Well laid broad objectives,accordingly: To abate pollution and improve water quality To conserve biodiversity To develop an integrated river basin management approach To conduct comprehensive research to further these objectives To gain experience for implementing similar river clean up     programs in other polluted rivers in India. SWOT Analysis of GAP
SWOT Analysis of GAP Implementation The objective, at the time of launching the Ganga Action Plan in 1985, was to improve the water quality of Ganga to acceptable standards by preventing the pollution load from reaching the river.  Later, in 1987, on the recommendations of the Monitoring Committee of GAP, the objective of the Plan was modified to restoring the river water quality to the Designated Best Use class of Ganga, which is “Bathing Class” (Class B).
Review of Ganga Action Plan Strengths: A start has been made.  Some wastewater collection and treatment infrastructure has been created. Civil society, politicians and other decision makers are now aware of the issues concerning water quality of rivers in the Ganga basin.   There is a consensus for strong action to improve river water quality in Ganga river basin. There is clarity regarding wastewater treatment technologies to be adopted. Availability of Data and Information
Review of Ganga Action Plan Weaknesses Failure of GAP to improve the river water quality sufficiently due to various reasons, i.e., non-functioning of wastewater collection and pumping infrastructure, non-functional wastewater treatment plants, insufficient wastewater collection and treatment infrastructure, etc.    Lack of clarity regarding wastewater treatment technologies to be adopted, e.g., anaerobic versus aerobic technologies. The plan for operation and maintenance of assets created was flawed, e.g., lack of trained personnel, funds, and electricity for operating wastewater treatment plants, capacity and priority of local bodies Quality of Data and accessibility of  data/information and analysis
Review of Ganga Action Plan Opportunities There is sufficient expertise in the country for formulating and implementing large river basin management plans. There is clarity regarding reasons behind failure/sub-optimal performance of a majority of projects sanctioned under GAP 73rd  & 74th Amendment – Strengthening Local Government There is clarity regarding policy gaps/failures during implementation of GAP River monitoring & performance evaluation of STPs
Review of Ganga Action Plan Threats Failure to learn the lessons from technological and policy failures encountered during GAP Sanctioning of projects in an unplanned manner without clearly specified objectives. Not having clearly specified mid-term goals/benchmarks to judge the progress of the plan. Chlorination of treated sewage is proposed or carried out to comply with effluent discharge standards of MPN. DBPs thus introduced are not removed in conventional water treatment plant.
Action in the interim period, i.e., before a GRBMP is in place Creation of wastewater diversion infrastructure, i.e., construction of intercepting sewers, nala interception, pumping, etc.  These projects shall ensure that a) there is NO wastewater disposal (treated or untreated) to rivers in certain critical stretches, and (b) all wastewater generated in urban centers can be collected for treatment.
Action in the interim period, i.e. before a GRBMP is in place Preparation of comprehensive wastewater management plans for urban centers with a time horizon of 50 years.  Such plans must clearly specify how all wastewater generated in urban centers over the next 50 years will be collected treated and disposed/reused/recycled.
Action in the interim period, i.e. before a GRBMP is in place Strengthen Panchayatiraj Institutions Complete collection, interception and diversion (Close coordination with MoUD) Acquisition of Land considering 50 Years planning period Excellent Preliminary and Primary Treatment including sludge management Secondary Treatment Tertiary Treatment
Action in the interim period, i.e. before a GRBMP is in place Achieve Zero Discharge Concept at Key places  Haridwar/Rishikesha; Garhmukteshwar; Kanpur; Allahabad and Varanasi Best Available Practices for Industries discharging in Ramganga, Kali, and directly in Ganga (Kanpur)
Thank You !

Mais conteúdo relacionado

Mais procurados

Methodology for Preparation of Master Plan
Methodology  for  Preparation of Master PlanMethodology  for  Preparation of Master Plan
Methodology for Preparation of Master PlanJIT KUMAR GUPTA
 
Elements of national housing policy
Elements of national housing policyElements of national housing policy
Elements of national housing policykvn virinchi
 
Draft Proposal of Town Planning Scheme
Draft Proposal of Town Planning SchemeDraft Proposal of Town Planning Scheme
Draft Proposal of Town Planning SchemeYajush Sonar
 
Storm water harvestin_Anamrita khan_2013
Storm water harvestin_Anamrita khan_2013Storm water harvestin_Anamrita khan_2013
Storm water harvestin_Anamrita khan_2013India Water Portal
 
Pradhan Mantri Awas Yojna
Pradhan Mantri Awas YojnaPradhan Mantri Awas Yojna
Pradhan Mantri Awas YojnaJIT KUMAR GUPTA
 
Urban redevelopment pattern a study of Jadibuti node, Kathmandu
Urban redevelopment pattern a study of Jadibuti node, KathmanduUrban redevelopment pattern a study of Jadibuti node, Kathmandu
Urban redevelopment pattern a study of Jadibuti node, KathmanduAmit Pokharel
 
Pune Towards Smart City - Pune Municipal Corporation
Pune Towards Smart City - Pune Municipal CorporationPune Towards Smart City - Pune Municipal Corporation
Pune Towards Smart City - Pune Municipal Corporationpmcpune
 
Aranya Community Housing
Aranya Community HousingAranya Community Housing
Aranya Community HousingKhushboo Sood
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agradeeksha sharma
 
State of urban networks and services
State of urban networks and servicesState of urban networks and services
State of urban networks and servicesSiddhi Vakharia
 
Surveys - Urban And Regional Planning
Surveys - Urban And Regional PlanningSurveys - Urban And Regional Planning
Surveys - Urban And Regional Planningvinayak1211
 
Urban Planning & Development Act, 1973
Urban Planning & Development Act, 1973Urban Planning & Development Act, 1973
Urban Planning & Development Act, 1973Aman Kudesia
 
Integrated Urban Water Management, by Kala Vairavamoorthy
Integrated Urban Water Management, by Kala VairavamoorthyIntegrated Urban Water Management, by Kala Vairavamoorthy
Integrated Urban Water Management, by Kala VairavamoorthyGlobal Water Partnership
 

Mais procurados (20)

Methodology for Preparation of Master Plan
Methodology  for  Preparation of Master PlanMethodology  for  Preparation of Master Plan
Methodology for Preparation of Master Plan
 
Elements of national housing policy
Elements of national housing policyElements of national housing policy
Elements of national housing policy
 
Land readjustment
Land readjustmentLand readjustment
Land readjustment
 
Draft Proposal of Town Planning Scheme
Draft Proposal of Town Planning SchemeDraft Proposal of Town Planning Scheme
Draft Proposal of Town Planning Scheme
 
Storm water harvestin_Anamrita khan_2013
Storm water harvestin_Anamrita khan_2013Storm water harvestin_Anamrita khan_2013
Storm water harvestin_Anamrita khan_2013
 
Pradhan Mantri Awas Yojna
Pradhan Mantri Awas YojnaPradhan Mantri Awas Yojna
Pradhan Mantri Awas Yojna
 
Urban redevelopment pattern a study of Jadibuti node, Kathmandu
Urban redevelopment pattern a study of Jadibuti node, KathmanduUrban redevelopment pattern a study of Jadibuti node, Kathmandu
Urban redevelopment pattern a study of Jadibuti node, Kathmandu
 
planning theory
planning theory planning theory
planning theory
 
Chandigarh
ChandigarhChandigarh
Chandigarh
 
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
 
Pune Towards Smart City - Pune Municipal Corporation
Pune Towards Smart City - Pune Municipal CorporationPune Towards Smart City - Pune Municipal Corporation
Pune Towards Smart City - Pune Municipal Corporation
 
Placemaking
PlacemakingPlacemaking
Placemaking
 
Aranya Community Housing
Aranya Community HousingAranya Community Housing
Aranya Community Housing
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agra
 
State of urban networks and services
State of urban networks and servicesState of urban networks and services
State of urban networks and services
 
URDPFI - 2016
URDPFI - 2016URDPFI - 2016
URDPFI - 2016
 
Surveys - Urban And Regional Planning
Surveys - Urban And Regional PlanningSurveys - Urban And Regional Planning
Surveys - Urban And Regional Planning
 
Urban land policies
Urban land policiesUrban land policies
Urban land policies
 
Urban Planning & Development Act, 1973
Urban Planning & Development Act, 1973Urban Planning & Development Act, 1973
Urban Planning & Development Act, 1973
 
Integrated Urban Water Management, by Kala Vairavamoorthy
Integrated Urban Water Management, by Kala VairavamoorthyIntegrated Urban Water Management, by Kala Vairavamoorthy
Integrated Urban Water Management, by Kala Vairavamoorthy
 

Semelhante a Swot analysis of gap

DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...Deltares
 
Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water managementhydrologyproject2
 
Deep watershed management overview
Deep  watershed management   overviewDeep  watershed management   overview
Deep watershed management overviewRajesh Davulluri
 
Chesapeake Bay Watershed Implementation Planning Process
Chesapeake Bay Watershed Implementation Planning ProcessChesapeake Bay Watershed Implementation Planning Process
Chesapeake Bay Watershed Implementation Planning ProcessMarti Donley
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentationjnett
 
Overview India-EU Water Partnership Spring 2017
Overview India-EU Water Partnership Spring 2017Overview India-EU Water Partnership Spring 2017
Overview India-EU Water Partnership Spring 2017India-EU Water Partnership
 
GUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPERGUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPERnuramiradayang
 
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...India-EU Water Partnership
 

Semelhante a Swot analysis of gap (20)

DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
 
Integrating River Basin Management Plans with the planning system
Integrating River Basin Management Plans with the planning systemIntegrating River Basin Management Plans with the planning system
Integrating River Basin Management Plans with the planning system
 
Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water management
 
Ganga action plan 2014
Ganga action plan 2014Ganga action plan 2014
Ganga action plan 2014
 
LaMP: Great Lakes Program Reporting
LaMP: Great Lakes Program ReportingLaMP: Great Lakes Program Reporting
LaMP: Great Lakes Program Reporting
 
Deep watershed management overview
Deep  watershed management   overviewDeep  watershed management   overview
Deep watershed management overview
 
Moore
MooreMoore
Moore
 
Need For Water Management
Need For Water ManagementNeed For Water Management
Need For Water Management
 
Chesapeake Bay Watershed Implementation Planning Process
Chesapeake Bay Watershed Implementation Planning ProcessChesapeake Bay Watershed Implementation Planning Process
Chesapeake Bay Watershed Implementation Planning Process
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation
 
25. Tools & Mechanisms to Integrate Outcomes into the Planning System
25. Tools & Mechanisms to Integrate Outcomes into the Planning System25. Tools & Mechanisms to Integrate Outcomes into the Planning System
25. Tools & Mechanisms to Integrate Outcomes into the Planning System
 
National Water Mission
National Water MissionNational Water Mission
National Water Mission
 
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
 
Helathy Ganga
Helathy GangaHelathy Ganga
Helathy Ganga
 
Overview India-EU Water Partnership Spring 2017
Overview India-EU Water Partnership Spring 2017Overview India-EU Water Partnership Spring 2017
Overview India-EU Water Partnership Spring 2017
 
National water law policy
National water law policy  National water law policy
National water law policy
 
action plan.pptx
action plan.pptxaction plan.pptx
action plan.pptx
 
GUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPERGUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPER
 
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
 
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
 

Mais de FRANK Water

Swot analysis of open access movement
Swot analysis of open access movementSwot analysis of open access movement
Swot analysis of open access movementFRANK Water
 
Content to Connectivity: The Prospective Digital Platform for Inclusive Growt...
Content to Connectivity: The Prospective Digital Platform for Inclusive Growt...Content to Connectivity: The Prospective Digital Platform for Inclusive Growt...
Content to Connectivity: The Prospective Digital Platform for Inclusive Growt...FRANK Water
 
Open Access in Agro forestry research
Open Access in Agro forestry researchOpen Access in Agro forestry research
Open Access in Agro forestry researchFRANK Water
 
Open access initiative at CSIR
Open access initiative at CSIROpen access initiative at CSIR
Open access initiative at CSIRFRANK Water
 
Experiences of CSA and Sahaja Aharam
Experiences of CSA and Sahaja AharamExperiences of CSA and Sahaja Aharam
Experiences of CSA and Sahaja AharamFRANK Water
 
Pk reddy open accessnaarm oct2014
Pk reddy open accessnaarm oct2014Pk reddy open accessnaarm oct2014
Pk reddy open accessnaarm oct2014FRANK Water
 
Ak jai ne resources-oct2014
Ak jai ne resources-oct2014Ak jai ne resources-oct2014
Ak jai ne resources-oct2014FRANK Water
 
last mile farmer reach using open agriculture and knowledge and Innovation ICT
last mile farmer reach using open agriculture and knowledge and Innovation ICTlast mile farmer reach using open agriculture and knowledge and Innovation ICT
last mile farmer reach using open agriculture and knowledge and Innovation ICTFRANK Water
 
CIARD Ring/GODAN - Towards Open Access Knowledge
CIARD Ring/GODAN - Towards Open Access KnowledgeCIARD Ring/GODAN - Towards Open Access Knowledge
CIARD Ring/GODAN - Towards Open Access KnowledgeFRANK Water
 
Open Access and Natural Resource Conservation
Open Access and Natural Resource ConservationOpen Access and Natural Resource Conservation
Open Access and Natural Resource ConservationFRANK Water
 
Open Access in Agriculture - ICAR Perspectice
Open Access in Agriculture - ICAR Perspectice Open Access in Agriculture - ICAR Perspectice
Open Access in Agriculture - ICAR Perspectice FRANK Water
 
Opening Data, Information and Knowledge for Agriculture Development
Opening Data, Information and Knowledge for Agriculture Development Opening Data, Information and Knowledge for Agriculture Development
Opening Data, Information and Knowledge for Agriculture Development FRANK Water
 
Open data & knowledge solutions - a cgiar perspective dileep
Open data & knowledge solutions - a cgiar perspective dileepOpen data & knowledge solutions - a cgiar perspective dileep
Open data & knowledge solutions - a cgiar perspective dileepFRANK Water
 
Program Schedule of Workshop on “Open Access to Agricultural Knowledge for In...
Program Schedule of Workshop on “Open Access to Agricultural Knowledge for In...Program Schedule of Workshop on “Open Access to Agricultural Knowledge for In...
Program Schedule of Workshop on “Open Access to Agricultural Knowledge for In...FRANK Water
 
Open access icrisat ps_2014_oct_27
Open access icrisat ps_2014_oct_27Open access icrisat ps_2014_oct_27
Open access icrisat ps_2014_oct_27FRANK Water
 
Ecosan Visualization
Ecosan VisualizationEcosan Visualization
Ecosan VisualizationFRANK Water
 
Ecosan -there is more to it!
Ecosan -there is more to it!Ecosan -there is more to it!
Ecosan -there is more to it!FRANK Water
 
Ecosan advocacy Presentation
Ecosan advocacy PresentationEcosan advocacy Presentation
Ecosan advocacy PresentationFRANK Water
 
Visualization of NATIONAL WATER RESOURCES FRAMEWORK STUDY done by CEEW
Visualization of NATIONAL WATER RESOURCES FRAMEWORK STUDY done by CEEWVisualization of NATIONAL WATER RESOURCES FRAMEWORK STUDY done by CEEW
Visualization of NATIONAL WATER RESOURCES FRAMEWORK STUDY done by CEEWFRANK Water
 

Mais de FRANK Water (20)

Swot analysis of open access movement
Swot analysis of open access movementSwot analysis of open access movement
Swot analysis of open access movement
 
Content to Connectivity: The Prospective Digital Platform for Inclusive Growt...
Content to Connectivity: The Prospective Digital Platform for Inclusive Growt...Content to Connectivity: The Prospective Digital Platform for Inclusive Growt...
Content to Connectivity: The Prospective Digital Platform for Inclusive Growt...
 
Open Access in Agro forestry research
Open Access in Agro forestry researchOpen Access in Agro forestry research
Open Access in Agro forestry research
 
Open access initiative at CSIR
Open access initiative at CSIROpen access initiative at CSIR
Open access initiative at CSIR
 
Experiences of CSA and Sahaja Aharam
Experiences of CSA and Sahaja AharamExperiences of CSA and Sahaja Aharam
Experiences of CSA and Sahaja Aharam
 
Pk reddy open accessnaarm oct2014
Pk reddy open accessnaarm oct2014Pk reddy open accessnaarm oct2014
Pk reddy open accessnaarm oct2014
 
Ak jai ne resources-oct2014
Ak jai ne resources-oct2014Ak jai ne resources-oct2014
Ak jai ne resources-oct2014
 
last mile farmer reach using open agriculture and knowledge and Innovation ICT
last mile farmer reach using open agriculture and knowledge and Innovation ICTlast mile farmer reach using open agriculture and knowledge and Innovation ICT
last mile farmer reach using open agriculture and knowledge and Innovation ICT
 
agINFRA
agINFRAagINFRA
agINFRA
 
CIARD Ring/GODAN - Towards Open Access Knowledge
CIARD Ring/GODAN - Towards Open Access KnowledgeCIARD Ring/GODAN - Towards Open Access Knowledge
CIARD Ring/GODAN - Towards Open Access Knowledge
 
Open Access and Natural Resource Conservation
Open Access and Natural Resource ConservationOpen Access and Natural Resource Conservation
Open Access and Natural Resource Conservation
 
Open Access in Agriculture - ICAR Perspectice
Open Access in Agriculture - ICAR Perspectice Open Access in Agriculture - ICAR Perspectice
Open Access in Agriculture - ICAR Perspectice
 
Opening Data, Information and Knowledge for Agriculture Development
Opening Data, Information and Knowledge for Agriculture Development Opening Data, Information and Knowledge for Agriculture Development
Opening Data, Information and Knowledge for Agriculture Development
 
Open data & knowledge solutions - a cgiar perspective dileep
Open data & knowledge solutions - a cgiar perspective dileepOpen data & knowledge solutions - a cgiar perspective dileep
Open data & knowledge solutions - a cgiar perspective dileep
 
Program Schedule of Workshop on “Open Access to Agricultural Knowledge for In...
Program Schedule of Workshop on “Open Access to Agricultural Knowledge for In...Program Schedule of Workshop on “Open Access to Agricultural Knowledge for In...
Program Schedule of Workshop on “Open Access to Agricultural Knowledge for In...
 
Open access icrisat ps_2014_oct_27
Open access icrisat ps_2014_oct_27Open access icrisat ps_2014_oct_27
Open access icrisat ps_2014_oct_27
 
Ecosan Visualization
Ecosan VisualizationEcosan Visualization
Ecosan Visualization
 
Ecosan -there is more to it!
Ecosan -there is more to it!Ecosan -there is more to it!
Ecosan -there is more to it!
 
Ecosan advocacy Presentation
Ecosan advocacy PresentationEcosan advocacy Presentation
Ecosan advocacy Presentation
 
Visualization of NATIONAL WATER RESOURCES FRAMEWORK STUDY done by CEEW
Visualization of NATIONAL WATER RESOURCES FRAMEWORK STUDY done by CEEWVisualization of NATIONAL WATER RESOURCES FRAMEWORK STUDY done by CEEW
Visualization of NATIONAL WATER RESOURCES FRAMEWORK STUDY done by CEEW
 

Swot analysis of gap

  • 1. Well laid broad objectives,accordingly: To abate pollution and improve water quality To conserve biodiversity To develop an integrated river basin management approach To conduct comprehensive research to further these objectives To gain experience for implementing similar river clean up programs in other polluted rivers in India. SWOT Analysis of GAP
  • 2. SWOT Analysis of GAP Implementation The objective, at the time of launching the Ganga Action Plan in 1985, was to improve the water quality of Ganga to acceptable standards by preventing the pollution load from reaching the river. Later, in 1987, on the recommendations of the Monitoring Committee of GAP, the objective of the Plan was modified to restoring the river water quality to the Designated Best Use class of Ganga, which is “Bathing Class” (Class B).
  • 3. Review of Ganga Action Plan Strengths: A start has been made. Some wastewater collection and treatment infrastructure has been created. Civil society, politicians and other decision makers are now aware of the issues concerning water quality of rivers in the Ganga basin. There is a consensus for strong action to improve river water quality in Ganga river basin. There is clarity regarding wastewater treatment technologies to be adopted. Availability of Data and Information
  • 4. Review of Ganga Action Plan Weaknesses Failure of GAP to improve the river water quality sufficiently due to various reasons, i.e., non-functioning of wastewater collection and pumping infrastructure, non-functional wastewater treatment plants, insufficient wastewater collection and treatment infrastructure, etc. Lack of clarity regarding wastewater treatment technologies to be adopted, e.g., anaerobic versus aerobic technologies. The plan for operation and maintenance of assets created was flawed, e.g., lack of trained personnel, funds, and electricity for operating wastewater treatment plants, capacity and priority of local bodies Quality of Data and accessibility of data/information and analysis
  • 5. Review of Ganga Action Plan Opportunities There is sufficient expertise in the country for formulating and implementing large river basin management plans. There is clarity regarding reasons behind failure/sub-optimal performance of a majority of projects sanctioned under GAP 73rd & 74th Amendment – Strengthening Local Government There is clarity regarding policy gaps/failures during implementation of GAP River monitoring & performance evaluation of STPs
  • 6. Review of Ganga Action Plan Threats Failure to learn the lessons from technological and policy failures encountered during GAP Sanctioning of projects in an unplanned manner without clearly specified objectives. Not having clearly specified mid-term goals/benchmarks to judge the progress of the plan. Chlorination of treated sewage is proposed or carried out to comply with effluent discharge standards of MPN. DBPs thus introduced are not removed in conventional water treatment plant.
  • 7. Action in the interim period, i.e., before a GRBMP is in place Creation of wastewater diversion infrastructure, i.e., construction of intercepting sewers, nala interception, pumping, etc. These projects shall ensure that a) there is NO wastewater disposal (treated or untreated) to rivers in certain critical stretches, and (b) all wastewater generated in urban centers can be collected for treatment.
  • 8. Action in the interim period, i.e. before a GRBMP is in place Preparation of comprehensive wastewater management plans for urban centers with a time horizon of 50 years. Such plans must clearly specify how all wastewater generated in urban centers over the next 50 years will be collected treated and disposed/reused/recycled.
  • 9. Action in the interim period, i.e. before a GRBMP is in place Strengthen Panchayatiraj Institutions Complete collection, interception and diversion (Close coordination with MoUD) Acquisition of Land considering 50 Years planning period Excellent Preliminary and Primary Treatment including sludge management Secondary Treatment Tertiary Treatment
  • 10. Action in the interim period, i.e. before a GRBMP is in place Achieve Zero Discharge Concept at Key places  Haridwar/Rishikesha; Garhmukteshwar; Kanpur; Allahabad and Varanasi Best Available Practices for Industries discharging in Ramganga, Kali, and directly in Ganga (Kanpur)