2010 ADA Standards Seminar:
Applications for Existing Buildings
          July 26, 2012


           Code Consultants, Inc.
Kevin D. Morin, PE                            Amy J. Murdock, PE
                Principal                                     Principal

Code Consultants Professional Engineers, PC            Code Consultants, Inc.
      215 West 40th Street, 15th Floor             2043 Woodland Pkwy; Suite 300
        New York, New York 10018                      St. Louis, Missouri 63146
               212-216-9596                                 314-991-2633




                      Copyrighted Materials
This presentation is protected by US and International copyright law.
   Reproduction, display and use of the presentation material without
       the expressed written consent of the speaker is prohibited.
                          © Code Consultants, Inc. 2012




                                                   © 2012 CODE CONSULTANTS, INC.   2
Agenda

•   Accessibility Codes, Standards, Guidelines
•   Definitions
•   Barrier Removal
•   Alterations
•   New 2010 Requirements




                               © 2012 CODE CONSULTANTS, INC.   3
Codes, Standards, and Guidelines

• 2008 NYC Building Code
    references ICC/ANSI A117.1,  2003 Edition
    Local Law 58
• Fair Housing Act
• 2010 Standards for Accessible Design.  Title III 
  Rule of the Americans with Disabilities Act 
  (ADA)
• Proposed Accessibility Guidelines for 
  Pedestrian Facilities in the Public Right‐of‐Way

                                  © 2012 CODE CONSULTANTS, INC.   4
Short list of differences between new (2008) 
and old (1968) New York City Building 
Code….




                             © 2012 CODE CONSULTANTS, INC.   5
Item                            LL58 ‐ 1987                      New NYCBC                       FHA                             ADA

Exterior entry doors            All “public”                     All “public”                    At least one                    ADAAG: 
                                                                                                                                 50 percent
                                                                                                                                 2010 Standards:
                                                                                                                                 60 percent
Exterior Door Opening Force     8.5 pounds                       8.5 pounds                      No requirement                  No requirement

Interior threshold height       1 inch max                       1/2 inch max                    1/2 inch max                    1/2 inch max

Threshold height at exterior    No requirement                   3/4 inch for permeable deck;    3/4 inch for permeable deck;    N/A
deck in residential space                                        4 inches for non‐permeable      4 inches for non‐permeable 
                                                                 deck                            deck
Threshold height at exterior    1 inch max                       1/2 inch max                    1/2 inch max                    1/2 inch max
deck in public space
Toilet room space at water      16‐1/2 inches to wall, 16‐1/2    18 inches to wall, 18 inches    Varies depending on safe        N/A
closet in residential space     inches to lavatory, total 33     to lavatory, total 36 inches    harbor:
                                inches wall to lavatory          wall to lavatory                18 inches to wall,
                                                                                                 15 inches to lavatory
Toilet room space at water      18 inches to wall, 18 inches     16‐18 inches to wall,           Varies depending on safe        ADAAG: 
closet in public space          to lavatory                      60 inches from side wall to     harbor:                         18 inches to wall, 18 inches 
                                                                 lavatory                        Either:                         to lavatory
                                                                                                 18 inches to wall, 18 inches    2010 Standards:
                                                                                                 to lavatory; or,                16‐18 inches to wall,
                                                                                                 16‐18 inches to wall,           60 inches from side wall to 
                                                                                                 60 inches from side wall to     lavatory
                                                                                                 lavatory

Side wall grab bar length in    15 inches min starting 12        18 inches min starting 12     Varies depending on safe          N/A
residential space               inches max from rear wall,       inches from rear wall,        harbor: 
                                extending 15 inches min from     extending 30 inches min from  24 ‐ 42 inches
                                rear wall                        rear wall
Side wall grab bar length in    42 inches                        42 inches                       42 inches                       42 inches
public space
                                                                                                                                                    6
                                                                                                             © 2012 CODE CONSULTANTS, INC.
Application of Rules for NYC Apts/Condos
                                                                            Regulation
                                                 Existing  Building: Same       New construction; or, Existing 
   Jurisdiction           Building Area          occupancy with less than       Construction with changed 
                                                 50% of the cost in             occupancy for the building or > 
                                                 alterations                    50% cost of the building in 
                                                                                alteration expense
New York City        Common/public use           Local Law 58‐1987 with         2008 NYCBC with 2003 ANSI 
                     (lobby, parking,            the 1986 ANSI A117.1           A117.1
                     sidewalks)
                     Residential units

US Federal Law * Public use (lobby,              HUD’s Fair Housing Act (FHA)**
                 sidewalks, retail, 
                                                 ‐ Prior to March 15, 2012: 1994 ADAAG
                 leasing office)
                                                 ‐ March 15, 2012+: 2010 Standards

                     Residential units and       HUD’s Fair Housing Act (FHA)**
                     common use areas 
                     (lobby, parking, pool)

*The ADA applies only to areas accessible by the public. It covers retail areas and the main lobby as well as any
leasing/rental office. It does not apply to any elevator which provides access to only residential floors.

**HUD recognizes 10 safe harbors for compliance with the Fair Housing Act’s design and construction
requirements.
                                                                          © 2012 CODE CONSULTANTS, INC.             7
Fair Housing Act: HUD Safe Harbors
1. HUD Fair Housing Accessibility Guidelines published on March 6, 1991 and the 
      Supplemental Notice to Fair Housing Accessibility Guidelines: Questions and 
      Answers about the Guidelines, published on June 28, 1994.
2.    HUD Fair Housing Act Design Manual
3.    ANSI A117.1 (1986), used with the Fair Housing Act, HUD's regulations, and the 
      Guidelines.
4.    CABO/ANSI A117.1 (1992), used with the Fair Housing Act, HUD's regulations, and 
      the Guidelines.
5.    ICC/ANSI A117.1 (1998), used with the Fair Housing Act, HUD's regulations, and 
      the Guidelines.
6.    Code Requirements for Housing Accessibility 2000 (CRHA).
7.    International Building Code 2000 as amended by the 2001 Supplement to the 
      International Codes.
8.    International Building Code 2003, with one condition.
9.    ICC/ANSI A117.1 (2003) used with the Fair Housing Act, HUD's regulations, and 
      the Guidelines
10.   2006 International Building Code ® 


                                                       © 2012 CODE CONSULTANTS, INC.     8
2010 Standards
• March 15, 2012: The 2010 Standards 
  become mandatory.  There is no option for 
  using the old ADAAG any longer.

• The “trigger” date is the date on 
  which the application for a 
  building permit or permit 
  extension is accepted/certified 
  by the local AHJ – not the date of 
  permit issuance.

                              © 2012 CODE CONSULTANTS, INC.   9
What Happened March 15, 2012 –
Element‐by‐Element Safe Harbor

• 1994 ADAAG existing facilities – safe harbor and 
  don’t have to comply with 2010 Standards until 
  the specific element is altered or required to be 
  altered.
• At the time of alteration then the element must 
  comply with the new rules.



                                © 2012 CODE CONSULTANTS, INC.   10
What Happens March 15, 2012 –
Removal of Barriers; New Item
• New provisions in 2010 Standards not in the 
  ADAAG need to be made compliant.
    Recreational equipment (including play areas)
    Water features
    Pool access
    Exercise equipment
    Team or player seating
    Accessible route in court sports facilities


                                © 2012 CODE CONSULTANTS, INC.   11
Construction – Removal of Barriers

Recall that all public accommodation buildings 
covered by the ADA are subject to the 
removing barriers.
 • Applies to existing buildings whether 
   alterations are planned or not.
 • Hierarchy/priority list 
 • Install off‐set hinges on a narrow door, 
   ramping a curb, installing visual alarms, 
   switching door hardware, etc. 

                              © 2012 CODE CONSULTANTS, INC.   12
Barrier Removal

• Only applies to buildings constructed prior 
  to 1992
• Priority List
    Exterior Access
    Interior Access (basic/general)
    Restrooms
    Interior Access (detailed/specific)




                                  © 2012 CODE CONSULTANTS, INC.   13
Barrier Removal Priority List –
Detailed Review
Exterior Access            Interior Access
• Public sidewalks,        • Areas where goods or 
• Parking, or                  services are available.
• Public transportation.   • Corridors
Example                    Example
• Install entrance ramp,   • Widen doors,
• Widen entrance, or       • Rearranging displays, or
• Provide accessible       • Install Braille and raised 
   parking spaces              character signage.


                                 © 2012 CODE CONSULTANTS, INC.   14
Barrier Removal Priority List –
Detailed Review
Restroom Access           Interior Access
• Widen doors,            Any other measures 
• Install ramps,          necessary to provide 
• Install accessible      access to the goods, 
   signage,               services, facilities, 
                          privileges, advantages, or 
• Widen toilet stalls,    accommodations.
• Install grab bars, or
• Relocate dispensers. 



                                © 2012 CODE CONSULTANTS, INC.   15
Barrier Removal – N/A?

• Buildings constructed after 
  1992 and have accessibility 
  deficiencies are noncompliant.
    Really NO “barrier removal”
    All noncompliant conditions need 
    to be remedied 
    Priority order could follow barrier 
    removal list
    Priority could be easy to difficult


                                  © 2012 CODE CONSULTANTS, INC.   16
Barrier Removal – 2010

• New 2010 Standard provisions not outlined 
  in ADAAG need to be remedied.
• Even if the industry is 
  pushing back, remove the 
  barrier.
• Building owner can 
  establish a timeline to 
  complete the updates.


                              © 2012 CODE CONSULTANTS, INC.   17
Construction ‐ Alteration

If an area of primary function is altered the 
path of travel to the altered area must be 
made accessible including restrooms, 
telephones and drinking fountains.  
• The path of travel must be made accessible 
    to the maximum extent feasible until the 20 
    percent threshold is achieved.
• Priority List for alterations also!

                              © 2012 CODE CONSULTANTS, INC.   18
Alteration Priority List

1. An accessible entrance; 
2. An accessible route to the altered area;
3. At least one accessible restroom for each sex or a 
   single unisex restroom;
4. Accessible telephones;
5. Accessible drinking fountains; and,
6. Where possible, additional accessible elements such 
   as parking, storage, and alarms.




                                   © 2012 CODE CONSULTANTS, INC.   19
Alteration – Disproportionate Cost

• Not readily achievable 
• Deemed to be a disproportionate cost (>20% 
  of the project cost)
• Accommodations must be made to provide 
  goods and services.  
• Reasons which accessibility cannot be 
  achieved should be documented and kept 
  with a project file or somewhere where it can 
  be retrieved in the future. 

                             © 2012 CODE CONSULTANTS, INC.   20
Alteration – IMPORTANT!

• Courts have ruled that up to 20% of a project 
  costs can be considered a reasonable expense 
  to provide the accessible route to the altered 
  area of primary function. 
• So…remove barriers for a cost up to 20% of a 
  project’s cost; unless no barriers are 
  presented.



                             © 2012 CODE CONSULTANTS, INC.   21
Definitions – Dimensions
The Million Dollar Question

•   Dimensions that are not stated as 
    “maximum” or “minimum” are absolute 
    – can’t be above; can’t be below.
•   Absolute dimensions are subject to conventional 
    industry tolerances.
•   Range dimensions (max. and min. end points) are not 
    subject to tolerances.
•   Centerline measurements are normally more liberal 
    due to difficulty.

                                                         104.1
                                  © 2012 CODE CONSULTANTS, INC.   22
Definitions – Impracticable (aka Tech Infeas)
A friendly reminder
• Structural conditions would require 
  removal or alteration of a load‐bearing 
  member essential to structural frame.
• Existing site constraints prohibit 
  modification.
• Not just because project doesn’t have fee in 
  the budget.


                                                      106.5
                              © 2012 CODE CONSULTANTS, INC.   23
Impracticable Situation
DOCUMENT!!!
• DoJ has ruled 20% of construction costs should 
  be allocated to Barrier Removal.
• Document your case if impracticable.
                                      Public Street




                        infill slab    Add lift   Another
                                                  entrance



                                                        106.5
                                © 2012 CODE CONSULTANTS, INC.   24
Example:  1108 Amy’s Way, NYC

• 10 story office building; built 1990
• Level 3 will be altered to include a food 
  court.
• Level 4 will be altered to include 
  meeting/event rooms for the public to rent.




                              © 2012 CODE CONSULTANTS, INC.   25
1108 Amy’s Way – Alteration

• Codes – NYC
    Where the estimated cost of the building 
    alterations in any 12 month period exceeds fifty 
    percent of the cost of replacement of the 
    building, compliance with the NYCBC is 
    required.
    Otherwise LL 58 or 2008 NYCBC is acceptable.
• CCI would suggest 2008 NYCBC


                                 © 2012 CODE CONSULTANTS, INC.   26
1108 Amy’s Way – Alteration

• Codes – 2010 ADA Standards
    Confirm path of travel compliance
      Main entrance
      Restrooms
      Drinking fountains…
    Confirm 20%!!!
• Level 3 food court and Level 4 
  meeting/event rooms design must comply.


                                © 2012 CODE CONSULTANTS, INC.   27
Kevin D. Morin, PE                      Amy J. Murdock, PE
                Principal                               Principal

Code Consultants Professional Engineers, PC        Code Consultants, Inc.
      215 West 40th Street, 15th Floor         2043 Woodland Pkwy; Suite 300
        New York, New York 10018                  St. Louis, Missouri 63146
               212-216-9596                             314-991-2633




                                              © 2012 CODE CONSULTANTS, INC.

Mais conteúdo relacionado

Destaque

Assignment#1 Mapacpac, F M P (Cs3112 Os)
Assignment#1 Mapacpac, F M P  (Cs3112 Os)Assignment#1 Mapacpac, F M P  (Cs3112 Os)
Assignment#1 Mapacpac, F M P (Cs3112 Os)dyandmy
 
视频编码原理简介
视频编码原理简介视频编码原理简介
视频编码原理简介pluschen
 
как стать партнером Swb
как стать партнером Swbкак стать партнером Swb
как стать партнером Swbpanipan
 
The 7 Habits of Highly Effective Search Engine Marketing
The 7 Habits of Highly Effective Search Engine MarketingThe 7 Habits of Highly Effective Search Engine Marketing
The 7 Habits of Highly Effective Search Engine Marketingdogpatchlabs
 
Maurizio bday slideshow
Maurizio bday slideshowMaurizio bday slideshow
Maurizio bday slideshowlshapiro128
 
Benvenuti nel gruppo curcio
Benvenuti nel gruppo curcioBenvenuti nel gruppo curcio
Benvenuti nel gruppo curciogiuseppe
 
Colonel转码集群
Colonel转码集群Colonel转码集群
Colonel转码集群pluschen
 
码率选择之殇
码率选择之殇码率选择之殇
码率选择之殇pluschen
 
Pension slides 15 mts.
Pension slides 15 mts.Pension slides 15 mts.
Pension slides 15 mts.Exwel Trust
 
Matrices
MatricesMatrices
MatricesNORAIMA
 
Ricardo sarmiento visibilidad_diseminación_portafolio
Ricardo sarmiento visibilidad_diseminación_portafolioRicardo sarmiento visibilidad_diseminación_portafolio
Ricardo sarmiento visibilidad_diseminación_portafoliochisnet
 
C:\documents and settings\secundaria.miranda\mis documentos\irene c\story sim...
C:\documents and settings\secundaria.miranda\mis documentos\irene c\story sim...C:\documents and settings\secundaria.miranda\mis documentos\irene c\story sim...
C:\documents and settings\secundaria.miranda\mis documentos\irene c\story sim...Cervee
 

Destaque (18)

Assignment#1 Mapacpac, F M P (Cs3112 Os)
Assignment#1 Mapacpac, F M P  (Cs3112 Os)Assignment#1 Mapacpac, F M P  (Cs3112 Os)
Assignment#1 Mapacpac, F M P (Cs3112 Os)
 
视频编码原理简介
视频编码原理简介视频编码原理简介
视频编码原理简介
 
%Ba%b7%b7%d5%e8 2
%Ba%b7%b7%d5%e8 2%Ba%b7%b7%d5%e8 2
%Ba%b7%b7%d5%e8 2
 
OSS Project Quality & management
OSS Project Quality & managementOSS Project Quality & management
OSS Project Quality & management
 
Siasat Para Pemburu Rubah
Siasat Para Pemburu RubahSiasat Para Pemburu Rubah
Siasat Para Pemburu Rubah
 
как стать партнером Swb
как стать партнером Swbкак стать партнером Swb
как стать партнером Swb
 
The 7 Habits of Highly Effective Search Engine Marketing
The 7 Habits of Highly Effective Search Engine MarketingThe 7 Habits of Highly Effective Search Engine Marketing
The 7 Habits of Highly Effective Search Engine Marketing
 
Maurizio bday slideshow
Maurizio bday slideshowMaurizio bday slideshow
Maurizio bday slideshow
 
Benvenuti nel gruppo curcio
Benvenuti nel gruppo curcioBenvenuti nel gruppo curcio
Benvenuti nel gruppo curcio
 
OWF2013 INTERNET OF THINGS
OWF2013 INTERNET OF THINGSOWF2013 INTERNET OF THINGS
OWF2013 INTERNET OF THINGS
 
Colonel转码集群
Colonel转码集群Colonel转码集群
Colonel转码集群
 
IDEA - Opportunities in the Games Industry - 15 November 2011
IDEA - Opportunities in the Games Industry  - 15 November 2011IDEA - Opportunities in the Games Industry  - 15 November 2011
IDEA - Opportunities in the Games Industry - 15 November 2011
 
码率选择之殇
码率选择之殇码率选择之殇
码率选择之殇
 
Pension slides 15 mts.
Pension slides 15 mts.Pension slides 15 mts.
Pension slides 15 mts.
 
Matrices
MatricesMatrices
Matrices
 
Ricardo sarmiento visibilidad_diseminación_portafolio
Ricardo sarmiento visibilidad_diseminación_portafolioRicardo sarmiento visibilidad_diseminación_portafolio
Ricardo sarmiento visibilidad_diseminación_portafolio
 
C:\documents and settings\secundaria.miranda\mis documentos\irene c\story sim...
C:\documents and settings\secundaria.miranda\mis documentos\irene c\story sim...C:\documents and settings\secundaria.miranda\mis documentos\irene c\story sim...
C:\documents and settings\secundaria.miranda\mis documentos\irene c\story sim...
 
fOSSa2012- l grisoni - collbaoration between art and science
fOSSa2012- l grisoni - collbaoration between art and sciencefOSSa2012- l grisoni - collbaoration between art and science
fOSSa2012- l grisoni - collbaoration between art and science
 

Mais de REBNY

052011 DEP Water Rate Proposal
052011 DEP Water Rate Proposal052011 DEP Water Rate Proposal
052011 DEP Water Rate ProposalREBNY
 
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...REBNY
 
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...REBNY
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Comme...
 REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Comme... REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Comme...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Comme...REBNY
 
REBNY NYC Benchmarking Seminar: EnergyStar Portfolio Managerr
REBNY NYC Benchmarking Seminar: EnergyStar Portfolio ManagerrREBNY NYC Benchmarking Seminar: EnergyStar Portfolio Managerr
REBNY NYC Benchmarking Seminar: EnergyStar Portfolio ManagerrREBNY
 
NYC Benchmarking Seminar: Aggregated Consumption Data
NYC Benchmarking Seminar: Aggregated Consumption DataNYC Benchmarking Seminar: Aggregated Consumption Data
NYC Benchmarking Seminar: Aggregated Consumption DataREBNY
 
The NYC Department of Buildings Benchmarking Team - Complying with New York C...
The NYC Department of Buildings Benchmarking Team - Complying with New York C...The NYC Department of Buildings Benchmarking Team - Complying with New York C...
The NYC Department of Buildings Benchmarking Team - Complying with New York C...REBNY
 
NYC Energy Benchmarking Checklist
NYC Energy Benchmarking ChecklistNYC Energy Benchmarking Checklist
NYC Energy Benchmarking ChecklistREBNY
 
Greener Greater Building Plan Overview
Greener Greater Building Plan Overview Greener Greater Building Plan Overview
Greener Greater Building Plan Overview REBNY
 
Benchmarking New York City
Benchmarking New York CityBenchmarking New York City
Benchmarking New York CityREBNY
 
Rebny recap 2010
Rebny recap 2010Rebny recap 2010
Rebny recap 2010REBNY
 
FASB Lease Accounting Standards
 FASB Lease Accounting Standards FASB Lease Accounting Standards
FASB Lease Accounting StandardsREBNY
 
FASB Lease Accounting Standards
FASB Lease Accounting StandardsFASB Lease Accounting Standards
FASB Lease Accounting StandardsREBNY
 
NYC Dept. of Buildings Reorganization and Strategy
NYC Dept. of Buildings Reorganization and StrategyNYC Dept. of Buildings Reorganization and Strategy
NYC Dept. of Buildings Reorganization and StrategyREBNY
 
Nyc bid conference
Nyc bid conferenceNyc bid conference
Nyc bid conferenceREBNY
 

Mais de REBNY (16)

052011 DEP Water Rate Proposal
052011 DEP Water Rate Proposal052011 DEP Water Rate Proposal
052011 DEP Water Rate Proposal
 
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
 
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
REBNY NYC Benchmarking Seminar: NYSERDA ncentive Programs for Multi‐family Bu...
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Comme...
 REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Comme... REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Comme...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Comme...
 
REBNY NYC Benchmarking Seminar: EnergyStar Portfolio Managerr
REBNY NYC Benchmarking Seminar: EnergyStar Portfolio ManagerrREBNY NYC Benchmarking Seminar: EnergyStar Portfolio Managerr
REBNY NYC Benchmarking Seminar: EnergyStar Portfolio Managerr
 
NYC Benchmarking Seminar: Aggregated Consumption Data
NYC Benchmarking Seminar: Aggregated Consumption DataNYC Benchmarking Seminar: Aggregated Consumption Data
NYC Benchmarking Seminar: Aggregated Consumption Data
 
The NYC Department of Buildings Benchmarking Team - Complying with New York C...
The NYC Department of Buildings Benchmarking Team - Complying with New York C...The NYC Department of Buildings Benchmarking Team - Complying with New York C...
The NYC Department of Buildings Benchmarking Team - Complying with New York C...
 
NYC Energy Benchmarking Checklist
NYC Energy Benchmarking ChecklistNYC Energy Benchmarking Checklist
NYC Energy Benchmarking Checklist
 
Greener Greater Building Plan Overview
Greener Greater Building Plan Overview Greener Greater Building Plan Overview
Greener Greater Building Plan Overview
 
Benchmarking New York City
Benchmarking New York CityBenchmarking New York City
Benchmarking New York City
 
Rebny recap 2010
Rebny recap 2010Rebny recap 2010
Rebny recap 2010
 
FASB Lease Accounting Standards
 FASB Lease Accounting Standards FASB Lease Accounting Standards
FASB Lease Accounting Standards
 
FASB Lease Accounting Standards
FASB Lease Accounting StandardsFASB Lease Accounting Standards
FASB Lease Accounting Standards
 
NYC Dept. of Buildings Reorganization and Strategy
NYC Dept. of Buildings Reorganization and StrategyNYC Dept. of Buildings Reorganization and Strategy
NYC Dept. of Buildings Reorganization and Strategy
 
Nyc bid conference
Nyc bid conferenceNyc bid conference
Nyc bid conference
 

Último

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 

Último (20)

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 

2010 ADA Standards Seminar: Application for Existing Buildings

  • 2. Kevin D. Morin, PE Amy J. Murdock, PE Principal Principal Code Consultants Professional Engineers, PC Code Consultants, Inc. 215 West 40th Street, 15th Floor 2043 Woodland Pkwy; Suite 300 New York, New York 10018 St. Louis, Missouri 63146 212-216-9596 314-991-2633 Copyrighted Materials This presentation is protected by US and International copyright law. Reproduction, display and use of the presentation material without the expressed written consent of the speaker is prohibited. © Code Consultants, Inc. 2012 © 2012 CODE CONSULTANTS, INC. 2
  • 3. Agenda • Accessibility Codes, Standards, Guidelines • Definitions • Barrier Removal • Alterations • New 2010 Requirements © 2012 CODE CONSULTANTS, INC. 3
  • 4. Codes, Standards, and Guidelines • 2008 NYC Building Code references ICC/ANSI A117.1,  2003 Edition Local Law 58 • Fair Housing Act • 2010 Standards for Accessible Design.  Title III  Rule of the Americans with Disabilities Act  (ADA) • Proposed Accessibility Guidelines for  Pedestrian Facilities in the Public Right‐of‐Way © 2012 CODE CONSULTANTS, INC. 4
  • 6. Item LL58 ‐ 1987 New NYCBC FHA ADA Exterior entry doors All “public” All “public” At least one ADAAG:  50 percent 2010 Standards: 60 percent Exterior Door Opening Force 8.5 pounds 8.5 pounds No requirement No requirement Interior threshold height 1 inch max 1/2 inch max 1/2 inch max 1/2 inch max Threshold height at exterior  No requirement 3/4 inch for permeable deck;  3/4 inch for permeable deck;  N/A deck in residential space 4 inches for non‐permeable  4 inches for non‐permeable  deck deck Threshold height at exterior  1 inch max 1/2 inch max 1/2 inch max 1/2 inch max deck in public space Toilet room space at water  16‐1/2 inches to wall, 16‐1/2  18 inches to wall, 18 inches  Varies depending on safe  N/A closet in residential space inches to lavatory, total 33  to lavatory, total 36 inches  harbor: inches wall to lavatory wall to lavatory 18 inches to wall, 15 inches to lavatory Toilet room space at water  18 inches to wall, 18 inches  16‐18 inches to wall, Varies depending on safe  ADAAG:  closet in public space to lavatory 60 inches from side wall to  harbor: 18 inches to wall, 18 inches  lavatory Either: to lavatory 18 inches to wall, 18 inches  2010 Standards: to lavatory; or,  16‐18 inches to wall, 16‐18 inches to wall, 60 inches from side wall to  60 inches from side wall to  lavatory lavatory Side wall grab bar length in  15 inches min starting 12  18 inches min starting 12  Varies depending on safe  N/A residential space inches max from rear wall,  inches from rear wall,  harbor:  extending 15 inches min from  extending 30 inches min from  24 ‐ 42 inches rear wall rear wall Side wall grab bar length in  42 inches 42 inches 42 inches 42 inches public space 6 © 2012 CODE CONSULTANTS, INC.
  • 7. Application of Rules for NYC Apts/Condos Regulation Existing  Building: Same  New construction; or, Existing  Jurisdiction Building Area occupancy with less than  Construction with changed  50% of the cost in  occupancy for the building or >  alterations 50% cost of the building in  alteration expense New York City Common/public use  Local Law 58‐1987 with  2008 NYCBC with 2003 ANSI  (lobby, parking,  the 1986 ANSI A117.1 A117.1 sidewalks) Residential units US Federal Law * Public use (lobby,  HUD’s Fair Housing Act (FHA)** sidewalks, retail,  ‐ Prior to March 15, 2012: 1994 ADAAG leasing office) ‐ March 15, 2012+: 2010 Standards Residential units and  HUD’s Fair Housing Act (FHA)** common use areas  (lobby, parking, pool) *The ADA applies only to areas accessible by the public. It covers retail areas and the main lobby as well as any leasing/rental office. It does not apply to any elevator which provides access to only residential floors. **HUD recognizes 10 safe harbors for compliance with the Fair Housing Act’s design and construction requirements. © 2012 CODE CONSULTANTS, INC. 7
  • 8. Fair Housing Act: HUD Safe Harbors 1. HUD Fair Housing Accessibility Guidelines published on March 6, 1991 and the  Supplemental Notice to Fair Housing Accessibility Guidelines: Questions and  Answers about the Guidelines, published on June 28, 1994. 2. HUD Fair Housing Act Design Manual 3. ANSI A117.1 (1986), used with the Fair Housing Act, HUD's regulations, and the  Guidelines. 4. CABO/ANSI A117.1 (1992), used with the Fair Housing Act, HUD's regulations, and  the Guidelines. 5. ICC/ANSI A117.1 (1998), used with the Fair Housing Act, HUD's regulations, and  the Guidelines. 6. Code Requirements for Housing Accessibility 2000 (CRHA). 7. International Building Code 2000 as amended by the 2001 Supplement to the  International Codes. 8. International Building Code 2003, with one condition. 9. ICC/ANSI A117.1 (2003) used with the Fair Housing Act, HUD's regulations, and  the Guidelines 10. 2006 International Building Code ®  © 2012 CODE CONSULTANTS, INC. 8
  • 9. 2010 Standards • March 15, 2012: The 2010 Standards  become mandatory.  There is no option for  using the old ADAAG any longer. • The “trigger” date is the date on  which the application for a  building permit or permit  extension is accepted/certified  by the local AHJ – not the date of  permit issuance. © 2012 CODE CONSULTANTS, INC. 9
  • 10. What Happened March 15, 2012 – Element‐by‐Element Safe Harbor • 1994 ADAAG existing facilities – safe harbor and  don’t have to comply with 2010 Standards until  the specific element is altered or required to be  altered. • At the time of alteration then the element must  comply with the new rules. © 2012 CODE CONSULTANTS, INC. 10
  • 11. What Happens March 15, 2012 – Removal of Barriers; New Item • New provisions in 2010 Standards not in the  ADAAG need to be made compliant. Recreational equipment (including play areas) Water features Pool access Exercise equipment Team or player seating Accessible route in court sports facilities © 2012 CODE CONSULTANTS, INC. 11
  • 12. Construction – Removal of Barriers Recall that all public accommodation buildings  covered by the ADA are subject to the  removing barriers. • Applies to existing buildings whether  alterations are planned or not. • Hierarchy/priority list  • Install off‐set hinges on a narrow door,  ramping a curb, installing visual alarms,  switching door hardware, etc.  © 2012 CODE CONSULTANTS, INC. 12
  • 13. Barrier Removal • Only applies to buildings constructed prior  to 1992 • Priority List Exterior Access Interior Access (basic/general) Restrooms Interior Access (detailed/specific) © 2012 CODE CONSULTANTS, INC. 13
  • 14. Barrier Removal Priority List – Detailed Review Exterior Access Interior Access • Public sidewalks, • Areas where goods or  • Parking, or  services are available. • Public transportation. • Corridors Example  Example • Install entrance ramp, • Widen doors, • Widen entrance, or • Rearranging displays, or • Provide accessible  • Install Braille and raised  parking spaces character signage. © 2012 CODE CONSULTANTS, INC. 14
  • 15. Barrier Removal Priority List – Detailed Review Restroom Access Interior Access • Widen doors, Any other measures  • Install ramps, necessary to provide  • Install accessible  access to the goods,  signage, services, facilities,  privileges, advantages, or  • Widen toilet stalls, accommodations. • Install grab bars, or • Relocate dispensers.  © 2012 CODE CONSULTANTS, INC. 15
  • 16. Barrier Removal – N/A? • Buildings constructed after  1992 and have accessibility  deficiencies are noncompliant. Really NO “barrier removal” All noncompliant conditions need  to be remedied  Priority order could follow barrier  removal list Priority could be easy to difficult © 2012 CODE CONSULTANTS, INC. 16
  • 17. Barrier Removal – 2010 • New 2010 Standard provisions not outlined  in ADAAG need to be remedied. • Even if the industry is  pushing back, remove the  barrier. • Building owner can  establish a timeline to  complete the updates. © 2012 CODE CONSULTANTS, INC. 17
  • 19. Alteration Priority List 1. An accessible entrance;  2. An accessible route to the altered area; 3. At least one accessible restroom for each sex or a  single unisex restroom; 4. Accessible telephones; 5. Accessible drinking fountains; and, 6. Where possible, additional accessible elements such  as parking, storage, and alarms. © 2012 CODE CONSULTANTS, INC. 19
  • 20. Alteration – Disproportionate Cost • Not readily achievable  • Deemed to be a disproportionate cost (>20%  of the project cost) • Accommodations must be made to provide  goods and services.   • Reasons which accessibility cannot be  achieved should be documented and kept  with a project file or somewhere where it can  be retrieved in the future.  © 2012 CODE CONSULTANTS, INC. 20
  • 21. Alteration – IMPORTANT! • Courts have ruled that up to 20% of a project  costs can be considered a reasonable expense  to provide the accessible route to the altered  area of primary function.  • So…remove barriers for a cost up to 20% of a  project’s cost; unless no barriers are  presented. © 2012 CODE CONSULTANTS, INC. 21
  • 22. Definitions – Dimensions The Million Dollar Question • Dimensions that are not stated as  “maximum” or “minimum” are absolute  – can’t be above; can’t be below. • Absolute dimensions are subject to conventional  industry tolerances. • Range dimensions (max. and min. end points) are not  subject to tolerances. • Centerline measurements are normally more liberal  due to difficulty. 104.1 © 2012 CODE CONSULTANTS, INC. 22
  • 23. Definitions – Impracticable (aka Tech Infeas) A friendly reminder • Structural conditions would require  removal or alteration of a load‐bearing  member essential to structural frame. • Existing site constraints prohibit  modification. • Not just because project doesn’t have fee in  the budget. 106.5 © 2012 CODE CONSULTANTS, INC. 23
  • 24. Impracticable Situation DOCUMENT!!! • DoJ has ruled 20% of construction costs should  be allocated to Barrier Removal. • Document your case if impracticable. Public Street infill slab Add lift Another entrance 106.5 © 2012 CODE CONSULTANTS, INC. 24
  • 25. Example:  1108 Amy’s Way, NYC • 10 story office building; built 1990 • Level 3 will be altered to include a food  court. • Level 4 will be altered to include  meeting/event rooms for the public to rent. © 2012 CODE CONSULTANTS, INC. 25
  • 26. 1108 Amy’s Way – Alteration • Codes – NYC Where the estimated cost of the building  alterations in any 12 month period exceeds fifty  percent of the cost of replacement of the  building, compliance with the NYCBC is  required. Otherwise LL 58 or 2008 NYCBC is acceptable. • CCI would suggest 2008 NYCBC © 2012 CODE CONSULTANTS, INC. 26
  • 27. 1108 Amy’s Way – Alteration • Codes – 2010 ADA Standards Confirm path of travel compliance Main entrance Restrooms Drinking fountains… Confirm 20%!!! • Level 3 food court and Level 4  meeting/event rooms design must comply. © 2012 CODE CONSULTANTS, INC. 27
  • 28. Kevin D. Morin, PE Amy J. Murdock, PE Principal Principal Code Consultants Professional Engineers, PC Code Consultants, Inc. 215 West 40th Street, 15th Floor 2043 Woodland Pkwy; Suite 300 New York, New York 10018 St. Louis, Missouri 63146 212-216-9596 314-991-2633 © 2012 CODE CONSULTANTS, INC.