2. BASIC DESIGN
CONCEPT DESIGN
MENTERJEMAHKAN GENERAL REQUIREMENT
KEDALAM PARAMETER DASAR PERENCANAAN KAPAL
PERLUNYA FEASIBILITY STUDY
PRELIMINARY DESIGN
PEMERIKSAAN DIKAITKAN DENGAN BIAYA
SCOPE OF BASIC DESIGN
ESTIMASI : DISPLACEMENT, MAIN DIMENSION,
LINESPLAN, POWER CALCULATION, GENERAL
ARRANGEMENT, STABILITAS, STRUCTURE, WEIGHT
CALCULATION, COST
3. CONTRACT DESIGN
DOKUMEN KONTRAK PEMBANGUNAN
EVALUASI DISERTAI DENGAN PENGUJIAN
DETAIL BERAT & TITIK BERAT, GENERAL ARRANGEMENT,
SPESIFIKASI STANDAR KUALITAS, METODE PENGUJIAN
SCOPE OF CONTRACT DESIGN
HULL SECTION
LINES PLAN, STABILITAS, GENERAL ARRANGEMENT, DETAIL KONSTRUKSI
& KEKUATAN MEMANJANG, CAPACITY PLAN
MACHINERY SECTION
HEAT BALANCE, LAY OUT MACHINERY ROOM, MACHINERY SYSTEM PLAN
DIAGRAM, HULL PIPING SYSTEM, VENTILATION, AC, PROPELLER
ELECTRICAL SECTION
POWER & LIGHTING SYSTEM, GENERAL LOAD ANALYSIS, WIRING
DIAGRAM, DETAIL OF ELECTRICAL SPESIFICATION
4. DETAIL DESIGN
WORKING / YARD PLAN
PERINTAH / INSTRUKSI KERJA
CUTTER, WELDER, OUT FITTER, MACHINERY FENDOR
SCOPE OF DETAIL DESIGN
FAIRING THE LINES
PLATING MODEL
PERCOBAAN MODEL ( PROPELLER, TAHANAN)
DETAIL WEIGHT CALCULATION
LAUNCHING CALCULATION
URUT-URUTAN TEST (SEA TRIAL)
PETUNJUK OPERASI PERLENGKAPAN KAPAL (SAFETY
EQUIPMENT)
5. FLOWCHART MANUAL DESIGN
PERFORMANCE
START A HIDROSTATIC TERPENUHI
DESIGN CONDITION
FRAME SYSTEM
PRINCIPAL DIEMSION (ESTIMATION)
LINES PLAN
SPEED POWER PREDICTION
DRAFT MEMENUHI SYARAT
KECEPATAN TERCAPAI ?
FREEBOARD CALCULATION
LIGHT WEIGHT ESTIMATION
DEAD WEIGHT ESTIMATION DISPL = LWT + DWT ?
6. FLOWCHART MANUAL DESIGN
PERFORMANCE
B
G/A
A
PERHITUNGAN TERPENUHI ?
WATER TIGHT BHD
TRIM, STABILITY & LONG STRENGTH
FLOODABLE LENGTH CALCULATION
LIGHT WEIGHT CALC & DISTRIB
C
PERHITUNGAN TERPENUHI CROSS CURVE OF STABILITY CALC
CAPACITY PLAN / TANK PERHITUNGAN SESUAI
KAPASITAS TERPENUHI TONAGE CALCULATION
7. FLOWCHART MANUAL DESIGN
PERFORMANCE
B
PERLU PERHIT PELUNCURAN ?
LAUNCHING CALCULATION
INCLINING TEST
STOP
MEMPENGARUHI PERHIT SEBELUMNYA PENYUSUNAN LOADING MANUAL
8. GENERAL REQUIREMENT
1. OWNER REQUIREMENT
# KECEPATAN
# DWT KAPAL
# RUTE PELAYARAN, DLL.
2. CLASS REQUIREMENT
# SUB DIVISION
# CONSTRUCTION
# MATERIAL CONSTRUCTION
# SURVEY
3. GOVERNMENT REQUIREMENT
# TAX
# WORKING
4. IMO, ASSURANCE, SYAHBANDAR
# KESELAMATAN PELAYARAN
# PENCEGAHAN PENCEMARAN LAUT
9. DISTRIBUSI GAMBAR KERJA DI PT. PAL
SHIP PERFORMANCE
KEY PLAN OWNER
YARD PLAN CLASS
PRODUCTION DRAWING ELECTRICAL OUTFITTING
MACHINERY OUTFITTING ACCOMODATION DIVISION / QA
BENGKEL BENGKEL BENGKEL
10. DISTRIBUSI GAMBAR KERJA DI PT. PAL
1. SHIP PERFORMANCE
2. KEYPLAN
3. YARDPLAN
4. GAMBAR KERJA ( PD, MO, EO & QA )
11. SHIP PERFORMANCE
1. LINESPLAN + DATA OFFSET
2. GENERAL ARRANGEMENT
3. INNER CONTOUR
4. TANK CONDITION
5. STABILITAS
6. FREEBOARD CALCULATION
7. LIGHT WEIGHT ESTIMATION
12. KEY PLAN
1. MIDSHIP SECTION
2. STEEL PLAN
3. TRANSVERSAL BULKHEAD
4. SHELL EXPANTION
5. BLOCK DIVISION
6. MATERIAL ESTIMATION
7. DOCKING PLAN
8. X-RAY PLAN / POSITION
13. YARD PLAN
1. FORE CONSTRUCTION
2. CARGO HOLD CONSTRUCTION
# CARGO HOLD FORE CONSTRUCTION
# CARGO HOLD MIDDLE CONSTRUCTION
# CARGO HOLD AFT CONSTRUCTION
3. E/R CONSTRUCTION
# DOUBLE BOTTOM IN E/R CONSTRUCTION
# SIDE SHELL IN E/R CONSTRUCTION
4. AFT CONSTRUCTION
5. ACCOMODATION CONSTRUCTION
6. RUDDER CONSTRUCTION
7. LIGHT WEIGHT CALCULATION
14. PRODUCTION DRAWING
1. WORKING DRAWING
2. MATERIAL LIST
3. MARKING LIST
4. PIECE DRAWING
5. NESTING PLAN
6. STEEL LIST
7. JIG INFORMATION
8. BENDING TEMPLATE
# RAMBU BENDING
# INVERS BENDING
15. CONTRACT DESIGN
STANDARD CONTRACT :
1. AWES : ASSOCIATION OF WEST EUROPEAN
SHIPBUILDERS
2. MARAD : MARITIME ADMINSTRATION USA
3. SAJ : SHIPOWNERS ASSOCIATION OF
JAPAN
16. DESCRIPTION OF AWES
1. SUBJECT OF CONTRACT
2. INSPECTION & APPROVAL
3. MODIFICATIONS
4. TRIALS
5. GUARANTEE
6. DELIVERY
7. PRICE
8. PROPERTY
9. INSURANCE
10. DEFAULT BY THE CONTRACTOR
11. GUARANTEE AFTER DELIVERY
12. CONTRACT EXPENSES
13. PATENTS
14. REFERENCE TO EXPERT & ARBITRATION
15. CONDITION FOR CONTRACT
16. LEGAL DOMICILE ( OF PURCHASER )
17. ASSIGMNET
17. SHIP CONTRACT
JENIS PEMBAYARAN :
1. 10 % : SIGNING CONTRACT
2. 10 % : ARRIVAL OF MATERIALS ON SITE
3. 10 % : KEEL LAYING
4. 20 % : LAUNCHING
5. 50 % : DELIVERY
18. PROSES PERENCANAAN
(SPIRAL DESIGN)
GENERAL
REQUIREMENT
MAIN COST
DIMENSION ESTIMATION
LINES
STABILITY
PLAN
HIDRO DETAIL
CAPACITIES
STATIC DESIGN
FREEBOARD & WEIGHT
SUB DIVISION ESTIMATION
GENERAL
POWERING
ARRAGEMENT
CON
STRUCTION