1. Some implementations of the control systems
Control system for water deaeration, beer filtration and distribution to
packaging line, Nigerian Breweries, Heineken group, Ota, Nigeria.
For Corosys Proc
• 2 Siemens S7-300 PLC's,
• 2 Siemens MP377 operator panels,
• about 500 I/O.
I've made all system, electrical supervision, comissioning.
Piotr Nieoczym Page 1
2. Brewhouse control system, Nigerian Breweries, Heineken group, Ota,
Nigeria.
• 3 x S7-400 PLC's,
• 2 x Siemens MP377 operator panels,
• about 2500 I/O.
I made part of the PLC programming, electrial works co-supervision, commissioning.
Piotr Nieoczym Page 2
3. Control system for medical waste incinerator
• PLC - S7 300,
• about 300 I/O,
• Operator stadion - ASIX.
All design and commissioning have been made by me.
Piotr Nieoczym Page 3
4. Control system for pneumatic transport of copper sulphate, Copper Smelter in
Głogów
• Schneider Quantum PLC,
• Magelis – operator panel, about. 300 I/O.
All design and commissioning have been made by me.
Piotr Nieoczym Page 4
5. Installation of ovens gas cleaning anode, copper smelter in Legnica
• 2 xSiemens S7-400 PLCs,
• 2 x Siemens MP-270 panels,
• 2 x operator stations Wonderware Intouch SCADA,
• about. 1500 I/O.
I made the SCADA system, comissioning.
Piotr Nieoczym Page 5
6. Installation of gas purification in Mahhindra Ugine Steel Company Ltd, Jagdish
Nagar, India
• Schneider Electric Premium PLC,
• Operator stadion based on ASIX,
• about 500 I/O.
I made SCADA system, comissioning.
Piotr Nieoczym Page 6
7. Control system for washing machine factory building Amica Wronki SA
• 17 x S7-300 PLCs,
• 2 x opeator stations Wonderware Intouch SCADA,
• about 6500 I/O.
I made SCADA system and a part of PLC software, comissioning.
Piotr Nieoczym Page 7
8. Recovery of rhenium from acid slurry, Ecoren SA in Glogow
• Schneider Electric Premium PLC
• 3 operator stations Wonderware InTouch,
• about 400 I/O.
I made SCADA system and part of PLC program, comissioning.
Piotr Nieoczym Page 8
10. Installation for the production of zinc oxide and the installation of flue
gas from rotary kilns (wet), Boleslaw Recycling in Bukowno
• 7 x S7-400 PLCs,
• 1x Redundant WinCC server
• 8 x operator stations Siemens WinCC 6.0 SCADA,
• about 5000 I/O.
I made SCADA system and part of PLC program, comissioning.
Piotr Nieoczym Page 10
12. Dust extraction system for ZRP kolumn Stack gases Hindistan Zinc ltd.
Chanderia Led Zinc Smelter India.
• Alarn Bradley RsLogix 500 PLC,
• 2 operator stations Rsview 32 SCADA,
• about 600 I/O.
I made SCADA system, comissioning.
Piotr Nieoczym Page 12
13. Control System for ash removing and sorbent feed in a 460 MW power
plant in Bedzin
• 8 x S7-300 PLCs,
• 6 x operator panels MP 270
• 2 x oparator stations Asix SCADA,
• about 3000 I/O.
I made SCADA system and PLC programs for all PLC’s, comissioning.
Piotr Nieoczym Page 13
14. Flue gas desulphurisation (dry scrubing) for copper smelter „Głogów”
• 11 x PLC controllers Schneider Electric Quantum,
• about 5000 I/O,
• 10 x operator panels - PanelMate 3000,
• 2 x operator stations MonitorPro SCADA.
I’ve made most of PLC’s programs and all applications for operator panels, commissioning.
Piotr Nieoczym Page 14