1. CURRICULUM -VITEA
PARTHASARATHY.V
SARATHYBHAVANAM
PULLIKKANAKKU P.O
KAYAMKULAM
ALAPPUZHA
KERALA
Pin: 690537
Contact: 0479-2442107(R)
Mob: +918976845679(Mumbai), 919847477284(Kerala)
Mail id: v.parthan1987@gmail.com
v.parthan1987@outlook.com
OBJECTIVE:
Seeking a challenging career in a reputed firm, this will provide an opportunity to outstand in
my profession. I would like to undertake exhilarating and challenging jobs.
OIL AND GAS EXPOSURE:
Overall 8 years of Project and Maintenance experience in Oil and Gas sector as an Senior
Instrument Technician on ONGC(NEELAM,HEERA,WIN,ICP,BHS,SHP) BG India offshore platforms.
EXPERIENCE:
1. M/s DAS Offshore Engineering. Pvt .Ltd:
Company Profile: DAS Instrumentation is part of DAS Offshore Eng. Pvt. Ltd.
A well reputed ISO 9001-2008,BS-OHSAS-18001:2007,EMS 14001:2004,U&R Stamp
Certified Company engaged with Mechanical and Electrical Instrumentation works at offshore oil &
gas process platforms, rigs etc.
Clients: L&T, BG India, SARKU, NGI, LEIGHTON,SWIBER, ESSAR & ONGC.
Project BG C5 C5 CAMPAIGN BROWN FIELD
Client BG
Contractor DAS Offshore Eng. Pvt. Ltd.
Duration Jan 2015-Tilldate
Designation Sr. Instrument technician/Instrument Supervisor
Objective Installation and Commissioning of Chemical injection skid, MPFM
System, Gas lift panel and related instruments.
Project HRD,PRP3 and APP Project
Client ONGC
Contractor LEIGHTON
Sub-contractor DAS Offshore Eng. Pvt. Ltd.
Duration Jan 2014-May2015
Designation Sr. Instrument technician/Instrument Supervisor
Objective Installation and commissioning of Launcher, pig Receiver,HPU and
related instrument’s
Project Shifting of MIP Neelam & Reinstall the same at Heera platform
Client ONGC
Contractor DAS Offshore Eng. Pvt. Ltd.
Sub-contractor Nil
Duration July 2013- January 2014
Designation Sr. Instrument technician/Instrument Supervisor
Objective Installation &commissioning of Main injection pump(MIP),related
Instruments, LCP panel & VTMS system.
2. Project SHP SHG Piping modification project
Client ONGC
Contractor DAS Offshore Eng. Pvt. Ltd.
Sub-contractor Nil
Duration Aug2012-June 2013
Designation Sr. Instrument technician/Instrument Supervisor
Objective Installation & Commissioning of Smart type of transmitters,
control valves Delta V DCS system and engineering work station .
Project WIN REWAMPING
Client ONGC
Contractor LEIGHTON
Sub-contractor DAS Offshore Eng. Pvt. Ltd.
Duration Jan 2012-Jul 2012
Designation Instrument technician
Objective
Installation &commissioning of sea water lift pumps, Booster pumps,
Main injection pumps, Chlorinator skid, Fine filter skid , Fuel Gas skid
and Smart type transmitters and control valves. This project includes
revamping of Water Injection North platform which includes
replacement of various skids and line instruments; with newly installed
5000 I/O DCS system. It also includes replacement of all
Transformers, HT/ MV/ LV switchgears, DC/AC Distribution boards,
DCS/ ESD Panels etc.
Project NHRC (Neelam-Heera Reconstruction Project)
Client ONGC
Contractor EOSSL (Essar offshore Subsea Limited)
Sub-contractor DAS Offshore Eng. Pvt. Ltd.
Duration Nov 2010 – Jan 2012
Designation Instrument technician
Objective
Revamping of separators , Installation & commissioning of Produced
water conditioning skid (PWC), Waste Heat Recovery unit, Fuel
Gas Skid, GDU and related smart type instruments on man and un-
manned platforms on Neelam and Heera Field.
2. M/s AutoCal Solutions Pvt Ltd:
Autocal Solutions Pvt Ltd is a pan India Company established in 2002with a local focus. Expertise
includes Calibration, Thermal Validation and clean room validation.
Project Neelam, Heera Maintenance works
Client ONGC
Contractor Autocal Solutions Pvt Ltd
Sub-contractor Nil
Duration Jan 2010-Oct 2010
Designation Instrument technician
Objective
Maintenance and Calibration of instruments on un- manned platforms
on Neelam & Heera Field
3. 3. . M/s Global SS Construction Pvt Ltd:
Company Profile:
Deals with Petrochemical equipment’s and manufacturers, onshore maintenance of power plant
equipment and transformer, offshore maintenance and calibration of field instruments.
Project Neelam, Heera Maintenance works
Client ONGC
Contractor M/s Global SS Construction Pvt Ltd
Sub-contractor Nil
Duration June 2007 – Dec 2009
Designation Assistant Instrument technician and Instrument technician
Objective
Maintenance and Calibration of instruments on man and un- manned
platforms on Neelam and Heera Field.
FIELD INSTRUMENTS HANDLED:-
Electrical & Instrumentation
Theoretical & practical training in testing, installation, fault finding Calibration and loop
checking on different types process control instruments.
Calibration , installation & commissioning Experience in Wireless and wired type(Electronics
and Pneumatic) of Pressure, Level /Interface Level(Displacer and Radar type level control),
Flow(ultrasonic, Magnetic ,corolisis and Vortex type flow meter) Temperature Transmitters
and switches according to calibration procedure & hook-up drawings. Made by Rosemount,
Honeywell,ABB,E&H ,Yokogawa, Ashcroft, United Electric, Itt, chemtrol, Magnetrol and delta
control.
Calibration & installation Experience in Wireless and wired type of I/P converters and Smart
type of Positioners made by DVC- 6000, 5000, Moore, Fisher, Taylor, Bells, Masonelan,
Foxboro, Siemens & ABB.
Experience in Calibration , installation , Dismantling and assembling of various types of
control valves , HIPPS valves, Motor operated valves and on-off valves. Servicing &
overhauling jobs like replacing gland packing plug & seat replacement of Fisher control valves,
seven glocon, Biffi, Kentintrol control valve and mokveld.
Dismantling and assembling Experience in Solenoid valves made by Asco, Falcon & Festo.
Installation and testing of instruments and its accessories including installation and testing of
panel, as per project document i.e. PID, hook up, loop diagrams, cable schedule, logic
diagrams, safe charts, installation layouts, performing the cold and hot loop tests.
Installation and hook-up of instruments with existing system.
Continuity and loop checking of instruments after installation.
After installation, commissioning of the instruments.
Hook up of different SKID’S after installation of skid instruments.
Certification for the calibrated instrument’s from the third party inspectors.
Installation of various skids like sea-water lift pump, fine filter’s, coarse filter’s, de-
oxygenation system, launchers and receivers, separators, fuel gas skid, turbine gas skid,
produced water conditioning skid, flash vessel, waste heat rec overy unit. Etc with package
and line instruments.
Interconnecting wiring of switch gear room and control room which is include various motor
controls pump controls, power distribution of 24 V DC, 110 VDC 240 VAC etc.
4. TURBINE GENERATOR controls, from switchgear room as well as control room.
Can handle pre-commissioning & start up activities including loop check & function testing •
Perform calibration, testing, repair & online maintenance during start -up & pre-commissioning
of Plant, troubleshoot problems of field instruments independently • Conversant with
emergency shutdown systems wiring & its troubleshooting • Calibration & trouble shooting of
all instruments.
Corrective maintenance and Installation Experience of Distributed control system (DCS-
ABB-800F, Honeywell(Experion,C-200 and C-300), Yokogawa CS -3000 FCS,
Emerson provox and Delta v), ESD Systems (TMR- ABB, Honeywell - FSC, Yokogawa
Pro safe RS ) ,PLC’s Like Allen Bradley, Siemens ,ABB.
Cable laying, glanding, termination, tubing.
Finalizing the location of instrument and preparation of as-built drawings
Survey of platform as per the scope for Pre-engineering & Pre-construction.
Calibration of instruments And certification of same from TPI and CA
(like CEIL,RENA,VELOCI,ABS).
Supervising Cable laying, cable glanding of appropriate size, termination , assistance to
vendor for commissioning activities.
Preparation of as built Drawings if needed for various Instrumentation Hook ups & equipment
installation.
Review P&ID, Instrument index, Instrument/equipment Datasheets, Bulk MTO, cable
schedule/list, junction box drawing, Instrument Hook-up and installation details, Instrument
Location Plan and Cable Routing, Instrument Loop Diagram, verification of isometric drawings
and coordination with other piping and design departments for instruments interface with
equipments
Studying all the documents related to platform as per the survey reports, other documents
and analyzing the scope of work on each platform.
Study and Segregation of all documents such as PIDs, Datasheets of instruments ,MIR,
Onshore calibration reports, hookups, Safe charts ,Instrument and JB location layout,, Fire
and Gas layout, Cable and cable tray layout.
Procurement of instruments. Communicate with vendor.
Inspection of Instruments at vendors place.
Vibration Monitoring System (Bently Nevada-3500 series)
Loop checking of vibration transmitters from field to MMS system.
Gap adjustment of Bentley Nevada vibration probes 3500,3000.
Servicing Of Burner Element & adjust the Air registor gap(Smitsvonk)
Fire & Gas system
Repair, calibration , loop checking and programming of FIRE & GAS instruments like gas
detectors, Smoke detectors, UV detectors manual call points, beacons and hooters etc.
Worked in DELUGE SYSTEM of TYCO FIRE AND GAS SYSTEM.
Gas detectors make - Zellweger, Honeywell, Detron.
Flammable & toxic gas detectors (LEL,H2S & HYDROGEN)
5. TEST EQUIPMENTS HANDLED
Druck TRX-II&MCX universal calibrators, DPI- 610 , UPS-IS loop calibrator.
Dead weight Tester- Budenberg
Temperature Bath- Jofra, Druck.
Decade resistance- Time Electronics
mA source –Beta, Druck ,Rosemount
Digital multi meter –Fluke
Multi loop calibrator – Jofra ,Druck,Yokogawa
Communicators -275,375,475(HART)
Achievements
Actively participated and completed shutdown job activity at Neelam process complex at NHRC
project.
PWC skid installation and commissioning.
WHRU installation and commissioning.
Fine filter 8 Nos. skid, fuel gas skid for TG, separator HP & LP, skimmer vessel, LP flare auto
ignition system, risers, deluge systems commissioning.
MIP skid installation and commissioning.
Total DCS system installation and commissioning at WIN revamping project .
Emerson Delta V DCS installation & Commissioning at SHP free gas separator revamping project.
Chemical injection skid, Gaslift kid,MPFM system and related instruments installation &
Commissioning at BG C5 project.
QUALIFICATION
S.S.L.C
H.S.E
Diploma in process instrumentation-MG Institute Thiruvalla-JUNE 2004-MARCH 2007
ADDITIONAL QUALIFICATION:
Basic Knowledge of DCS, PLC & SCADA
STCW-95
PERSONAL DETAILS:
Father’s Name : Vijayan.N
Date of Birth : 07-04-1987
Nationality : Indian
Religion : Hindu
Marital Status : Married
Sex : Male
6. PASSPORT DETAILS:
Passport Number : G 8586155
Date of Issue : 26/05/2008
Date of Expiry : 25/05/2018
Place of Issue : Cochin
DECLERATION
I hereby declare that the above mentioned particulars are true and correct to the best of my
knowledge and belief.
Name: Parthasarathy. V
Place : Navi mumbai
Date :