Raja Rama Mohan Roy
Resident Construction Manager
Raja Rama Mohan Roy has over 28 years of total experience in Construction
Management pertaining to Oil & Gas processing Projects and Refinery &
Petrochemical Projects including handling of projects in 15MMTPA Refinery.
COMPETENCIES OVERVIEW
 Construction Management (both at Home office and at
Project sites) which includes operation of contracts (both LSTK
and Conventional / EPC) with respect to the scope, specifications
and drawings including cost control,
 Worked in seven Refineries in India for various green field and
brown field projects, Four Oil & Gas onshore project sites,
Petrochemical projects in India and abroad
 Worked in Crude distillation Units, Delayed Coker Units, Hydro
Cracker Unit, FCCU, VBU, SRU, ARU, SWS, SARU, Butamer,
Alkalisation Unit and offsites in various Refineries. Also worked in
C2,C3 recovery project, Methonolysis units etc and successfully
completed.
 Successfully executed special assignments like offshore platforms
installation works, submarine pipe laying works, shutdown works
 Ensured safe working environment by Monitoring and
implementing HSE (Health, Safety and Environment) activities
 Resolving interfaces issues between different agencies and
ensuring overall completion on time
 Construction execution / Job expediting, progress monitoring
 Team building and monitoring performance of team members
 Review of Plot plans, erection studies, construction studies etc and
providing inputs
 Review of resources and ensuring mobilization of sufficient
resources (experienced manpower and machinery) to meet the
project targets
 Proposals for improvement and Construction strategies to deliver
within time frame of project schedules
 Implementation of Quality Assurance and Quality Control Systems
at construction sites (including guiding and review of QMS
documents submitted by contractors like Inspection & Test Plans,
QAPs, Job procedures/ Method statements etc),
 Conducting technical audits at construction sites
 Equipment Erection works pertaining to Static & Rotary Equipment
viz. columns/ towers, heat exchangers, Gas turbines&
Compressors, Diesel engine Generators etc in both Offshore and
onshore projects.
 Preparation of final handing over documentation(Dossiers),
Material reconciliation and accounting for to the client(in case of
FIM) handing over final documentation dossiers to the client
 Coordinating Pre commissioning activities
 Closing of contracts and closing of site( successfully closed 22
contracts)
 Coordination of Home office construction activities like
Review of plot plans and Project Documents, Review of
Date of Birth:
25th
November, 1962
Nationality:
Indian
Educational Qualifications:
B.E Mechanical Engineering
Professional Qualifications:
Industrial Radiography
Welding and NDT
Passport Details:
Number : H1440265
Valid till : 05/11/2018
Communication Address:
House No: 8-3-6/2,
Flat No: A-2, Ramakrishna
Mansions,
Vizainagar Palace,
Peddawaltair,
Visakhapatnam-530017,
Andhra Pradesh,
India
Contact No:
Mob : +601117710920
+91- 9441209267
Tel : +91-0891-2745189
E-mail ID:
rrmroyk@yahoo.co.uk
rajaramamohanroy@gmail.com
rrmroy@rediffmail.com
Raja Rama Mohan Roy
Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 2 of 7
Constructability Studies and Heavy lift studies, Providing inputs in
Model Reviews and for sub contractors tender requisitions,
Working out of construction work loads and periodic review
 Develop and allocate resource requirements for assigned projects
making best use of available resources.
 Ensuring a satisfactory teamwork operation for the effective
execution of projects within assigned responsibilities to achieve the
Corporate and project profitability and schedule requirements.
 Carryout regular reviews of construction workload, manpower
utilisation, and staffing requirements to ensure both the adequacy
and efficiency of all assigned staff.
 Providing construction planning inputs for preparation of project
schedules, Providing technical support, Liaison/ Coordination with
Project Engineering, and Engineering and other teams, exercising
home office duties.
Experience with Fluor from Aug 2015 – till date)
Presently working with Fluor for their joint venture in
Malaysia, overseeing overall Construction
Management for the Amine Regeneration Unit
(ARU), Sulphur Recovery Unit (SRU), Sour Water
Stripping Unit (SWS) package on the project (value
of 575 Million USD) .
Duration : 4th Aug 2015 to Date
Designation : Construction Manager at Construction site
Project : RAPID Project
Client : Petronas
Job Details : Presently handling a project of grassroot refinery
Experience with Foster Wheeler(Amec FW) (2009–2015)
Duration : 16th September 2009 to July 2015
Designation : Area Manager for Team 3 at HOME OFFICE and Resident
Construction Manager at Construction site
Project : IOCL Paradip Project
Client : Indian Oil Corporation Limited
Job Details : Handled projects of 555 Million USD of 3000 crores (Indian
rupees) grassroot refinery
A. Home office:
 Preparation and Review of Project Documents.
 Review of plot plans Preparation and Review of Constructability
Studies and Heavy lift studies based on lessons learnt , including
for safety, lifting studies, plot plan, design and model reviews.
 Liaison/ Coordination with Project Engineering, and Engineering
and other teams, exercising home office duties.
 Providing inputs in Model Reviews
 Providing construction planning inputs for preparation of project
schedules
Raja Rama Mohan Roy
Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 3 of 7
 Manage, co-ordinate and execute, scheduling construction field
activities for projects in a standardised manner
 Delivering all HO generated construction execution strategies and
procedures to ensure that the content is consistent and complies
with corporate and project requirements.
 Managing, initiating and developing constructability participation,
philosophies, paths of construction, methodologies, practices and
checklists, identifying critical execution issues and implement
lessons learnt for progressive projects, including for safety, lifting
studies, plot plan, design and model reviews.
 Providing technical support to all disciplines in developing the
Engineering drawings
 Providing inputs for sub contractors tender requisitions and
evaluation of the tenders
 Working out of construction work loads and periodic review
 Over viewing construction schedules
 Preparing Discipline wise sequence of construction activities etc.
 Construction progress monitoring to meet the target schedules
 Contract management
 Leading the team by example
B. Construction Site:
 Worked for 15 MMTPA grass root refinery, as a Construction Manager,
for Alkalisation Unit, Butamer unit, Kero Treater, Naphtha treater Units,
Sulphur regeneration unit, Sulphur recovery unit, Civil works like Refinery
storm water reservoirs and storm water drainage system, Control room
buildings etc.
 Implementing the Construction Execution Plan to ensure Refinery project
objectives are attained.
 Review of erection plans and safe execution of Equipment including
Heavy lifts
 Ensuring that Underground vessels foundations, Under ground systems
and Civil and Structural works are executed as per drawings and
specifications
 Ensuring that the project achieves its objectives in respect of HSES,
quality, cost and schedule
 Material management services
 Actively participate in the effective administration of construction
contractors and supplier site service representatives including offsite pre-
assembly and pre-fabrication areas.
 Following up with various vendors for delivery and resolving the quality
issues on Equipment
 Managing, guiding, set targets, objectives and clear responsibilities for all
supervisory staff, and progressively monitor individual performance
against the agreed criteria and conduct formal appraisals at least
annually.
 Promoting company policies by demonstrating professionalism and
efficiency, establishing credible client and contact working relationships.
 Ensure adherence to national/Client HSES regulations.
 Ensuring that the Health, Safety, Environment, Security (HSES) and
quality policy is understood and implemented by all supervisory staff and
construction contractors.
 Fully implement all aspects of the HSES plan, including training.
 Providing feedback to the engineering regarding AFC drawing
requirements, engineering design, safety alerts, material requirements,
material shortages/damages etc in respect of the construction site.
Raja Rama Mohan Roy
Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 4 of 7
 Monitor and review materials supply status to ensure ROS dates are
achieved for a defined construction area. Ensure materials are issued to
contractors or client as per procedure.
Experience with Lurgi (2008-2009)
Duration : Nov’2008 to Aug’2009
Organisation : M/s Lurgi
Designation : Chief Construction Manager
Project Name : SRU, SWS, TGT,ARU and Incinerators
Client / Owner : Indian Oil Corporation Limited, Haldia Refinery
Responsibilities : Responsible for overall project completion (contract
administration and total construction management services
at site , progress monitoring, coordination with HO and
client, providing Material management / warehouse
management services, quality control/quality assurance
(QC/QA) , process monitoring & scheduling, review of
heavy erection schemes, HSE etc. and handing over to the
client. This includes executing around 2000 piles for
various Civil foundations and buildings like substations and
control room buildings.
Experience with Engineers India Ltd.(1993–2008)
Duration : Sep’2008 to Nov’2008
Organisation : Engineers India Limited
Designation : Senior Construction Manager
Project Name : Naphtha Cracker project, Panipat, India
Client : Indian Oil Corporation Limited, Panipat Refinery
Responsibilities : Handled Mechanical Works.
Duration : Nov’2005 to Aug’2008
Organisation : Engineers India Limited
Designation : Area Manager
Project Name : Visakh Refinery, HPCL, Vizag( Brown field project)
Client : Hindustan Petroleum Corporation Limited
Responsibilities : Successfully completed Mechanical works for Additional
crude facilities project and Cryogenic Nitrogen plant.
Handled Mechanical works (both piping & Equipment)
Flare system for Euro III project, FCCU Revamp(Brown
field project works (which involves 112 days of shutdown
works). Major contribution was that successful erection of
35M-height column in running unit of FCCU and erection of
85 T columns in running Merox unit, micro level shutdown
scheduling, safe completion of Civil and structural works
and equipment erection in the running FCCU unit while in
operation. Also Civil and Mechanical works for Cooling
towers has been successfully executed.
Raja Rama Mohan Roy
Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 5 of 7
Duration : Aug’2003 to Nov’2005
Organisation : Engineers India Limited
Designation : Head of Department, Equipments and Pre-commissioning
Project Name : C2 Recovery project
Client : Pars Petrochemical Company, Iran
Responsibilities : Handled Mechanical Equipment department (Gas and
Steam turbines, Compressors supplied by M/s Nuovo
pignone, M/s Atlas Copco, Pumps, Towers, and Coolers
etc) at Iran in one of the Petrochemical Plant, which was
commissioned.. Also responsible for finalization of
Inspection and Test Plans (ITPs), Quality Assurance and
Quality Control system implementation, progress
monitoring and expediting, liaison with owner and
Licensers/ other agencies. Involved in Conducting and
Coordinating Technical Audits during different stages of
Construction. Coordinated Mechanical completion/ pre-
commissioning activities between different disciplines i.e.
Civil, Structural, Instrumentation, piping, Equipments
division, Electrical and Instrumentation, including
coordinating with M/s Linde. During execution of
Equipments works, four qualified Engineers and four
diploma Engineers were working under me
Duration : Jul’2002 to Aug’2003
Organisation : Engineers India Limited
Designation : Area Manager
Project Name : Hydro cracker unit, VBU, SRU
Client : Chennai Petroleum Corporation Ltd, Chennai
Responsibilities : Responsible for construction Coordination and supervision
of Hydro Cracker unit, Vis-breaker and Sulphur Recovery
(VBU and SRU) Units and Cooling towers. Also executed
Equipment works (heavy lift Static and Rotary) and piping
works. Also handled heavy lift package works.
Responsible for finalization of Inspection and Test Plans
(ITPs), Quality Assurance and Quality Control system
implementation, progress monitoring and Expediting,
liaison with owner and other agencies, Final settlement
and Closing of contract.
Handled Heavy lifts
Fully Conversant with contract management and contract
administration.
Duration : Apr’1996 to Jul’2002
Organisation : Engineers India Limited
Designation : Site In charge /Site Construction Manager
Project Name : Insitu Combustion Projects, GGS,ETPs
Client : Oil and Natural Gas commission (ONGC)
Responsibilities : Responsible construction management for total
construction works related to various onshore projects
including Insitu combustion project, Effluent treatment plant
and Group Gathering Stations, Control rooms, substation
buildings, cooling towers etc.
Responsible for construction management of the works
which involves review and approval of work methodology,
implementation of QA/QC systems, finalization of
Inspection and Test plans, technical audit, monitoring of
construction quality, interaction with different contractors
Raja Rama Mohan Roy
Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 6 of 7
and owner on day to day matters, progress monitoring and
expediting etc.
Also responsible for contract administration, approval of
work schedules to control the project costs and generate
reports indicating project schedule vis-à-vis progress of
works, informing owner well in advance about the
deficiencies, contradictions/ omissions which will hamper
the project implementation & performance, perform
audits/inspections to ensure implementation of owners
requirements & issuance of project coordination procedure,
ensure implementation of steps required to present / halt or
minimize the delays & budget over running in all adverse
conditions, verify consistency of the contract
implementation for all the major proposals, implementation
of Health, Safety and Environment policies in the project.
Well versed with contract administration and expert in
project coordination activities.
Also handled erection (most of the components of
reciprocating compressors were assembled at site),
alignment and commissioning of Centrifugal (Centac)
compressors (supplied by M/s Ingersoll Rand and Atlas
Copco), Reciprocating Compressors supplied by M/s
Dresser Rand, Atlas copco and M/s KG Khosla
Duration : Mar’1993 to Apr’1996
Organisation : Engineers India Limited
Designation : Site In charge /Site Construction Manager
Project Name : LPG Recovery project, RMCR and Refinery expansion
project etc
Client : Bongaigaon Refinery and Petroleum Limited, Bongaigaon,
Assam
Responsibilities: Revamp works (brown field project works) including
Shutdown works for CDU & DCU, Methenolysis plant
Construction supervision of mechanical works pertaining to
erection/ assembly / alignment of static and rotary
equipment, piping works. (Loops preparation, erection,
testing etc) for LPG recovery project, RMCR and Refinery
expansion project
Experience with Hindustan Shipyard Ltd.
(1988-1993)
Duration : Aug’1988 to Feb’1993
Organisation : Hindustan Shipyard Limited
Designation : Management Trainee, QA/QC Piping Engineer, NDT
Engineer, QA/QC Instrumentation Engineer and structural
Engineer, Submarine pipeline Engineer at offshore
Project Name : Offshore platforms installation and submarine pipe laying
works
Client : M/s Oil and Natural Gas Commission, India
Responsibilities : Involved in Construction supervision of Offshore platforms
and jackets construction (Piping, equipment, structural and
instrumentation), & NDT works at fabrication site.
Worked as a piping & Instrumentation Engineer on well
platforms in Bombay High offshore field and Ravva
offshore Oil field.
Also worked for submarine pipe laying works at
Raja Rama Mohan Roy
Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 7 of 7
offshore worked on ETPM barge.
Additionally handled Instrumentation works including
Calibration and Instrumentation loop testing for oil well
platforms at offshore.

Mais conteúdo relacionado

Mais procurados

Giri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineerGiri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineer
Giri Rao
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
Suresha Rao
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
Jitendra Shende
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
John Raj BE, MBA
 
ASLim CV1
ASLim CV1ASLim CV1
ASLim CV1
Lim Soo
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
kalathil716
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
ehsan nazeer
 
Tracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical EngineerTracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical Engineer
Tracy Brooks
 

Mais procurados (19)

Giri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineerGiri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineer
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Topside
TopsideTopside
Topside
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Ahmed Elsonbaty Resume Oct_2016
Ahmed Elsonbaty Resume Oct_2016Ahmed Elsonbaty Resume Oct_2016
Ahmed Elsonbaty Resume Oct_2016
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
joy S resume
joy S resumejoy S resume
joy S resume
 
ASLim CV1
ASLim CV1ASLim CV1
ASLim CV1
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 
Tracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical EngineerTracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical Engineer
 

Destaque

Esitlus 2010 Taotlusvoor Kokku
Esitlus 2010 Taotlusvoor KokkuEsitlus 2010 Taotlusvoor Kokku
Esitlus 2010 Taotlusvoor Kokku
laanemaa123
 
CV SHJM Douven Nederlands WEB
CV SHJM Douven Nederlands WEBCV SHJM Douven Nederlands WEB
CV SHJM Douven Nederlands WEB
Sil Douven
 

Destaque (15)

The Influence Report - Cannes 2015
The Influence Report - Cannes 2015The Influence Report - Cannes 2015
The Influence Report - Cannes 2015
 
Divulgando a experiência
Divulgando a experiênciaDivulgando a experiência
Divulgando a experiência
 
Esitlus 2010 Taotlusvoor Kokku
Esitlus 2010 Taotlusvoor KokkuEsitlus 2010 Taotlusvoor Kokku
Esitlus 2010 Taotlusvoor Kokku
 
نهاية ممتدة
نهاية ممتدةنهاية ممتدة
نهاية ممتدة
 
Pattern
PatternPattern
Pattern
 
cv Kenneth Hauters 2016
cv Kenneth Hauters 2016cv Kenneth Hauters 2016
cv Kenneth Hauters 2016
 
Averroes w fleming
Averroes w flemingAverroes w fleming
Averroes w fleming
 
CV SHJM Douven Nederlands WEB
CV SHJM Douven Nederlands WEBCV SHJM Douven Nederlands WEB
CV SHJM Douven Nederlands WEB
 
Revolucion y dictadura en America Latina
Revolucion y dictadura en America LatinaRevolucion y dictadura en America Latina
Revolucion y dictadura en America Latina
 
The Digital Transformation Catalyst
The Digital Transformation CatalystThe Digital Transformation Catalyst
The Digital Transformation Catalyst
 
Основы ведения интервью
Основы ведения интервьюОсновы ведения интервью
Основы ведения интервью
 
RIW2016 - UX RESEARCH НА РАЗЛИЧНЫХ ЭТАПАХ РАЗРАБОТКИ DIGITAL-ПРОДУКТОВ
RIW2016 - UX RESEARCH НА РАЗЛИЧНЫХ ЭТАПАХ РАЗРАБОТКИ DIGITAL-ПРОДУКТОВRIW2016 - UX RESEARCH НА РАЗЛИЧНЫХ ЭТАПАХ РАЗРАБОТКИ DIGITAL-ПРОДУКТОВ
RIW2016 - UX RESEARCH НА РАЗЛИЧНЫХ ЭТАПАХ РАЗРАБОТКИ DIGITAL-ПРОДУКТОВ
 
Norteamérica y el capitalismo norteamericano en la vida del continente
Norteamérica y el capitalismo norteamericano en la vida del continenteNorteamérica y el capitalismo norteamericano en la vida del continente
Norteamérica y el capitalismo norteamericano en la vida del continente
 
В одной шкуре, Alimov&Mishenko, Arriba!
В одной шкуре, Alimov&Mishenko, Arriba!В одной шкуре, Alimov&Mishenko, Arriba!
В одной шкуре, Alimov&Mishenko, Arriba!
 
República Dominicana
República DominicanaRepública Dominicana
República Dominicana
 

Semelhante a Raja Rama Mohan Roy - 26th May 2016

Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
Abu Dhabi Oil Company (JAPAN)
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
Sankar Sundaram PMP
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
Ismail Shaikh
 

Semelhante a Raja Rama Mohan Roy - 26th May 2016 (20)

CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
Resume
ResumeResume
Resume
 
updated CV
updated CVupdated CV
updated CV
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
 
RESUME
RESUMERESUME
RESUME
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Resume New
Resume NewResume New
Resume New
 
Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
RESUME=
RESUME=RESUME=
RESUME=
 

Raja Rama Mohan Roy - 26th May 2016

  • 1. CareerSummary Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 1 of 7 Raja Rama Mohan Roy Resident Construction Manager Raja Rama Mohan Roy has over 28 years of total experience in Construction Management pertaining to Oil & Gas processing Projects and Refinery & Petrochemical Projects including handling of projects in 15MMTPA Refinery. COMPETENCIES OVERVIEW  Construction Management (both at Home office and at Project sites) which includes operation of contracts (both LSTK and Conventional / EPC) with respect to the scope, specifications and drawings including cost control,  Worked in seven Refineries in India for various green field and brown field projects, Four Oil & Gas onshore project sites, Petrochemical projects in India and abroad  Worked in Crude distillation Units, Delayed Coker Units, Hydro Cracker Unit, FCCU, VBU, SRU, ARU, SWS, SARU, Butamer, Alkalisation Unit and offsites in various Refineries. Also worked in C2,C3 recovery project, Methonolysis units etc and successfully completed.  Successfully executed special assignments like offshore platforms installation works, submarine pipe laying works, shutdown works  Ensured safe working environment by Monitoring and implementing HSE (Health, Safety and Environment) activities  Resolving interfaces issues between different agencies and ensuring overall completion on time  Construction execution / Job expediting, progress monitoring  Team building and monitoring performance of team members  Review of Plot plans, erection studies, construction studies etc and providing inputs  Review of resources and ensuring mobilization of sufficient resources (experienced manpower and machinery) to meet the project targets  Proposals for improvement and Construction strategies to deliver within time frame of project schedules  Implementation of Quality Assurance and Quality Control Systems at construction sites (including guiding and review of QMS documents submitted by contractors like Inspection & Test Plans, QAPs, Job procedures/ Method statements etc),  Conducting technical audits at construction sites  Equipment Erection works pertaining to Static & Rotary Equipment viz. columns/ towers, heat exchangers, Gas turbines& Compressors, Diesel engine Generators etc in both Offshore and onshore projects.  Preparation of final handing over documentation(Dossiers), Material reconciliation and accounting for to the client(in case of FIM) handing over final documentation dossiers to the client  Coordinating Pre commissioning activities  Closing of contracts and closing of site( successfully closed 22 contracts)  Coordination of Home office construction activities like Review of plot plans and Project Documents, Review of Date of Birth: 25th November, 1962 Nationality: Indian Educational Qualifications: B.E Mechanical Engineering Professional Qualifications: Industrial Radiography Welding and NDT Passport Details: Number : H1440265 Valid till : 05/11/2018 Communication Address: House No: 8-3-6/2, Flat No: A-2, Ramakrishna Mansions, Vizainagar Palace, Peddawaltair, Visakhapatnam-530017, Andhra Pradesh, India Contact No: Mob : +601117710920 +91- 9441209267 Tel : +91-0891-2745189 E-mail ID: rrmroyk@yahoo.co.uk rajaramamohanroy@gmail.com rrmroy@rediffmail.com
  • 2. Raja Rama Mohan Roy Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 2 of 7 Constructability Studies and Heavy lift studies, Providing inputs in Model Reviews and for sub contractors tender requisitions, Working out of construction work loads and periodic review  Develop and allocate resource requirements for assigned projects making best use of available resources.  Ensuring a satisfactory teamwork operation for the effective execution of projects within assigned responsibilities to achieve the Corporate and project profitability and schedule requirements.  Carryout regular reviews of construction workload, manpower utilisation, and staffing requirements to ensure both the adequacy and efficiency of all assigned staff.  Providing construction planning inputs for preparation of project schedules, Providing technical support, Liaison/ Coordination with Project Engineering, and Engineering and other teams, exercising home office duties. Experience with Fluor from Aug 2015 – till date) Presently working with Fluor for their joint venture in Malaysia, overseeing overall Construction Management for the Amine Regeneration Unit (ARU), Sulphur Recovery Unit (SRU), Sour Water Stripping Unit (SWS) package on the project (value of 575 Million USD) . Duration : 4th Aug 2015 to Date Designation : Construction Manager at Construction site Project : RAPID Project Client : Petronas Job Details : Presently handling a project of grassroot refinery Experience with Foster Wheeler(Amec FW) (2009–2015) Duration : 16th September 2009 to July 2015 Designation : Area Manager for Team 3 at HOME OFFICE and Resident Construction Manager at Construction site Project : IOCL Paradip Project Client : Indian Oil Corporation Limited Job Details : Handled projects of 555 Million USD of 3000 crores (Indian rupees) grassroot refinery A. Home office:  Preparation and Review of Project Documents.  Review of plot plans Preparation and Review of Constructability Studies and Heavy lift studies based on lessons learnt , including for safety, lifting studies, plot plan, design and model reviews.  Liaison/ Coordination with Project Engineering, and Engineering and other teams, exercising home office duties.  Providing inputs in Model Reviews  Providing construction planning inputs for preparation of project schedules
  • 3. Raja Rama Mohan Roy Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 3 of 7  Manage, co-ordinate and execute, scheduling construction field activities for projects in a standardised manner  Delivering all HO generated construction execution strategies and procedures to ensure that the content is consistent and complies with corporate and project requirements.  Managing, initiating and developing constructability participation, philosophies, paths of construction, methodologies, practices and checklists, identifying critical execution issues and implement lessons learnt for progressive projects, including for safety, lifting studies, plot plan, design and model reviews.  Providing technical support to all disciplines in developing the Engineering drawings  Providing inputs for sub contractors tender requisitions and evaluation of the tenders  Working out of construction work loads and periodic review  Over viewing construction schedules  Preparing Discipline wise sequence of construction activities etc.  Construction progress monitoring to meet the target schedules  Contract management  Leading the team by example B. Construction Site:  Worked for 15 MMTPA grass root refinery, as a Construction Manager, for Alkalisation Unit, Butamer unit, Kero Treater, Naphtha treater Units, Sulphur regeneration unit, Sulphur recovery unit, Civil works like Refinery storm water reservoirs and storm water drainage system, Control room buildings etc.  Implementing the Construction Execution Plan to ensure Refinery project objectives are attained.  Review of erection plans and safe execution of Equipment including Heavy lifts  Ensuring that Underground vessels foundations, Under ground systems and Civil and Structural works are executed as per drawings and specifications  Ensuring that the project achieves its objectives in respect of HSES, quality, cost and schedule  Material management services  Actively participate in the effective administration of construction contractors and supplier site service representatives including offsite pre- assembly and pre-fabrication areas.  Following up with various vendors for delivery and resolving the quality issues on Equipment  Managing, guiding, set targets, objectives and clear responsibilities for all supervisory staff, and progressively monitor individual performance against the agreed criteria and conduct formal appraisals at least annually.  Promoting company policies by demonstrating professionalism and efficiency, establishing credible client and contact working relationships.  Ensure adherence to national/Client HSES regulations.  Ensuring that the Health, Safety, Environment, Security (HSES) and quality policy is understood and implemented by all supervisory staff and construction contractors.  Fully implement all aspects of the HSES plan, including training.  Providing feedback to the engineering regarding AFC drawing requirements, engineering design, safety alerts, material requirements, material shortages/damages etc in respect of the construction site.
  • 4. Raja Rama Mohan Roy Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 4 of 7  Monitor and review materials supply status to ensure ROS dates are achieved for a defined construction area. Ensure materials are issued to contractors or client as per procedure. Experience with Lurgi (2008-2009) Duration : Nov’2008 to Aug’2009 Organisation : M/s Lurgi Designation : Chief Construction Manager Project Name : SRU, SWS, TGT,ARU and Incinerators Client / Owner : Indian Oil Corporation Limited, Haldia Refinery Responsibilities : Responsible for overall project completion (contract administration and total construction management services at site , progress monitoring, coordination with HO and client, providing Material management / warehouse management services, quality control/quality assurance (QC/QA) , process monitoring & scheduling, review of heavy erection schemes, HSE etc. and handing over to the client. This includes executing around 2000 piles for various Civil foundations and buildings like substations and control room buildings. Experience with Engineers India Ltd.(1993–2008) Duration : Sep’2008 to Nov’2008 Organisation : Engineers India Limited Designation : Senior Construction Manager Project Name : Naphtha Cracker project, Panipat, India Client : Indian Oil Corporation Limited, Panipat Refinery Responsibilities : Handled Mechanical Works. Duration : Nov’2005 to Aug’2008 Organisation : Engineers India Limited Designation : Area Manager Project Name : Visakh Refinery, HPCL, Vizag( Brown field project) Client : Hindustan Petroleum Corporation Limited Responsibilities : Successfully completed Mechanical works for Additional crude facilities project and Cryogenic Nitrogen plant. Handled Mechanical works (both piping & Equipment) Flare system for Euro III project, FCCU Revamp(Brown field project works (which involves 112 days of shutdown works). Major contribution was that successful erection of 35M-height column in running unit of FCCU and erection of 85 T columns in running Merox unit, micro level shutdown scheduling, safe completion of Civil and structural works and equipment erection in the running FCCU unit while in operation. Also Civil and Mechanical works for Cooling towers has been successfully executed.
  • 5. Raja Rama Mohan Roy Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 5 of 7 Duration : Aug’2003 to Nov’2005 Organisation : Engineers India Limited Designation : Head of Department, Equipments and Pre-commissioning Project Name : C2 Recovery project Client : Pars Petrochemical Company, Iran Responsibilities : Handled Mechanical Equipment department (Gas and Steam turbines, Compressors supplied by M/s Nuovo pignone, M/s Atlas Copco, Pumps, Towers, and Coolers etc) at Iran in one of the Petrochemical Plant, which was commissioned.. Also responsible for finalization of Inspection and Test Plans (ITPs), Quality Assurance and Quality Control system implementation, progress monitoring and expediting, liaison with owner and Licensers/ other agencies. Involved in Conducting and Coordinating Technical Audits during different stages of Construction. Coordinated Mechanical completion/ pre- commissioning activities between different disciplines i.e. Civil, Structural, Instrumentation, piping, Equipments division, Electrical and Instrumentation, including coordinating with M/s Linde. During execution of Equipments works, four qualified Engineers and four diploma Engineers were working under me Duration : Jul’2002 to Aug’2003 Organisation : Engineers India Limited Designation : Area Manager Project Name : Hydro cracker unit, VBU, SRU Client : Chennai Petroleum Corporation Ltd, Chennai Responsibilities : Responsible for construction Coordination and supervision of Hydro Cracker unit, Vis-breaker and Sulphur Recovery (VBU and SRU) Units and Cooling towers. Also executed Equipment works (heavy lift Static and Rotary) and piping works. Also handled heavy lift package works. Responsible for finalization of Inspection and Test Plans (ITPs), Quality Assurance and Quality Control system implementation, progress monitoring and Expediting, liaison with owner and other agencies, Final settlement and Closing of contract. Handled Heavy lifts Fully Conversant with contract management and contract administration. Duration : Apr’1996 to Jul’2002 Organisation : Engineers India Limited Designation : Site In charge /Site Construction Manager Project Name : Insitu Combustion Projects, GGS,ETPs Client : Oil and Natural Gas commission (ONGC) Responsibilities : Responsible construction management for total construction works related to various onshore projects including Insitu combustion project, Effluent treatment plant and Group Gathering Stations, Control rooms, substation buildings, cooling towers etc. Responsible for construction management of the works which involves review and approval of work methodology, implementation of QA/QC systems, finalization of Inspection and Test plans, technical audit, monitoring of construction quality, interaction with different contractors
  • 6. Raja Rama Mohan Roy Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 6 of 7 and owner on day to day matters, progress monitoring and expediting etc. Also responsible for contract administration, approval of work schedules to control the project costs and generate reports indicating project schedule vis-à-vis progress of works, informing owner well in advance about the deficiencies, contradictions/ omissions which will hamper the project implementation & performance, perform audits/inspections to ensure implementation of owners requirements & issuance of project coordination procedure, ensure implementation of steps required to present / halt or minimize the delays & budget over running in all adverse conditions, verify consistency of the contract implementation for all the major proposals, implementation of Health, Safety and Environment policies in the project. Well versed with contract administration and expert in project coordination activities. Also handled erection (most of the components of reciprocating compressors were assembled at site), alignment and commissioning of Centrifugal (Centac) compressors (supplied by M/s Ingersoll Rand and Atlas Copco), Reciprocating Compressors supplied by M/s Dresser Rand, Atlas copco and M/s KG Khosla Duration : Mar’1993 to Apr’1996 Organisation : Engineers India Limited Designation : Site In charge /Site Construction Manager Project Name : LPG Recovery project, RMCR and Refinery expansion project etc Client : Bongaigaon Refinery and Petroleum Limited, Bongaigaon, Assam Responsibilities: Revamp works (brown field project works) including Shutdown works for CDU & DCU, Methenolysis plant Construction supervision of mechanical works pertaining to erection/ assembly / alignment of static and rotary equipment, piping works. (Loops preparation, erection, testing etc) for LPG recovery project, RMCR and Refinery expansion project Experience with Hindustan Shipyard Ltd. (1988-1993) Duration : Aug’1988 to Feb’1993 Organisation : Hindustan Shipyard Limited Designation : Management Trainee, QA/QC Piping Engineer, NDT Engineer, QA/QC Instrumentation Engineer and structural Engineer, Submarine pipeline Engineer at offshore Project Name : Offshore platforms installation and submarine pipe laying works Client : M/s Oil and Natural Gas Commission, India Responsibilities : Involved in Construction supervision of Offshore platforms and jackets construction (Piping, equipment, structural and instrumentation), & NDT works at fabrication site. Worked as a piping & Instrumentation Engineer on well platforms in Bombay High offshore field and Ravva offshore Oil field. Also worked for submarine pipe laying works at
  • 7. Raja Rama Mohan Roy Z:tempwindows20160621024213_f004c05af9104ebc5b5b40ea25031763af9c0f0ba2f10d98- 6908-4475- b7ab-41bf48186c71-160621024216.docx 7 of 7 offshore worked on ETPM barge. Additionally handled Instrumentation works including Calibration and Instrumentation loop testing for oil well platforms at offshore.