Professional summary
I have 16 Years of experience of Developing Plant Layouts, Isometrics, Area Plot Plans, Equipment
location plans, G.A. drawings, field checkouts of given area. Also experience of Design Review with
client, Follow on engineering / construction support and As Build on variety of projects.
These projects have been Oil and Gas SAGD, Refineries, Power plants (fire fighting), Mining,
Pharmaceutical, Agri food plants, dairy Industries and distillers.
Software knowledge includes Auto Plant, AutoCAD 2014 , 2D Microstation ,3D PDS(Plant Design
System), Modelling of equipment and piping, Isogen, 3D Design Review, 3D Smart Plant Review,
Lotus 123, MSWord, Global Material System , PipeCAD, FD Plan, FDIso.
Education
Diploma in Mechanical Drafting and Apprenticeship
Employment history
AMEC Foster Wheeler , Senior Piping Designer, 2007 – 23rd
.Oct.-2015
Colt Engineering, Senior PDS Designer, 2006 – 2007
AMEC Americas, Piping Designer, 2003 – 2006
Fluor Canada, PDS/CAD Designer, 2002 – 2003
AMEC Americas, Junior CAD Designer, 2001 – 2002
Representative projects
AMEC Foster Wheeler, Calgary, AB, 2007 – .Oct.-2015
Senior Piping Designer
Projects included:
Shell AOSP (Extraction Area): Responsible for the Detail designing for Hot Water Pump house
equipment layout, Piping, Design review with client and Isometric extraction.
Shell AOSP (Utilities Area): Responsible for the Fire water routing near Froth Sellers. After
completion of this duty, I was assigned to various areas to boost up the Isometric Production.
Syncrude Project: Responsible for the ATM (Aurora Tailings Management) project. It was a pump
house with Hydro Cyclones. Completed the piping, internal and design reviews with client.
Kearl KID, MSF Area: Responsible for MSF area detail design. This included U/G Utility Piping,
OWS (Oily Ware System) Strom water, coordination with Flour Canada for all Tie-Ins and
generating G.A. drawings.
2. Rajiv Kainth
Page 2 of 3
KID Hydrotransport Area: Responsible for 4 Pump houses at circumference of East ETA for
seepage collection in addition Hypochlorite system including Tank, Layout of Hypochlorite area
and piping to Basal water pond.
KID OPP: Responsible to supervise the design work being done by Krupp inside the OPP, epically
2 hydrotransport lines and related pumps, recycle pumps and related piping, trenches from OPP to
EDP , CCO spools.
KEP Hydrotransport Area: Responsible for the designing hydrotranport typical pumphouse layout
which could be used at different stage of hydrotransport pipe line to PSV without any change in
layout. Purposed three layout options and one of them was picked up by IORVL. Also involved in
the detail design of Hydrotransport corridor, U/G Utilidor, Caustic system, CCO Spools detailing,
Pond 7 pump house, and pond discharge line to ETA (crossing KID Utilidor, 72Kv Power line, KID
HT lines, KID Tailing lines)
KID Follow On: Helped the Lead with copy scope isometric list from KID to KEP, Routing of
various piping which was not in KID but required in KEP, Demolition ISOs, Concurrent engineering
ISOs.
KMDB: Responsible for designing the KMDB OPP and hydrotransport (brand new areas) along
with relocated KID OPP and Hydrotransport lines. Provided a layout which could accommodate
these 2 options together without encroaching KODA space. After that worked in Rerouting of KID
and KEP Hydrotransport lines to KMDB Flow distributer options.
KDeOX: Responsible for generating G.A. drawing, KDeOX lines from KEP recycle water pump
house, Chemical Injection Area detail design including tanks and inside Pumphouse, Tie ins.
Nexen Long Lake South Ph.1 SAGD Project
Colt Engineering, 2006 – 2007
Senior PDS Designer
Responsible for the Detail design for De-Oiling area, in this area which included Tank farm, 2 pump
house, IGF units. Also responsible for making the Equipment and piping status List, LDT , Plot Plan in
this given area.
CNRL Horizon
AMEC Americas, Calgary, AB, 2005 – 2006
Piping Designer
Responsible for detail designing of Tailing pump houses, NRU (Naphtha Recovering Unit) 3D PDS
modelling, Isometric extraction design review meeting with clients. Also responsible for all Cr. Carbide
spool drawings in CNRL (Horizon) Project.
SQWR
AMEC Americas, Calgary, AB, 2003 – 2005
Piping Designer
Responsible for the 3D PDS detailed Modeling of slurry preparation building. Co-ordination with
Mech., Stress, Process and Instrument department for completion of given area. Extraction/
preparation of piping isometrics for stress and fabrication. Co-ordination with site, for latest upgrade.
UE-1
Fluor Canada, 2002 – 2003
PDS/CAD Designer
Responsible for the 3D PDS detailed designing and modeling of Amine regenerator tower and nearby
3. Rajiv Kainth
Page 3 of 3
area. Nozzle orientation, ladder and platform orientation and detailed piping. Co-ordination with Mech.,
Stress, Process and Instrument department for completion of given area. Internal/design reviews with
client, incorporation of design review comments. Extraction/preparation of piping isometrics for stress
and fabrication. Production of General Arrangement drawings.
AMEC Americas, 2001 – 2002
Junior CAD Designer
Responsible for the 3D PDS detailed modelling for different equipment, piperacks, and buildings
across the plant. Extraction of different reports of 3D PDS. Drafting of PFDs and P&IDs, material take
off. Isometric extraction for fabrication.
Project included:
Fort Hills Oil and Sand Project
Aurora 2 Project
All above mentioned projects were perform on AutoCAD, Microstation, GMS, and 3D PDS system
depending of the client’s preferable systems.
Personal Information:
Marital status : Married
Status in Canada : Citizen
In Canada Since : Year , 2000
References:
Malcolm Burge : Checker Fluor Canada
Cell No: 403 616 7893
Dave Spear : Piping Lead, SNC Lavalin (Calgary)
Cell No: 403 512 4061
Paul Chatten : KDeOX Project Piping Lead, AMEC Foster Wheeler (Calgary)
Cell No: 403 889 9159