A
SEMINAR
ON
“Advance Magnetic Levitation Train Technology ”
Submitted in Partial Fulfillment for the Award of
Bachelor of Technology Degree
Of
Rajasthan Technical University, Kota
05/03/15 1
Contents
Introduction
Objective
How train works ?
Levitation System power
Propulsion System
Pantograph
Pantograph
Application Information
Transrapid Project
Advantage and Limitations
Conclusion
References
05/03/15 205/03/15 2
INTRODUCTION
• A pantograph always remains in contact with the overhead train
line is used to send electricity to the main transformer of the
electric train, thus providing power.
• Due to many external Disturbances the train line may lose
contact with pantograph, causes arcing phenomena to occur.
• The arcing produced creates harmonics in the electric over head
line and degrades the Power Quality
• Physical properties of magnetic components is used improve the
contact between the pantograph and the overhead train line
05/03/15 3
OBJECTIVES
• To reduce the arcing caused by contact loss of overhead train
line and the pantograph using magnetic components.
• To improve the Power Quality in the Over head train line by
reducing the current fluctuations.
• To optimize the magnetic force based arc prevention methods
using Artificial Neural Network.
05/03/15 4
How Train Works
• The electromagnets on the underside of the train pull it up to
the ferromagnetic stators on the track and levitate the train.
• The magnets on the side keep the train from moving from side
to side.
• A computer changes the amount of current to keep the train 1
cm from the track.
This means there is no friction between the train and the track!
05/03/1505/03/15 55
05/03/1505/03/15 66
Levitation System’s Power Supply
• Batteries on the train power the system, and therefore
it still functions without propulsion.
• The batteries can levitate the train for 30 minutes
without any additional energy.
• Linear generators in the magnets on board the train
use the motion of the train to recharge the batteries.
• Levitation system uses less power than the trains air
conditioning.
05/03/1505/03/15 77
Propulsion
•An alternating current is ran through electromagnet coils on the
guide walls of the guide way. This creates a magnetic field that
attracts and repels the superconducting magnets on the train and
propels the train forward.
•Braking is accomplished by sending an alternating current in the
reverse direction so that it is slowed by attractive and repulsive
forces.
05/03/1505/03/15 88
Propulsion System
•The system consists of
aluminum three-phase cable
windings in the stator packs
that are on the guideway
•When a current is supplied
to the windings, it creates a
traveling alternating current
that propels the train
forward by pushing and
pulling.
05/03/1505/03/15 99
•When the alternating current is reversed, the train brakes.
•Different speeds are achieved by varying the intensity of the
current.
•Only the section of track where the train is traveling is
electrified.
.
Propulsion System
05/03/1505/03/15 1010
Pantograph
• Pantograph is always placed at the top of the train Engine.
• Pantograph send electricity to the main transformer of the
electric train by making contact with the overhead train line.
• A graphite plate is their in pantograph that slides on over head
line.
• Various Disturbances can cause pantograph rapidly contact and
separate with train line results as arcing produced.
05/03/15 11
Lower Arm
Upper Arm
Coupling Rod Damper System
Collector Head
Slide Plate
Base Frame
Fig: General Description of Pantograph
Pantograph Design
05/03/15 12
Power system Structure of the Electrifie
Railway
Fig.. Single-phase booster transformer (BT) power supply circuit diagram for the Taiwan rail system.
05/03/15 13
Application Information
Safety
•The trains are virtually impossible to derail because the train is
wrapped around the track.
•Collisions between trains are unlikely because computers are
controlling the trains movements.
Maintenance
• There is very little maintenance because there is no contact
between the parts.
05/03/1505/03/15 1414
Comfort
•The ride is smooth while not accelerating..
Economic Efficency
•The initial investment is similar to other high speed rail roads.
(Maglift is $20-$40 million per mile and I-279 in Pittsburg cost
$37 million per mile 17 years ago.)
•Operating expenses are half of that of other railroads.
•A train is composed of sections that each contain 100 seats, and
a train can have between 2 and 10 sections.
•The linear generators produce electricity for the cabin of the
train.
05/03/1505/03/15 1515
Speed
•The train can travel at about 300 mph. (Acela can only go 150
mph)
•For trips of distances up to 500 miles its total travel time is
equal to a planes (including check in time and travel to airport.)
•It can accelerate to 200 mph in 3 miles, so it is ideal for short
jumps. (ICE needs 20 miles to reach 200 mph.)
05/03/1505/03/15 1616
Environment
•It uses less energy than existing transportation systems. For
every seat on a 300 km trip with 3 stops, the gasoline used per
100 miles varies with the speed. At 200 km/h it is 1 liter, at 300
km/h it is 1.5 liters and at 400 km/h it is 2 liters. This is 1/3 the
energy used by cars and 1/5 the energy used by jets per mile.
•The tracks have less impact on the environment because the
elevated models (50ft in the air) allows all animals to pass, low
models ( 5-10 ft) allow small animals to pass, they use less land
than conventional trains, and they can follow the landscape better
than regular trains since it can climb 10% gradients (while other
trains can only climb 4 gradients) and can handle tighter turns.
05/03/1505/03/15 1717
Noise Pollution
•The train makes little noise because it does not touch the track
and it has no motor. Therefore, all noise comes from moving air.
This sound is equivalent to the noise produced by city traffic.
05/03/1505/03/15 1818
Magnetic Field:
•The magnetic field created is low, therefore there are no
adverse effects.
05/03/1505/03/15 1919
Transrapid Projects
 Germany was going to build a
magnetic lift system between
Berlin and Hamburg (200 miles)
in 1996, but never did because a
new political party came in and
decided that the improvements
over ICE was not worth $7
billion dollars.
 China is building a 20 mile system between Shanghai Pudong
and Pudong International Airport. It will open in January of
2004, and it will reach speeds of over 250 mph. If the project is
successful, then China will build a system from Beijing to
Shanghai, a journey of over 800 miles.
05/03/1505/03/15 2020
How Magnets Uses
•This train uses superconducting electric magnets in the vehicle to
levitate and propel the train. These magnets are cooled by liquid
helium or liquid nitrogen. This means that once electrified these
magnets do not require additional energy.
05/03/1505/03/15 2121
Lateral Guidance
•When one side of the train nears the side of the guideway,
the super conducting magnet on the train induces a
repulsive force from the levitation coils on the side closer to
the train and an attractive force from the coils on the
farther side. This keeps the train in the center.
05/03/1505/03/15 2222
Advantage and Limitations
 This system is not ready for use now, but it should be ready in a few
years.
 It’s top speed with people aboard is 350 mph.
 The super conducting magnets create a strong magnetic field that
could be a problem for some passengers.
 The train is earthquake proof because the greater space (10 cm)
between the track and the train leaves more room for track
deformation
 Linear generators will produce all the electricity needed in the
train’s interior.
 Only the part of the track that is used will be electrified so no energy
is wasted.
05/03/1505/03/15 2323
Conclusion
•Since there is no friction these trains can reach
high speeds.
•It is a safe and efficient way to travel.
•Governments have mixed feelings about the
technology. Some countries, like China, have
embraced it and others like Germany have
balked at the expense.
05/03/1505/03/15 2424
References
1. W. Wang et al., “Experimental study of electrical
characteristics on pantograph arcing,” in Proc. 1st ICEPE-ST,
2011, pp. 602–607.
2. T. Li et al., “Pantograph arcing’s impact on locomotive
equipment's,” in Proc. IEEE 57th Holm Conf. Elect. Contacts,
2011, pp. 1–5.
3. T. Ding, G. X. Chen, and J. Bu, “Effect of temperature and
arc discharge on friction and wear behaviors of carbon
strip/copper contact wire in pantograph–catenary systems,”
Wear, vol. 271, no. 9/10, pp. 1629–1636, Jul. 2011.
4. G. Bucca, A. Collina, and R. Manigrasso, “Analysis of
electrical interferences related to the current collection quality
in pantograph–catenary interaction,” Proc. Inst. Mech. Eng., J.
Rail Rapid Transit, vol. 225, no. F5, pp. 483–499, 2011.
05/03/1505/03/15 2525
05/03/1505/03/15 2626
05/03/1505/03/15 2727

Mais conteúdo relacionado

Mais procurados

High speed rail (h2 s)
High speed rail (h2 s)High speed rail (h2 s)
High speed rail (h2 s)Kumar M.
 
Pantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing RegimePantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing RegimeKelvin Lam
 
Railway Electrification - Traction
Railway Electrification - TractionRailway Electrification - Traction
Railway Electrification - TractionSUDIN BISWAS
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railwayssuresh shindhe
 
Electric traction doc/sanjeet-1308143
Electric traction doc/sanjeet-1308143Electric traction doc/sanjeet-1308143
Electric traction doc/sanjeet-1308143sanjeet kumar
 
Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction pptragulkncet
 
CHALLENGES IN MAKING THE BULLET TRAIN
CHALLENGES IN MAKING THE BULLET TRAINCHALLENGES IN MAKING THE BULLET TRAIN
CHALLENGES IN MAKING THE BULLET TRAINAditya Shiva Appalla
 
Electric traction
Electric tractionElectric traction
Electric tractionsoprajap
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railwayssuresh shindhe
 
Pantograph Failure & Analysis
Pantograph Failure & AnalysisPantograph Failure & Analysis
Pantograph Failure & AnalysisKelvin Lam
 
ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)Arshad Hussain
 
Electric Traction
Electric TractionElectric Traction
Electric TractionNawaz Nz
 
Electric traction
Electric tractionElectric traction
Electric tractionDipak Meher
 
Electric traction (Part 2)
Electric traction (Part 2)Electric traction (Part 2)
Electric traction (Part 2)vishalwadkar9
 
EV traction motor comparison - Techno Frontier 2013 - M Burwell - Internatio...
 EV traction motor comparison - Techno Frontier 2013 - M Burwell - Internatio... EV traction motor comparison - Techno Frontier 2013 - M Burwell - Internatio...
EV traction motor comparison - Techno Frontier 2013 - M Burwell - Internatio...mcburwell
 
Super conducting power cable in dc electric railway systems
Super conducting power cable in dc electric railway systemsSuper conducting power cable in dc electric railway systems
Super conducting power cable in dc electric railway systemsponnameni Ramesh.Eee
 
Electric traction system and motors used in Electric traction system
Electric traction system and motors used in Electric traction systemElectric traction system and motors used in Electric traction system
Electric traction system and motors used in Electric traction systemabrar younas
 
Electric traction ankit
Electric traction ankitElectric traction ankit
Electric traction ankitAnkit Verma
 

Mais procurados (20)

High speed rail (h2 s)
High speed rail (h2 s)High speed rail (h2 s)
High speed rail (h2 s)
 
Pantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing RegimePantograph II - Failure Analysis, Monitor & Testing Regime
Pantograph II - Failure Analysis, Monitor & Testing Regime
 
Magnetic Levitation
Magnetic LevitationMagnetic Levitation
Magnetic Levitation
 
Railway Electrification - Traction
Railway Electrification - TractionRailway Electrification - Traction
Railway Electrification - Traction
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
Electric traction doc/sanjeet-1308143
Electric traction doc/sanjeet-1308143Electric traction doc/sanjeet-1308143
Electric traction doc/sanjeet-1308143
 
Electric traction ppt
Electric traction pptElectric traction ppt
Electric traction ppt
 
CHALLENGES IN MAKING THE BULLET TRAIN
CHALLENGES IN MAKING THE BULLET TRAINCHALLENGES IN MAKING THE BULLET TRAIN
CHALLENGES IN MAKING THE BULLET TRAIN
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
Pantograph Failure & Analysis
Pantograph Failure & AnalysisPantograph Failure & Analysis
Pantograph Failure & Analysis
 
ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)
 
Electric Traction
Electric TractionElectric Traction
Electric Traction
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Electric traction (Part 2)
Electric traction (Part 2)Electric traction (Part 2)
Electric traction (Part 2)
 
Basics of maglev
Basics of maglevBasics of maglev
Basics of maglev
 
EV traction motor comparison - Techno Frontier 2013 - M Burwell - Internatio...
 EV traction motor comparison - Techno Frontier 2013 - M Burwell - Internatio... EV traction motor comparison - Techno Frontier 2013 - M Burwell - Internatio...
EV traction motor comparison - Techno Frontier 2013 - M Burwell - Internatio...
 
Super conducting power cable in dc electric railway systems
Super conducting power cable in dc electric railway systemsSuper conducting power cable in dc electric railway systems
Super conducting power cable in dc electric railway systems
 
Electric traction system and motors used in Electric traction system
Electric traction system and motors used in Electric traction systemElectric traction system and motors used in Electric traction system
Electric traction system and motors used in Electric traction system
 
Electric traction ankit
Electric traction ankitElectric traction ankit
Electric traction ankit
 

Destaque

Science project on Maglev Trains By Ardhendu
Science project on Maglev Trains By ArdhenduScience project on Maglev Trains By Ardhendu
Science project on Maglev Trains By Ardhenduardhendu03
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabadPalash Awasthi
 
MAGLEV TRAIN PPT NIKKI.CV
MAGLEV TRAIN PPT NIKKI.CVMAGLEV TRAIN PPT NIKKI.CV
MAGLEV TRAIN PPT NIKKI.CVNutan kumar C V
 
MAGLEV TRAIN (Train that floats in the air)
MAGLEV TRAIN (Train that floats in the air)MAGLEV TRAIN (Train that floats in the air)
MAGLEV TRAIN (Train that floats in the air)mokhim
 
Magnetic levitation
Magnetic levitationMagnetic levitation
Magnetic levitationsunnynigah
 
Superconductivity and new superconductors
Superconductivity and new superconductorsSuperconductivity and new superconductors
Superconductivity and new superconductorsSupravat Pratihar
 
magnetic levitation
magnetic levitationmagnetic levitation
magnetic levitationyesh_sriram
 
Superconductors and Superconductivity
Superconductors and SuperconductivitySuperconductors and Superconductivity
Superconductors and SuperconductivityJayanshu Gundaniya
 
Magnetic levitation in trains
Magnetic levitation in trainsMagnetic levitation in trains
Magnetic levitation in trainsgopikahariharan
 
Basic Maglev Train and its Working
Basic Maglev Train and its WorkingBasic Maglev Train and its Working
Basic Maglev Train and its WorkingVASAV SHETHNA
 

Destaque (13)

Science project on Maglev Trains By Ardhendu
Science project on Maglev Trains By ArdhenduScience project on Maglev Trains By Ardhendu
Science project on Maglev Trains By Ardhendu
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
 
Sandeep
SandeepSandeep
Sandeep
 
MAGLEV TRAIN PPT NIKKI.CV
MAGLEV TRAIN PPT NIKKI.CVMAGLEV TRAIN PPT NIKKI.CV
MAGLEV TRAIN PPT NIKKI.CV
 
MAGLEV TRAIN (Train that floats in the air)
MAGLEV TRAIN (Train that floats in the air)MAGLEV TRAIN (Train that floats in the air)
MAGLEV TRAIN (Train that floats in the air)
 
Magnetic levitation
Magnetic levitationMagnetic levitation
Magnetic levitation
 
Superconductivity and new superconductors
Superconductivity and new superconductorsSuperconductivity and new superconductors
Superconductivity and new superconductors
 
magnetic levitation
magnetic levitationmagnetic levitation
magnetic levitation
 
Superconductors and Superconductivity
Superconductors and SuperconductivitySuperconductors and Superconductivity
Superconductors and Superconductivity
 
Railway Training ppt
Railway Training pptRailway Training ppt
Railway Training ppt
 
Magnetic levitation in trains
Magnetic levitation in trainsMagnetic levitation in trains
Magnetic levitation in trains
 
Basic Maglev Train and its Working
Basic Maglev Train and its WorkingBasic Maglev Train and its Working
Basic Maglev Train and its Working
 
MAGLEV PPT
MAGLEV PPTMAGLEV PPT
MAGLEV PPT
 

Semelhante a maglev train (20)

MAGLEV TRAIN
MAGLEV TRAIN MAGLEV TRAIN
MAGLEV TRAIN
 
Maglev trains by deepanshu sharma
Maglev trains by deepanshu sharmaMaglev trains by deepanshu sharma
Maglev trains by deepanshu sharma
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
application of superconductors maglev
application of superconductors maglevapplication of superconductors maglev
application of superconductors maglev
 
Train electriques 1.pptx
Train electriques 1.pptxTrain electriques 1.pptx
Train electriques 1.pptx
 
Suit ppt
Suit pptSuit ppt
Suit ppt
 
MAGLEV
MAGLEVMAGLEV
MAGLEV
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Magnetic levitation
Magnetic levitationMagnetic levitation
Magnetic levitation
 
Railay internship report
Railay internship reportRailay internship report
Railay internship report
 
Magnetic levitation
Magnetic levitationMagnetic levitation
Magnetic levitation
 
Magnetic Levitating train
Magnetic Levitating trainMagnetic Levitating train
Magnetic Levitating train
 
Maglev
MaglevMaglev
Maglev
 
Maglev ppt
Maglev ppt Maglev ppt
Maglev ppt
 
magnetic levitation
magnetic levitationmagnetic levitation
magnetic levitation
 
The bullet train
The bullet trainThe bullet train
The bullet train
 

Último

Artificial_intelligence_in_cctv_survelliance FINAL.pptx
Artificial_intelligence_in_cctv_survelliance FINAL.pptxArtificial_intelligence_in_cctv_survelliance FINAL.pptx
Artificial_intelligence_in_cctv_survelliance FINAL.pptxhariprasad279825
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalFabian de Rijk
 
History of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth deathHistory of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth deathphntsoaki
 
ECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentationECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentationFahadFazal7
 
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORNLITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORNtntlai16
 
Using AI to boost productivity for developers
Using AI to boost productivity for developersUsing AI to boost productivity for developers
Using AI to boost productivity for developersTeri Eyenike
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESfuthumetsaneliswa
 
globalisation project report displayed overview
globalisation project report displayed overviewglobalisation project report displayed overview
globalisation project report displayed overviewasadzafar8520
 
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...Sosiaali- ja terveysministeriö / yleiset
 
Introduction to Artificial intelligence.
Introduction to Artificial intelligence.Introduction to Artificial intelligence.
Introduction to Artificial intelligence.thamaeteboho94
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityHung Le
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESfuthumetsaneliswa
 
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptxBEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptxthusosetemere
 
2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdfNancy Goebel
 
The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...Kayode Fayemi
 
"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXRMegan Campos
 
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfMahamudul Hasan
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...David Celestin
 

Último (20)

Artificial_intelligence_in_cctv_survelliance FINAL.pptx
Artificial_intelligence_in_cctv_survelliance FINAL.pptxArtificial_intelligence_in_cctv_survelliance FINAL.pptx
Artificial_intelligence_in_cctv_survelliance FINAL.pptx
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of Drupal
 
History of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth deathHistory of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth death
 
ECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentationECOLOGY OF FISHES.pptx full presentation
ECOLOGY OF FISHES.pptx full presentation
 
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORNLITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
 
Using AI to boost productivity for developers
Using AI to boost productivity for developersUsing AI to boost productivity for developers
Using AI to boost productivity for developers
 
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
globalisation project report displayed overview
globalisation project report displayed overviewglobalisation project report displayed overview
globalisation project report displayed overview
 
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
 
Introduction to Artificial intelligence.
Introduction to Artificial intelligence.Introduction to Artificial intelligence.
Introduction to Artificial intelligence.
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptxBEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
 
2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf
 
The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...
 
"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR
 
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait Cityin kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
 
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
 

maglev train

  • 1. A SEMINAR ON “Advance Magnetic Levitation Train Technology ” Submitted in Partial Fulfillment for the Award of Bachelor of Technology Degree Of Rajasthan Technical University, Kota 05/03/15 1
  • 2. Contents Introduction Objective How train works ? Levitation System power Propulsion System Pantograph Pantograph Application Information Transrapid Project Advantage and Limitations Conclusion References 05/03/15 205/03/15 2
  • 3. INTRODUCTION • A pantograph always remains in contact with the overhead train line is used to send electricity to the main transformer of the electric train, thus providing power. • Due to many external Disturbances the train line may lose contact with pantograph, causes arcing phenomena to occur. • The arcing produced creates harmonics in the electric over head line and degrades the Power Quality • Physical properties of magnetic components is used improve the contact between the pantograph and the overhead train line 05/03/15 3
  • 4. OBJECTIVES • To reduce the arcing caused by contact loss of overhead train line and the pantograph using magnetic components. • To improve the Power Quality in the Over head train line by reducing the current fluctuations. • To optimize the magnetic force based arc prevention methods using Artificial Neural Network. 05/03/15 4
  • 5. How Train Works • The electromagnets on the underside of the train pull it up to the ferromagnetic stators on the track and levitate the train. • The magnets on the side keep the train from moving from side to side. • A computer changes the amount of current to keep the train 1 cm from the track. This means there is no friction between the train and the track! 05/03/1505/03/15 55
  • 7. Levitation System’s Power Supply • Batteries on the train power the system, and therefore it still functions without propulsion. • The batteries can levitate the train for 30 minutes without any additional energy. • Linear generators in the magnets on board the train use the motion of the train to recharge the batteries. • Levitation system uses less power than the trains air conditioning. 05/03/1505/03/15 77
  • 8. Propulsion •An alternating current is ran through electromagnet coils on the guide walls of the guide way. This creates a magnetic field that attracts and repels the superconducting magnets on the train and propels the train forward. •Braking is accomplished by sending an alternating current in the reverse direction so that it is slowed by attractive and repulsive forces. 05/03/1505/03/15 88
  • 9. Propulsion System •The system consists of aluminum three-phase cable windings in the stator packs that are on the guideway •When a current is supplied to the windings, it creates a traveling alternating current that propels the train forward by pushing and pulling. 05/03/1505/03/15 99
  • 10. •When the alternating current is reversed, the train brakes. •Different speeds are achieved by varying the intensity of the current. •Only the section of track where the train is traveling is electrified. . Propulsion System 05/03/1505/03/15 1010
  • 11. Pantograph • Pantograph is always placed at the top of the train Engine. • Pantograph send electricity to the main transformer of the electric train by making contact with the overhead train line. • A graphite plate is their in pantograph that slides on over head line. • Various Disturbances can cause pantograph rapidly contact and separate with train line results as arcing produced. 05/03/15 11
  • 12. Lower Arm Upper Arm Coupling Rod Damper System Collector Head Slide Plate Base Frame Fig: General Description of Pantograph Pantograph Design 05/03/15 12
  • 13. Power system Structure of the Electrifie Railway Fig.. Single-phase booster transformer (BT) power supply circuit diagram for the Taiwan rail system. 05/03/15 13
  • 14. Application Information Safety •The trains are virtually impossible to derail because the train is wrapped around the track. •Collisions between trains are unlikely because computers are controlling the trains movements. Maintenance • There is very little maintenance because there is no contact between the parts. 05/03/1505/03/15 1414
  • 15. Comfort •The ride is smooth while not accelerating.. Economic Efficency •The initial investment is similar to other high speed rail roads. (Maglift is $20-$40 million per mile and I-279 in Pittsburg cost $37 million per mile 17 years ago.) •Operating expenses are half of that of other railroads. •A train is composed of sections that each contain 100 seats, and a train can have between 2 and 10 sections. •The linear generators produce electricity for the cabin of the train. 05/03/1505/03/15 1515
  • 16. Speed •The train can travel at about 300 mph. (Acela can only go 150 mph) •For trips of distances up to 500 miles its total travel time is equal to a planes (including check in time and travel to airport.) •It can accelerate to 200 mph in 3 miles, so it is ideal for short jumps. (ICE needs 20 miles to reach 200 mph.) 05/03/1505/03/15 1616
  • 17. Environment •It uses less energy than existing transportation systems. For every seat on a 300 km trip with 3 stops, the gasoline used per 100 miles varies with the speed. At 200 km/h it is 1 liter, at 300 km/h it is 1.5 liters and at 400 km/h it is 2 liters. This is 1/3 the energy used by cars and 1/5 the energy used by jets per mile. •The tracks have less impact on the environment because the elevated models (50ft in the air) allows all animals to pass, low models ( 5-10 ft) allow small animals to pass, they use less land than conventional trains, and they can follow the landscape better than regular trains since it can climb 10% gradients (while other trains can only climb 4 gradients) and can handle tighter turns. 05/03/1505/03/15 1717
  • 18. Noise Pollution •The train makes little noise because it does not touch the track and it has no motor. Therefore, all noise comes from moving air. This sound is equivalent to the noise produced by city traffic. 05/03/1505/03/15 1818
  • 19. Magnetic Field: •The magnetic field created is low, therefore there are no adverse effects. 05/03/1505/03/15 1919
  • 20. Transrapid Projects  Germany was going to build a magnetic lift system between Berlin and Hamburg (200 miles) in 1996, but never did because a new political party came in and decided that the improvements over ICE was not worth $7 billion dollars.  China is building a 20 mile system between Shanghai Pudong and Pudong International Airport. It will open in January of 2004, and it will reach speeds of over 250 mph. If the project is successful, then China will build a system from Beijing to Shanghai, a journey of over 800 miles. 05/03/1505/03/15 2020
  • 21. How Magnets Uses •This train uses superconducting electric magnets in the vehicle to levitate and propel the train. These magnets are cooled by liquid helium or liquid nitrogen. This means that once electrified these magnets do not require additional energy. 05/03/1505/03/15 2121
  • 22. Lateral Guidance •When one side of the train nears the side of the guideway, the super conducting magnet on the train induces a repulsive force from the levitation coils on the side closer to the train and an attractive force from the coils on the farther side. This keeps the train in the center. 05/03/1505/03/15 2222
  • 23. Advantage and Limitations  This system is not ready for use now, but it should be ready in a few years.  It’s top speed with people aboard is 350 mph.  The super conducting magnets create a strong magnetic field that could be a problem for some passengers.  The train is earthquake proof because the greater space (10 cm) between the track and the train leaves more room for track deformation  Linear generators will produce all the electricity needed in the train’s interior.  Only the part of the track that is used will be electrified so no energy is wasted. 05/03/1505/03/15 2323
  • 24. Conclusion •Since there is no friction these trains can reach high speeds. •It is a safe and efficient way to travel. •Governments have mixed feelings about the technology. Some countries, like China, have embraced it and others like Germany have balked at the expense. 05/03/1505/03/15 2424
  • 25. References 1. W. Wang et al., “Experimental study of electrical characteristics on pantograph arcing,” in Proc. 1st ICEPE-ST, 2011, pp. 602–607. 2. T. Li et al., “Pantograph arcing’s impact on locomotive equipment's,” in Proc. IEEE 57th Holm Conf. Elect. Contacts, 2011, pp. 1–5. 3. T. Ding, G. X. Chen, and J. Bu, “Effect of temperature and arc discharge on friction and wear behaviors of carbon strip/copper contact wire in pantograph–catenary systems,” Wear, vol. 271, no. 9/10, pp. 1629–1636, Jul. 2011. 4. G. Bucca, A. Collina, and R. Manigrasso, “Analysis of electrical interferences related to the current collection quality in pantograph–catenary interaction,” Proc. Inst. Mech. Eng., J. Rail Rapid Transit, vol. 225, no. F5, pp. 483–499, 2011. 05/03/1505/03/15 2525