
15th October, 15th January and 15th May of every year and failure to file
the return will be viewed seriously by the Income Tax department. Each
collection of tax should be remitted within 7 days and delayed payment
also attracts penal provision. The DFO is also requested to file the income
tax return for all the collections in one return and obtain the PAN numbers
of the contractors and also to note the TAN number of the DFO failure to
which the remittance should not find place in the statements of the
income tax department and the refund claim by the Contractor is not
entertained by the Income Tax Department. In such situation the
contractor file the claim with the Forest Department for refund of such tax
collected from him.
13. Bank Reconciliation

The DFO is requested to get the
reconciliation done with the cash book
and bank pass book duly obtaining
statement of account every month
and attest on the statement.

14.Acquittance Register

:

The DFO is requested to maintain a
Acquittances register for the payments
made by him.

15. BILLS UNDER CONTRACT SYSTEM:
The FROs who are sending the contractor bills to the division office
for payment, an office copy should be retained in the Forest range office
so as to know the payments made to the contractors for the works
executed in their ranges. They should enter the bill in a register duly a
giving a serial number of the year along with the connected records like M
book, bills, store/ seed registers to verify the receipt of stock and
execution of works with reference to M book so as to make payment. On
receipt of the bill, in the division it should be verified and pass and
payment order to be made under the attestation of the DFO. The cheque
should be sent along with the proceedings to the contractors and
immediately the same should be entered in the bill war register and the
action

may

be

taken

to

send

the

deductions

to

the

respective

departments and/or obtain call deposits.
16. VOUCHERS:
 Vouchers are split for the same period of work to make
payment within the competency of Forest Section Officer.
This increases the work load thereby the vouchers are
increased.

The payment can be made for the total work

completed up to the date of payment by cheque/DD duly
pre-auditing the voucher by the next higher authority who
is competent to make payment of the particular bill
amount.

As

seen

from

the

vouchers,

the

following

observations are made.
 Payments above Rs.5000/- are made in cash. No payment
should be made beyond Rs.5000/- in cash.
 Whenever ARs are issued to Forest Section Officers and
making payment through them, the Cash Accounts are to
be written by the Section Officers.

If the payment is

directly made by the Forest Range Officer, he/she has to
write the cash book.
 Vouchers are split for the same period of work to make
payment within the competency of Forest Section Officer.
This increases the work load thereby the vouchers are
increased.

The payment can be made for the total work

completed up to the date of payment by cheque/DD duly
pre-auditing the voucher by the next higher authority who
is competent to make payment of the particular bill
amount.
 In some bills the deductions were not made properly and
payment is made in full, while reviewing the completion
reports this aspect has to be observed.
 All the vouchers (Month-wise) as per LoP should be filed
duly signed by the staff, Forest Range Officer concerned
and countersigned by the Divisional Forest Officer.
 No expenditure should be incurred beyond the budget
allotment.
 The vouchers in respect of the payments made to the
different departments should be properly filed and file the
returns.
 The voucher should contain all the details such as SO no,,
period of work done, name of the work, quantity of work
done, rate, amount paid, signature of the payee and the
officer making payment duly signed by the Forest Range
Officer concerned and the countersignature of the DFO.
17. Work Register:
While posting the Work Registers, the following shall be
attended for fool proof verification and accounting.
 Index should be maintained.
 The detailed Head of Service shall be written on the top of the
page.
 The period of work done shall be noted so as to know the date of
commencement of the work and date of completion of work
 M. Book page no. shall be written in red ink while posting the
register.
 Month-wise and cumulative totals for each item of work should
be made and got the signature of the In-charge of Office shall be
taken.
 The details of deductions such as collection of taxes, Further
Security Deposits etc.

to be noted in the Work Register along

with the details of payments at the bottom of the page.
 The filing of CRs should be written with the attestation of the Incharge of Office and also the excess expenditure if any recovered
should also be recorded.
 After filing, in the Index page, such work should be rounded with
red ink duly noting filing amount.
 Component wise allocation as per the estimate should be noted in
the work register.
 M. Book page no. shall be written in red ink while posting the
register.
 Month-wise and cumulative totals for each item of work should be
made and the signature of the In-charge of Office shall be taken.
 The expenditure should be posted as per the passed bill in case of
contractors.
 The details of deductions such as collection of taxes, Further
Security Deposits etc.,

to be noted in the Work Register along

with the details of payments at the bottom of the page.
 The filing of CRs should be written with the attestation of the Incharge of Office and also the excess expenditure if any recovered
should also be recorded.
18. SANCTION OF ESTIMATES:
Estimates are to be sanctioned before commencement of the work.
Work either purchase / work should be commenced only after
sanction of estimates. No work should be commenced before
sanction of an estimate.

It is not correct to sanction estimates without obtaining and
accepting the quotations for the works/purchases.
The Forest Range Officers are empowered to sanction
estimates up to Rs.50000/- for works only.
Whenever expenditure to be incurred on other than works, Misc.
Sanction orders are to be issued.

As such, for payment of oil

charges, repairs and replacement to vehicles sanction orders are to
be issued by competent authority
Wherever sanction orders are issued as per the data the data
should be approved by the competent authority and then only the
estimates are sanctioned.
Estimates were prepared basing on the quotations and sanction was
accorded. In this connection, it is suggested to prepare a data /
assess the rates as per the market rates for purchases and for
works a detailed data for material + transport + labour may be
prepared and then only approved the quotations.
Detailed description has to be written for each item of work with
reference to the FSR as well as in the Specifications prescribed in
the Special conditions should be noted.
The rate for each item of work separately is to be noted when
material and labour involved. No group of items shall be noted in
the sanctioned estimates but for each item separately and the rate
also to be noted accordingly.
While sanctioning the estimate the date of the sanctioning authority
must be noted on the sanctioned estimate.
While sanctioning the estimate if any material is available and for
further processing work / utilization is only made, the same should
be mentioned in the estimate.
As per the instructions of PCCF, AP, Hyderabad, copies of estimates
sanctioned by the Forest Range Officer and Sub-DFOs are to be sent
to the division office and the technical officer of division office has to
scrutinize

those

estimates

and

inform

the

objections

before

incurring the expenditure.
In some estimates works executed in different areas are shown in
one estimate due to which lot of confusion prevails in execution
check measurement and watching the progress of expenditure.
Contingencies provided in the estimate are being paid to the
contractors.

The contingencies should not be allowed to the

contractors beyond the sanction of estimates.
No item should be sanctioned other than the FSR. And if any
item/work to be purchased or executed, permission from the
Competent authority should be obtained.
Estimates were prepared basing on the quotations and sanction was
accorded.

In this connection, it is suggested to prepare a data /

assess the rates as per the market rates for purchases and for
works a detailed data for material + transport + labour may be
prepared and then only approved the quotations.
Detailed description has to be written for each item of work with
reference to the FSR as well as in the Specifications prescribed in
the Special conditions should be noted.
The rate for each item of work separately when material and labour
involved.

No group of items shall be noted in the sanctioned

estimates but for each item separately and the rate also to be noted
accordingly.
19. PURCHASES:
All items more than Rs.5000/- should be purchased through
open tenders.
Whenever purchase / works are to be made through quotations, to
avoid complications, the following procedure may be adopted.
i.

Assess the desirability / essentiality of the work / purchases
to be made.

ii.

Availability of budget

iii.

Whether the work / purchases are within the approval of the
scheme under which the works / purchases are to be done.

iv.

Enquire / publicize inviting tenders / quotations.

v.

Quotations may be accepted only the firms having registered
with the concerned authority.

vi.

Receipt of quotations to be field properly duly affixing the
date stamp and initials of the officer in which office they are
received.

vii.

Prepare comparative statement duly noting the reasons for
accepting the rejecting the quotation/tender and also on the
quotations.

viii.

Based on the approved quotations, sanction orders to be
issued.

ix.

After sanction, the work order has to be issued to the
successful tenderer.

x.

After receipt of goods / completion of work, the same can be
recorded in the prime registers, such as Store Register and M.
Book and recommended for payment duly satisfying the
goods/service rendered.
xi.

After fulfilling the above condition, the payment can be made.
Whenever

purchase

/ works are

to

be

made

through

quotations, to avoid complications, the following procedure
may be adopted.
20. MEASUREMENT BOOKS:
The M. Books for the works executed were produced. The following
are the observations.
The test-checking of Forest Range Officer has to be ensured in
most of the cases.
The detailed measurements like lat-longs, location, RF area,
Compartment no. etc., in respect of Ha/Running meters are to be
recorded in the M. Books.
After payment Voucher nos. are to be written across the M. Book
page duly depicting the Division / Range as the case may be.
The recording of pass order and payment order has to be clearly
understood while signing.
For a work one M. Book is to be preferred rather recording so
many works in one M. Book. After all, the M. Book can be used
for another work after the former is over.
Measurements are to be recorded up to date and then deduct the
previous measurements.
Payment should be after the check-measurement.
Dates of recording the FBO/FSO are not noted.
Dates of check-measurement of the FSO/FRO are not noted in
some instances.
The contents mentioned in the previous page of M. Book are not
being brought forward in the next page.
Whenever the Dy. Range Officer in-charge of a Range, the check
measurement should be done by the superior officer.
Detailed measurements in respect of rmt. are to be noted but for
lump sum recording which should be avoided.
One work can be recorded in one M. Book and after its
completion; it may be used for recording the subsequent work.
Index is not maintained.
Dates of recording the FBO/FSO are not noted. Dates of checkmeasurement of the FSO/FRO are not noted.
Period of work done is noted.
S.O. No. and Voucher Nos. are not noted.
In respect of area, the details are not noted.
The signature of the payee is not obtained.
The check-measurement of the FRO is not done up to the required
percentage.
In respect of works costing more than Rs.5.00 lakhs, 30% of the
works has to be check-measured by the DFO.
The contents mentioned in the previous page of M. Book are not
being brought forward in the next page.
Index is to be maintained.
Dates of check-measurement of the FSO/FRO are to be noted.
S.O. No. and Voucher Nos. are to be noted.
In respect of area, the details are to be noted.
The signature of the payee is to be obtained.
The check-measurement of the FRO is to be done up to the
required percentage.
In respect of works costing more than Rs.5.00 lakhs, 30% of the
works has to be check-measured by the DFO.
Seigenorage charges are to be collected.
The contents mentioned in the previous page of M. Book are to be
brought forward in the next page. The test-checking of Forest
Range Officer has to be ensured in most of the cases.
The detailed measurements like lat-longs, location, RF area,
Compartment no. etc. in respect of Ha/Running meters are to be
recorded in the M. Books.
After payment Vr. Nos. are to be written across the M. Book page
duly depicting the Division / Range as the case may be.
The recording of pass order and payment order has to be clearly
understood while signing.
For a work one M. Book is to be preferred rather recording so many
works in one M. Book.

After all, the M. Book can be used for

another work after the former is over.
Measurements are to be recorded up to date and then deduct the
previous measurements.
Payment should be after the check-measurement.
Dates of recording the FBO/FSO are not noted.
Dates of check-measurement of the FSO/FRO are not noted.
Period of work done is noted.
S.O. No. and Voucher Nos. are not noted.
In respect of area, the details are not noted.
The signature of the payee is not obtained.
In respect of works costing more than Rs.5.00 lakhs, 30% of the
works has to be check-measured by the DFO.
The contents mentioned in the previous page of M. Book are not
being brought forward in the next page.
Vague recording of entries in the M. Book is not permitted. Index
is not maintained.
Dates of recording the FBO/FSO are not noted.
Dates of check-measurement of the FSO/FRO are not noted.
Period of work done is noted.
S.O. No. and Voucher Nos. are not noted.
In respect of area, the details are not noted.
The check-measurement of the FRO is not done up to the
required percentage.
Seigenorage charges are not being collected.

21. STORES:
22. MATERIAL AT SITE ACCOUNT:
23. PETROL, OIL, LUBRICANTS:
1. All the bills received should be signed by the Officer as well as the
Driver who are in charge of the vehicle.
2. The log book page no. should be noted down on the bill and it
should immediately be noted in the Log book.
3. The oils purchased should be entered in the Oils Register also.
4. The consolidated report submitted to the Divisional Forest Officer (if
the bills are paid by the Officer in charge), the details should be
mentioned stating that the bills are paid by me.
5. The oils purchased in any other scheme also should be noted down
in the Log book.
6. The log book should be written update and without writing the log
book, incurring of expenditure is not correct.
7. All the other registers should be updated every month.
8. Abstract of consumption of oils should be written every month.
9.
24. BILDINGS:
A. PREPARATION OF STANDARD MEASUREMENT BOOKS:
B. DEMOLITION OF GOVERNMENT QUARTERS
Permission from the Principal Chief Conservator of Forests, AP,
Hyderabad has been obtained for demolition of the above quarters.
25. Plantation / Nursery Journals:
As seen from the Plantation / Nursery Journals, the following
omissions are noted.
1. Expenditure details are to be posted every month.
2. The dates of checking of Watch & Ward and watering are not
mentioned.

Instead, they are preparing voucher for the total

period of month, which is to be corrected.
3. The observations of the FSO / FRO / DFO / or Other Superior
Officers are to be pasted.
26. DFLR:
The DFLR was not checked by the next higher authority in
common but the recordings in M. Book were checked. It is not
correct.

As far as the extraction of Bamboo is concerned, the

next higher authority must necessarily check the DFLR as per the
prescriptions of the DE Manual.
The work of transportation of Bamboo by vehicle is being done
which should be recorded by date wise, permit wise, lorry wise, if
at all it has to be recorded in M. Book. But the work carried out
in a continuous period, the writing of recording / checkmeasurement on the concluding day is not at all correct.

The

Divisional Forest Officer is requested to examine this and submit
his remarks / report to the Principal Chief Conservator of Forests
through Conservator of Forests, Rajahmundry.
27. GENERAL:
The

following

further

suggestions

are

made

with

regard

to

maintenance of Accounts.
 Wherever sanction orders are issued as per the data, the data
should be approved by the competent authority and then only the
estimates are sanctioned.
 The date of sanction should invariably be noted in the estimate.
 To maintain AR ledger promptly and obtain the signature of the
DFO/FRO.
 To maintain a Bill-war Register to observe the deduction of Taxes
and EMD/FSD. To maintain a Tender received and sold.
 To maintain a Register of Contractors update.
 To maintain a Register of Contractor, by name posting the details of
all payments in a year to observe the I.T. deduction and to issue a
necessary certificate as required.
 To maintain a Register for CALL DEPOSITS for the EMD/FSDs
collected and converted in the shape of call-deposits and to release
to the contractors.
 To file TCS return for every quarter.
 To maintain a communications charges Register.
 The Range Works Registers are to be posted every month. The
monthly totals and cumulative are to be written at the end of the
month and this should be attested by the FRO/DFO.
 No lump-sum depositing in VSS should be made but if the VSS
people are willing to work as labour, they may be engaged in the
execution of works.
 To collect seigenorage charges for the bills already paid without
collecting the seigenorage charges.
 To appoint Contractor with the prior approval of Conservator of
Forests.
 To obtain Bank-reconciliation statement every month and verify the
balances.
 Wherever dismantling of buildings was taken up, permission from
the

competent

completed

authority

buildings

be

obtained.

respect

in

should

of

new

Likewise,

constructions

the
and

renovations, the same may be immediately handed over to the
persons for whom the buildings are meant.

-

Prepared by
Sri G.V.N.Murali Krishna,
Accounts Officer,
Rajahmundry Circle,
Rajahmundry

Mais conteúdo relacionado

Mais procurados

G.o.ms.no.571, revenue (ass i) dept, 14.09.2012
G.o.ms.no.571, revenue (ass i) dept, 14.09.2012G.o.ms.no.571, revenue (ass i) dept, 14.09.2012
G.o.ms.no.571, revenue (ass i) dept, 14.09.2012bansi default
 
Childrens education allowance
Childrens education allowanceChildrens education allowance
Childrens education allowanceMukut Deori
 
Comprehensive study of agricultural income
Comprehensive study of agricultural incomeComprehensive study of agricultural income
Comprehensive study of agricultural incomeAbhishek Murali
 
Presentation on assessment of search cases
Presentation on assessment of search casesPresentation on assessment of search cases
Presentation on assessment of search casesCA. Sanjeev Lalan
 
CCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptCCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptjiki8
 
EXEMPTION U/S 11 OF INCOME TAX ACT,1961
EXEMPTION U/S 11 OF INCOME TAX ACT,1961EXEMPTION U/S 11 OF INCOME TAX ACT,1961
EXEMPTION U/S 11 OF INCOME TAX ACT,1961Admin SBS
 
Assessment Under section 143
Assessment Under section 143Assessment Under section 143
Assessment Under section 143Pallav Dodrajka
 
Recent judicial precedents in transfer pricing
Recent judicial precedents in transfer pricingRecent judicial precedents in transfer pricing
Recent judicial precedents in transfer pricingDVSResearchFoundatio
 
General financial rules
General financial rulesGeneral financial rules
General financial rulesaagkingshuk
 
paparan UOBK Kab Tasikmalaya.pptx
paparan UOBK Kab Tasikmalaya.pptxpaparan UOBK Kab Tasikmalaya.pptx
paparan UOBK Kab Tasikmalaya.pptxRSUDKENDALKEUANGAN
 

Mais procurados (20)

G.o.ms.no.571, revenue (ass i) dept, 14.09.2012
G.o.ms.no.571, revenue (ass i) dept, 14.09.2012G.o.ms.no.571, revenue (ass i) dept, 14.09.2012
G.o.ms.no.571, revenue (ass i) dept, 14.09.2012
 
Childrens education allowance
Childrens education allowanceChildrens education allowance
Childrens education allowance
 
Comprehensive study of agricultural income
Comprehensive study of agricultural incomeComprehensive study of agricultural income
Comprehensive study of agricultural income
 
Revenue acts
Revenue actsRevenue acts
Revenue acts
 
Servicematters material
Servicematters materialServicematters material
Servicematters material
 
Presentation on assessment of search cases
Presentation on assessment of search casesPresentation on assessment of search cases
Presentation on assessment of search cases
 
CCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptCCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.ppt
 
EXEMPTION U/S 11 OF INCOME TAX ACT,1961
EXEMPTION U/S 11 OF INCOME TAX ACT,1961EXEMPTION U/S 11 OF INCOME TAX ACT,1961
EXEMPTION U/S 11 OF INCOME TAX ACT,1961
 
Kerala Service Rules- Part 3
Kerala Service Rules- Part 3Kerala Service Rules- Part 3
Kerala Service Rules- Part 3
 
2016 rev ms153
2016 rev ms1532016 rev ms153
2016 rev ms153
 
Assessment Under section 143
Assessment Under section 143Assessment Under section 143
Assessment Under section 143
 
Recent judicial precedents in transfer pricing
Recent judicial precedents in transfer pricingRecent judicial precedents in transfer pricing
Recent judicial precedents in transfer pricing
 
Land Assignment Act.
Land Assignment Act.Land Assignment Act.
Land Assignment Act.
 
General financial rules
General financial rulesGeneral financial rules
General financial rules
 
Kerala- Minimum tenure policy for transfer for government employees.
Kerala- Minimum tenure policy for transfer for government employees.Kerala- Minimum tenure policy for transfer for government employees.
Kerala- Minimum tenure policy for transfer for government employees.
 
Land Assignment Procedures in Kerala by REALUTIONZ
Land Assignment Procedures in Kerala  by REALUTIONZLand Assignment Procedures in Kerala  by REALUTIONZ
Land Assignment Procedures in Kerala by REALUTIONZ
 
VAT ACT 1991 Bangladesh
VAT ACT 1991 BangladeshVAT ACT 1991 Bangladesh
VAT ACT 1991 Bangladesh
 
Revised Leave Rules 1980.ppt
Revised Leave Rules 1980.pptRevised Leave Rules 1980.ppt
Revised Leave Rules 1980.ppt
 
Calculation of tds on salary.bose
Calculation of tds on salary.boseCalculation of tds on salary.bose
Calculation of tds on salary.bose
 
paparan UOBK Kab Tasikmalaya.pptx
paparan UOBK Kab Tasikmalaya.pptxpaparan UOBK Kab Tasikmalaya.pptx
paparan UOBK Kab Tasikmalaya.pptx
 

Semelhante a Guide on maintenance of accounts

PRE-AUDIT CHECKLIST (1).pptx
PRE-AUDIT CHECKLIST (1).pptxPRE-AUDIT CHECKLIST (1).pptx
PRE-AUDIT CHECKLIST (1).pptxShoaibMuneer4
 
Form 5 & Case Studies in rera
Form 5 & Case Studies in reraForm 5 & Case Studies in rera
Form 5 & Case Studies in rerasandesh mundra
 
Training Report_Ford Bohol (Mar1-5,2015)
Training Report_Ford Bohol (Mar1-5,2015)Training Report_Ford Bohol (Mar1-5,2015)
Training Report_Ford Bohol (Mar1-5,2015)Thea M. Casio
 
ROLE LEARNING'S - IBL, AJAY BATTI
ROLE LEARNING'S - IBL, AJAY BATTIROLE LEARNING'S - IBL, AJAY BATTI
ROLE LEARNING'S - IBL, AJAY BATTIAJAY KUMAR BATTI
 
Wct a detailed guide
Wct a detailed guideWct a detailed guide
Wct a detailed guideParag Jain
 
Recent changes in GST
Recent changes in GST Recent changes in GST
Recent changes in GST Gayathri Menon
 
Gst Update - Draft New Simplified GST returns
Gst Update - Draft New Simplified GST returnsGst Update - Draft New Simplified GST returns
Gst Update - Draft New Simplified GST returnsKunal Gandhi
 
Banking Theory and Practices
Banking Theory and PracticesBanking Theory and Practices
Banking Theory and PracticesPioshy
 
Information return precautions by mfg and service providers
Information return precautions by mfg and service providersInformation return precautions by mfg and service providers
Information return precautions by mfg and service providersAshish Chaudhary
 
Contract Labour (R&A) Act
Contract Labour (R&A) ActContract Labour (R&A) Act
Contract Labour (R&A) ActJanardan Raccha
 

Semelhante a Guide on maintenance of accounts (20)

PRE-AUDIT CHECKLIST (1).pptx
PRE-AUDIT CHECKLIST (1).pptxPRE-AUDIT CHECKLIST (1).pptx
PRE-AUDIT CHECKLIST (1).pptx
 
Form 5 & Case Studies in rera
Form 5 & Case Studies in reraForm 5 & Case Studies in rera
Form 5 & Case Studies in rera
 
Service tax procedures
Service tax proceduresService tax procedures
Service tax procedures
 
Employee Loan in HR
Employee Loan in HREmployee Loan in HR
Employee Loan in HR
 
Training Report_Ford Bohol (Mar1-5,2015)
Training Report_Ford Bohol (Mar1-5,2015)Training Report_Ford Bohol (Mar1-5,2015)
Training Report_Ford Bohol (Mar1-5,2015)
 
HRD_CLR&A_act.ppt
HRD_CLR&A_act.pptHRD_CLR&A_act.ppt
HRD_CLR&A_act.ppt
 
ROLE LEARNING'S - IBL, AJAY BATTI
ROLE LEARNING'S - IBL, AJAY BATTIROLE LEARNING'S - IBL, AJAY BATTI
ROLE LEARNING'S - IBL, AJAY BATTI
 
Wct a detailed guide
Wct a detailed guideWct a detailed guide
Wct a detailed guide
 
Fema declaration
Fema declarationFema declaration
Fema declaration
 
Recent changes in GST
Recent changes in GST Recent changes in GST
Recent changes in GST
 
PAYMENT OF GRATUITY ACT- 1972
PAYMENT OF GRATUITY ACT- 1972 PAYMENT OF GRATUITY ACT- 1972
PAYMENT OF GRATUITY ACT- 1972
 
Bir updates gacpa
Bir updates   gacpaBir updates   gacpa
Bir updates gacpa
 
Gst Update - Draft New Simplified GST returns
Gst Update - Draft New Simplified GST returnsGst Update - Draft New Simplified GST returns
Gst Update - Draft New Simplified GST returns
 
Wct
WctWct
Wct
 
Acquisory news-bytes-14th-15th-june-2017
Acquisory news-bytes-14th-15th-june-2017Acquisory news-bytes-14th-15th-june-2017
Acquisory news-bytes-14th-15th-june-2017
 
Banking Theory and Practices
Banking Theory and PracticesBanking Theory and Practices
Banking Theory and Practices
 
Information return precautions by mfg and service providers
Information return precautions by mfg and service providersInformation return precautions by mfg and service providers
Information return precautions by mfg and service providers
 
Ao2 k2
Ao2 k2Ao2 k2
Ao2 k2
 
Contract Labour (R&A) Act
Contract Labour (R&A) ActContract Labour (R&A) Act
Contract Labour (R&A) Act
 
Advance tax tds and tcs
Advance tax tds and tcsAdvance tax tds and tcs
Advance tax tds and tcs
 

Mais de Rajkumar Kamarsu

Memo.32708 cfms instructions and clarifications to dd os
Memo.32708 cfms instructions and clarifications to dd osMemo.32708 cfms instructions and clarifications to dd os
Memo.32708 cfms instructions and clarifications to dd osRajkumar Kamarsu
 
Interim Relief to State Government Employees
Interim Relief to State Government EmployeesInterim Relief to State Government Employees
Interim Relief to State Government EmployeesRajkumar Kamarsu
 
Ammendment on Recovery of contribution for Health Cards
Ammendment on Recovery of contribution for Health CardsAmmendment on Recovery of contribution for Health Cards
Ammendment on Recovery of contribution for Health CardsRajkumar Kamarsu
 
Go.343 ehf premium payment from jan 2014 payable in feb 2014
Go.343 ehf premium payment from jan 2014 payable in feb 2014Go.343 ehf premium payment from jan 2014 payable in feb 2014
Go.343 ehf premium payment from jan 2014 payable in feb 2014Rajkumar Kamarsu
 
Forest martyrs 2013_as_on_01.11.2013
Forest martyrs 2013_as_on_01.11.2013Forest martyrs 2013_as_on_01.11.2013
Forest martyrs 2013_as_on_01.11.2013Rajkumar Kamarsu
 
Circular no.11 of_2013_-_saw_mills_inspections
Circular no.11 of_2013_-_saw_mills_inspectionsCircular no.11 of_2013_-_saw_mills_inspections
Circular no.11 of_2013_-_saw_mills_inspectionsRajkumar Kamarsu
 
Cbet guidelines for_submitting_proposals_4.3.2011
Cbet guidelines for_submitting_proposals_4.3.2011Cbet guidelines for_submitting_proposals_4.3.2011
Cbet guidelines for_submitting_proposals_4.3.2011Rajkumar Kamarsu
 
Bio sap guidelines-10.10.2013
Bio sap guidelines-10.10.2013Bio sap guidelines-10.10.2013
Bio sap guidelines-10.10.2013Rajkumar Kamarsu
 

Mais de Rajkumar Kamarsu (20)

Cssr 2014-15
Cssr 2014-15Cssr 2014-15
Cssr 2014-15
 
Memo.32708 cfms instructions and clarifications to dd os
Memo.32708 cfms instructions and clarifications to dd osMemo.32708 cfms instructions and clarifications to dd os
Memo.32708 cfms instructions and clarifications to dd os
 
Interim Relief to State Government Employees
Interim Relief to State Government EmployeesInterim Relief to State Government Employees
Interim Relief to State Government Employees
 
Ammendment on Recovery of contribution for Health Cards
Ammendment on Recovery of contribution for Health CardsAmmendment on Recovery of contribution for Health Cards
Ammendment on Recovery of contribution for Health Cards
 
2013 14 gis new tables
2013 14 gis new tables2013 14 gis new tables
2013 14 gis new tables
 
EHS
EHSEHS
EHS
 
Go.343 ehf premium payment from jan 2014 payable in feb 2014
Go.343 ehf premium payment from jan 2014 payable in feb 2014Go.343 ehf premium payment from jan 2014 payable in feb 2014
Go.343 ehf premium payment from jan 2014 payable in feb 2014
 
Det manual
Det manualDet manual
Det manual
 
Det manu appendix
Det manu appendixDet manu appendix
Det manu appendix
 
Forest martyrs 2013_as_on_01.11.2013
Forest martyrs 2013_as_on_01.11.2013Forest martyrs 2013_as_on_01.11.2013
Forest martyrs 2013_as_on_01.11.2013
 
Rssr 2013 14
Rssr 2013 14Rssr 2013 14
Rssr 2013 14
 
Building ssr 2013-14
Building ssr 2013-14Building ssr 2013-14
Building ssr 2013-14
 
Circular no. 7__of_2013
Circular no. 7__of_2013Circular no. 7__of_2013
Circular no. 7__of_2013
 
Circular no.11 of_2013_-_saw_mills_inspections
Circular no.11 of_2013_-_saw_mills_inspectionsCircular no.11 of_2013_-_saw_mills_inspections
Circular no.11 of_2013_-_saw_mills_inspections
 
Circular 4 2011
Circular 4 2011Circular 4 2011
Circular 4 2011
 
Circular 2 of_2013
Circular 2 of_2013Circular 2 of_2013
Circular 2 of_2013
 
Cbet guidelines for_submitting_proposals_4.3.2011
Cbet guidelines for_submitting_proposals_4.3.2011Cbet guidelines for_submitting_proposals_4.3.2011
Cbet guidelines for_submitting_proposals_4.3.2011
 
Cbet circular 2_2007
Cbet circular 2_2007Cbet circular 2_2007
Cbet circular 2_2007
 
Bio sap guidelines-10.10.2013
Bio sap guidelines-10.10.2013Bio sap guidelines-10.10.2013
Bio sap guidelines-10.10.2013
 
Circulars 2002 to_2006
Circulars 2002 to_2006Circulars 2002 to_2006
Circulars 2002 to_2006
 

Último

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 

Último (20)

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 

Guide on maintenance of accounts

  • 1. Prepared by Sri G.V.N.Murali Krishna, Accounts Officer, Rajahmundry Circle, Rajahmundry HAND BOOK ON MAINTENACE OF ACCOUNTS AND REGISTERS AND RECORDS RELATING TO WORKS 1. Division Cash book: 2. Cheque Book Register 3. Cheques drawn register: As seen from the Cheques drawn register it is observed that all the cheques were issued on the last date of a month and accounts obtained for the same month. It is suggested to issue cheques in a phased manner so as to avoid to complications. It is observed that many numbers of cheques were cancelled. The DFO is requested to preserve all the cancelled cheques under attestation explaining the reasons and produce the same to audit. 3. AR Ledger: Whenever, AR advance issued to FSO / Dy. ROs, the FSO / Dy. RO has to necessarily write the cash book. If the payment is directly made by the Forest Range Officer, he has to write the cash book. As seen from the AR ledger it is observed that the date(s) of issue of cheque (s) are not being written. It is suggested to mention date and cheque number for each cheque and
  • 2. also to show the work recoveries at the end of the month. It is further observed that the AR ledger at Range level are not being maintained which should be insisted up on. 4. Fund Application Register: The register is maintained. All the fund applications must be filed in the respective produce month’s them account to the audit and for verification. 1. Whenever, funds are advanced to Forest Range Officers, proceedings along with a copy fund applications for which the amounts were sanctioned and under what head of service the expenditure has to be booked have to be sent to Forest Range Officers. booking of This mitigates all the problems in expenditure which should be scrupulously followed in future 5. Bill War Register: A Register for the bills paid to the Contractors has to be maintained in the following proforma. The deductions like FSD, IT, VAT, CESS etc., are to be immediately paid to the respective departments and/or obtain call deposits in the name of contractors so as to release them to the respective contractors after the defect liability period is over. Otherwise spent for the the amount works will under be the
  • 3. impression available that under the amount CAMPA and is the payments to the contractors would be held up. 6. Security/Call Deposit Register: After conversion of EMD and FSD in the shape of Security/Call deposits, the details can be written a Register so as to release/forfeit the deposits as the case may be after the defect liability period is over. The PCCF, AP, Hyd Ref. no. 6665/10-CAMPA, dt.21.04.11 issued detailed guidelines and a proforma is prescribed maintain call deposit register. Accounts Officer, IA, to The Rajahmundry designed a proforma in continuation of the proforma prescribed by the PCCF, AP, Hyderabad. The following is the proforma and it has to be maintained Due date for completion Actual date of completion EMD collected @2.5% 7 8 9 13 14 15 16 17 Remarks of Orders DFO 12 liability 11 Defect period 10 Signature of the contractor of Date agreement 6 Amount released/forfeit ed Agreement amount 5 the Works entrusted on nomination/ tender 4 Remarks/report of the FRO after liability defect period Name of the work 3 Balance (EMD+FSD) S.O.no 2 released FSD with final bill @5% 1 FSD collection @ 7.5%/ 3% Sl. no by contractor/work wise. 18
  • 4. TENDERS: NOMINATION: No work should be entrusted on Nomination without prior approval of the competent authority. Notices are being sent to the Registered Contractors to execute the works. But in the past, it was seen that nobody come forward to take up the works Conservator on of nomination, Forests permission to execute is being the accorded works by under the Petty Contract/Departmental method from the panel of Registered Contractors. The Divisional Forest Officers are executing the works by giving work order to a Registered Contractor by limiting the work bills to Rs.20,000/out of the estimate sanctioned. As such, the entire expenditure was incurred by paying the estimated amounts to a 5-6 persons called as petty contractors under departmental method. The work of extraction and transportation on each estimate is ranging from Rs.4-5 and this work is being executed by 4-5 persons by way of petty contract agreement by splitting the work and voucher to the eligibility purview of a Section Officer. As per the guidelines issued by the Prl. Chief Conservator of Forests in Manual of Instructions on Forest Works, the Schedule contract method which is otherwise called as Petty contract system is in use mainly in Forest Department for works costing not more than Rs.5,000/-. The Divisional Forest Officer executing the works in piece meal by a work order duly deducting Income Tax from the Contractors; this is not either Schedule Contract Method or Piece Work Contract Method for in Piece Work Contract method the value of the work is not more than one lakh and EMD and FSD has to be collected. More over the work has to be executed from the panel of Registered Contractors of Forest Department.
  • 5. With regard to transportation of bamboo or timber, the transportation work is also being taken up with petty contract agreement and as such the contractor need not have any vehicle and no specific conditions were mentioned in the petty contract agreement. If the transporter / petty contractor commits any unlawful activities or indulged any breach of trust, as per the existing contract form no action could initiated against them and as it is not properly recorded in which vehicle the transportation was made and to whom the payment is made and who is the actual owner of the vehicle. The whole issue has to be examined in letter and spirit and detailed instructions/guidance may please be issued. EMD: The Earnest Money Deposit given in the shape of DDs should be converted into call deposits and enter into Security deposit Register. And 5% of deposit shall be refunded to the Contractor along with the Final Bill after initial observation and the remaining 5% deposit shall be refunded after the defect liability period is over. There is delay in conversion of Security deposit in the shape of call deposits which should be avoided. The EMDs collected and refunded should be taken into Cash Accounts of Division Office in the respective months and this can be FSD: Further Security Deposit at 7.5% from the Contractor from each Running Bill in case of the Contractor appointed on Tender and in case of Nomination, 3% of the FSD shall be collected. The amount so collected shall be converted in the shape of call deposits and enter in the Security Deposit Register. And 5% of FSD shall be refunded to the Contractor along with the Final Bill after initial observation and the remaining 5% deposit shall be refunded after the defect liability period is over. There is delay in conversion of Security deposit in the shape of call deposits which should be avoided.
  • 6. 7. Register of Contractors: It is observed from the list of cheques drawn register payments were made to the contractors who are appointed on nomination were other than the contractors registered in the Division. It is stated that those were appointed as contractors in other divisions of Rajahmundry circle. The DFO is requested to entrust the works on nomination only to the registered contractors. No work should be entrusted to the contractor on nomination without prior approval of the Conservator of Forests. Even the works entrusted on nomination agreement should be entered and filed in the division. 8. Tender notices issued: The tender notices issued in a year should be in chronological order by issuing a number to the notice and specifically note I / II Call. 9. Register of Tenders schedules sold: The register is to be updated. The cost of tender schedules received was not remitted into CAMPA account. It should be done immediately. The EMDs so collected from the successful bidder along with the balance EMD should be converted as call deposit
  • 7. and entered in the Security Deposit Register. It should be done immediately. 10. Register of tenders received: The register is to be updated and all the columns should be filled in with the attestation of DFO. 11. Communication charges register : Instead of giving Rs.500/- as communication charges to the executive subordinates, the DFO has obtained CUG telephone numbers and given to the staff. The payments are being made at division office. It is however requested to update the register and watch the payments regularly. 12. Filing of TCS (Income tax) Return: The quarterly return for tax collection has to be filed on 15 th July, 15th October, 15th January and 15th May of every year and failure to file the return will be viewed seriously by the Income Tax department. Each collection of tax should be remitted within 7 days and delayed payment also attracts penal provision. The DFO is also requested to file the income tax return for all the collections in one return and obtain the PAN numbers of the contractors and also to note the TAN number of the DFO failure to which the remittance should not find place in the statements of the income tax department and the refund claim by the Contractor is not entertained by the Income Tax Department. In such situation the contractor file the claim with the Forest Department for refund of such tax collected from him.
  • 8. 13. Bank Reconciliation The DFO is requested to get the reconciliation done with the cash book and bank pass book duly obtaining statement of account every month and attest on the statement. 14.Acquittance Register : The DFO is requested to maintain a Acquittances register for the payments made by him. 15. BILLS UNDER CONTRACT SYSTEM: The FROs who are sending the contractor bills to the division office for payment, an office copy should be retained in the Forest range office so as to know the payments made to the contractors for the works executed in their ranges. They should enter the bill in a register duly a giving a serial number of the year along with the connected records like M book, bills, store/ seed registers to verify the receipt of stock and execution of works with reference to M book so as to make payment. On receipt of the bill, in the division it should be verified and pass and payment order to be made under the attestation of the DFO. The cheque should be sent along with the proceedings to the contractors and immediately the same should be entered in the bill war register and the action may be taken to send the deductions to the respective departments and/or obtain call deposits. 16. VOUCHERS:  Vouchers are split for the same period of work to make payment within the competency of Forest Section Officer. This increases the work load thereby the vouchers are increased. The payment can be made for the total work completed up to the date of payment by cheque/DD duly
  • 9. pre-auditing the voucher by the next higher authority who is competent to make payment of the particular bill amount. As seen from the vouchers, the following observations are made.  Payments above Rs.5000/- are made in cash. No payment should be made beyond Rs.5000/- in cash.  Whenever ARs are issued to Forest Section Officers and making payment through them, the Cash Accounts are to be written by the Section Officers. If the payment is directly made by the Forest Range Officer, he/she has to write the cash book.  Vouchers are split for the same period of work to make payment within the competency of Forest Section Officer. This increases the work load thereby the vouchers are increased. The payment can be made for the total work completed up to the date of payment by cheque/DD duly pre-auditing the voucher by the next higher authority who is competent to make payment of the particular bill amount.  In some bills the deductions were not made properly and payment is made in full, while reviewing the completion reports this aspect has to be observed.  All the vouchers (Month-wise) as per LoP should be filed duly signed by the staff, Forest Range Officer concerned and countersigned by the Divisional Forest Officer.  No expenditure should be incurred beyond the budget allotment.  The vouchers in respect of the payments made to the different departments should be properly filed and file the returns.  The voucher should contain all the details such as SO no,, period of work done, name of the work, quantity of work
  • 10. done, rate, amount paid, signature of the payee and the officer making payment duly signed by the Forest Range Officer concerned and the countersignature of the DFO. 17. Work Register: While posting the Work Registers, the following shall be attended for fool proof verification and accounting.  Index should be maintained.  The detailed Head of Service shall be written on the top of the page.  The period of work done shall be noted so as to know the date of commencement of the work and date of completion of work  M. Book page no. shall be written in red ink while posting the register.  Month-wise and cumulative totals for each item of work should be made and got the signature of the In-charge of Office shall be taken.  The details of deductions such as collection of taxes, Further Security Deposits etc. to be noted in the Work Register along with the details of payments at the bottom of the page.  The filing of CRs should be written with the attestation of the Incharge of Office and also the excess expenditure if any recovered should also be recorded.  After filing, in the Index page, such work should be rounded with red ink duly noting filing amount.  Component wise allocation as per the estimate should be noted in the work register.  M. Book page no. shall be written in red ink while posting the register.  Month-wise and cumulative totals for each item of work should be made and the signature of the In-charge of Office shall be taken.
  • 11.  The expenditure should be posted as per the passed bill in case of contractors.  The details of deductions such as collection of taxes, Further Security Deposits etc., to be noted in the Work Register along with the details of payments at the bottom of the page.  The filing of CRs should be written with the attestation of the Incharge of Office and also the excess expenditure if any recovered should also be recorded. 18. SANCTION OF ESTIMATES: Estimates are to be sanctioned before commencement of the work. Work either purchase / work should be commenced only after sanction of estimates. No work should be commenced before sanction of an estimate. It is not correct to sanction estimates without obtaining and accepting the quotations for the works/purchases. The Forest Range Officers are empowered to sanction estimates up to Rs.50000/- for works only. Whenever expenditure to be incurred on other than works, Misc. Sanction orders are to be issued. As such, for payment of oil charges, repairs and replacement to vehicles sanction orders are to be issued by competent authority Wherever sanction orders are issued as per the data the data should be approved by the competent authority and then only the estimates are sanctioned. Estimates were prepared basing on the quotations and sanction was accorded. In this connection, it is suggested to prepare a data / assess the rates as per the market rates for purchases and for works a detailed data for material + transport + labour may be prepared and then only approved the quotations.
  • 12. Detailed description has to be written for each item of work with reference to the FSR as well as in the Specifications prescribed in the Special conditions should be noted. The rate for each item of work separately is to be noted when material and labour involved. No group of items shall be noted in the sanctioned estimates but for each item separately and the rate also to be noted accordingly. While sanctioning the estimate the date of the sanctioning authority must be noted on the sanctioned estimate. While sanctioning the estimate if any material is available and for further processing work / utilization is only made, the same should be mentioned in the estimate. As per the instructions of PCCF, AP, Hyderabad, copies of estimates sanctioned by the Forest Range Officer and Sub-DFOs are to be sent to the division office and the technical officer of division office has to scrutinize those estimates and inform the objections before incurring the expenditure. In some estimates works executed in different areas are shown in one estimate due to which lot of confusion prevails in execution check measurement and watching the progress of expenditure. Contingencies provided in the estimate are being paid to the contractors. The contingencies should not be allowed to the contractors beyond the sanction of estimates. No item should be sanctioned other than the FSR. And if any item/work to be purchased or executed, permission from the Competent authority should be obtained. Estimates were prepared basing on the quotations and sanction was accorded. In this connection, it is suggested to prepare a data / assess the rates as per the market rates for purchases and for works a detailed data for material + transport + labour may be prepared and then only approved the quotations.
  • 13. Detailed description has to be written for each item of work with reference to the FSR as well as in the Specifications prescribed in the Special conditions should be noted. The rate for each item of work separately when material and labour involved. No group of items shall be noted in the sanctioned estimates but for each item separately and the rate also to be noted accordingly. 19. PURCHASES: All items more than Rs.5000/- should be purchased through open tenders. Whenever purchase / works are to be made through quotations, to avoid complications, the following procedure may be adopted. i. Assess the desirability / essentiality of the work / purchases to be made. ii. Availability of budget iii. Whether the work / purchases are within the approval of the scheme under which the works / purchases are to be done. iv. Enquire / publicize inviting tenders / quotations. v. Quotations may be accepted only the firms having registered with the concerned authority. vi. Receipt of quotations to be field properly duly affixing the date stamp and initials of the officer in which office they are received. vii. Prepare comparative statement duly noting the reasons for accepting the rejecting the quotation/tender and also on the quotations. viii. Based on the approved quotations, sanction orders to be issued. ix. After sanction, the work order has to be issued to the successful tenderer. x. After receipt of goods / completion of work, the same can be recorded in the prime registers, such as Store Register and M.
  • 14. Book and recommended for payment duly satisfying the goods/service rendered. xi. After fulfilling the above condition, the payment can be made. Whenever purchase / works are to be made through quotations, to avoid complications, the following procedure may be adopted. 20. MEASUREMENT BOOKS: The M. Books for the works executed were produced. The following are the observations. The test-checking of Forest Range Officer has to be ensured in most of the cases. The detailed measurements like lat-longs, location, RF area, Compartment no. etc., in respect of Ha/Running meters are to be recorded in the M. Books. After payment Voucher nos. are to be written across the M. Book page duly depicting the Division / Range as the case may be. The recording of pass order and payment order has to be clearly understood while signing. For a work one M. Book is to be preferred rather recording so many works in one M. Book. After all, the M. Book can be used for another work after the former is over. Measurements are to be recorded up to date and then deduct the previous measurements. Payment should be after the check-measurement. Dates of recording the FBO/FSO are not noted. Dates of check-measurement of the FSO/FRO are not noted in some instances. The contents mentioned in the previous page of M. Book are not being brought forward in the next page. Whenever the Dy. Range Officer in-charge of a Range, the check measurement should be done by the superior officer.
  • 15. Detailed measurements in respect of rmt. are to be noted but for lump sum recording which should be avoided. One work can be recorded in one M. Book and after its completion; it may be used for recording the subsequent work. Index is not maintained. Dates of recording the FBO/FSO are not noted. Dates of checkmeasurement of the FSO/FRO are not noted. Period of work done is noted. S.O. No. and Voucher Nos. are not noted. In respect of area, the details are not noted. The signature of the payee is not obtained. The check-measurement of the FRO is not done up to the required percentage. In respect of works costing more than Rs.5.00 lakhs, 30% of the works has to be check-measured by the DFO. The contents mentioned in the previous page of M. Book are not being brought forward in the next page. Index is to be maintained. Dates of check-measurement of the FSO/FRO are to be noted. S.O. No. and Voucher Nos. are to be noted. In respect of area, the details are to be noted. The signature of the payee is to be obtained. The check-measurement of the FRO is to be done up to the required percentage. In respect of works costing more than Rs.5.00 lakhs, 30% of the works has to be check-measured by the DFO. Seigenorage charges are to be collected. The contents mentioned in the previous page of M. Book are to be brought forward in the next page. The test-checking of Forest Range Officer has to be ensured in most of the cases.
  • 16. The detailed measurements like lat-longs, location, RF area, Compartment no. etc. in respect of Ha/Running meters are to be recorded in the M. Books. After payment Vr. Nos. are to be written across the M. Book page duly depicting the Division / Range as the case may be. The recording of pass order and payment order has to be clearly understood while signing. For a work one M. Book is to be preferred rather recording so many works in one M. Book. After all, the M. Book can be used for another work after the former is over. Measurements are to be recorded up to date and then deduct the previous measurements. Payment should be after the check-measurement. Dates of recording the FBO/FSO are not noted. Dates of check-measurement of the FSO/FRO are not noted. Period of work done is noted. S.O. No. and Voucher Nos. are not noted. In respect of area, the details are not noted. The signature of the payee is not obtained. In respect of works costing more than Rs.5.00 lakhs, 30% of the works has to be check-measured by the DFO. The contents mentioned in the previous page of M. Book are not being brought forward in the next page. Vague recording of entries in the M. Book is not permitted. Index is not maintained. Dates of recording the FBO/FSO are not noted. Dates of check-measurement of the FSO/FRO are not noted. Period of work done is noted. S.O. No. and Voucher Nos. are not noted. In respect of area, the details are not noted. The check-measurement of the FRO is not done up to the required percentage.
  • 17. Seigenorage charges are not being collected. 21. STORES: 22. MATERIAL AT SITE ACCOUNT: 23. PETROL, OIL, LUBRICANTS: 1. All the bills received should be signed by the Officer as well as the Driver who are in charge of the vehicle. 2. The log book page no. should be noted down on the bill and it should immediately be noted in the Log book. 3. The oils purchased should be entered in the Oils Register also. 4. The consolidated report submitted to the Divisional Forest Officer (if the bills are paid by the Officer in charge), the details should be mentioned stating that the bills are paid by me. 5. The oils purchased in any other scheme also should be noted down in the Log book. 6. The log book should be written update and without writing the log book, incurring of expenditure is not correct. 7. All the other registers should be updated every month. 8. Abstract of consumption of oils should be written every month. 9. 24. BILDINGS: A. PREPARATION OF STANDARD MEASUREMENT BOOKS: B. DEMOLITION OF GOVERNMENT QUARTERS Permission from the Principal Chief Conservator of Forests, AP, Hyderabad has been obtained for demolition of the above quarters. 25. Plantation / Nursery Journals: As seen from the Plantation / Nursery Journals, the following omissions are noted. 1. Expenditure details are to be posted every month.
  • 18. 2. The dates of checking of Watch & Ward and watering are not mentioned. Instead, they are preparing voucher for the total period of month, which is to be corrected. 3. The observations of the FSO / FRO / DFO / or Other Superior Officers are to be pasted. 26. DFLR: The DFLR was not checked by the next higher authority in common but the recordings in M. Book were checked. It is not correct. As far as the extraction of Bamboo is concerned, the next higher authority must necessarily check the DFLR as per the prescriptions of the DE Manual. The work of transportation of Bamboo by vehicle is being done which should be recorded by date wise, permit wise, lorry wise, if at all it has to be recorded in M. Book. But the work carried out in a continuous period, the writing of recording / checkmeasurement on the concluding day is not at all correct. The Divisional Forest Officer is requested to examine this and submit his remarks / report to the Principal Chief Conservator of Forests through Conservator of Forests, Rajahmundry. 27. GENERAL: The following further suggestions are made with regard to maintenance of Accounts.  Wherever sanction orders are issued as per the data, the data should be approved by the competent authority and then only the estimates are sanctioned.  The date of sanction should invariably be noted in the estimate.  To maintain AR ledger promptly and obtain the signature of the DFO/FRO.  To maintain a Bill-war Register to observe the deduction of Taxes and EMD/FSD. To maintain a Tender received and sold.  To maintain a Register of Contractors update.
  • 19.  To maintain a Register of Contractor, by name posting the details of all payments in a year to observe the I.T. deduction and to issue a necessary certificate as required.  To maintain a Register for CALL DEPOSITS for the EMD/FSDs collected and converted in the shape of call-deposits and to release to the contractors.  To file TCS return for every quarter.  To maintain a communications charges Register.  The Range Works Registers are to be posted every month. The monthly totals and cumulative are to be written at the end of the month and this should be attested by the FRO/DFO.  No lump-sum depositing in VSS should be made but if the VSS people are willing to work as labour, they may be engaged in the execution of works.  To collect seigenorage charges for the bills already paid without collecting the seigenorage charges.  To appoint Contractor with the prior approval of Conservator of Forests.  To obtain Bank-reconciliation statement every month and verify the balances.  Wherever dismantling of buildings was taken up, permission from the competent completed authority buildings be obtained. respect in should of new Likewise, constructions the and renovations, the same may be immediately handed over to the persons for whom the buildings are meant. - Prepared by Sri G.V.N.Murali Krishna, Accounts Officer, Rajahmundry Circle, Rajahmundry