What is ERTMS Regional?
• The first world wide ERTMS level 3 application in
commercial operation
• A cost-benefit optimised and complete track-side control
command system for regional lines
• 100% TSI CCS compliant
1. Based on ERTMS specifications (SRS 2.3.0 d)
2. On board ERTMS (L1-L3) adopted without changes2. On board ERTMS (L1 L3) adopted without changes
3. New development for track-side equipment
2 2012-05-03
Why was the UIC ERTMS Regional project born 1998?
ERTMS only for high speed
Use ERTMS compliant onboards
Why was the UIC ERTMS Regional project born 1998?
Satellite navigation for position
Whitebox or blackbox
UIC Low cost project
Different system developments ongoing
• Germany: The Funk Fahr Betrieb
• France: The SER project
• Sweden: The radio block system
The UIC
ERTMS Regional
project
• Sweden: The radio block system
• Italy: Use of satellite technology
• Denmark: The RADAS project
• EU + some industries: LOCOPROL
Oth d l t llproject
(Trackside only)
• Other developments as well
EU documents regarding visions for Interoperability
3 2012-05-03
Why consider ERTMS on Regional lines in year 2000Why consider ERTMS on Regional lines in year 2000
(Scope extension of the TSI’s)
High-speed passenger trains
Conventional passenger/ freight trainsConventional passenger/ freight trains
Local passenger trains
High-speed
lines
Conventional
TEN lines
Conventional
main lines
Conventional
regional lines
Conventional
local lines
4 2012-05-03
Present situation on RegionalPresent situation on Regional
lines in Sweden 1(2)
• 2 116 km (21%) of the Swedish network
are still manually operated (pink lines)
These are the target lines for ERTMSThese are the target lines for ERTMS
Regional in Sweden.
• 20–30% of the European network can be20 30% of the European network can be
regarded as Regional lines
5 2012-05-03
Present situation on Regional lines 2(2)
• Old interlocking
• No line block-systems
• No ATP
• Manual dispatching by telephone
6 2012-05-03
Project background and goals
• Lower operational cost
• Increased capacity
• Increased flexibility
• Increased safety
7 2012-05-03
UIC ERTMS Regional Project activities 2000-2012
UIC ERTMS Regional specifications developed:
• FRS
• Operational scenario document
• Operational rules document
• Basic GRS spec. including the architecture
• Basic RAMS spec.
• Basic for test scenarios
• Participation in tests in Swedenp
• Interface with the UIC benchmark group
8 2012-05-03
Way forward for the UIC ERTMS Regional project
• Update of the UIC specifications
• Indentify and quantify cost reduction opportunities
• TIMS (Train integrity monitoring system)
9 2012-05-03
System Structure
Controller Machine Interface
CMI
Interlocking/RBC
Server
GSM-RISDN
LAN/WAN (TCP/IP)
LAN/WAN (TCP/IP)
Handheld EuroradioHandheld
terminal
GPRS
GPRS
OCC, Object
Controller
Cabinets
ERTMS Level 3
Public GSM
Eurobalises
Cabinets
10 2012-05-03
ERTMS REGIONAL: Cost saving factors
• Staff reduction in stations • Minimizing cables by controllingStaff reduction in stations
(TMS integrated management)
• Less track side equipment and
Minimizing cables by controlling
objects via radio
• Track circuits and axle counters
reduced maintenance costs
• No traditional interlocking,
no or less line side signals
as an option on special locations
• Standardized specifications for
procurementno or less line side signals procurement
The goal is to reduce the investment cost to 50 % of a conventional traffic control system
11 2012-05-03
Flexible system
• TIMS: Technical system onboard or
driver responsibility
• Transmission: Radio (GSM/R GPRS) or fixed
network (inhouse or external)
• Block principle: Moving block or
Fixed block
• Train detection: With track circuits / axel counters
or without track circuits / axel counters
12 2012-05-03
Status in Sweden
• Final safety assessment successfully completed
• ISC assessment by a Notified Body completedy y p
• Commissioning of the pilot line February 2012
Implementation projects on two new Regional lines started• Implementation projects on two new Regional lines started
• Dispatchers and drivers are satisfied with the new system
13 2012-05-03
Expirience in Sweden
The targets are meet!
1 Th ti l1. The operational
2. The technical
3. The cost savings
14 2012-05-03
Thank you for your kind attention
Poul Frøsig, UIC ERTMS Regional
Contact details:
Phone +4544842879 or Mobil +4527104364
E mail:FROSIG@MAIL.DK
Per Erik Ingels TrafikverketPer Erik Ingels, Trafikverket
Contact details:
Phone +46101231969 or Mobil +46707245750
E mail:per-erik.ingels@trafikverket.seE mail:per erik.ingels@trafikverket.se
15 2012-05-03

Mais conteúdo relacionado

Mais procurados

FuTRO Launch Presentations
FuTRO Launch PresentationsFuTRO Launch Presentations
FuTRO Launch Presentations
Amplified Events
 
Application of traffic light
Application of traffic lightApplication of traffic light
Application of traffic light
are you
 
20160531 Testing Expo_Benefits and Requirements of Automotive Ethernet
20160531 Testing Expo_Benefits and Requirements of Automotive Ethernet20160531 Testing Expo_Benefits and Requirements of Automotive Ethernet
20160531 Testing Expo_Benefits and Requirements of Automotive Ethernet
Guenther Trautzl
 

Mais procurados (18)

Design and Construction of Speed Detection System for Vehicles
Design and Construction of Speed Detection System for VehiclesDesign and Construction of Speed Detection System for Vehicles
Design and Construction of Speed Detection System for Vehicles
 
Project 2015
Project 2015Project 2015
Project 2015
 
Automated traffic control system
Automated traffic control systemAutomated traffic control system
Automated traffic control system
 
VLITE NODE – SOLUTION for PRECISION FARMING2
VLITE NODE – SOLUTION for PRECISION FARMING2VLITE NODE – SOLUTION for PRECISION FARMING2
VLITE NODE – SOLUTION for PRECISION FARMING2
 
Reefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical AdvantageReefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical Advantage
 
Intelligence traffic management system for metrocities
Intelligence traffic management system for metrocitiesIntelligence traffic management system for metrocities
Intelligence traffic management system for metrocities
 
FuTRO Launch Presentations
FuTRO Launch PresentationsFuTRO Launch Presentations
FuTRO Launch Presentations
 
Solarmon eng pp final 05-2013
Solarmon eng pp final 05-2013Solarmon eng pp final 05-2013
Solarmon eng pp final 05-2013
 
I John Siraut Economic Impact Of Traffic Signals Final
I   John Siraut   Economic Impact Of Traffic Signals FinalI   John Siraut   Economic Impact Of Traffic Signals Final
I John Siraut Economic Impact Of Traffic Signals Final
 
FactIS Wayside CM Systems
FactIS Wayside CM SystemsFactIS Wayside CM Systems
FactIS Wayside CM Systems
 
EUROCAT
EUROCATEUROCAT
EUROCAT
 
AIRPORTS AUTHORITY OF INDIA
AIRPORTS AUTHORITY OF INDIAAIRPORTS AUTHORITY OF INDIA
AIRPORTS AUTHORITY OF INDIA
 
Application of traffic light
Application of traffic lightApplication of traffic light
Application of traffic light
 
VESSEL TRAFFIC MANAGEMENT SYSTEM
VESSEL TRAFFIC MANAGEMENT SYSTEMVESSEL TRAFFIC MANAGEMENT SYSTEM
VESSEL TRAFFIC MANAGEMENT SYSTEM
 
ATM system history
ATM system historyATM system history
ATM system history
 
20160531 Testing Expo_Benefits and Requirements of Automotive Ethernet
20160531 Testing Expo_Benefits and Requirements of Automotive Ethernet20160531 Testing Expo_Benefits and Requirements of Automotive Ethernet
20160531 Testing Expo_Benefits and Requirements of Automotive Ethernet
 
How the Dutch Police Force consolidated 26 datacenters into eight.
How the Dutch Police Force consolidated 26 datacenters into eight.How the Dutch Police Force consolidated 26 datacenters into eight.
How the Dutch Police Force consolidated 26 datacenters into eight.
 
Traffic light controller with verilog
Traffic light controller with verilogTraffic light controller with verilog
Traffic light controller with verilog
 

Destaque

susan mayor resume 2015
susan mayor resume 2015susan mayor resume 2015
susan mayor resume 2015
Susan Mayor
 
Presentacion esquizofrenia
Presentacion esquizofreniaPresentacion esquizofrenia
Presentacion esquizofrenia
JenyferSanchez
 
sheriff_tom_dart_endorsement
sheriff_tom_dart_endorsementsheriff_tom_dart_endorsement
sheriff_tom_dart_endorsement
John Donovan
 

Destaque (15)

susan mayor resume 2015
susan mayor resume 2015susan mayor resume 2015
susan mayor resume 2015
 
Presentacion esquizofrenia
Presentacion esquizofreniaPresentacion esquizofrenia
Presentacion esquizofrenia
 
Senior Certificate
Senior CertificateSenior Certificate
Senior Certificate
 
Grazia Tatò, Gli archivi: come aprire davvero le porte alla fruizione
Grazia Tatò, Gli archivi: come aprire davvero le porte alla fruizioneGrazia Tatò, Gli archivi: come aprire davvero le porte alla fruizione
Grazia Tatò, Gli archivi: come aprire davvero le porte alla fruizione
 
School Finances
School FinancesSchool Finances
School Finances
 
Slide vas
Slide vasSlide vas
Slide vas
 
Fobesoft: Fresh P&Ls Served Up Daily
Fobesoft: Fresh P&Ls Served Up DailyFobesoft: Fresh P&Ls Served Up Daily
Fobesoft: Fresh P&Ls Served Up Daily
 
sheriff_tom_dart_endorsement
sheriff_tom_dart_endorsementsheriff_tom_dart_endorsement
sheriff_tom_dart_endorsement
 
RfID apps
RfID appsRfID apps
RfID apps
 
4 flow control statements
4 flow control statements4 flow control statements
4 flow control statements
 
La información geográfica en las páginas web de los destinos turísticos de Es...
La información geográfica en las páginas web de los destinos turísticos de Es...La información geográfica en las páginas web de los destinos turísticos de Es...
La información geográfica en las páginas web de los destinos turísticos de Es...
 
Compiladores - Flex y Bison
Compiladores - Flex y BisonCompiladores - Flex y Bison
Compiladores - Flex y Bison
 
Lineage3
Lineage3Lineage3
Lineage3
 
Islamic Finance 3
Islamic Finance 3Islamic Finance 3
Islamic Finance 3
 
Sanchit
SanchitSanchit
Sanchit
 

Semelhante a E2-Per-Erik-Ingels-Poul-FrosigV1

Hamza Al-Jaghbeer - Training Report Presentation - Yarmouk Univ. - Hijjawi
Hamza Al-Jaghbeer - Training Report Presentation - Yarmouk Univ. - HijjawiHamza Al-Jaghbeer - Training Report Presentation - Yarmouk Univ. - Hijjawi
Hamza Al-Jaghbeer - Training Report Presentation - Yarmouk Univ. - Hijjawi
Hamza Al-Jaghbeer
 
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
Business Finland
 
PLNOG 6: Robert Bondarenko, Jarosław Kucio - Native Packet Optical
PLNOG 6: Robert Bondarenko, Jarosław Kucio - Native Packet Optical PLNOG 6: Robert Bondarenko, Jarosław Kucio - Native Packet Optical
PLNOG 6: Robert Bondarenko, Jarosław Kucio - Native Packet Optical
PROIDEA
 

Semelhante a E2-Per-Erik-Ingels-Poul-FrosigV1 (20)

Carl bjorgan
Carl bjorganCarl bjorgan
Carl bjorgan
 
Sro Project Brief
Sro Project BriefSro Project Brief
Sro Project Brief
 
Next Generation eCall (3/3)
Next Generation eCall (3/3)Next Generation eCall (3/3)
Next Generation eCall (3/3)
 
Aplicacions de 5G al IoT i la Indústria 4.0: mMTC i URLLC
Aplicacions de 5G al IoT i la Indústria 4.0: mMTC i URLLCAplicacions de 5G al IoT i la Indústria 4.0: mMTC i URLLC
Aplicacions de 5G al IoT i la Indústria 4.0: mMTC i URLLC
 
Railway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsRailway Data Communication in Harsh Environments
Railway Data Communication in Harsh Environments
 
For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...
For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...
For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...
 
Presentation #WDM #FST LCT #Technology #fiber #AGENDA #intro #future #huawei
Presentation #WDM #FST LCT #Technology #fiber #AGENDA #intro #future #huawei Presentation #WDM #FST LCT #Technology #fiber #AGENDA #intro #future #huawei
Presentation #WDM #FST LCT #Technology #fiber #AGENDA #intro #future #huawei
 
Pbt article packet-optical-integration_vishal_05-08-12
Pbt article packet-optical-integration_vishal_05-08-12Pbt article packet-optical-integration_vishal_05-08-12
Pbt article packet-optical-integration_vishal_05-08-12
 
Iscit2007 keynote juergenschindler
Iscit2007 keynote juergenschindlerIscit2007 keynote juergenschindler
Iscit2007 keynote juergenschindler
 
Implications of 4G Deployments (MEF for MPLS World Congress Ethernet Wholesa...
Implications of 4G Deployments (MEF for MPLS World Congress  Ethernet Wholesa...Implications of 4G Deployments (MEF for MPLS World Congress  Ethernet Wholesa...
Implications of 4G Deployments (MEF for MPLS World Congress Ethernet Wholesa...
 
Rafik Jedidi CV
Rafik Jedidi CVRafik Jedidi CV
Rafik Jedidi CV
 
RESUME LATEST
RESUME LATESTRESUME LATEST
RESUME LATEST
 
VANETS Vehicular Adhoc NETworkS
VANETS Vehicular Adhoc NETworkSVANETS Vehicular Adhoc NETworkS
VANETS Vehicular Adhoc NETworkS
 
Hamza Al-Jaghbeer - Training Report Presentation - Yarmouk Univ. - Hijjawi
Hamza Al-Jaghbeer - Training Report Presentation - Yarmouk Univ. - HijjawiHamza Al-Jaghbeer - Training Report Presentation - Yarmouk Univ. - Hijjawi
Hamza Al-Jaghbeer - Training Report Presentation - Yarmouk Univ. - Hijjawi
 
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
 
A Satellite-based Metering Architecture to improve Renewable Energy Productio...
A Satellite-based Metering Architecture to improve Renewable Energy Productio...A Satellite-based Metering Architecture to improve Renewable Energy Productio...
A Satellite-based Metering Architecture to improve Renewable Energy Productio...
 
4G Technology
4G Technology4G Technology
4G Technology
 
4 g demystified-celplan
4 g demystified-celplan4 g demystified-celplan
4 g demystified-celplan
 
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
 
PLNOG 6: Robert Bondarenko, Jarosław Kucio - Native Packet Optical
PLNOG 6: Robert Bondarenko, Jarosław Kucio - Native Packet Optical PLNOG 6: Robert Bondarenko, Jarosław Kucio - Native Packet Optical
PLNOG 6: Robert Bondarenko, Jarosław Kucio - Native Packet Optical
 

E2-Per-Erik-Ingels-Poul-FrosigV1

  • 1. ERTMS Regional UIC ERTMS World Conference 2012, session E2, Per-Erik Ingels, TrafikverketPer Erik Ingels, Trafikverket Poul Frøsig, UIC
  • 2. What is ERTMS Regional? • The first world wide ERTMS level 3 application in commercial operation • A cost-benefit optimised and complete track-side control command system for regional lines • 100% TSI CCS compliant 1. Based on ERTMS specifications (SRS 2.3.0 d) 2. On board ERTMS (L1-L3) adopted without changes2. On board ERTMS (L1 L3) adopted without changes 3. New development for track-side equipment 2 2012-05-03
  • 3. Why was the UIC ERTMS Regional project born 1998? ERTMS only for high speed Use ERTMS compliant onboards Why was the UIC ERTMS Regional project born 1998? Satellite navigation for position Whitebox or blackbox UIC Low cost project Different system developments ongoing • Germany: The Funk Fahr Betrieb • France: The SER project • Sweden: The radio block system The UIC ERTMS Regional project • Sweden: The radio block system • Italy: Use of satellite technology • Denmark: The RADAS project • EU + some industries: LOCOPROL Oth d l t llproject (Trackside only) • Other developments as well EU documents regarding visions for Interoperability 3 2012-05-03
  • 4. Why consider ERTMS on Regional lines in year 2000Why consider ERTMS on Regional lines in year 2000 (Scope extension of the TSI’s) High-speed passenger trains Conventional passenger/ freight trainsConventional passenger/ freight trains Local passenger trains High-speed lines Conventional TEN lines Conventional main lines Conventional regional lines Conventional local lines 4 2012-05-03
  • 5. Present situation on RegionalPresent situation on Regional lines in Sweden 1(2) • 2 116 km (21%) of the Swedish network are still manually operated (pink lines) These are the target lines for ERTMSThese are the target lines for ERTMS Regional in Sweden. • 20–30% of the European network can be20 30% of the European network can be regarded as Regional lines 5 2012-05-03
  • 6. Present situation on Regional lines 2(2) • Old interlocking • No line block-systems • No ATP • Manual dispatching by telephone 6 2012-05-03
  • 7. Project background and goals • Lower operational cost • Increased capacity • Increased flexibility • Increased safety 7 2012-05-03
  • 8. UIC ERTMS Regional Project activities 2000-2012 UIC ERTMS Regional specifications developed: • FRS • Operational scenario document • Operational rules document • Basic GRS spec. including the architecture • Basic RAMS spec. • Basic for test scenarios • Participation in tests in Swedenp • Interface with the UIC benchmark group 8 2012-05-03
  • 9. Way forward for the UIC ERTMS Regional project • Update of the UIC specifications • Indentify and quantify cost reduction opportunities • TIMS (Train integrity monitoring system) 9 2012-05-03
  • 10. System Structure Controller Machine Interface CMI Interlocking/RBC Server GSM-RISDN LAN/WAN (TCP/IP) LAN/WAN (TCP/IP) Handheld EuroradioHandheld terminal GPRS GPRS OCC, Object Controller Cabinets ERTMS Level 3 Public GSM Eurobalises Cabinets 10 2012-05-03
  • 11. ERTMS REGIONAL: Cost saving factors • Staff reduction in stations • Minimizing cables by controllingStaff reduction in stations (TMS integrated management) • Less track side equipment and Minimizing cables by controlling objects via radio • Track circuits and axle counters reduced maintenance costs • No traditional interlocking, no or less line side signals as an option on special locations • Standardized specifications for procurementno or less line side signals procurement The goal is to reduce the investment cost to 50 % of a conventional traffic control system 11 2012-05-03
  • 12. Flexible system • TIMS: Technical system onboard or driver responsibility • Transmission: Radio (GSM/R GPRS) or fixed network (inhouse or external) • Block principle: Moving block or Fixed block • Train detection: With track circuits / axel counters or without track circuits / axel counters 12 2012-05-03
  • 13. Status in Sweden • Final safety assessment successfully completed • ISC assessment by a Notified Body completedy y p • Commissioning of the pilot line February 2012 Implementation projects on two new Regional lines started• Implementation projects on two new Regional lines started • Dispatchers and drivers are satisfied with the new system 13 2012-05-03
  • 14. Expirience in Sweden The targets are meet! 1 Th ti l1. The operational 2. The technical 3. The cost savings 14 2012-05-03
  • 15. Thank you for your kind attention Poul Frøsig, UIC ERTMS Regional Contact details: Phone +4544842879 or Mobil +4527104364 E mail:FROSIG@MAIL.DK Per Erik Ingels TrafikverketPer Erik Ingels, Trafikverket Contact details: Phone +46101231969 or Mobil +46707245750 E mail:per-erik.ingels@trafikverket.seE mail:per erik.ingels@trafikverket.se 15 2012-05-03