SlideShare uma empresa Scribd logo
1 de 8
Just-In-Time (JIT) Manufacturing:
What? Where? When?
Rahul Iyer, ASQ CQE
October 2015
Mesa AZ USA
Introduction to Just-In-Time (JIT)
Manufacturing
What is JIT?
History of JIT
Application of JIT
What is JIT?

JIT-Just In Time Manufacturing-a methodology aimed
primarily at reducing flow times within production as well
as response times from suppliers and to customers

Can be attributed to Toyota Production Systems
(TPS), and Lean Manufacturing methodology

Can include the use of kanban:

a Japanese manufacturing system in which the
supply of components is regulated through the
use of a card displaying a sequence of
specifications and instructions, sent along the
production line.

Components and goods do not “sit around” too long in
holding area waiting for next step in process
What is JIT? (Cont'd)
Graphical Description
of a Kanban
Diagram of a JIT
Manufacturing
Operation
History of JIT
Not exactly clear as to when developed
Traditionally Attributed to Post WW II Japan: developed &
implemented at Toyota --Ohno, Taiichi (1988), Just-In-Time
for Today and Tomorrow, Productivity Press, ISBN 0-
915299-20-8.
Could be argued that it was developed in 1890 in Bombay
by Mahadeo Havaji Bachche, when he setup the
Dubbawallah System--Ravichandran, N (2005), World Class
Logistics Operations: The Case Of The Bombay
Dubbawallahs, Ahmedabad: Indian Institute of
Management.
History of JIT
What is a Dubbawallah?
– is a person in India, most commonly in Mumbai, who is part
of a delivery system that collects hot food in lunch boxes
from the residences of workers in the late morning, delivers
the lunches to the workplace, predominantly using bicycles
and the railway trains, and returns the empty boxes to the
worker's residence that afternoon. They are also made use
of by meal suppliers in Mumbai where they ferry ready,
cooked meals from central kitchens to the customers and
back.
Application of JIT

Assembly of automobiles
(Toyota, Honda, Nissan,
Harley Davidson)

Assembly of Computers
(Dell)

Meal Delivery Systems
(Mumbai Dubbawallah,
Airline meals)
Conclusion

JIT-Just In Time Manufacturing is a methodology that
has been adopted across many industries

It helps to reduce waste & many techniques have been
applied for it

It is not a new idea, dating back to the 1890s in India, or
Post WW II in Japan

It is increasingly becoming part of our lives each day.

Mais conteúdo relacionado

Mais procurados (20)

Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Integrated Logistics Management
Integrated Logistics ManagementIntegrated Logistics Management
Integrated Logistics Management
 
Qfd ppt
Qfd pptQfd ppt
Qfd ppt
 
Jit
JitJit
Jit
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Introduction to lean manufacturing
Introduction to lean manufacturingIntroduction to lean manufacturing
Introduction to lean manufacturing
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process planning SMED and VSM: Single minute exchange of die and Value stream...
 
What is 5s, 5S PPT
What is 5s, 5S PPTWhat is 5s, 5S PPT
What is 5s, 5S PPT
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Kanban (1)
Kanban (1)Kanban (1)
Kanban (1)
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean Management
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Just in time
Just in timeJust in time
Just in time
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Cycle time
Cycle timeCycle time
Cycle time
 

Destaque

ETUG Fall Workshop 2013: Just in Case vs Just in Time Learning Models
ETUG Fall Workshop 2013: Just in Case vs Just in Time Learning ModelsETUG Fall Workshop 2013: Just in Case vs Just in Time Learning Models
ETUG Fall Workshop 2013: Just in Case vs Just in Time Learning ModelsBCcampus
 
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...IAEME Publication
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturingahmad bassiouny
 
Sirris manufacturingday2011 qrm-harol
Sirris manufacturingday2011 qrm-harolSirris manufacturingday2011 qrm-harol
Sirris manufacturingday2011 qrm-harolSirris
 
Just In Time Manufacturing Process
Just In Time Manufacturing ProcessJust In Time Manufacturing Process
Just In Time Manufacturing ProcessBoricha Jaydeep
 
A study on overall quality assurance in just in time manufacturing process in...
A study on overall quality assurance in just in time manufacturing process in...A study on overall quality assurance in just in time manufacturing process in...
A study on overall quality assurance in just in time manufacturing process in...Sathiskumar M
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturingAkhil Bhatia
 
Role of production planning and control in operation management
Role of production planning and control in operation managementRole of production planning and control in operation management
Role of production planning and control in operation managementRiya Sunny
 
Improving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemImproving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemSteven Muñoz
 
Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study Ananth Palaniappan
 
Optimized Production Technology
Optimized Production TechnologyOptimized Production Technology
Optimized Production TechnologyRahardi Gautama
 

Destaque (13)

ETUG Fall Workshop 2013: Just in Case vs Just in Time Learning Models
ETUG Fall Workshop 2013: Just in Case vs Just in Time Learning ModelsETUG Fall Workshop 2013: Just in Case vs Just in Time Learning Models
ETUG Fall Workshop 2013: Just in Case vs Just in Time Learning Models
 
Just in Time
Just in Time Just in Time
Just in Time
 
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturing
 
Sirris manufacturingday2011 qrm-harol
Sirris manufacturingday2011 qrm-harolSirris manufacturingday2011 qrm-harol
Sirris manufacturingday2011 qrm-harol
 
Just In Time Manufacturing Process
Just In Time Manufacturing ProcessJust In Time Manufacturing Process
Just In Time Manufacturing Process
 
A study on overall quality assurance in just in time manufacturing process in...
A study on overall quality assurance in just in time manufacturing process in...A study on overall quality assurance in just in time manufacturing process in...
A study on overall quality assurance in just in time manufacturing process in...
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
 
Supply chain
Supply chainSupply chain
Supply chain
 
Role of production planning and control in operation management
Role of production planning and control in operation managementRole of production planning and control in operation management
Role of production planning and control in operation management
 
Improving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis SystemImproving Lean Manufacturing Through a KPI Analysis System
Improving Lean Manufacturing Through a KPI Analysis System
 
Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study
 
Optimized Production Technology
Optimized Production TechnologyOptimized Production Technology
Optimized Production Technology
 

Semelhante a What is Just In Time (JIT) Manufacturing?

Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Dr. Mahmoud Al-Naimi
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Reviewvivatechijri
 
Production management.. ppt
Production management.. pptProduction management.. ppt
Production management.. pptKusum Parmar
 
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'amJust in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'amMd. Moazzem Hossain
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemDeepak25
 
Application Of Lean Manufacturing Tools And Techniques A Case Study In A Man...
Application Of Lean Manufacturing Tools And Techniques  A Case Study In A Man...Application Of Lean Manufacturing Tools And Techniques  A Case Study In A Man...
Application Of Lean Manufacturing Tools And Techniques A Case Study In A Man...Anna Landers
 
A Brief Overview on Toyota Production System (TPS.pdf
A Brief Overview on Toyota Production System (TPS.pdfA Brief Overview on Toyota Production System (TPS.pdf
A Brief Overview on Toyota Production System (TPS.pdfSarah Adams
 
Kaizen pom presentation
Kaizen pom presentationKaizen pom presentation
Kaizen pom presentationMinal Kashyap
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution pptAkshay Jain
 
Project report on just in time
Project report on just in timeProject report on just in time
Project report on just in timeProjects Kart
 
A Case Study on Just in Time (JIT)
A Case Study on Just in Time (JIT)A Case Study on Just in Time (JIT)
A Case Study on Just in Time (JIT)ijsrd.com
 
Prod. & operation mgt.
Prod. & operation mgt.Prod. & operation mgt.
Prod. & operation mgt.Rohit Mishra
 
Prod. & operation mgt.
Prod. & operation mgt.Prod. & operation mgt.
Prod. & operation mgt.Rohit Mishra
 
JUST IN TIME MANUFACTURING - module 1
JUST IN TIME MANUFACTURING -  module 1JUST IN TIME MANUFACTURING -  module 1
JUST IN TIME MANUFACTURING - module 1Rashmi Srinivas
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)Prasanna3804
 

Semelhante a What is Just In Time (JIT) Manufacturing? (20)

just in time EMERSON EDUARDO RODRIGUES
just in time EMERSON EDUARDO RODRIGUESjust in time EMERSON EDUARDO RODRIGUES
just in time EMERSON EDUARDO RODRIGUES
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
Ppt jit
Ppt jitPpt jit
Ppt jit
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Review
 
Production management.. ppt
Production management.. pptProduction management.. ppt
Production management.. ppt
 
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'amJust in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Application Of Lean Manufacturing Tools And Techniques A Case Study In A Man...
Application Of Lean Manufacturing Tools And Techniques  A Case Study In A Man...Application Of Lean Manufacturing Tools And Techniques  A Case Study In A Man...
Application Of Lean Manufacturing Tools And Techniques A Case Study In A Man...
 
A Brief Overview on Toyota Production System (TPS.pdf
A Brief Overview on Toyota Production System (TPS.pdfA Brief Overview on Toyota Production System (TPS.pdf
A Brief Overview on Toyota Production System (TPS.pdf
 
Kaizen pom presentation
Kaizen pom presentationKaizen pom presentation
Kaizen pom presentation
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
Project report on just in time
Project report on just in timeProject report on just in time
Project report on just in time
 
A Case Study on Just in Time (JIT)
A Case Study on Just in Time (JIT)A Case Study on Just in Time (JIT)
A Case Study on Just in Time (JIT)
 
Prod. & operation mgt.
Prod. & operation mgt.Prod. & operation mgt.
Prod. & operation mgt.
 
Prod. & operation mgt.
Prod. & operation mgt.Prod. & operation mgt.
Prod. & operation mgt.
 
JUST IN TIME MANUFACTURING - module 1
JUST IN TIME MANUFACTURING -  module 1JUST IN TIME MANUFACTURING -  module 1
JUST IN TIME MANUFACTURING - module 1
 
3mu
3mu3mu
3mu
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
P450294101
P450294101P450294101
P450294101
 

Mais de Rahul Laxman Iyer MSE Mech Eng, EIT, LSSBB/TPS/Kaizen

Mais de Rahul Laxman Iyer MSE Mech Eng, EIT, LSSBB/TPS/Kaizen (19)

Rahul Iyer
Rahul IyerRahul Iyer
Rahul Iyer
 
Spaghetti Diagrams
Spaghetti DiagramsSpaghetti Diagrams
Spaghetti Diagrams
 
Lean Thanksgiving
Lean ThanksgivingLean Thanksgiving
Lean Thanksgiving
 
What does six sigma really mean??
What does six sigma really mean??What does six sigma really mean??
What does six sigma really mean??
 
Histogram
HistogramHistogram
Histogram
 
The Pareto Principle
The Pareto PrincipleThe Pareto Principle
The Pareto Principle
 
Quality (Q), Cost (C), Delivery (D)---Q-C-D
Quality (Q), Cost (C), Delivery (D)---Q-C-DQuality (Q), Cost (C), Delivery (D)---Q-C-D
Quality (Q), Cost (C), Delivery (D)---Q-C-D
 
Toyota Part Approval (PA) Process
Toyota Part Approval (PA) ProcessToyota Part Approval (PA) Process
Toyota Part Approval (PA) Process
 
Plan-Do-Check-Act (P-D-C-A)
Plan-Do-Check-Act (P-D-C-A)Plan-Do-Check-Act (P-D-C-A)
Plan-Do-Check-Act (P-D-C-A)
 
Physical & Functional Decomposition of a Manufactured Product And Implication...
Physical & Functional Decomposition of a Manufactured Product And Implication...Physical & Functional Decomposition of a Manufactured Product And Implication...
Physical & Functional Decomposition of a Manufactured Product And Implication...
 
Recommendation from Former Employer in Tennessee
Recommendation from Former Employer in TennesseeRecommendation from Former Employer in Tennessee
Recommendation from Former Employer in Tennessee
 
Recommendation From Most Current Employer in Metro Phoenix
Recommendation From Most Current Employer in Metro PhoenixRecommendation From Most Current Employer in Metro Phoenix
Recommendation From Most Current Employer in Metro Phoenix
 
When Automobiles Go KaBoom!
When Automobiles  Go KaBoom!When Automobiles  Go KaBoom!
When Automobiles Go KaBoom!
 
The Wayback Machine
The Wayback MachineThe Wayback Machine
The Wayback Machine
 
Gage r&r part ii 082015
Gage r&r part ii 082015Gage r&r part ii 082015
Gage r&r part ii 082015
 
Introduction to Gage R&R
Introduction to Gage R&RIntroduction to Gage R&R
Introduction to Gage R&R
 
Iyer resume
Iyer resumeIyer resume
Iyer resume
 
Resume rahul iyer jan 2014 vietnam
Resume rahul iyer jan 2014 vietnamResume rahul iyer jan 2014 vietnam
Resume rahul iyer jan 2014 vietnam
 
Resume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 internationalResume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 international
 

Último

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 

Último (20)

(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

What is Just In Time (JIT) Manufacturing?

  • 1. Just-In-Time (JIT) Manufacturing: What? Where? When? Rahul Iyer, ASQ CQE October 2015 Mesa AZ USA
  • 2. Introduction to Just-In-Time (JIT) Manufacturing What is JIT? History of JIT Application of JIT
  • 3. What is JIT?  JIT-Just In Time Manufacturing-a methodology aimed primarily at reducing flow times within production as well as response times from suppliers and to customers  Can be attributed to Toyota Production Systems (TPS), and Lean Manufacturing methodology  Can include the use of kanban:  a Japanese manufacturing system in which the supply of components is regulated through the use of a card displaying a sequence of specifications and instructions, sent along the production line.  Components and goods do not “sit around” too long in holding area waiting for next step in process
  • 4. What is JIT? (Cont'd) Graphical Description of a Kanban Diagram of a JIT Manufacturing Operation
  • 5. History of JIT Not exactly clear as to when developed Traditionally Attributed to Post WW II Japan: developed & implemented at Toyota --Ohno, Taiichi (1988), Just-In-Time for Today and Tomorrow, Productivity Press, ISBN 0- 915299-20-8. Could be argued that it was developed in 1890 in Bombay by Mahadeo Havaji Bachche, when he setup the Dubbawallah System--Ravichandran, N (2005), World Class Logistics Operations: The Case Of The Bombay Dubbawallahs, Ahmedabad: Indian Institute of Management.
  • 6. History of JIT What is a Dubbawallah? – is a person in India, most commonly in Mumbai, who is part of a delivery system that collects hot food in lunch boxes from the residences of workers in the late morning, delivers the lunches to the workplace, predominantly using bicycles and the railway trains, and returns the empty boxes to the worker's residence that afternoon. They are also made use of by meal suppliers in Mumbai where they ferry ready, cooked meals from central kitchens to the customers and back.
  • 7. Application of JIT  Assembly of automobiles (Toyota, Honda, Nissan, Harley Davidson)  Assembly of Computers (Dell)  Meal Delivery Systems (Mumbai Dubbawallah, Airline meals)
  • 8. Conclusion  JIT-Just In Time Manufacturing is a methodology that has been adopted across many industries  It helps to reduce waste & many techniques have been applied for it  It is not a new idea, dating back to the 1890s in India, or Post WW II in Japan  It is increasingly becoming part of our lives each day.