This document provides a summary of Peng Sher Seong's contact information, educational background, employment history, and work experience as an Associate - Infrastructure Engineer at Dr YG Tan Jurutera Perunding Sdn. Bhd. since 2007. It details his role in numerous infrastructure and construction projects for clients like Genting Property Sdn Bhd, Sapphire Index Sdn Bhd, and UEM Sunrise. His responsibilities included design, tendering, construction supervision, and liaising with local authorities on approvals.
1. PENG SHER SEONG
Contact Info
Address : B-15-13A, Block B, Pangsapuri Kinrara Mas, No.3, Jalan Mas
1, Bukit Jalil, 58200 Kuala Lumpur.
Mobile No. : 019-3578101
Email : sherseong@gmail.com
Personal Particulars
Age : 34 years
Date of Birth : 28 October 1982
Nationality : Malaysia
Gender : Male
Marital Status : Married (1 kid)
IC No. : 821028-01-5879
Permanent Residence : Malaysia
Educational Background
Bachelor's Degree
Field of Study : Civil and Environmental Engineering
Institute/University : National University Of Malaysia (UKM)
Grade : Upper Second Class Honours
Graduation Date : April 2007
Employment History
Dr YG Tan Jurutera Perunding Sdn. Bhd.
Position Level : Associate – Infrastructure Engineer
Specialization : Civil and Infrastructure
Duration : May 2007 - Present
2. Working Experience
May 2007 – Present:
Project Involved:
Client: Genting Property Sdn Bhd – Design & Construction Stage
Design, Tender, Submission, Construction and supervision of building and
infrastructure development at Indahpura, Kulai, Johor
Involved the overall planning for 8,310 Acres land at Indahpura, Kulai, Johor.
Design for all civil infrastructures and as a design coordinator for building works
(Bungalow, semi-D, cluster houses, terrace houses, shops) and infrastructure works
(main road, detention pond, water tank, pumping station, and incoming main water pipes)
for the overall development at Indahpura, Kulai, Johor.
Building development involved:
i. 156 unit double storey shop office – Indahpura Central (Completed)
ii. 34 unit double storey shop office – Phoenix 8 (Completed)
iii. 38 unit single storey low cost shop - (Completed)
iv. 166 unit double storey house – Diamond Residency (Completed)
v. 536 unit single storey terrace house – Ledang Ria & Ledang Indah (Completed)
vi. 30 unit semi - D – Lakeview Residency (Completed)
vii. 163 unit bungalow, semi-D, Cluster house – Raintree Residences – Phase 1
(Completed)
viii. 151 unit 2 ½ storey terrace house – The Crystal (Under Construction)
ix. 193 unit double storey house – Cassington Indahpura (Under Construction)
Infrastructures works involved:
i. 2 nos of 1.0 MGD elevated water tank & 1 nos of 4.0 MGD suction tank & pump
house design.
ii. 1200mm incoming main water pipe approximately 3.5 kilometer.
iii. 132ft & 100ft main road & drainage design
iv. Detention pond design with compliance to JPS requirement
v. 3000 PE sewerage pump house
vi. Earthwork & Infrastructure design for AEON Kulai & Johor Premium Outlet (JPO).
Responsible for the timely completion and submission of quality drawings which are
compliance to local authority requirement and specification.
Liason with local authority to obtain the approval. – MPKu, IWK, SAJ, JPS Johor, JKR
Johor.
Prepare tender document and BQ for all the infrastructure work and chair the tender
interview to justify the tender rate and resolve technical issue.
To chair the site meeting and resolve technical issues raised on site relating to civil
infrastructure and building works.
3. Client: Sapphire Index Sdn Bhd – Design & Construction Stage
Design, Tender, Submission, Construction and supervision of infrastructure
development at Tropicana Aman, Kota Kemuning, Selangor
Design for all civil infrastructures and as a design coordinator for infrastructure for the
development.
Design for all civil infrastructures and as a design coordinator for infrastructure works
(main road, detention pond, water tank, sewerage treatment plant (STP), pumping station,
and incoming main water pipes) for the overall development at Tropicana Aman,
Selangor.
Infrastructures works involved:
vii. 6 nos of 1.0 MGD elevated water tank & 1 nos of 2.0 MGD suction tank & pump
house design.
viii. 700mm incoming main water pipe approximately 5.0 kilometer.
ix. 100ft main road & drainage design
x. Detention pond design with compliance to JPS requirement
xi. 60,000 PE sewerage treatment plant
xii. 50,000 PE sewerage pump house
Responsible for the timely completion and submission of quality drawings which are
compliance to local authority requirement and specification.
Liason with local authority to obtain the approval. – MDKL, IWK, SYABAS, JPS, JKR.
Prepare tender document and BQ for all the infrastructure work and chair the tender
interview to justify the tender rate and resolve technical issue.
To chair the site meeting and resolve technical issues raised on site relating to civil
infrastructure and building works.
Client: ACGT Sdn Bhd (Under Genting Property Sdn Bhd) - Completed.
Design, Tender, Submission, Construction and supervision of laboratory building and
infrastructure development at Sepang, Selangor
Design for all civil infrastructures and as a design coordinator for building works and
infrastructure for the development at Sepang, Selangor.
Responsible for the timely completion and submission of quality drawings which are
compliance to local authority requirement and specification.
Liason with local authority to obtain the approval. – MPS, IWK, SYABAS, JPS, JKR.
Prepare tender document and BQ for all the infrastructure work and chair the tender
interview to justify the tender rate and resolve technical issue.
To chair the site meeting and resolve technical issues raised on site relating to civil
infrastructure and building works.
4. Client: Genting Property Sdn Bhd - Completed.
Design, Tender, Submission, Construction and supervision of single storey house at
Pura Kencana, Batu Pahat, Johor
Design coordinator for building works for the development at Pura Kencana, Batu Pahat.
Responsible for the timely completion and submission of quality drawings which are
compliance to local authority requirement and specification.
To chair the site meeting and resolve technical issues raised on site relating to civil
infrastructure and building works.
Client: Eco Sanctuary Sdn Bhd – Design & Construction Stage
Design, Tender, Submission, Construction and supervision of infrastructure
development at Eco Sanctuary, Kota Kemuning, Selangor
Design for all civil infrastructures and as a design coordinator for infrastructure for the
development.
Responsible for the timely completion and submission of quality drawings which are
compliance to local authority requirement and specification.
Liason with local authority to obtain the approval. – MDKL, IWK, SYABAS, JPS, JKR.
Prepare tender document and BQ for all the infrastructure work and chair the tender
interview to justify the tender rate and resolve technical issue.
To chair the site meeting and resolve technical issues raised on site relating to civil
infrastructure and building works.
Client: CGPV Industrial Building Sdn Bhd – Design Stage
Design, Tender, Submission, Construction and supervision of Factory and
infrastructure works at Jalan Tanjung Kupang, Johor.
Design and submission for all civil infrastructures for the mix development at Jalan
Tanjung Kupang, Johor.
Liason with local authority to obtain the approval. – MPJBT, IWK, SAJ, JPS Johor, JKR
Johor.
To attend the CCM meeting and resolve technical issues raised relating to civil
infrastructure and building works.
5. Client: IJM Land Sdn Bhd (Shng Villas) – Construction Stage
Design, Tender, Submission, Construction and supervision of semi-detached houses
and related infrastructure works at Jalan Kuari, Pandan Bistari, Cheras, KL.
Design for all civil infrastructures and as a design coordinator for building works and
infrastructure for the hill site development at Cheras, KL.
Responsible for the timely completion and submission of quality drawings which are
compliance to local authority requirement and specification.
Liason with local authority to obtain the approval. – MPAJ, IWK, SYABAS
To chair the site meeting and resolve technical issues raised on site relating to civil
infrastructure and building works.
Client: Country Garden Pacificview Sdn Bhd – Design Stage
Design & Submission of Mix development and infrastructure works at Jalan Tanjung
Kupang, Johor.
Design and submission for all civil infrastructures for the mix development at Jalan
Tanjung Kupang, Johor.
Liason with local authority to obtain the approval. – MPJBT, IWK, SAJ, JPS Johor, JKR
Johor.
To attend the CCM meeting and resolve technical issues raised relating to civil
infrastructure and building works.
Client: LYL Land Sdn Bhd – Construction Stage
Design, Tender, Submission, Construction and supervision of Warehouse and
infrastructure works at Batu Arang, U10, Shah Alam.
Design for all civil infrastructures and as a design coordinator for Architectural and
building works for the warehouse & office construction (9 unit of warehouse ~ 65.0 Acres
land) at Jalan Batu Arang, U10, Shah Alam.
Responsible for the timely completion and submission of quality drawings which are
compliance to local authority requirement and specification.
Liason with local authority to obtain the approval. - MBSA, IWK, SYABAS, JPS Selangor,
JKR Selangor.
To chair the site meeting and resolve technical issues raised on site relating to civil
infrastructure and building works.
6. Client: LYL Land Sdn Bhd – Completed.
Design, Tender, Submission, Construction and supervision of Bungalow and
infrastructure works at The Royale, Taman Segar Perdana, Cheras.
Design for all civil infrastructures and as a design coordinator for building works for 30
unit bungalow at The Royale, Taman Segar Perdana, Cheras.
Responsible for the timely completion and submission of quality drawings which are
compliance to local authority requirement and specification.
Liason with local authority to obtain the approval. - MBSA, IWK, SYABAS, JPS Selangor,
JKR Selangor
Attend the site meeting and resolve technical issues raised on site relating to civil
infrastructure and building works.
Client: UEM Sunrise (Medini Mall) – Completed.
Design, Tender, Submission, Construction and supervision of Shopping Complex and
infrastructure works at Iskandar, Johor.
Design for all civil infrastructures and as a design coordinator for building works for
Shop Complex at Iskandar, Johor.
Responsible for the timely completion and submission of quality drawings which are
compliance to local authority requirement and specification.
Liason with local authority to obtain the approval. - MPJBT, IWK, SAJ, JPS Johor.
Attend the site meeting and resolve technical issues raised on site relating to civil
infrastructure and building works.
Client: Jabatan Kerja Raya Selangor (JKR) – Completed.
Supervision of New RC Bridge to Replace Existing JKR Bridge FT 3216/3/70 over
Sungai Rasa, Klang, Selangor.
As Assistant Resident Engineer (12 months full time) for construction of bridge &
infrastructure works over Sg. Rasa, Klang.
Full time supervision on the foundation, bridge construction and relocation of water pipe,
drainage, RC & RE wall and road works.
Chair the site meeting and resolve technical issues raised by work contractor on site
relating to bridge works.
Availability : 1st
January 2017