SlideShare uma empresa Scribd logo
1 de 3
Page 1 of 3
Rajiv Kainth
Sr.3D PDS Piping Designer
101 Legacy Green S.E.
Calgary – Alberta
T2X 0X6
403 830 1052
kainthrajiv@gmail.com
Professional summary
I have 16 Years of experience of Developing Plant Layouts, Isometrics, Area Plot Plans, Equipment
location plans, G.A. drawings, field checkouts of given area. Also experience of Design Review with
client, Follow on engineering / construction support and As Build on variety of projects.
These projects have been Oil and Gas SAGD, Refineries, Power plants (fire fighting), Mining,
Pharmaceutical, Agri food plants, dairy Industries and distillers.
Software knowledge includes Auto Plant, AutoCAD 2014 , 2D Microstation ,3D PDS(Plant Design
System), Modelling of equipment and piping, Isogen, 3D Design Review, 3D Smart Plant Review,
Lotus 123, MSWord, Global Material System , PipeCAD, FD Plan, FDIso.
Education
Diploma in Mechanical Drafting and Apprenticeship
Employment history
AMEC Foster Wheeler , Senior Piping Designer, 2007 – 23rd
.Oct.-2015
Colt Engineering, Senior PDS Designer, 2006 – 2007
AMEC Americas, Piping Designer, 2003 – 2006
Fluor Canada, PDS/CAD Designer, 2002 – 2003
AMEC Americas, Junior CAD Designer, 2001 – 2002
Representative projects
AMEC Foster Wheeler, Calgary, AB, 2007 – .Oct.-2015
Senior Piping Designer
Projects included:
 Shell AOSP (Extraction Area): Responsible for the Detail designing for Hot Water Pump house
equipment layout, Piping, Design review with client and Isometric extraction.
 Shell AOSP (Utilities Area): Responsible for the Fire water routing near Froth Sellers. After
completion of this duty, I was assigned to various areas to boost up the Isometric Production.
 Syncrude Project: Responsible for the ATM (Aurora Tailings Management) project. It was a pump
house with Hydro Cyclones. Completed the piping, internal and design reviews with client.
 Kearl KID, MSF Area: Responsible for MSF area detail design. This included U/G Utility Piping,
OWS (Oily Ware System) Strom water, coordination with Flour Canada for all Tie-Ins and
generating G.A. drawings.
Rajiv Kainth
Page 2 of 3
 KID Hydrotransport Area: Responsible for 4 Pump houses at circumference of East ETA for
seepage collection in addition Hypochlorite system including Tank, Layout of Hypochlorite area
and piping to Basal water pond.
 KID OPP: Responsible to supervise the design work being done by Krupp inside the OPP, epically
2 hydrotransport lines and related pumps, recycle pumps and related piping, trenches from OPP to
EDP , CCO spools.
 KEP Hydrotransport Area: Responsible for the designing hydrotranport typical pumphouse layout
which could be used at different stage of hydrotransport pipe line to PSV without any change in
layout. Purposed three layout options and one of them was picked up by IORVL. Also involved in
the detail design of Hydrotransport corridor, U/G Utilidor, Caustic system, CCO Spools detailing,
Pond 7 pump house, and pond discharge line to ETA (crossing KID Utilidor, 72Kv Power line, KID
HT lines, KID Tailing lines)
 KID Follow On: Helped the Lead with copy scope isometric list from KID to KEP, Routing of
various piping which was not in KID but required in KEP, Demolition ISOs, Concurrent engineering
ISOs.
 KMDB: Responsible for designing the KMDB OPP and hydrotransport (brand new areas) along
with relocated KID OPP and Hydrotransport lines. Provided a layout which could accommodate
these 2 options together without encroaching KODA space. After that worked in Rerouting of KID
and KEP Hydrotransport lines to KMDB Flow distributer options.
 KDeOX: Responsible for generating G.A. drawing, KDeOX lines from KEP recycle water pump
house, Chemical Injection Area detail design including tanks and inside Pumphouse, Tie ins.
Nexen Long Lake South Ph.1 SAGD Project
Colt Engineering, 2006 – 2007
Senior PDS Designer
Responsible for the Detail design for De-Oiling area, in this area which included Tank farm, 2 pump
house, IGF units. Also responsible for making the Equipment and piping status List, LDT , Plot Plan in
this given area.
CNRL Horizon
AMEC Americas, Calgary, AB, 2005 – 2006
Piping Designer
Responsible for detail designing of Tailing pump houses, NRU (Naphtha Recovering Unit) 3D PDS
modelling, Isometric extraction design review meeting with clients. Also responsible for all Cr. Carbide
spool drawings in CNRL (Horizon) Project.
SQWR
AMEC Americas, Calgary, AB, 2003 – 2005
Piping Designer
Responsible for the 3D PDS detailed Modeling of slurry preparation building. Co-ordination with
Mech., Stress, Process and Instrument department for completion of given area. Extraction/
preparation of piping isometrics for stress and fabrication. Co-ordination with site, for latest upgrade.
UE-1
Fluor Canada, 2002 – 2003
PDS/CAD Designer
Responsible for the 3D PDS detailed designing and modeling of Amine regenerator tower and nearby
Rajiv Kainth
Page 3 of 3
area. Nozzle orientation, ladder and platform orientation and detailed piping. Co-ordination with Mech.,
Stress, Process and Instrument department for completion of given area. Internal/design reviews with
client, incorporation of design review comments. Extraction/preparation of piping isometrics for stress
and fabrication. Production of General Arrangement drawings.
AMEC Americas, 2001 – 2002
Junior CAD Designer
Responsible for the 3D PDS detailed modelling for different equipment, piperacks, and buildings
across the plant. Extraction of different reports of 3D PDS. Drafting of PFDs and P&IDs, material take
off. Isometric extraction for fabrication.
Project included:
 Fort Hills Oil and Sand Project
 Aurora 2 Project
All above mentioned projects were perform on AutoCAD, Microstation, GMS, and 3D PDS system
depending of the client’s preferable systems.
Personal Information:
Marital status : Married
Status in Canada : Citizen
In Canada Since : Year , 2000
References:
Malcolm Burge : Checker Fluor Canada
Cell No: 403 616 7893
Dave Spear : Piping Lead, SNC Lavalin (Calgary)
Cell No: 403 512 4061
Paul Chatten : KDeOX Project Piping Lead, AMEC Foster Wheeler (Calgary)
Cell No: 403 889 9159

Mais conteúdo relacionado

Destaque

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Destaque (20)

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 

Sr.Piping Designer

  • 1. Page 1 of 3 Rajiv Kainth Sr.3D PDS Piping Designer 101 Legacy Green S.E. Calgary – Alberta T2X 0X6 403 830 1052 kainthrajiv@gmail.com Professional summary I have 16 Years of experience of Developing Plant Layouts, Isometrics, Area Plot Plans, Equipment location plans, G.A. drawings, field checkouts of given area. Also experience of Design Review with client, Follow on engineering / construction support and As Build on variety of projects. These projects have been Oil and Gas SAGD, Refineries, Power plants (fire fighting), Mining, Pharmaceutical, Agri food plants, dairy Industries and distillers. Software knowledge includes Auto Plant, AutoCAD 2014 , 2D Microstation ,3D PDS(Plant Design System), Modelling of equipment and piping, Isogen, 3D Design Review, 3D Smart Plant Review, Lotus 123, MSWord, Global Material System , PipeCAD, FD Plan, FDIso. Education Diploma in Mechanical Drafting and Apprenticeship Employment history AMEC Foster Wheeler , Senior Piping Designer, 2007 – 23rd .Oct.-2015 Colt Engineering, Senior PDS Designer, 2006 – 2007 AMEC Americas, Piping Designer, 2003 – 2006 Fluor Canada, PDS/CAD Designer, 2002 – 2003 AMEC Americas, Junior CAD Designer, 2001 – 2002 Representative projects AMEC Foster Wheeler, Calgary, AB, 2007 – .Oct.-2015 Senior Piping Designer Projects included:  Shell AOSP (Extraction Area): Responsible for the Detail designing for Hot Water Pump house equipment layout, Piping, Design review with client and Isometric extraction.  Shell AOSP (Utilities Area): Responsible for the Fire water routing near Froth Sellers. After completion of this duty, I was assigned to various areas to boost up the Isometric Production.  Syncrude Project: Responsible for the ATM (Aurora Tailings Management) project. It was a pump house with Hydro Cyclones. Completed the piping, internal and design reviews with client.  Kearl KID, MSF Area: Responsible for MSF area detail design. This included U/G Utility Piping, OWS (Oily Ware System) Strom water, coordination with Flour Canada for all Tie-Ins and generating G.A. drawings.
  • 2. Rajiv Kainth Page 2 of 3  KID Hydrotransport Area: Responsible for 4 Pump houses at circumference of East ETA for seepage collection in addition Hypochlorite system including Tank, Layout of Hypochlorite area and piping to Basal water pond.  KID OPP: Responsible to supervise the design work being done by Krupp inside the OPP, epically 2 hydrotransport lines and related pumps, recycle pumps and related piping, trenches from OPP to EDP , CCO spools.  KEP Hydrotransport Area: Responsible for the designing hydrotranport typical pumphouse layout which could be used at different stage of hydrotransport pipe line to PSV without any change in layout. Purposed three layout options and one of them was picked up by IORVL. Also involved in the detail design of Hydrotransport corridor, U/G Utilidor, Caustic system, CCO Spools detailing, Pond 7 pump house, and pond discharge line to ETA (crossing KID Utilidor, 72Kv Power line, KID HT lines, KID Tailing lines)  KID Follow On: Helped the Lead with copy scope isometric list from KID to KEP, Routing of various piping which was not in KID but required in KEP, Demolition ISOs, Concurrent engineering ISOs.  KMDB: Responsible for designing the KMDB OPP and hydrotransport (brand new areas) along with relocated KID OPP and Hydrotransport lines. Provided a layout which could accommodate these 2 options together without encroaching KODA space. After that worked in Rerouting of KID and KEP Hydrotransport lines to KMDB Flow distributer options.  KDeOX: Responsible for generating G.A. drawing, KDeOX lines from KEP recycle water pump house, Chemical Injection Area detail design including tanks and inside Pumphouse, Tie ins. Nexen Long Lake South Ph.1 SAGD Project Colt Engineering, 2006 – 2007 Senior PDS Designer Responsible for the Detail design for De-Oiling area, in this area which included Tank farm, 2 pump house, IGF units. Also responsible for making the Equipment and piping status List, LDT , Plot Plan in this given area. CNRL Horizon AMEC Americas, Calgary, AB, 2005 – 2006 Piping Designer Responsible for detail designing of Tailing pump houses, NRU (Naphtha Recovering Unit) 3D PDS modelling, Isometric extraction design review meeting with clients. Also responsible for all Cr. Carbide spool drawings in CNRL (Horizon) Project. SQWR AMEC Americas, Calgary, AB, 2003 – 2005 Piping Designer Responsible for the 3D PDS detailed Modeling of slurry preparation building. Co-ordination with Mech., Stress, Process and Instrument department for completion of given area. Extraction/ preparation of piping isometrics for stress and fabrication. Co-ordination with site, for latest upgrade. UE-1 Fluor Canada, 2002 – 2003 PDS/CAD Designer Responsible for the 3D PDS detailed designing and modeling of Amine regenerator tower and nearby
  • 3. Rajiv Kainth Page 3 of 3 area. Nozzle orientation, ladder and platform orientation and detailed piping. Co-ordination with Mech., Stress, Process and Instrument department for completion of given area. Internal/design reviews with client, incorporation of design review comments. Extraction/preparation of piping isometrics for stress and fabrication. Production of General Arrangement drawings. AMEC Americas, 2001 – 2002 Junior CAD Designer Responsible for the 3D PDS detailed modelling for different equipment, piperacks, and buildings across the plant. Extraction of different reports of 3D PDS. Drafting of PFDs and P&IDs, material take off. Isometric extraction for fabrication. Project included:  Fort Hills Oil and Sand Project  Aurora 2 Project All above mentioned projects were perform on AutoCAD, Microstation, GMS, and 3D PDS system depending of the client’s preferable systems. Personal Information: Marital status : Married Status in Canada : Citizen In Canada Since : Year , 2000 References: Malcolm Burge : Checker Fluor Canada Cell No: 403 616 7893 Dave Spear : Piping Lead, SNC Lavalin (Calgary) Cell No: 403 512 4061 Paul Chatten : KDeOX Project Piping Lead, AMEC Foster Wheeler (Calgary) Cell No: 403 889 9159