SlideShare uma empresa Scribd logo
1 de 31
Baixar para ler offline
PGI Engineering, organization certified to ISO 9001¹ and ISO 14001 ², with
registration numbers ER-0339/2007 and GA-2009/0111 respectively, for the
consultancy and project preparation for MEP in buildings, obtaining opening
licenses and permissions from Spanish local authorities and supply companies,
MEP contractor’s tenders , technical assistance and direction of MEP works.
¹ Offices in Barcelona, Madrid and Girona. ² Delegation of Girona
INDEX




1. PRESENTATION


2. SERVICES


3. PRIZES AND AWARDS


4. RELATED WORKS

   4.1 HOSPITALS AND HEALTHCARE CENTERS

   4.2-LABORATORIES AND RESEARCH CENTERS

   4.3 NURSING HOMES


5. ENERGETIC EFFICIENCY

   5.1 PRESENTATION

   5.2 OBJECTIVES

   5.3 AREAS AND SERVICES


6. ARCHITECS


7. DEVELOPPERS




                                           Página 2 de 31
1.-PRESENTATION

PGI ENGINEERING is a group of companies of INTEGRATED SERVICES OF
ENGINEERING that since his creation in 1992 has experienced a steady
expansion in the market thanks mainly to the high degree of professionalism
of its human team, facing each project with utmost enthusiasm.

At present the company consists of more than 100 engineers and technicians
distributed in the several work centers located in Spain, North of Africa and
Latin America. In these centers we find the following companies:

   •   PeGI Engineering, S.L.P.
   •   PGI Ingenieria Madrid S.L.
   •   Consultoria de Projectes Girona SL / Consultoria de Projectes Girona SLP
   •   PGI 2000 Consultoria i Enginyeria Barcelona SL /Consultoria de
       Projectes Barcelona SLP
   •   CIASA / Consultoria Madrid SLP
   •   URCULO / PGI Ingeniería
   •   PGI Gest SLP
   •   PGI Tarragona 2007 SLP
   •   PGI Energy
   •   PGI Group Atlas / Casablanca
   •   PGI Perú (subsidiary in legalization process)


During its career as Business of Engineering, PGI ENGINEERING has
participated in the design and construction of more than 3.000 Projects,
working for all kinds of Clients, national and international.

The company is formed by a wide range of specialized engineers and
technicians with a high level of experience in designing, developing,
monitoring and managing projects as well as in technical studies, related to
the installations engineering in the construction field. The basic criteria PGI
ENGINEERING / PGI GRUP follows to carry out this work are:


   •   Rationalization of the design of the installations and services of a
       building, whether of industrial or services use, to obtain a reasonable
       and adjusted price of execution under the specifications of the client.
   •   Development of the project until the last details, this being one of the
       main differentiating factors versus the competition.
   •   Control of the execution of the works in order to obtain an equal or
       superior quality to the one indicated in the project and if possible at a
       lower price. That is to say, we will defend the client’s interests, both
       technical and economical.
   •   Advice and assistance to manage more efficiently maintenance and
       infrastructure operations, improving design and facility management.




                                                                                   Página 3 de 31
Today, PGI ENGINEERING is an important Engineering Company in the
construction industry, responsible for the design and monitoring of installations
in the field of construction and with an approximate total amount of executed
Engineering Installations MEP works over 125 million of €.
Throughout its history, PGI ENGINEERING has provided a broad spectrum of
services to an ever-expanding marketplace and we enjoy working with our
clients on a wide variety of projects. The projects include:

           •   hospitals and medical buildings
           •   resort and recreation developments
           •   data Processing Centers
           •   office and industrial parks
           •   retail shopping centers
           •   mixed-use development projects
           •   academic and research institutions
           •   residential developments
           •   leisure, sport and culture facilities.

 PGI ENGINEERING / PGI GRUP belongs to the following associations:

           •   ASINCA: (Tecniberia-FIDIC) Association of Enterprises of Engineering of
               Catalonia (SPAIN).
           •   ASICMA: (Tecniberia-FIDIC) Association of Enterprises of Engineering,
               Consulting, Environment, Architecture  and Technological Services of
               Madrid.
           •   ACI: Association of Installations Consultancy of Catalonia (SPAIN).
           •   AEM: Association of Maintenance Enterprises.
           •   ATECYR: Spanish Technical Association of Refrigeration and Cooling
               Systems.
           •   CEEC: Cluster of Energetic Efficiency of Catalonia (SPAIN).


 2.-SERVICES

 PGI ENGINEERING develops his business activity offering the services that
 follow:
 Main activity:
 Engineering and Consulting in Mechanical, Electrical and Plumbing (MEP)

 Complementary activities:
   • Engineering and consulting in energy saving
   • Engineering and consulting in renewable energies
   • Engineering in energy infrastructures
   • (Generation, Cogeneration, Trigeneration, Distribution, etc.)
   • Engineering in acoustic and audiovisual infrastructures
   • Engineering in water supply / wastewater infrastructures (wastewater
     treatment, purge, purification, etc.)
   • Logistical and industrial buildings

                                                                                         Página 4 de 31
3.-PRIZES AND AWARDS


-   During the year 2010 several projects where PGI ENGINEERING has
    participated have been awarded:

       •   The Building Espacio Baronda (Barcelona) has won the Award to the
           “Most innovative initiative in Architecture”.

       •   The Headquarters of Layetana -Plaza Europa 31 (Barcelona) – have won
           the Award to the “Best Sustainable Building”.

       •   The Seafront of Benidorm has won the “Prize of Architecture in Public
           Spaces and Infrastructures”.

       •   The Hotel Aire in Bardenas has won the “Prize to the Hotel
           Architecture”.

       •   The Can Framis Museum has been finalist to the “FAD Prize 2010”.

       •   The Football Staudium RCDE Español has been chosen Worldwide
           Sportive Facility of the Year in the Stadium Business Award 2010.

       •   The Football Stadium RCDE Español has won the “Catalonia Building
           Prize”, given by the Technicians in Architecture College of Catalonia.

-   The Building of Social Housing for Young People in the neighborhood of Sant
    Andreu (Barcelona) won the “FAD Prize 2008”

-   2007 The “Telefonica City of Communications” project in Madrid won the “BEX
    Prize” (BUILDING EXCHANGE) Energy Sustainability.

-   2006 PGI ENGINEERING won the “SUSTAINABLE ARCHITECTURE Prize” from
    the Junta de Castilla La Mancha for the Project TELEFÓNICA CALL CENTER

-   1999 PGI GIRONA won the "CONSTRUMAT Prize 1999" to the technological
    innovation in building with the factory SIMON S.A. in Olot, Girona.

-   1996 PGI MADRID won the “IDAE-CEI ANNUAL Prize 1996” on Electricity
    Saving Projects in lighting, for the design of the lighting system developed for
    the NCR BUILDING in Madrid.




                              www.pgiengineering.com

                                                                                       Página 5 de 31
4.-WORKS

            4.1 HOSPITALS AND HEALTHCARE CENTERS

             PUERTA DEL HIERRO HOSPITAL
                                               Installation
    Client      Architecture      Location
                                                 budget
 FERROVIAL-                     Majadahonda     57.250.000
                  BERNA 10
   NECSO                          (Madrid)          €
                                                   Date
    State                 Surface
                                                  Project
      ---                145.250 m2                2004
Observations:
                                                  850 Beds.
Performance:
                       Installations MEP Preliminary Design.


             SANT JOAN DE REUS HOSPITAL
                                               Installation
   Client       Architecture      Location
                                                 budget
               COREA MORAN
                                   Reus         20.131.200
  INNOVA          – PICH
                                (Tarragona)         €
                 AGUILERA
                                                   Date
   State                 Surface
                                                  Project
 Completed              106.000 m²                 2007
Observations:
                                                  460 Beds.

Performance:
Environmental Licence Project, Installations MEP Preliminary
         and Execution Design, Acoustic Design and Works
                                                Supervision.


                  VALLECAS HOSPITAL
                                               Installation
    Client      Architecture      Location
                                                 budget
                                   Vallecas     21.700.000
  FERROVIAL       BERNA 10
                                   (Madrid)         €
                                                   Date
    State                 Surface
                                                  Project
  Completed              85.400 m2                 2005
Observations:
                                                  324 Beds.
Performance:
                            Installations Preliminary Design.




                                                                Página 6 de 31
NORTH HOSPITAL

                                                    Installation
   Client      Architecture        Location
                                                      budget
                              S.S. de los Reyes
 FERROVIAL      BERNA 10                            16.010.000 €
                                  (Madrid)
   State                   Surface                  Date Project
                                     2
 Completed               84.300 m                       2005
Observations:
                                                          349 Beds.
Performance:
                              Installations MEP Preliminary Design.


                     PARLA HOSPITAL

                                                  Installation
   Client      Architecture        Location
                                                    budget
 FERROVIAL       BERNA 10        Parla (Madrid) 18.815.000 €
   State                 Surface                Date Project
 Completed              75.200 m2                    2005
Observations:
                                                     250 Beds.

Performance:
                        Installations MEP Preliminary Design.



            HOSPITAL DEL MAR - EXTENSION
                                                  Installation
   Client       Architecture        Location
                                                    budget
                 A.I.A. Arq -
Hospital del
                Brullet Pineda      Barcelona      4.600.000 €
   Mar
                      Arq
                                                      Date
   State                   Surface
                                                     Project
 In Progress             30.100 m²                    2007
Observations:
     Refurbishment and extension of the “Hospital de Mar”,
                  joined to the Faculty of Medicine to UPF.
Performance:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision


                   COSLADA HOSPITAL
                                                  Installation
   Client      Architecture         Location
                                                    budget
                                    Coslada        16.260.000
 FERROVIAL       BERNA 10
                                    (Madrid)           €
                                                      Date
   State                   Surface
                                                     Project
 Completed               60.160 m2                    2005
Observations:
                                                     239 Beds.
Performance:
                        Installations MEP Preliminary Design.



                                                                      Página 7 de 31
HOSPITAL DE ARGANDA
                                                   Installation
    Client       Architecture        Location
                                                     budget
                                     Arganda       11.950.000
  FERROVIAL        BERNA 10
                                     (Madrid)          €
                                                      Date
    State                   Surface
                                                     Project
  Completed                51.950 m2                  2005
Observations:
                                                     148 Beds.
Performance:
                        Installations MEP Preliminary Design.


 HOSPITAL DE SANT PAU – MASTER PLAN (PHASE I)
                                                   Installation
   Client       Architecture         Location
                                                     budget
                Javier Asarta –                    4.000.000 €
  UNESCO                             Barcelona
                 XavierGuitart                       (Fase I)
                                                      Date
    State                  Surface
                                                     Project
 In progress              45.280 m²                   2007
Performance:
   Installations MEP Master Plan for the refurbishment of 17
        pavilions (45.280 m²) and the outside areas general
                                              infrastructures.


                   HOSPITAL DEL TAJO
                                                   Installation
    Client       Architecture        Location
                                                     budget
                                    Aranjuez       11.550.000
  FERROVIAL       BERNA 10
                                    (Madrid)           €
                                                      Date
    State                   Surface
                                                     Project
  Completed                42.400 m2                  2005
Observations:
                                                     116 Beds.
Performance:
                        Preliminary Installations MEP Design.


REFURBISHMENT AND EXTENSION OF THE HOSPITAL
           “LA MANCHA CENTRAL”
                                                   Installation
    Client       Architecture        Location
                                                     budget
                                  Alcázar de San
   SESCAM          ARGOLA                          7.200.000 €
                                  Juan (C. Real)
                                                      Date
    State                   Surface
                                                     Project
  In progress              25.000 m2                  2003
Performance:
                          Installations MEP Execution Design.




                                                                  Página 8 de 31
HEALTH-CARE CENTER “COCHERAS DE BORBÓN”
                                                  Installation
   Client       Architecture        Location
                                                    budget
 CHC VITRE      LA VINYA DE LA                    4.236.563,2
                                    Barcelona
   S.A.           VILLA ARQ                           5€
                                                     Date
    State                  Surface
                                                    Project
 Completed                15.120 m2                   2006
Performance:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision.


NURSING HOME AND HEALTH-CARE CENTER ECUADOR
                                                  Installation
   Client       Architecture        Location
                                                    budget
                  ALONSO &
  REGESA                            Barcelona     3.000.000 €
                  BALAGUER
                                                     Date
    State                  Surface
                                                    Project
 Completed                 7.900 m²                   2007
Performances:
       Town-Planning Adequacy Certificate, Final Legalization
Certificate and Project for the MEP Installations, Installations
    MEP Preliminary and Execution Design, Installations MEP
                                           Works Supervision.


                HOSPITAL DE MONTECANAL
                                                  Installation
    Client       Architecture       Location
                                                    budget
                    MANUEL
VIAMED SALUD                        Zaragoza      2.700.000 €
                    BLASCO
                                                     Date
     State                  Surface
                                                    Project
 In execution               6.500 m2                  2004
Observations:
  48 rooms, 6 surgery rooms, Emergency services, 5 offices
                                  and a unit of diagnosis.
Performance:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision.


             TARAZONA HEALTH-CARE CENTER
                                                  Installation
     Client        Architecture       Location
                                                    budget
 GOBIERNO DE    CÓDIGO     Tarazona
                                                  1.560.000 €
   ARAGÓN    ARQUITECTURA (Zaragoza)
                                                     Date
     State                   Surface
                                                    Project
   On Project               5.350 m2                  2005
Performance:
       Installations MEP Preliminary and Execution Design.




                                                                   Página 9 de 31
DAY CENTER, NURSING HOME AND HEALTH-CARE
                   CENTER
                                                Installation
   Client       Architecture       Location
                                                  budget
                OLIVERAS BOIX        Reus
AYTO. REUS                                       900.130 €
                 ARQUITECTES      (Tarragona)
                                                   Date
   State                   Surface
                                                  Project
 In progress               4.760 m²                2009
Observations:
         Day center, nursing home and health-care center.
Performances:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision.


                 HEALTH PARK CAMP CLAR
                                                Installation
   Client       Architecture       Location
                                                  budget
                RAHOLA VIDAL       Camp Clar
 CATSALUT                                       1.300.000 €
                    ARQ           (Tarragona)
                                                   Date
   State                   Surface
                                                  Project
 In progress               3.500 m²                2009



Performance:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision.




         HOSPITAL SANTA MARIA DE LLEIDA-
         REFURBISHMENT OF THE EAST WING
                                                Installation
   Client       Architecture       Location
                                                  budget
Hospital Sta.
                 Intersalus -
  Maria de                            Lleida    1.449.675 €
                Albert Vitaller
   Lleida
                                                   Date
   State                   Surface
                                                  Project
 On Project                3.411 m²                2006
Observations:
 Refurbishment of the East Wing of Santa Maria Hospital de
                                                    Lleida
Performance:
   Environmental Licence Project, Preliminary and Execution
              Design, Installations MEP Works Supervision.




                                                               Página 10 de 31
REFURBISHMENT AND EXTENSION OF THE
 EMERGENCY SERVICES AND THE 7th FLOOR OF THE
      HOSPITAL JOAN XXIII OF TARRAGONA
                                                 Installation
   Client       Architecture       Location
                                                   budget
  HOSPITAL
            ARQ. QUIÑOA Y
 JOAN XXIII
             ASOCIADOS,           Tarragona      1.775.700€
    DE
                 S.L.
TARRAGONA
                                                    Date
    State                 Surface
                                                   Project
 In progress              3.360 m²                  2008
Observations:
Refurbishment and extension of the emergency services and
        the 7th floor of the hospital Joan XXIII of Tarragona.
Performances:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision.


        “LA MILAGROSA” HEALTHCARE CENTER
                                                 Installation
   Client       Architecture       Location
                                                   budget
                  MIGUEL
I. N. SALUD                          Soria        615.000 €
                COLMENARES
                                                    Date
    State                 Surface
                                                   Project
In execution              3.300 m2                  2002
Performance:
                         Installations MEP Execution Design.


   DENTAL CLINIC – UNIVERSITAT DE SALAMANCA
                                                 Installation
   Client       Architecture       Location
                                                   budget
               Emilio Sanchez
 DRAGADOS                         Salamanca       700.000 €
                     Gil
                                                    Date
    State                 Surface
                                                   Project
 Completed                2.500 m²                  2003
Performance:
       Installations MEP Preliminary and Execution Design,
                      Installations MEP Works Supervision.


  PRIMARY HEALTH-CARE CENTER – SANT FELIU DE
                   GUÍXOLS
                                                 Installation
   Client       Architecture       Location
                                                   budget
                  CROUS,         Sant Feliu de
    GISA        GRABULEDA,          Guíxols      1.000.000 €
                RIERA ARQ.         (Girona)
                                                    Data
    State                 Surface
                                                   Project
 Completed                2.500 m²                  2006
Performances:
   Environmental Licence Project, Preliminary and Execution
              Design, Installations MEP Works Supervision.




                                                                 Página 11 de 31
PRIMARY HEALTH-CARE CENTER - NORD
                                                 Installation
   Client      Architecture       Location
                                                   budget
    GISA        BAMMP Arq.          Terrassa      820.000 €
                                                    Data
   State                  Surface
                                                   Project
 Completed               2.245 m²                   2006
Performances:
 Environmental Licence Project and Certificate, Installations
    MEP Preliminary and Execution Design, Installations MEP
                                        Works Supervision.


REFURBISHMENT AND EXTENSION OF THE HOSPITAL
               PIUS DE VALLS
                                                 Installation
   Client      Architecture       Location
                                                   budget
 HOSPITAL
                  DIEGO
  PIUS DE                            Valls       2.198.300 €
                NAKAMATSU
   VALLS
                                                    Data
   State                  Surface
                                                   Project
 In progress             2.230 m²                   2009
Observations:
  Refurbishment and extension of the Hospital Pius de Valls.
Performances:
       Installations MEP Preliminary and Execution Design,
                      Installations MEP Works Supervision.


   PRIMARY HEALTH-CARE CENTER – CONCÓRDIA
                                                 Installation
   Client      Architecture       Location
                                                   budget
                                  Sabadell
    GISA         HAZ ARQ.                         600.000 €
                                 (Barcelona)
                                                    Data
   State                  Surface
                                                   Project
 Completed               1.650 m²                   2006
Performances:
 Environmental Licence Project and Certificate, Installations
    MEP Preliminary and Execution Design, Installations MEP
                                        Works Supervision.


 PRIMARY HEALTH-CARE CENTER - PALAU SOLITÀ I
                 PLEGAMANS
                                                 Installation
   Client      Architecture       Location
                                                   budget
                CASANOVAS,      Palau Solità i
    GISA       GRAUS, PEREZ      Plegamans        470.500 €
                   ARQ           (Barcelona)
                                                    Data
   State                  Surface
                                                   Project
 Completed               1.500 m²                   2007
Performances:
 Environmental Licence Project and Certificate, Installations
    MEP Preliminary and Execution Design, Installations MEP
                                        Works Supervision.




                                                                Página 12 de 31
PRIMARY HEALTH-CARE CENTER - GRÀCIA
                                               Installation
   Client       Architecture       Location
                                                 budget
                                  Sabadell
    GISA        CC245 ARQ                        315.500 €
                                 (Barcelona)
                                                   Data
   State                  Surface
                                                  Project
 In progress             1.000 m²                  2006
Performances:
 Environmental Licence Project and Certificate, Installations
    MEP Preliminary and Execution Design, Installations MEP
                                        Works Supervision.


 HOSPITALIZATION UNIT (BUILDING B, 3th FLOOR)
      JOAN XXIII HOSPITAL OF TARRAGONA
                                               Installation
   Client       Architecture       Location
                                                 budget
Hospital Joan
              ARQ. Quiñoa y
  XXIII de                        Tarragona      510.000 €
              Asociados, S.L.
 Tarragona
                                                   Date
   State                  Surface
                                                  Project
 Completed               1.100 m²                  2005
Observations:
    Reform of hospitalization unit (3th Floor, Building B) of
                       Joan’s XXIII Hospital, in Tarragona.
Performance:
   Environmental Licence Project, Preliminary and Execution
                                                    Design.


  ENDOSCOPY UNIT OF JOSEP TRUETA UNIVERSITY
                  HOSPITAL
                                               Installation
   Client       Architecture       Location
                                                 budget
  Hospital
Universitario    PGI GRUP           Girona       40.000 €
Josep Trueta
                                                   Date
   State                  Surface
                                                  Project
 Completed                600 m²                   2005
Observations:
                            Josep Trueta University Hospital
Performance:
   Environmental Licence Project, Preliminary and Execution
              Design, Installations MEP Works Supervision.




                                                                Página 13 de 31
PRIMARY HEALTH-CARE CENTER – CASTELLÓ
                 D’EMPURIES
                                               Installation
   Client      Architecture        Location
                                                 budget
                ORDOÑEZ-            Castelló
    GISA         GARCÍA-           Empuries      300.000 €
              FERRANDO UTE         (Girona)
                                                   Data
   State                  Surface
                                                  Project
 Completed                500 m²                   2006
Performances:
 Environmental Licence Project and Certificate, Installations
    MEP Preliminary and Execution Design, Installations MEP
                                        Works Supervision.




                                                                Página 14 de 31
4.2- LABORATORIES AND RESEARCH CENTERS


        OFFICES AND LABORATORIES GIROC CT
                                                   Installation
    Client        Architecture      Location
                                                     budget
                                    Mollet del
LABORATORIO JORDI MARCÈ
                                      Vallés        650.000 €
  S GIROC       ARQ
                                   (Barcelona)
                                                      Data
    State                    Surface
                                                     Project
  In progress                2.000 m2                  2009
Performances:
 Installations MEP Execution Design for the renovation of the
                                               HVA facilities.


                   ISDIN HEADQUATERS
                                                   Installation
   Client         Architecture         Location
                                                     budget
    ISDIN              GCA             Barcelona    650.000 €
                                                      Data
    State                  Surface
                                                     Project
 Completed                 4.000 m2                    2009
Observations:
    Headquarters of the company in Barcelona on the 22@
     district, 4.000 m². Building with research laboratories.

Performances:
       Installations MEP Preliminary and Execution Design,
                      Installations MEP Works Supervision.



      BARCELONA SUPERCOMPUTING CENTER
                                               Installation
   Client       Architecture     Location
                                                 budget

                   BAAS
    UPC                          Barcelona     3.797.700 €
                ARQUITECTES

                                                    Data
   State                 Surface
                                                   Project
In progress             12.500 m2                   2008
Performances:
    Environmental Licence Project and Certificate , Town-
            Planning Adequacy Certificate , solar collectors
justification, Installations MEP Preliminary and Execution
  Design, CTE-SI justification, CTE-HE justification, Final
            Legalization Certificate and Project for the MEP
             Installations , Telecommunications Certificate,
   Emergency plan, Maintenance plan , Installations MEP
                                       Works Supervision .




                                                                  Página 15 de 31
TECNOCAMPUS MATARÓ PARK
                                                    Installation
   Client     Architecture        Location
                                                      budget
                 MBM               Mataró
  PUMSA                                             11.771.840 €
              ARQUITECTES        (Barcelona)
   State                   Surface                  Data Project
In progress              46.940 m²                      2007
Observations:
   University campus facilities, with office and commercial units,
                                       parking and an auditorium.
Performances:
   Environmental Licence Project and Certificate , Town-Planning
 Adequacy Certificate , solar collectors justification, Installations
MEP Preliminary and Execution Design, CTE-SI justification, CTE-
 HE justification, Final Legalization Certificate and Project for the
  MEP Installations , Telecommunications Certificate, Emergency
   plan, Maintenance plan ,Installations MEP Works Supervision.


 I+D BUILDING OF THE POLYTECHNICAL CATALONIA
                  UNIVERSITY
                                                  Installation
   Client      Architecture        Location
                                                    budget

               D. SOLDEVILA Castelldefells
   U.P.C.                                         1.100.000 €
               ARCHITECTURE (Barcelona)

   State                   Surface                Data Project
                                    2
 Completed                2.600 m                     2006
Observations:
 Variable Refrigerant Flow (VRF) condensate for loop water.
 Loop supply trough adiabatic cooling tower and condensing
   boiler. Reinforced with an alternative system of collector
  panels for the heating, and lake superficial waters cooling
                                            for refrigeration.
Performances:
 Environmental Licence Project, Installations MEP Execution
                                                    Design


 AUDITORIUM ROOM CPD OF THE CAMPUS ESADE IN
           SANT CUGAT DEL VALLÉS
                                                  Installation
    Client       Architecture        Location
                                                    budget
                                  St. Cugat del
 FUNDACIÓN
                                      Vallés       540.000 €
   ESADE
                                   (Barcelona)
                                                     Data
    State                    Surface
                                                    Project
  Completed                  600 m²                   2005
Observations:
     University campus consisting of: University buildings,
   Creativity center, Residence Hall, Sportive Areas, Green
                Areas, Parking and outdoor infrastructures.
Performances:
 Preliminary and Execution Design, Installations MEP Works
                                               Supervision.




                                                                        Página 16 de 31
INNOVATION AND RESEARCH CENTER LA RIOJA
                                                Installation
   Client        Architecture       Location
                                                  budget
FUNDACIÓN
                 INTERSALUS          Logroño    5.850.000 €
RIOJA SALUD
                                                   Data
   State                 Surface
                                                  Project
 Completed              20.400 m²                  2004
Observations:
 Health, care, nursing, administration and research building
                  belonging to the Health Rioja Foundation.
Performances:
   Environmental Licence Project, Preliminary and Execution
              Design, Installations MEP Works Supervision.


                   SCIENCE PARK UDG
                                                Installation
    Client      Architecture     Location
                                                  budget
UNIVERSIDAD   BOSCH-                            2.498.270,0
                                    Girona
  GIRONA    TARRÚS ARQ.                             0€
                                                   Data
    State                 Surface
                                                  Project
  Completed              11.304 m2                 2004
Observations:
      Business building for renting to research enterprises.

Performances:
   Environmental Licence Project, Preliminary and Execution
  Design, Installations MEP Works Supervision, Legalization
      Project for the MEP Installations and Emergency Plan.


                   CERECO LABORATORIES
                                                    Installation
     Client      Architecture        Location
                                                      budget
 LABORATORIO
      DE
INVESTIGACIÓN                    Maçanet de la
                   ACIEROID                          595.000 €
       Y                         Selva (Girona)
ASESORAMIENT
    O, S.L.
     State                   Surface               Data Project
                                       2
   Completed                 1.800 m                   2004
Performances:
 Environmental Licence Project, Preliminary and Execution Design,
                            Installations MEP Works Supervision.


         TELEFONICA CALL CENTER BUILDING
                                                Installation
    Client      Architecture     Location
                                                  budget
 CASTILLA LA        PICH
                                    Toledo      1.800.000 €
   MANCHA         AGUILERA
                                                   Data
    State                 Surface
                                                  Project
  Completed               6.000 m²                 2003
Performances:
 Preliminary and Execution Design, Installations MEP Works
                                               Supervision.

                                                                    Página 17 de 31
BOTANICAL INSTITUTE
                                                  Installation
   Client     Architecture          Location
                                                    budget
                 CARLOS
  C.S.I.C.                          Barcelona      400.000 €
                FARRATER
                                                     Data
   State                 Surface
                                                    Project
 Completed               2.800 m2                    2000
Observations:
                           Educational and Research Center
Performances:
 Preliminary and Execution Design, Installations MEP Works
                                               Supervision.


     MEDITERRANEAN CENTER OF SEA RESEARCH
                                                  Installation
   Client       Architecture          Location
                                                    budget
    CSIC           RGA Arq            Barcelona       ----
                                                     Data
   State                 Surface
                                                    Project
 Completed                   ----                    1998
Observations:
Filtration and Water treatment Design for the research water
                                                      tanks.
Performances:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision.




                                                                 Página 18 de 31
4.5. – NURSING HOMES

       MEETING POINT BUILDING IN CAMP CLAR
                                               Installation
   Client      Architecture      Location
                                                 budget
   AYTO.
                Jordi Marcè     Tarragona        712.133€
TARRAGONA
   State                 Surface               Data Project
In progress            2.031,65m²                  2009
Observations:
           Meeting Point Building in Camp Clar (Tarragona).
Performances:
  Environmental Licence Project, Installations MEP Preliminary
   and Execution Design, Installations MEP Works Supervision
                and Energetic Efficiency and Acoustic Design.


              CENTER FOR DISABLED PEOPLE
                                               Installation
  Client       Architecture      Location
                                                 budget
                 CÓDIGO
 IMSERSO                   Rabanedo(León 3.900.000 €
              ARQUITECTURA
                                                  Data
   State                 Surface
                                                 Project
Completed               13.400 m2                 2005
Observations:
                          123 rooms, auditorium 135 seats.
Performances:
Installations MEP Execution Design, Installations MEP Works
                                                Supervision.


                NURSING HOME COMPLEX
                                               Installation
   Client       Architecture       Location
                                                 budget
                                 Villajoyosa
   URBIS       ANGEL ASENJO                    4.500.000 €
                                 (Alicante)
                                                  Data
   State                  Surface
                                                 Project
 Completed               16.500 m2                2004
Observations:
                3 buildings with 40 apartments y 150 rooms.
Performances:
Installations MEP Execution Design, Installations MEP Works
                                                Supervision.




                                                                 Página 19 de 31
NURSING HOME AND DAY CENTER
                                               Installation
   Client       Architecture     Location
                                                 budget
                   TYM              Coslada
   AMMA                                        2.100.000 €
                ASOCIADOS           (Madrid)
                                                  Data
   State                  Surface
                                                 Project
 Completed              10.100 m2                 2003
Observations:
                                                164 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision
                                        and Emergency Plan.


            NURSING HOME AND DAY CENTER
                                               Installation
   Client       Architecture     Location
                                                 budget
                   TYM            Vicálvaro
   AMMA                                        2.300.000 €
                ASOCIADOS         (Madrid)
                                                  Data
   State                  Surface
                                                 Project
 Completed              10.450 m2                 2002
Observations:
                                                147 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision
                                        and Emergency Plan.


            NURSING HOME AND DAY CENTER
                                               Installation
   Client       Architecture     Location
                                                 budget
                   TYM         Colmenar Viejo
   AMMA                                       2.275.000 €
                ASOCIADOS         (Madrid)
                                                  Data
   State                  Surface
                                                 Project
 Completed              10.400 m2                 2002
Observations:
                                                164 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision
                                        and Emergency Plan.




                                                               Página 20 de 31
NURSING HOME AND DAY CENTER
                                               Installation
   Client     Architecture       Location
                                                 budget
                                 Puente de
                   TYM
   AMMA                           Vallecas     2.250.000 €
                ASOCIADOS
                                  (Madrid)
                                                  Data
   State                  Surface
                                                 Project
 Completed               10.400 m2                 2002
Observations:
                                                147 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision
                                        and Emergency Plan.


            NURSING HOME AND DAY CENTER
                                               Installation
   Client       Architecture      Location
                                                 budget
                   TYM          Arganzuela -
   AMMA                                        2.100.000 €
                ASOCIADOS          Madrid
                                                  Data
   State                  Surface
                                                 Project
 Completed               10.500 m2                2002
Observations:
                                                162 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision
                                        and Emergency Plan.


    MENTALLY HANDICAPPED CENTER “SAN JOSE”
                                               Installation
   Client       Architecture      Location
                                                 budget
 GOBIERNO          TYM
                                 Pamplona      1.660.000 €
DE NAVARRA      ASOCIADOS
                                                  Data
   State                  Surface
                                                 Project
 Completed               7.700 m2                  2001
Observations:
                                                164 rooms.
Performances:
       Installations MEP Preliminary and Execution Design,
                      Installations MEP Works Supervision.




                                                               Página 21 de 31
NURSING HOME AND DAY CENTER
                                                  Installation
    Client       Architecture      Location
                                                    budget
                   JOSE LUIS          Poio
    URBIS                                         1.550.000 €
                    PEREIRO       (Pontevedra)
                                                     Data
    State                     Surface
                                                    Project
  Completed                  6.250 m2                     2003
Observations:
                                                   115 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
 and Execution Design, Installations MEP Works Supervision.


           RESIDÈNCIA CREU DE PALAU EN GIRONA
                                                    Installation
   Client     Architecture        Location
                                                      budget
                   Crous
    GISA         Grabuleda         Girona             2.448.573 €
                    Arq
   State                     Surface                Data Project
 Completed               9.252 m2                           2003
Observations:
                      Reforma Residencia Creu de Palau en Girona
Performances:
 Environmental Licence Project, Installations MEP Preliminary and
         Execution Design, Installations MEP Works Supervision.


                NURSING HOME AND DAY CENTER EN ST. FELIU DE GUÍXOLS
       Client                Architecture                  Location      Installation budget
 AYTO. ST. FELIU DE                              Sant Feliu de Guíxols
                          Jordi Casadevall                                   500.000 €
     GUÍXOLS                                           (Girona)
        State                                Surface                        Data Project
                                                      2
     Completed                               3380 m                             1997
Performances:
          Environmental Licence Project, Installations MEP Preliminary and Execution Design.


                  NURSING HOME AND DAY CENTER EN EMPURIABRAVA
       Client                Architecture                  Location      Installation budget
       AYTO.                  Palomeras
                                                 Empuriabrava (Girona)       1.997.000 €
   EMPURIABRAVA               Arquitectes
        State                                Surface                        Data Project
     Completed                              13.500 m2                           2006
Performances:
          Environmental Licence Project, Installations MEP Preliminary and Execution Design.




                                                                                               Página 22 de 31
NURSING HOME URBIS
        Client             Architecture                 Location         Installation budget
        URBIS            Reyal Urbis, S.A.              Badalona              2.208.274 €
        State                                Surface                         Data Project
      Completed                              8.522 m²                            2004
Observations:
                                                          Nursing home and Parking in Badalona.
Performances:
Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations
                                                                       MEP Works Supervision.




                                                                                               Página 23 de 31
5. - ENERGETIC EFFICIENCY DEPARTMENT

  5.1. - PRESENTATION

PGI ENGINEERING created in 2006 the Department of Energy efficiency in
the Building, conscious of the need of a rational use of the energy and also
to give response to a few needs of the market with regard to the new
normative frame in the energetic area.

   Understanding that the Building sector is one of the main energetic
consumers, it is important to work from the initial phase of development
of the project aiming to obtain energetic important improvements that will
reverberate positively in the whole building, in the air quality, in his
movement, in the comfort of the persons and likewise in the optimization of
equipments to obtain as final result a better saving.


  5.2. - OBJECTIVES

  To give technical advice to our clients in order to obtain an optimized
design of the building, the installations and bringing the necessary tools for the
energetic management of the Buildings, in view to improve the savings and the
energetic efficiency during the life of the building.


  5.3. - AREAS AND SERVICES

  The services that our department is offering are structured in four
strategic areas which let us meet most of the requirements of our clients in
the energetic saving field.

  We are provided with a professional human team highly compromised,
qualified and motivated, with a working methodology focused in the
innovation and the continuous improvement of the quality assurance and
to give a high added value services.




                  ENERGETIC                     ENERGETIC
                   SERVICES                    ENGINEERING
                     AREA                         AREAS



                                BUILDING




                    I+D+i                       ENERGETIC
                    AREA                       CONSULTING
                                                  AREA




                                                                                 Página 24 de 31
5.3. a-ENERGETIC ENGINEERING AREA

   Implementation of measures of energy savings and energetic efficiency
referring as well the enclosure design as the installations from the early stage
until the completion of the project. Using powerful software to achieve several
simulation typologies allows us to optimize the final cost of the building.

   Compliance with the regulations of the CTE-DB-HE
   Energetic Qualification of the Buildings– Project Phase
   Energetic study of the building enclosure
   Energetic study of the installations MEP
   Energetic study of the building (EED)
   Energetic Qualification of the Buildings – Completion of the Work Phase.
   Justification of the Regulations of Water Saving
   Projects of renewable energy sources.
   Project of Justification of the Regulations of Thermal and Photovoltaic Solar
   Collection.


   5.3. b-ENERGETIC SERVICES AREA

  Implementation of working methods which will allow to reduce the energy
consumption and to improve the energetic efficiency in a steady way during
the life of the building according the established planning to reach the defined
objectives in the strategic plan of the company.

   Feasibility study auditing
   Energetic audit. Improvement proposals.
   Planning for the verification and measurement of the Savings (IPMVP)
   Maintenance Planning
   Energy Management
   Implementation of the proposals and Commissioning
   Training and Warning Technology.
   Implementation of the collaborative tools for the managing tasks.
   Commissioning
   Equipment Investment projects
   Assessment to the client
   Periodic Check and Follow-up


   5.3. c-ENERGETIC CONSULTING AREA

   We assess our clients regarding the current and future energetic model in
such a way to provide them with the maximum information to take decisions
regarding several actions in environment and energy topics which can concern
them in the future.
   We work on the search of strategies and solutions that will allow our clients
to reduce the energy consumption, the CO2 emissions and to make
environment improvements. All this will have an impact on his activity and will
increase competitiveness.




                                                                                   Página 25 de 31
Saving and energetic efficiency guides
      Implementation of renewable energy sources analysis
      Implementation of high technology and efficiency solutions
      Participation in technical days and presentation in the energy field
      Knowledge transfer/ Training to companies, associations, technical
      colleges.
      Knowledge transfer /Training to universities, teaching.
      Management and processing of the regional and state grants.
      Consulting in the Energy Management of the organization.
      Consulting in the Energy Management of the whole building.
      Consulting for the development of the Planning for the verification and
      measurement of the Energy and Water Savings.
      Feasibility study energy auditing
      Energetic classification of the building
      Certification of the Sustainable Building LEED
      Certification of the Sustainable Building “green building”
      Certification of Energy Management
      Auditing in the energetic management system.
      Processing of the Grants

  4.3. d- I+D+i AREA

   Engagement in research projects, development of research strands with
the universities and the administration with the clear commitment of
improving the systems, the technologies, the materials, the working
methodologies etc…in such a way thay we can be able to minimize the
energetic consumption having a positive impact in the environment.

   I+D+i projects
   Energy research strands collaborating with the universities.
   Research strands with Technology companies.


  4.4. - WORKS



                          CÁMARA DE COMERCIO DE BARCELONA CORPORATE
                          BUILDING
                          Date: 2009
                          Location: Barcelona
                          Area: 20.500 m2
                          Energy certification: A
                          Status: in draft

                          Energy study for architectural tender
                          Double-skin facade optimization using simulation software
                          Design of high performance air conditioning and lighting installation

                          Client: CÁMARA DE COMERCIO DE BARCELONA.




                                                                                                  Página 26 de 31
BANCO DE SABADELL OFFICE BUILDING
Date: 2009
Location: Sant Cugat del Vallès
Area: 31.592 m2
Energy certification: B
Status: under construction

Energy study
Critical facades optimization
Air conditioning machinery selection
Heating/Cooling production and lighting optimization
LEED certification in process

Client: BANCO DE SABADELL, S.A.



COMISIÓN     DEL      MERCADO                          DE   LAS
TELECOMUNICACIONES OFFICE BUILDING
Date: 2009
Location: Barcelona
Area: 18.523 m2
Energy certification: B
Status: Finished

Energy study
Critical facades optimization
Air conditioning machinery selection
Lighting optimization
ICAEN grant management for green buildings

Client: GRUPO INMOBILIARIO CASTELLVÍ



PUERTO VENECIA SHOPPING CENTER
Date: 2008
Location: Zaragoza
Area: 275.000 m2
Status: under construction

Energy study
Critical facades and sunscreen optimization using simulation
software
Sunscreen design: expanded metal rotating facades with solar
tracking system

Client: EUROFUND INVESTMENTS ZARAGOZA, S.L.



BARCELONA SUPERCOMPUTING CENTER BUILDING
Date: 2008
Location: Barcelona
Area: 12.597 m2
Energy certification: B
Status: under construction

Energy study
Critical facades optimization
Air conditioning machinery selection
Lighting optimization
ICAEN grant management for green buildings

Client: CENTRO NACIONAL DE SUPERCOMPUTACÓN – BSC




                                                              Página 27 de 31
HOSPITAL DEL MAR
                                    Date: 2008
                                    Location: Barcelona
                                    Area: 92.542 m2
                                    Status: under construction

                                    Energy study
                                    Critical facades optimization
                                    Air conditioning machinery and Heating/Cooling production selection
                                    Lighting optimization

                                    Client: CONSORCI SANITARI DE BARCELONA



Estudi 21 juny – solstici d’estiu   TORRE ONA BUILDING
                                    Date: 2008
                                    Location: Barcelona
                                    Area: 32.000 m2
                                    Energy certification: A
                                    Status: in draft

                                    Energy study
                                    Critical facades optimization
                                    Sunscreen design: expanded metal facades / natural light

                                    Client: BIMSA – AYUNTAMIENTO DE BARCELONA



                                    RBA EDITORES CORPORATE BUILDING
                                    Date: 2007
                                    Location: Barcelona
                                    Area: 26.755 m2
                                    Energy certification: B
                                    Status: Finished

                                    Energy study
                                    Critical facades optimization
                                    Design of high performance air conditioning and lighting installation
                                    ICAEN grant management for green buildings

                                    Client: RBA DIVISIÓN DE INMUEBLES, S.L.



                                    IGUZZINI ILUMINAZIONE CORPORATE BUILDING
                                    Date: 2007
                                    Location: Sant Cugat del Vallès
                                    Area: 9.000 m2
                                    Status: under de construction

                                    Energy study
                                    Critical facades optimization and sunscreen design using simulation
                                    software
                                    Sunscreen design: expanded metal rotating facades with solar
                                    tracking system

                                    Client: IGUZZINI ILUMINAZIONE ESPAÑA, S.A.




                                                                                                            Página 28 de 31
MEDIATIC 22@ OFFICE BUILDING
Date: 2006
Location: Barcelona
Area: 23.105 m2
Status: Finished

Energy study
Critical facades, air conditioning machinery and lighting optimization
Control of ETFE skin
30% global energy savings
LEED certification in process

Client: CONSORCIO DE LA ZONA FRANCA



LAYETANA INMOBILIARIA OFFICE BUILDING
Date: 2006
Location: Hospitalet de Llobregat
Area: 12.634 m2
Energy certification: A
Status: Finished

Energy study
LEED Certification obtained
ICAEN grant management for green buildings

Client: LAYETANA DESARROLLOS INMOBILIARIOS, S.L.



UNIVERSITAT DE BARCELONA BUILDINGS ENERGY AUDIT
Date: 2010
Location: Barcelona
Area: 130.000 m2 – 7 buildings
Current consumption: Electricity17 GWh/year; Gas 9.7 GWh/year;
Water 95,000 m3/year

Client: UNIVERSITAT DE BARCELONA



GENERALITAT DE CATALUNYA BUILDINGS ENERGY AUDIT
Date:2008 - 2009
Location: Cataluña

Energy audit in all Generalitat de Catalunya buildings
Design of remote management system in 200 Community Health
Centers and consumption analysis

Client: GENERALITAT DE CATALUNYA



BARCELONA LAW COURTS – CITY OF JUSTICE
COMISSIONING MANAGEMENT
Date: 2006
Location: Barcelona
Area: 233.000 m2

Comissioning Management of all buildings located in Barcelona City
of Justice

Client: Urbs ludex et Causidicus (URBICSA)




                                                                     Página 29 de 31
6.-ARCHITECTS

These are the architects with we have had the pleasure and

AAAR                          EMBT (MIRALLES - TAGLIABUE) NICOLAU PARÉS, CARLES
AB-A                          EMMA                          OCTAVIO MESTRE
ABALOS & HERREROS             ESPIGA-MONEO ARCHITECTURES OVE ARUP PARTNERS
ACP                           ESTUDIO ARQ. JORGE SALVAT     PASCUAL I ARGENTÉ, JOAN
ALIA                          ESTUDIO LAMELA                PICH-AGUILERA ARCHITECTURES
ALLENDE ARCHITECTURES         ESTUDIO VILLARROEL            POMAR MARIN. ÁNGEL M.
ALONSO & BALAGUER             FARGAS ASSOCIATS              PRADA I JAÉN, PERE DE
ARQUITECTURA ALTERNATIVA      FERRATER, CARLOS              PROYECTOS A+U
ARQ-SOCIS                     FINA, PERE                    PERÁLVAREZ RUIZ, ANTONIO
ARTEM ARCHITECTURES           F.I.V.Z.                      RAVENTÓS, IGNASI
ARTIGUES & SANABRIA           F.O.A.                        REDONDO I DOMÍNGUEZ, ERNEST
ARQUITECTURA OSCAR TUSQUETS FONT – VIÑOLAS ARCHITECTURES REID FENWICK.
ARREMENTERIA, IÑAKI           G.V. ARQUITECTES ASSOCIATS RELIMAC
                                                         RGA (RIERA-GUTIÉRREZ &
ARROYO, EDUARDO               GOAR
                                                         ASSOCIATS)
AURREKOETXEA, IÑAKI           GASULLA ARQUITECTURA       ROBUFFO, ROBERTO
B.S.T. (BONET, STEGMAN,       GIBAULT-LAGACHE,
                                                         ROMEU, ENRIQUE
TIANA)                        ARCHITECTURES
BADOSA/DOÑATE,
                              GIMENO I GONZÁLEZ, PILAR      ROS I BALLESTEROS, JORDI
ARCHITECTURES
BLANC-CONCA ARCHITECTURES     GUALLART FURIÓ, VICENTE       RUBIO&ALVAREZ-SALA
BORO, J.                      GUIBERNAU, JOAN               RUIZ, ELENA
BORRELL ARCHITECTURES         INDYA                         SALAZAR, JAVIER
BRU, EDUARD                   JUNQUERA, JERÓNIMO            SÁNCHEZ GIL, EMILIO
BRULLET I ASSOCIATS, S.L.     JUVANTENY I REIXACH, F. XAVIER SANS GIRONELLA, CÉSAR
BRINGAS & BELLOD              KATSURA, ARQUIT. Y URBANISMO SANTOS, JOSÉ ANGEL
CALAFELL I LAFUENTE, EDUARD   KM+P (KAUFMAN, MEEKS)         SANZ RUEDA, ÁNGEL
CALVO ONTORIA, ELADIO         L35                           SGA ESTUDIOS (VITORIA)
CAPELLA I SAMPER, JULI        LARROSA I PADRÓ, MANEL        SISTERNAS I SURIS, JOSEP LLUIS
CASADEVALL I DALMAU, JORDI    LÁZARO, CARLOS                SMITH, JOSÉ
                                                            S.O.B. ARQUITECTES
CHAPMAN TAYLOR                LÓPEZ, FERNANDO
                                                            (SOLER/BATALLA)
CHURTICHAGA+CUADRA SALCEDO LÓPEZ, VÍCTOR                    SOLÀ I BUSQUETS, PERE
CLOTET.PARICIO & ASSOCIATS    LOSADA, RAMÓN                 SOLID ARQUITECTURA
CÓDIGO ARQUITECTURA           MARTÍN MIRANDA, JOSÉ MANUEL SUÁREZ, JUAN JOSÉ
COLLADO, ÁNGEL                MARTORELL BOHIGAS MACKAY      SURÍS I SALA, JOAN S.
COLMENARES, MIGUEL            MATEO I MARTÍNEZ, JOSEP-LLUIS SUTRÍAS I FIGUERAS, JORDI
COOT ARQUITECTURA             MATEU POMAR, ELENA            T.A.C.
CROUS-GRABULEDA-RIERA         METRICA TIP                   TDB ARQUITECTURA,
CRUZ Y ORTIZ, ARCHITECTURES   MESTRE ARAMENDIA, OCTAVIO     T.D.A. TÉCNICA
DAVID CHIPPERFIELD ARCHITECTS MINGO & ARCHITECTURES         TYM ASOCIADOS
DÍAZ, JOSÉ LUÍS               MONEO, RAFAEL                 ÚBEDA, PASCUAL
DOMÍNGUEZ, HORACIO            MXC (MONSÓ, CONCEJAL)
ECHEVARRÍA SAINZ, FEDERICO    NADAL MARCÈ, ARCHITECTURES




                                                                                             Página 30 de 31
7.-DEVELOPPERS

ACCOR                      FORUM 2004                 PRESTIGE HOTELS-HOTEL ROSINCS
ACIEROID                   FUNDACIÓ PROMEDIC          PRIMA INMOBILIARIA
ADFINSA                    GALERIES TARRAGONA, S.A.   PROCOM DESARROLLOS URBANOS
AGBAR                      GAS NATURAL                PROCREU, S.L.
AGUIRRE NEWMAN
                           GERENS                     PROINOSA
ARQUITECTURA
AIG LINCOLN ESPAÑA         GENERALITAT DE CATALUNYA   PROMODEICO
AMENA                      GINKOPLANET                CLIENTA TORMA
APEX                       GIVAUDAN ROURE, S.A.       PUNT DIARI
ARQUITÈCNICS               G.M.P.                     RAFAEL HOTELES
ASEPEYO                    GOLF EMPORDÀ               RED ELÉCTRICA DE ESPAÑA
                                                      RESIDENCIAL PEDRALBES - CARRERAS,
AUTOLICA-QUADIS            GRUP FERRAN
                                                      S.L.
BLUENET                    GRUP TÈCNIC                RETEVISIÓN MÓVILES, S.A.
BOVIS LEND LEASE           GRUPO PALOMO               RETEVISIÓN S.A.
BOUYGUES INMOBILIARIA      GRUPO REYAL                REYAL HOTELES
BUY BUSINESS               GRUPO V. MUÑOZ-POMER       RIOFISA
CAMPS MOTOR, S.A.          HABITAT                    ROCKAL PROPERTIES
CANDESA                    HEWLETT PACKARD            RODAMCO
CASER                      HINES                      S B GRUP – SUBIRATS BERENGUER, S.A.
CENTRO INSULAR DE DEPORTES HOTUSA                     SAT-SUIS
CHAMPION – GRUPO
                           IDEA                       SEAT
CONTINENTE
CIMEX                      ING REAL STATE             SEGURFONDO DE INVERSIÓN
COBEGA                     INMOBILIARIA COLONIAL      SELENIUM CONSTRUCT
CODECSA, S.A.              INMOBILIARIA PUIGSACALM    SERVIHABITAT
CONDEMINAS                 INMOBILIARIA URBIS         SFERA JOVEN
CONSTRUCTORA ÁVALOS        JAIME MASCARÓ, S.A.        SIMON, S.A.
CONSTRUCTORA SAN JOSÉ      JOYERÍA SUÁREZ             TASINSA
COPCISA                    LANDSCAPE                  TELEFÓNICA
COPERFIL                   LAYETANA TERRASSA, S.L.    TESTA INMUEBLES
CORSAN - CORVIAM           LAR GROSVENOR              TIFSA
COYMAR                     M & S MODE                 TORRA, S.A.
DIAGONAL MAR RESIDENCIAL   MANGO                      TORRE BONANOVA GRUP INMOBILIARI
EDICSA                     MAXOR                      TRADE CENTER HOTEL, S.L.
EL CORTE INGLÉS            MERKAMUEBLE                TRANSPORTES AZKAR
ELECNOR                    MIGDIA PROMOCIÓ            TRAVEL LODGE HOTELES
E.M.V. MADRID              MIQUEL ALIMENTACIÓ         UGC CINE CITÉ ESPAÑA
ENRESA                     M.J.C.M. INMOBILIARIA      UNIVERSAL STUDIOS PORT AVENTURA
ERALAN                     NATUR HOTEL CATALUNYA, S.L. UNIVERSIDAD DE DEUSTO
ESPAIS                     NECSO                      UNIVERSITAT DE GIRONA
FALGÀS                     NEXITY ESPAÑA              VALLEHERMOSO
FERROVIAL-AGROMAN          NIKE                       VIAMED SALUD
FERROVIAL INMOBILIARIA     PANINI ESPAÑA, S.A.        VILA-SABARICH, S.L.
FINCAS PEDRALBES-STELGROC PERFUMERÍA GAL              ZUMOS PAGO
FIRA 2.000                 PITNEY BOWNES
FLEX                       P. FÚNEBRES B.LLOBREGAT



                                                                                            Página 31 de 31

Mais conteúdo relacionado

Destaque

Abalo Unternehmenspraesentation April 2014 Mobile Advertising LockScreen
Abalo Unternehmenspraesentation April 2014 Mobile Advertising LockScreenAbalo Unternehmenspraesentation April 2014 Mobile Advertising LockScreen
Abalo Unternehmenspraesentation April 2014 Mobile Advertising LockScreenDaniel Klarkowski
 
Automated Validation of Internet Security Protocols and Applications (AVISPA)
Automated Validation of Internet Security Protocols and Applications (AVISPA) Automated Validation of Internet Security Protocols and Applications (AVISPA)
Automated Validation of Internet Security Protocols and Applications (AVISPA) Krassen Deltchev
 
Fr fr regulatory-653267-052
Fr fr regulatory-653267-052Fr fr regulatory-653267-052
Fr fr regulatory-653267-052Rafikos1982
 
Mba Dirección y Administración de Empresa Eesae Salamanca 2012- 2013
Mba Dirección y Administración de Empresa Eesae Salamanca 2012- 2013Mba Dirección y Administración de Empresa Eesae Salamanca 2012- 2013
Mba Dirección y Administración de Empresa Eesae Salamanca 2012- 2013Eesae Salamanca
 
Caso de éxito Benihort
Caso de éxito BenihortCaso de éxito Benihort
Caso de éxito BenihortMarta Gregal
 
Análisis cuantitativo de eventos sísmicos registrados en ciudad guzmán, ja...
Análisis cuantitativo de eventos sísmicos registrados en ciudad guzmán, ja...Análisis cuantitativo de eventos sísmicos registrados en ciudad guzmán, ja...
Análisis cuantitativo de eventos sísmicos registrados en ciudad guzmán, ja...Academia de Ingeniería de México
 
Sunetra banerjee-sr-qa-engineer-project-lead resume
Sunetra banerjee-sr-qa-engineer-project-lead resumeSunetra banerjee-sr-qa-engineer-project-lead resume
Sunetra banerjee-sr-qa-engineer-project-lead resumeSunetra Banerjee
 
Moros i Cristians Denia 2014 Majorals de Sant Roc
Moros i Cristians Denia 2014 Majorals de Sant RocMoros i Cristians Denia 2014 Majorals de Sant Roc
Moros i Cristians Denia 2014 Majorals de Sant RocJuan Fernández Moro
 
FEM PRACTICA: Análisis crítica de aplicaciones interactivas: Facebook
FEM PRACTICA: Análisis crítica de aplicaciones interactivas: FacebookFEM PRACTICA: Análisis crítica de aplicaciones interactivas: Facebook
FEM PRACTICA: Análisis crítica de aplicaciones interactivas: FacebookBea Garcia Fernandez
 
Los retos del Marketing Directo
Los retos del Marketing DirectoLos retos del Marketing Directo
Los retos del Marketing DirectoAlberto Sánchez
 
Hospitality Procurement Services
Hospitality Procurement ServicesHospitality Procurement Services
Hospitality Procurement Serviceshpservicesu
 
Memòria mapa conceptual 2
Memòria mapa conceptual 2Memòria mapa conceptual 2
Memòria mapa conceptual 2CVA
 
Poradnik Telemarketing
Poradnik TelemarketingPoradnik Telemarketing
Poradnik Telemarketingguest28973a5
 
Cerebral Palsy Sneak Peak
Cerebral Palsy Sneak PeakCerebral Palsy Sneak Peak
Cerebral Palsy Sneak PeakRobyn Papworth
 

Destaque (20)

Abalo Unternehmenspraesentation April 2014 Mobile Advertising LockScreen
Abalo Unternehmenspraesentation April 2014 Mobile Advertising LockScreenAbalo Unternehmenspraesentation April 2014 Mobile Advertising LockScreen
Abalo Unternehmenspraesentation April 2014 Mobile Advertising LockScreen
 
Automated Validation of Internet Security Protocols and Applications (AVISPA)
Automated Validation of Internet Security Protocols and Applications (AVISPA) Automated Validation of Internet Security Protocols and Applications (AVISPA)
Automated Validation of Internet Security Protocols and Applications (AVISPA)
 
Fr fr regulatory-653267-052
Fr fr regulatory-653267-052Fr fr regulatory-653267-052
Fr fr regulatory-653267-052
 
Panorama Defesa Comercial - Fiesp - Março 2014
Panorama Defesa Comercial - Fiesp - Março 2014Panorama Defesa Comercial - Fiesp - Março 2014
Panorama Defesa Comercial - Fiesp - Março 2014
 
Mba Dirección y Administración de Empresa Eesae Salamanca 2012- 2013
Mba Dirección y Administración de Empresa Eesae Salamanca 2012- 2013Mba Dirección y Administración de Empresa Eesae Salamanca 2012- 2013
Mba Dirección y Administración de Empresa Eesae Salamanca 2012- 2013
 
Hijos tutores
Hijos tutoresHijos tutores
Hijos tutores
 
Caso de éxito Benihort
Caso de éxito BenihortCaso de éxito Benihort
Caso de éxito Benihort
 
eSalud2013
eSalud2013eSalud2013
eSalud2013
 
ALBA Planificamos
ALBA PlanificamosALBA Planificamos
ALBA Planificamos
 
Análisis cuantitativo de eventos sísmicos registrados en ciudad guzmán, ja...
Análisis cuantitativo de eventos sísmicos registrados en ciudad guzmán, ja...Análisis cuantitativo de eventos sísmicos registrados en ciudad guzmán, ja...
Análisis cuantitativo de eventos sísmicos registrados en ciudad guzmán, ja...
 
Eduado Vela Ruiz
Eduado Vela RuizEduado Vela Ruiz
Eduado Vela Ruiz
 
Sunetra banerjee-sr-qa-engineer-project-lead resume
Sunetra banerjee-sr-qa-engineer-project-lead resumeSunetra banerjee-sr-qa-engineer-project-lead resume
Sunetra banerjee-sr-qa-engineer-project-lead resume
 
Moros i Cristians Denia 2014 Majorals de Sant Roc
Moros i Cristians Denia 2014 Majorals de Sant RocMoros i Cristians Denia 2014 Majorals de Sant Roc
Moros i Cristians Denia 2014 Majorals de Sant Roc
 
FEM PRACTICA: Análisis crítica de aplicaciones interactivas: Facebook
FEM PRACTICA: Análisis crítica de aplicaciones interactivas: FacebookFEM PRACTICA: Análisis crítica de aplicaciones interactivas: Facebook
FEM PRACTICA: Análisis crítica de aplicaciones interactivas: Facebook
 
Los retos del Marketing Directo
Los retos del Marketing DirectoLos retos del Marketing Directo
Los retos del Marketing Directo
 
Capituloviii fuerzamagneticaycampomagnetico-
Capituloviii fuerzamagneticaycampomagnetico-Capituloviii fuerzamagneticaycampomagnetico-
Capituloviii fuerzamagneticaycampomagnetico-
 
Hospitality Procurement Services
Hospitality Procurement ServicesHospitality Procurement Services
Hospitality Procurement Services
 
Memòria mapa conceptual 2
Memòria mapa conceptual 2Memòria mapa conceptual 2
Memòria mapa conceptual 2
 
Poradnik Telemarketing
Poradnik TelemarketingPoradnik Telemarketing
Poradnik Telemarketing
 
Cerebral Palsy Sneak Peak
Cerebral Palsy Sneak PeakCerebral Palsy Sneak Peak
Cerebral Palsy Sneak Peak
 

Semelhante a 110623 pgi cv_hospitals_english

110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_redux110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_reduxPGI ENGINEERING
 
Tise research group-upm
Tise research group-upmTise research group-upm
Tise research group-upmeurekabuild2
 
Sustainable Construction
Sustainable ConstructionSustainable Construction
Sustainable ConstructionJokin Hidalgo
 
CV JOUSEAU Eric (EN)
CV JOUSEAU Eric (EN)CV JOUSEAU Eric (EN)
CV JOUSEAU Eric (EN)Eric Jouseau
 
R&D High Tech Buildings
R&D High Tech BuildingsR&D High Tech Buildings
R&D High Tech Buildingstmerino
 
Catalogoprojectos steinel
Catalogoprojectos steinelCatalogoprojectos steinel
Catalogoprojectos steinelMiguel Silva
 
Presentation Ibercontrol Chile
Presentation Ibercontrol ChilePresentation Ibercontrol Chile
Presentation Ibercontrol ChileStelvio Salomone
 
Alejandro Lorenzo Fernandez CV (en)
Alejandro Lorenzo Fernandez CV (en)Alejandro Lorenzo Fernandez CV (en)
Alejandro Lorenzo Fernandez CV (en)alejandro_lorenzo
 
Maintenance & Services (English)
Maintenance & Services (English)Maintenance & Services (English)
Maintenance & Services (English)COMSA Corporación
 
Catalogo Kliux En
Catalogo Kliux EnCatalogo Kliux En
Catalogo Kliux EnInaki1
 
Cv Enghish 2011 Web Site
Cv Enghish 2011 Web SiteCv Enghish 2011 Web Site
Cv Enghish 2011 Web Sitemsmarino
 
Présentation du Cluster Tweed - Energy Day 2014
Présentation du Cluster Tweed - Energy Day 2014Présentation du Cluster Tweed - Energy Day 2014
Présentation du Cluster Tweed - Energy Day 2014The Smart Company
 
Is D&D a motor for Innovation?
Is D&D a motor for Innovation?Is D&D a motor for Innovation?
Is D&D a motor for Innovation?Peter Berben
 

Semelhante a 110623 pgi cv_hospitals_english (20)

Cv Feb 2012
Cv Feb 2012Cv Feb 2012
Cv Feb 2012
 
110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_redux110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_redux
 
Tise research group-upm
Tise research group-upmTise research group-upm
Tise research group-upm
 
Auditel 2 O11 Ing
Auditel 2 O11 IngAuditel 2 O11 Ing
Auditel 2 O11 Ing
 
Sustainable Construction
Sustainable ConstructionSustainable Construction
Sustainable Construction
 
EU Residence (Portugal) Golden Visa Office Tower for sale
EU Residence (Portugal)  Golden Visa Office Tower for saleEU Residence (Portugal)  Golden Visa Office Tower for sale
EU Residence (Portugal) Golden Visa Office Tower for sale
 
CV JOUSEAU Eric (EN)
CV JOUSEAU Eric (EN)CV JOUSEAU Eric (EN)
CV JOUSEAU Eric (EN)
 
R&D High Tech Buildings
R&D High Tech BuildingsR&D High Tech Buildings
R&D High Tech Buildings
 
Barcelona Clean Energy Tour
Barcelona Clean Energy TourBarcelona Clean Energy Tour
Barcelona Clean Energy Tour
 
Project Engineering
Project EngineeringProject Engineering
Project Engineering
 
Catalogoprojectos steinel
Catalogoprojectos steinelCatalogoprojectos steinel
Catalogoprojectos steinel
 
Portfolio
PortfolioPortfolio
Portfolio
 
Materials science, innovation and industry.
Materials science, innovation and industry.Materials science, innovation and industry.
Materials science, innovation and industry.
 
Presentation Ibercontrol Chile
Presentation Ibercontrol ChilePresentation Ibercontrol Chile
Presentation Ibercontrol Chile
 
Alejandro Lorenzo Fernandez CV (en)
Alejandro Lorenzo Fernandez CV (en)Alejandro Lorenzo Fernandez CV (en)
Alejandro Lorenzo Fernandez CV (en)
 
Maintenance & Services (English)
Maintenance & Services (English)Maintenance & Services (English)
Maintenance & Services (English)
 
Catalogo Kliux En
Catalogo Kliux EnCatalogo Kliux En
Catalogo Kliux En
 
Cv Enghish 2011 Web Site
Cv Enghish 2011 Web SiteCv Enghish 2011 Web Site
Cv Enghish 2011 Web Site
 
Présentation du Cluster Tweed - Energy Day 2014
Présentation du Cluster Tweed - Energy Day 2014Présentation du Cluster Tweed - Energy Day 2014
Présentation du Cluster Tweed - Energy Day 2014
 
Is D&D a motor for Innovation?
Is D&D a motor for Innovation?Is D&D a motor for Innovation?
Is D&D a motor for Innovation?
 

Mais de PGI ENGINEERING

CLIMAEFICIENCIA. Articulo sobre Proyecto PGI en Torre Puig
CLIMAEFICIENCIA. Articulo sobre Proyecto PGI en Torre PuigCLIMAEFICIENCIA. Articulo sobre Proyecto PGI en Torre Puig
CLIMAEFICIENCIA. Articulo sobre Proyecto PGI en Torre PuigPGI ENGINEERING
 
2014 05 20-jornada ee ceec-sistemes de gestió energètica_cas d'exit colonial
2014 05 20-jornada ee ceec-sistemes de gestió energètica_cas d'exit colonial2014 05 20-jornada ee ceec-sistemes de gestió energètica_cas d'exit colonial
2014 05 20-jornada ee ceec-sistemes de gestió energètica_cas d'exit colonialPGI ENGINEERING
 
Inmobiliare no. 83 planner
Inmobiliare no. 83 plannerInmobiliare no. 83 planner
Inmobiliare no. 83 plannerPGI ENGINEERING
 
Expansión_PresPGIEnergy
Expansión_PresPGIEnergyExpansión_PresPGIEnergy
Expansión_PresPGIEnergyPGI ENGINEERING
 
Inmobiliare Frederic Gil, PGI Engineering
Inmobiliare Frederic Gil, PGI EngineeringInmobiliare Frederic Gil, PGI Engineering
Inmobiliare Frederic Gil, PGI EngineeringPGI ENGINEERING
 
PGI_Pres_Eficiencia Energética_v03_2012_esp
PGI_Pres_Eficiencia Energética_v03_2012_espPGI_Pres_Eficiencia Energética_v03_2012_esp
PGI_Pres_Eficiencia Energética_v03_2012_espPGI ENGINEERING
 
Lpw leaves performative_walls_presentation_japa_pgi
Lpw leaves performative_walls_presentation_japa_pgiLpw leaves performative_walls_presentation_japa_pgi
Lpw leaves performative_walls_presentation_japa_pgiPGI ENGINEERING
 
Entrevista PGI a Full dels Enginyers de Catalunya
Entrevista PGI a Full dels Enginyers de CatalunyaEntrevista PGI a Full dels Enginyers de Catalunya
Entrevista PGI a Full dels Enginyers de CatalunyaPGI ENGINEERING
 
La vanguardia pgi_congo_29072012
La vanguardia pgi_congo_29072012La vanguardia pgi_congo_29072012
La vanguardia pgi_congo_29072012PGI ENGINEERING
 
Presentació PGI Engineering Català 2010
Presentació PGI Engineering Català 2010Presentació PGI Engineering Català 2010
Presentació PGI Engineering Català 2010PGI ENGINEERING
 

Mais de PGI ENGINEERING (13)

CLIMAEFICIENCIA. Articulo sobre Proyecto PGI en Torre Puig
CLIMAEFICIENCIA. Articulo sobre Proyecto PGI en Torre PuigCLIMAEFICIENCIA. Articulo sobre Proyecto PGI en Torre Puig
CLIMAEFICIENCIA. Articulo sobre Proyecto PGI en Torre Puig
 
2014 05 20-jornada ee ceec-sistemes de gestió energètica_cas d'exit colonial
2014 05 20-jornada ee ceec-sistemes de gestió energètica_cas d'exit colonial2014 05 20-jornada ee ceec-sistemes de gestió energètica_cas d'exit colonial
2014 05 20-jornada ee ceec-sistemes de gestió energètica_cas d'exit colonial
 
Inmobiliare no. 83 planner
Inmobiliare no. 83 plannerInmobiliare no. 83 planner
Inmobiliare no. 83 planner
 
Expansión_PresPGIEnergy
Expansión_PresPGIEnergyExpansión_PresPGIEnergy
Expansión_PresPGIEnergy
 
22 pgi colonial
22 pgi colonial22 pgi colonial
22 pgi colonial
 
Inmobiliare Frederic Gil, PGI Engineering
Inmobiliare Frederic Gil, PGI EngineeringInmobiliare Frederic Gil, PGI Engineering
Inmobiliare Frederic Gil, PGI Engineering
 
PGI_Pres_Eficiencia Energética_v03_2012_esp
PGI_Pres_Eficiencia Energética_v03_2012_espPGI_Pres_Eficiencia Energética_v03_2012_esp
PGI_Pres_Eficiencia Energética_v03_2012_esp
 
Lpw leaves performative_walls_presentation_japa_pgi
Lpw leaves performative_walls_presentation_japa_pgiLpw leaves performative_walls_presentation_japa_pgi
Lpw leaves performative_walls_presentation_japa_pgi
 
Entrevista PGI a Full dels Enginyers de Catalunya
Entrevista PGI a Full dels Enginyers de CatalunyaEntrevista PGI a Full dels Enginyers de Catalunya
Entrevista PGI a Full dels Enginyers de Catalunya
 
La vanguardia pgi_congo_29072012
La vanguardia pgi_congo_29072012La vanguardia pgi_congo_29072012
La vanguardia pgi_congo_29072012
 
Pgi engineering fr
Pgi engineering frPgi engineering fr
Pgi engineering fr
 
111005 art gr_via0911
111005 art gr_via0911111005 art gr_via0911
111005 art gr_via0911
 
Presentació PGI Engineering Català 2010
Presentació PGI Engineering Català 2010Presentació PGI Engineering Català 2010
Presentació PGI Engineering Català 2010
 

Último

The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 

Último (20)

The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 

110623 pgi cv_hospitals_english

  • 1. PGI Engineering, organization certified to ISO 9001¹ and ISO 14001 ², with registration numbers ER-0339/2007 and GA-2009/0111 respectively, for the consultancy and project preparation for MEP in buildings, obtaining opening licenses and permissions from Spanish local authorities and supply companies, MEP contractor’s tenders , technical assistance and direction of MEP works. ¹ Offices in Barcelona, Madrid and Girona. ² Delegation of Girona
  • 2. INDEX 1. PRESENTATION 2. SERVICES 3. PRIZES AND AWARDS 4. RELATED WORKS 4.1 HOSPITALS AND HEALTHCARE CENTERS 4.2-LABORATORIES AND RESEARCH CENTERS 4.3 NURSING HOMES 5. ENERGETIC EFFICIENCY 5.1 PRESENTATION 5.2 OBJECTIVES 5.3 AREAS AND SERVICES 6. ARCHITECS 7. DEVELOPPERS Página 2 de 31
  • 3. 1.-PRESENTATION PGI ENGINEERING is a group of companies of INTEGRATED SERVICES OF ENGINEERING that since his creation in 1992 has experienced a steady expansion in the market thanks mainly to the high degree of professionalism of its human team, facing each project with utmost enthusiasm. At present the company consists of more than 100 engineers and technicians distributed in the several work centers located in Spain, North of Africa and Latin America. In these centers we find the following companies: • PeGI Engineering, S.L.P. • PGI Ingenieria Madrid S.L. • Consultoria de Projectes Girona SL / Consultoria de Projectes Girona SLP • PGI 2000 Consultoria i Enginyeria Barcelona SL /Consultoria de Projectes Barcelona SLP • CIASA / Consultoria Madrid SLP • URCULO / PGI Ingeniería • PGI Gest SLP • PGI Tarragona 2007 SLP • PGI Energy • PGI Group Atlas / Casablanca • PGI Perú (subsidiary in legalization process) During its career as Business of Engineering, PGI ENGINEERING has participated in the design and construction of more than 3.000 Projects, working for all kinds of Clients, national and international. The company is formed by a wide range of specialized engineers and technicians with a high level of experience in designing, developing, monitoring and managing projects as well as in technical studies, related to the installations engineering in the construction field. The basic criteria PGI ENGINEERING / PGI GRUP follows to carry out this work are: • Rationalization of the design of the installations and services of a building, whether of industrial or services use, to obtain a reasonable and adjusted price of execution under the specifications of the client. • Development of the project until the last details, this being one of the main differentiating factors versus the competition. • Control of the execution of the works in order to obtain an equal or superior quality to the one indicated in the project and if possible at a lower price. That is to say, we will defend the client’s interests, both technical and economical. • Advice and assistance to manage more efficiently maintenance and infrastructure operations, improving design and facility management. Página 3 de 31
  • 4. Today, PGI ENGINEERING is an important Engineering Company in the construction industry, responsible for the design and monitoring of installations in the field of construction and with an approximate total amount of executed Engineering Installations MEP works over 125 million of €. Throughout its history, PGI ENGINEERING has provided a broad spectrum of services to an ever-expanding marketplace and we enjoy working with our clients on a wide variety of projects. The projects include: • hospitals and medical buildings • resort and recreation developments • data Processing Centers • office and industrial parks • retail shopping centers • mixed-use development projects • academic and research institutions • residential developments • leisure, sport and culture facilities. PGI ENGINEERING / PGI GRUP belongs to the following associations: • ASINCA: (Tecniberia-FIDIC) Association of Enterprises of Engineering of Catalonia (SPAIN). • ASICMA: (Tecniberia-FIDIC) Association of Enterprises of Engineering, Consulting, Environment, Architecture and Technological Services of Madrid. • ACI: Association of Installations Consultancy of Catalonia (SPAIN). • AEM: Association of Maintenance Enterprises. • ATECYR: Spanish Technical Association of Refrigeration and Cooling Systems. • CEEC: Cluster of Energetic Efficiency of Catalonia (SPAIN). 2.-SERVICES PGI ENGINEERING develops his business activity offering the services that follow: Main activity: Engineering and Consulting in Mechanical, Electrical and Plumbing (MEP) Complementary activities: • Engineering and consulting in energy saving • Engineering and consulting in renewable energies • Engineering in energy infrastructures • (Generation, Cogeneration, Trigeneration, Distribution, etc.) • Engineering in acoustic and audiovisual infrastructures • Engineering in water supply / wastewater infrastructures (wastewater treatment, purge, purification, etc.) • Logistical and industrial buildings Página 4 de 31
  • 5. 3.-PRIZES AND AWARDS - During the year 2010 several projects where PGI ENGINEERING has participated have been awarded: • The Building Espacio Baronda (Barcelona) has won the Award to the “Most innovative initiative in Architecture”. • The Headquarters of Layetana -Plaza Europa 31 (Barcelona) – have won the Award to the “Best Sustainable Building”. • The Seafront of Benidorm has won the “Prize of Architecture in Public Spaces and Infrastructures”. • The Hotel Aire in Bardenas has won the “Prize to the Hotel Architecture”. • The Can Framis Museum has been finalist to the “FAD Prize 2010”. • The Football Staudium RCDE Español has been chosen Worldwide Sportive Facility of the Year in the Stadium Business Award 2010. • The Football Stadium RCDE Español has won the “Catalonia Building Prize”, given by the Technicians in Architecture College of Catalonia. - The Building of Social Housing for Young People in the neighborhood of Sant Andreu (Barcelona) won the “FAD Prize 2008” - 2007 The “Telefonica City of Communications” project in Madrid won the “BEX Prize” (BUILDING EXCHANGE) Energy Sustainability. - 2006 PGI ENGINEERING won the “SUSTAINABLE ARCHITECTURE Prize” from the Junta de Castilla La Mancha for the Project TELEFÓNICA CALL CENTER - 1999 PGI GIRONA won the "CONSTRUMAT Prize 1999" to the technological innovation in building with the factory SIMON S.A. in Olot, Girona. - 1996 PGI MADRID won the “IDAE-CEI ANNUAL Prize 1996” on Electricity Saving Projects in lighting, for the design of the lighting system developed for the NCR BUILDING in Madrid. www.pgiengineering.com Página 5 de 31
  • 6. 4.-WORKS 4.1 HOSPITALS AND HEALTHCARE CENTERS PUERTA DEL HIERRO HOSPITAL Installation Client Architecture Location budget FERROVIAL- Majadahonda 57.250.000 BERNA 10 NECSO (Madrid) € Date State Surface Project --- 145.250 m2 2004 Observations: 850 Beds. Performance: Installations MEP Preliminary Design. SANT JOAN DE REUS HOSPITAL Installation Client Architecture Location budget COREA MORAN Reus 20.131.200 INNOVA – PICH (Tarragona) € AGUILERA Date State Surface Project Completed 106.000 m² 2007 Observations: 460 Beds. Performance: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Acoustic Design and Works Supervision. VALLECAS HOSPITAL Installation Client Architecture Location budget Vallecas 21.700.000 FERROVIAL BERNA 10 (Madrid) € Date State Surface Project Completed 85.400 m2 2005 Observations: 324 Beds. Performance: Installations Preliminary Design. Página 6 de 31
  • 7. NORTH HOSPITAL Installation Client Architecture Location budget S.S. de los Reyes FERROVIAL BERNA 10 16.010.000 € (Madrid) State Surface Date Project 2 Completed 84.300 m 2005 Observations: 349 Beds. Performance: Installations MEP Preliminary Design. PARLA HOSPITAL Installation Client Architecture Location budget FERROVIAL BERNA 10 Parla (Madrid) 18.815.000 € State Surface Date Project Completed 75.200 m2 2005 Observations: 250 Beds. Performance: Installations MEP Preliminary Design. HOSPITAL DEL MAR - EXTENSION Installation Client Architecture Location budget A.I.A. Arq - Hospital del Brullet Pineda Barcelona 4.600.000 € Mar Arq Date State Surface Project In Progress 30.100 m² 2007 Observations: Refurbishment and extension of the “Hospital de Mar”, joined to the Faculty of Medicine to UPF. Performance: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision COSLADA HOSPITAL Installation Client Architecture Location budget Coslada 16.260.000 FERROVIAL BERNA 10 (Madrid) € Date State Surface Project Completed 60.160 m2 2005 Observations: 239 Beds. Performance: Installations MEP Preliminary Design. Página 7 de 31
  • 8. HOSPITAL DE ARGANDA Installation Client Architecture Location budget Arganda 11.950.000 FERROVIAL BERNA 10 (Madrid) € Date State Surface Project Completed 51.950 m2 2005 Observations: 148 Beds. Performance: Installations MEP Preliminary Design. HOSPITAL DE SANT PAU – MASTER PLAN (PHASE I) Installation Client Architecture Location budget Javier Asarta – 4.000.000 € UNESCO Barcelona XavierGuitart (Fase I) Date State Surface Project In progress 45.280 m² 2007 Performance: Installations MEP Master Plan for the refurbishment of 17 pavilions (45.280 m²) and the outside areas general infrastructures. HOSPITAL DEL TAJO Installation Client Architecture Location budget Aranjuez 11.550.000 FERROVIAL BERNA 10 (Madrid) € Date State Surface Project Completed 42.400 m2 2005 Observations: 116 Beds. Performance: Preliminary Installations MEP Design. REFURBISHMENT AND EXTENSION OF THE HOSPITAL “LA MANCHA CENTRAL” Installation Client Architecture Location budget Alcázar de San SESCAM ARGOLA 7.200.000 € Juan (C. Real) Date State Surface Project In progress 25.000 m2 2003 Performance: Installations MEP Execution Design. Página 8 de 31
  • 9. HEALTH-CARE CENTER “COCHERAS DE BORBÓN” Installation Client Architecture Location budget CHC VITRE LA VINYA DE LA 4.236.563,2 Barcelona S.A. VILLA ARQ 5€ Date State Surface Project Completed 15.120 m2 2006 Performance: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. NURSING HOME AND HEALTH-CARE CENTER ECUADOR Installation Client Architecture Location budget ALONSO & REGESA Barcelona 3.000.000 € BALAGUER Date State Surface Project Completed 7.900 m² 2007 Performances: Town-Planning Adequacy Certificate, Final Legalization Certificate and Project for the MEP Installations, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. HOSPITAL DE MONTECANAL Installation Client Architecture Location budget MANUEL VIAMED SALUD Zaragoza 2.700.000 € BLASCO Date State Surface Project In execution 6.500 m2 2004 Observations: 48 rooms, 6 surgery rooms, Emergency services, 5 offices and a unit of diagnosis. Performance: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. TARAZONA HEALTH-CARE CENTER Installation Client Architecture Location budget GOBIERNO DE CÓDIGO Tarazona 1.560.000 € ARAGÓN ARQUITECTURA (Zaragoza) Date State Surface Project On Project 5.350 m2 2005 Performance: Installations MEP Preliminary and Execution Design. Página 9 de 31
  • 10. DAY CENTER, NURSING HOME AND HEALTH-CARE CENTER Installation Client Architecture Location budget OLIVERAS BOIX Reus AYTO. REUS 900.130 € ARQUITECTES (Tarragona) Date State Surface Project In progress 4.760 m² 2009 Observations: Day center, nursing home and health-care center. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. HEALTH PARK CAMP CLAR Installation Client Architecture Location budget RAHOLA VIDAL Camp Clar CATSALUT 1.300.000 € ARQ (Tarragona) Date State Surface Project In progress 3.500 m² 2009 Performance: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. HOSPITAL SANTA MARIA DE LLEIDA- REFURBISHMENT OF THE EAST WING Installation Client Architecture Location budget Hospital Sta. Intersalus - Maria de Lleida 1.449.675 € Albert Vitaller Lleida Date State Surface Project On Project 3.411 m² 2006 Observations: Refurbishment of the East Wing of Santa Maria Hospital de Lleida Performance: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. Página 10 de 31
  • 11. REFURBISHMENT AND EXTENSION OF THE EMERGENCY SERVICES AND THE 7th FLOOR OF THE HOSPITAL JOAN XXIII OF TARRAGONA Installation Client Architecture Location budget HOSPITAL ARQ. QUIÑOA Y JOAN XXIII ASOCIADOS, Tarragona 1.775.700€ DE S.L. TARRAGONA Date State Surface Project In progress 3.360 m² 2008 Observations: Refurbishment and extension of the emergency services and the 7th floor of the hospital Joan XXIII of Tarragona. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. “LA MILAGROSA” HEALTHCARE CENTER Installation Client Architecture Location budget MIGUEL I. N. SALUD Soria 615.000 € COLMENARES Date State Surface Project In execution 3.300 m2 2002 Performance: Installations MEP Execution Design. DENTAL CLINIC – UNIVERSITAT DE SALAMANCA Installation Client Architecture Location budget Emilio Sanchez DRAGADOS Salamanca 700.000 € Gil Date State Surface Project Completed 2.500 m² 2003 Performance: Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. PRIMARY HEALTH-CARE CENTER – SANT FELIU DE GUÍXOLS Installation Client Architecture Location budget CROUS, Sant Feliu de GISA GRABULEDA, Guíxols 1.000.000 € RIERA ARQ. (Girona) Data State Surface Project Completed 2.500 m² 2006 Performances: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. Página 11 de 31
  • 12. PRIMARY HEALTH-CARE CENTER - NORD Installation Client Architecture Location budget GISA BAMMP Arq. Terrassa 820.000 € Data State Surface Project Completed 2.245 m² 2006 Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. REFURBISHMENT AND EXTENSION OF THE HOSPITAL PIUS DE VALLS Installation Client Architecture Location budget HOSPITAL DIEGO PIUS DE Valls 2.198.300 € NAKAMATSU VALLS Data State Surface Project In progress 2.230 m² 2009 Observations: Refurbishment and extension of the Hospital Pius de Valls. Performances: Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. PRIMARY HEALTH-CARE CENTER – CONCÓRDIA Installation Client Architecture Location budget Sabadell GISA HAZ ARQ. 600.000 € (Barcelona) Data State Surface Project Completed 1.650 m² 2006 Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. PRIMARY HEALTH-CARE CENTER - PALAU SOLITÀ I PLEGAMANS Installation Client Architecture Location budget CASANOVAS, Palau Solità i GISA GRAUS, PEREZ Plegamans 470.500 € ARQ (Barcelona) Data State Surface Project Completed 1.500 m² 2007 Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 12 de 31
  • 13. PRIMARY HEALTH-CARE CENTER - GRÀCIA Installation Client Architecture Location budget Sabadell GISA CC245 ARQ 315.500 € (Barcelona) Data State Surface Project In progress 1.000 m² 2006 Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. HOSPITALIZATION UNIT (BUILDING B, 3th FLOOR) JOAN XXIII HOSPITAL OF TARRAGONA Installation Client Architecture Location budget Hospital Joan ARQ. Quiñoa y XXIII de Tarragona 510.000 € Asociados, S.L. Tarragona Date State Surface Project Completed 1.100 m² 2005 Observations: Reform of hospitalization unit (3th Floor, Building B) of Joan’s XXIII Hospital, in Tarragona. Performance: Environmental Licence Project, Preliminary and Execution Design. ENDOSCOPY UNIT OF JOSEP TRUETA UNIVERSITY HOSPITAL Installation Client Architecture Location budget Hospital Universitario PGI GRUP Girona 40.000 € Josep Trueta Date State Surface Project Completed 600 m² 2005 Observations: Josep Trueta University Hospital Performance: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. Página 13 de 31
  • 14. PRIMARY HEALTH-CARE CENTER – CASTELLÓ D’EMPURIES Installation Client Architecture Location budget ORDOÑEZ- Castelló GISA GARCÍA- Empuries 300.000 € FERRANDO UTE (Girona) Data State Surface Project Completed 500 m² 2006 Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 14 de 31
  • 15. 4.2- LABORATORIES AND RESEARCH CENTERS OFFICES AND LABORATORIES GIROC CT Installation Client Architecture Location budget Mollet del LABORATORIO JORDI MARCÈ Vallés 650.000 € S GIROC ARQ (Barcelona) Data State Surface Project In progress 2.000 m2 2009 Performances: Installations MEP Execution Design for the renovation of the HVA facilities. ISDIN HEADQUATERS Installation Client Architecture Location budget ISDIN GCA Barcelona 650.000 € Data State Surface Project Completed 4.000 m2 2009 Observations: Headquarters of the company in Barcelona on the 22@ district, 4.000 m². Building with research laboratories. Performances: Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. BARCELONA SUPERCOMPUTING CENTER Installation Client Architecture Location budget BAAS UPC Barcelona 3.797.700 € ARQUITECTES Data State Surface Project In progress 12.500 m2 2008 Performances: Environmental Licence Project and Certificate , Town- Planning Adequacy Certificate , solar collectors justification, Installations MEP Preliminary and Execution Design, CTE-SI justification, CTE-HE justification, Final Legalization Certificate and Project for the MEP Installations , Telecommunications Certificate, Emergency plan, Maintenance plan , Installations MEP Works Supervision . Página 15 de 31
  • 16. TECNOCAMPUS MATARÓ PARK Installation Client Architecture Location budget MBM Mataró PUMSA 11.771.840 € ARQUITECTES (Barcelona) State Surface Data Project In progress 46.940 m² 2007 Observations: University campus facilities, with office and commercial units, parking and an auditorium. Performances: Environmental Licence Project and Certificate , Town-Planning Adequacy Certificate , solar collectors justification, Installations MEP Preliminary and Execution Design, CTE-SI justification, CTE- HE justification, Final Legalization Certificate and Project for the MEP Installations , Telecommunications Certificate, Emergency plan, Maintenance plan ,Installations MEP Works Supervision. I+D BUILDING OF THE POLYTECHNICAL CATALONIA UNIVERSITY Installation Client Architecture Location budget D. SOLDEVILA Castelldefells U.P.C. 1.100.000 € ARCHITECTURE (Barcelona) State Surface Data Project 2 Completed 2.600 m 2006 Observations: Variable Refrigerant Flow (VRF) condensate for loop water. Loop supply trough adiabatic cooling tower and condensing boiler. Reinforced with an alternative system of collector panels for the heating, and lake superficial waters cooling for refrigeration. Performances: Environmental Licence Project, Installations MEP Execution Design AUDITORIUM ROOM CPD OF THE CAMPUS ESADE IN SANT CUGAT DEL VALLÉS Installation Client Architecture Location budget St. Cugat del FUNDACIÓN Vallés 540.000 € ESADE (Barcelona) Data State Surface Project Completed 600 m² 2005 Observations: University campus consisting of: University buildings, Creativity center, Residence Hall, Sportive Areas, Green Areas, Parking and outdoor infrastructures. Performances: Preliminary and Execution Design, Installations MEP Works Supervision. Página 16 de 31
  • 17. INNOVATION AND RESEARCH CENTER LA RIOJA Installation Client Architecture Location budget FUNDACIÓN INTERSALUS Logroño 5.850.000 € RIOJA SALUD Data State Surface Project Completed 20.400 m² 2004 Observations: Health, care, nursing, administration and research building belonging to the Health Rioja Foundation. Performances: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. SCIENCE PARK UDG Installation Client Architecture Location budget UNIVERSIDAD BOSCH- 2.498.270,0 Girona GIRONA TARRÚS ARQ. 0€ Data State Surface Project Completed 11.304 m2 2004 Observations: Business building for renting to research enterprises. Performances: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision, Legalization Project for the MEP Installations and Emergency Plan. CERECO LABORATORIES Installation Client Architecture Location budget LABORATORIO DE INVESTIGACIÓN Maçanet de la ACIEROID 595.000 € Y Selva (Girona) ASESORAMIENT O, S.L. State Surface Data Project 2 Completed 1.800 m 2004 Performances: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. TELEFONICA CALL CENTER BUILDING Installation Client Architecture Location budget CASTILLA LA PICH Toledo 1.800.000 € MANCHA AGUILERA Data State Surface Project Completed 6.000 m² 2003 Performances: Preliminary and Execution Design, Installations MEP Works Supervision. Página 17 de 31
  • 18. BOTANICAL INSTITUTE Installation Client Architecture Location budget CARLOS C.S.I.C. Barcelona 400.000 € FARRATER Data State Surface Project Completed 2.800 m2 2000 Observations: Educational and Research Center Performances: Preliminary and Execution Design, Installations MEP Works Supervision. MEDITERRANEAN CENTER OF SEA RESEARCH Installation Client Architecture Location budget CSIC RGA Arq Barcelona ---- Data State Surface Project Completed ---- 1998 Observations: Filtration and Water treatment Design for the research water tanks. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 18 de 31
  • 19. 4.5. – NURSING HOMES MEETING POINT BUILDING IN CAMP CLAR Installation Client Architecture Location budget AYTO. Jordi Marcè Tarragona 712.133€ TARRAGONA State Surface Data Project In progress 2.031,65m² 2009 Observations: Meeting Point Building in Camp Clar (Tarragona). Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Energetic Efficiency and Acoustic Design. CENTER FOR DISABLED PEOPLE Installation Client Architecture Location budget CÓDIGO IMSERSO Rabanedo(León 3.900.000 € ARQUITECTURA Data State Surface Project Completed 13.400 m2 2005 Observations: 123 rooms, auditorium 135 seats. Performances: Installations MEP Execution Design, Installations MEP Works Supervision. NURSING HOME COMPLEX Installation Client Architecture Location budget Villajoyosa URBIS ANGEL ASENJO 4.500.000 € (Alicante) Data State Surface Project Completed 16.500 m2 2004 Observations: 3 buildings with 40 apartments y 150 rooms. Performances: Installations MEP Execution Design, Installations MEP Works Supervision. Página 19 de 31
  • 20. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget TYM Coslada AMMA 2.100.000 € ASOCIADOS (Madrid) Data State Surface Project Completed 10.100 m2 2003 Observations: 164 rooms. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget TYM Vicálvaro AMMA 2.300.000 € ASOCIADOS (Madrid) Data State Surface Project Completed 10.450 m2 2002 Observations: 147 rooms. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget TYM Colmenar Viejo AMMA 2.275.000 € ASOCIADOS (Madrid) Data State Surface Project Completed 10.400 m2 2002 Observations: 164 rooms. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. Página 20 de 31
  • 21. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget Puente de TYM AMMA Vallecas 2.250.000 € ASOCIADOS (Madrid) Data State Surface Project Completed 10.400 m2 2002 Observations: 147 rooms. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget TYM Arganzuela - AMMA 2.100.000 € ASOCIADOS Madrid Data State Surface Project Completed 10.500 m2 2002 Observations: 162 rooms. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. MENTALLY HANDICAPPED CENTER “SAN JOSE” Installation Client Architecture Location budget GOBIERNO TYM Pamplona 1.660.000 € DE NAVARRA ASOCIADOS Data State Surface Project Completed 7.700 m2 2001 Observations: 164 rooms. Performances: Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 21 de 31
  • 22. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget JOSE LUIS Poio URBIS 1.550.000 € PEREIRO (Pontevedra) Data State Surface Project Completed 6.250 m2 2003 Observations: 115 rooms. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. RESIDÈNCIA CREU DE PALAU EN GIRONA Installation Client Architecture Location budget Crous GISA Grabuleda Girona 2.448.573 € Arq State Surface Data Project Completed 9.252 m2 2003 Observations: Reforma Residencia Creu de Palau en Girona Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. NURSING HOME AND DAY CENTER EN ST. FELIU DE GUÍXOLS Client Architecture Location Installation budget AYTO. ST. FELIU DE Sant Feliu de Guíxols Jordi Casadevall 500.000 € GUÍXOLS (Girona) State Surface Data Project 2 Completed 3380 m 1997 Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design. NURSING HOME AND DAY CENTER EN EMPURIABRAVA Client Architecture Location Installation budget AYTO. Palomeras Empuriabrava (Girona) 1.997.000 € EMPURIABRAVA Arquitectes State Surface Data Project Completed 13.500 m2 2006 Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design. Página 22 de 31
  • 23. NURSING HOME URBIS Client Architecture Location Installation budget URBIS Reyal Urbis, S.A. Badalona 2.208.274 € State Surface Data Project Completed 8.522 m² 2004 Observations: Nursing home and Parking in Badalona. Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 23 de 31
  • 24. 5. - ENERGETIC EFFICIENCY DEPARTMENT 5.1. - PRESENTATION PGI ENGINEERING created in 2006 the Department of Energy efficiency in the Building, conscious of the need of a rational use of the energy and also to give response to a few needs of the market with regard to the new normative frame in the energetic area. Understanding that the Building sector is one of the main energetic consumers, it is important to work from the initial phase of development of the project aiming to obtain energetic important improvements that will reverberate positively in the whole building, in the air quality, in his movement, in the comfort of the persons and likewise in the optimization of equipments to obtain as final result a better saving. 5.2. - OBJECTIVES To give technical advice to our clients in order to obtain an optimized design of the building, the installations and bringing the necessary tools for the energetic management of the Buildings, in view to improve the savings and the energetic efficiency during the life of the building. 5.3. - AREAS AND SERVICES The services that our department is offering are structured in four strategic areas which let us meet most of the requirements of our clients in the energetic saving field. We are provided with a professional human team highly compromised, qualified and motivated, with a working methodology focused in the innovation and the continuous improvement of the quality assurance and to give a high added value services. ENERGETIC ENERGETIC SERVICES ENGINEERING AREA AREAS BUILDING I+D+i ENERGETIC AREA CONSULTING AREA Página 24 de 31
  • 25. 5.3. a-ENERGETIC ENGINEERING AREA Implementation of measures of energy savings and energetic efficiency referring as well the enclosure design as the installations from the early stage until the completion of the project. Using powerful software to achieve several simulation typologies allows us to optimize the final cost of the building. Compliance with the regulations of the CTE-DB-HE Energetic Qualification of the Buildings– Project Phase Energetic study of the building enclosure Energetic study of the installations MEP Energetic study of the building (EED) Energetic Qualification of the Buildings – Completion of the Work Phase. Justification of the Regulations of Water Saving Projects of renewable energy sources. Project of Justification of the Regulations of Thermal and Photovoltaic Solar Collection. 5.3. b-ENERGETIC SERVICES AREA Implementation of working methods which will allow to reduce the energy consumption and to improve the energetic efficiency in a steady way during the life of the building according the established planning to reach the defined objectives in the strategic plan of the company. Feasibility study auditing Energetic audit. Improvement proposals. Planning for the verification and measurement of the Savings (IPMVP) Maintenance Planning Energy Management Implementation of the proposals and Commissioning Training and Warning Technology. Implementation of the collaborative tools for the managing tasks. Commissioning Equipment Investment projects Assessment to the client Periodic Check and Follow-up 5.3. c-ENERGETIC CONSULTING AREA We assess our clients regarding the current and future energetic model in such a way to provide them with the maximum information to take decisions regarding several actions in environment and energy topics which can concern them in the future. We work on the search of strategies and solutions that will allow our clients to reduce the energy consumption, the CO2 emissions and to make environment improvements. All this will have an impact on his activity and will increase competitiveness. Página 25 de 31
  • 26. Saving and energetic efficiency guides Implementation of renewable energy sources analysis Implementation of high technology and efficiency solutions Participation in technical days and presentation in the energy field Knowledge transfer/ Training to companies, associations, technical colleges. Knowledge transfer /Training to universities, teaching. Management and processing of the regional and state grants. Consulting in the Energy Management of the organization. Consulting in the Energy Management of the whole building. Consulting for the development of the Planning for the verification and measurement of the Energy and Water Savings. Feasibility study energy auditing Energetic classification of the building Certification of the Sustainable Building LEED Certification of the Sustainable Building “green building” Certification of Energy Management Auditing in the energetic management system. Processing of the Grants 4.3. d- I+D+i AREA Engagement in research projects, development of research strands with the universities and the administration with the clear commitment of improving the systems, the technologies, the materials, the working methodologies etc…in such a way thay we can be able to minimize the energetic consumption having a positive impact in the environment. I+D+i projects Energy research strands collaborating with the universities. Research strands with Technology companies. 4.4. - WORKS CÁMARA DE COMERCIO DE BARCELONA CORPORATE BUILDING Date: 2009 Location: Barcelona Area: 20.500 m2 Energy certification: A Status: in draft Energy study for architectural tender Double-skin facade optimization using simulation software Design of high performance air conditioning and lighting installation Client: CÁMARA DE COMERCIO DE BARCELONA. Página 26 de 31
  • 27. BANCO DE SABADELL OFFICE BUILDING Date: 2009 Location: Sant Cugat del Vallès Area: 31.592 m2 Energy certification: B Status: under construction Energy study Critical facades optimization Air conditioning machinery selection Heating/Cooling production and lighting optimization LEED certification in process Client: BANCO DE SABADELL, S.A. COMISIÓN DEL MERCADO DE LAS TELECOMUNICACIONES OFFICE BUILDING Date: 2009 Location: Barcelona Area: 18.523 m2 Energy certification: B Status: Finished Energy study Critical facades optimization Air conditioning machinery selection Lighting optimization ICAEN grant management for green buildings Client: GRUPO INMOBILIARIO CASTELLVÍ PUERTO VENECIA SHOPPING CENTER Date: 2008 Location: Zaragoza Area: 275.000 m2 Status: under construction Energy study Critical facades and sunscreen optimization using simulation software Sunscreen design: expanded metal rotating facades with solar tracking system Client: EUROFUND INVESTMENTS ZARAGOZA, S.L. BARCELONA SUPERCOMPUTING CENTER BUILDING Date: 2008 Location: Barcelona Area: 12.597 m2 Energy certification: B Status: under construction Energy study Critical facades optimization Air conditioning machinery selection Lighting optimization ICAEN grant management for green buildings Client: CENTRO NACIONAL DE SUPERCOMPUTACÓN – BSC Página 27 de 31
  • 28. HOSPITAL DEL MAR Date: 2008 Location: Barcelona Area: 92.542 m2 Status: under construction Energy study Critical facades optimization Air conditioning machinery and Heating/Cooling production selection Lighting optimization Client: CONSORCI SANITARI DE BARCELONA Estudi 21 juny – solstici d’estiu TORRE ONA BUILDING Date: 2008 Location: Barcelona Area: 32.000 m2 Energy certification: A Status: in draft Energy study Critical facades optimization Sunscreen design: expanded metal facades / natural light Client: BIMSA – AYUNTAMIENTO DE BARCELONA RBA EDITORES CORPORATE BUILDING Date: 2007 Location: Barcelona Area: 26.755 m2 Energy certification: B Status: Finished Energy study Critical facades optimization Design of high performance air conditioning and lighting installation ICAEN grant management for green buildings Client: RBA DIVISIÓN DE INMUEBLES, S.L. IGUZZINI ILUMINAZIONE CORPORATE BUILDING Date: 2007 Location: Sant Cugat del Vallès Area: 9.000 m2 Status: under de construction Energy study Critical facades optimization and sunscreen design using simulation software Sunscreen design: expanded metal rotating facades with solar tracking system Client: IGUZZINI ILUMINAZIONE ESPAÑA, S.A. Página 28 de 31
  • 29. MEDIATIC 22@ OFFICE BUILDING Date: 2006 Location: Barcelona Area: 23.105 m2 Status: Finished Energy study Critical facades, air conditioning machinery and lighting optimization Control of ETFE skin 30% global energy savings LEED certification in process Client: CONSORCIO DE LA ZONA FRANCA LAYETANA INMOBILIARIA OFFICE BUILDING Date: 2006 Location: Hospitalet de Llobregat Area: 12.634 m2 Energy certification: A Status: Finished Energy study LEED Certification obtained ICAEN grant management for green buildings Client: LAYETANA DESARROLLOS INMOBILIARIOS, S.L. UNIVERSITAT DE BARCELONA BUILDINGS ENERGY AUDIT Date: 2010 Location: Barcelona Area: 130.000 m2 – 7 buildings Current consumption: Electricity17 GWh/year; Gas 9.7 GWh/year; Water 95,000 m3/year Client: UNIVERSITAT DE BARCELONA GENERALITAT DE CATALUNYA BUILDINGS ENERGY AUDIT Date:2008 - 2009 Location: Cataluña Energy audit in all Generalitat de Catalunya buildings Design of remote management system in 200 Community Health Centers and consumption analysis Client: GENERALITAT DE CATALUNYA BARCELONA LAW COURTS – CITY OF JUSTICE COMISSIONING MANAGEMENT Date: 2006 Location: Barcelona Area: 233.000 m2 Comissioning Management of all buildings located in Barcelona City of Justice Client: Urbs ludex et Causidicus (URBICSA) Página 29 de 31
  • 30. 6.-ARCHITECTS These are the architects with we have had the pleasure and AAAR EMBT (MIRALLES - TAGLIABUE) NICOLAU PARÉS, CARLES AB-A EMMA OCTAVIO MESTRE ABALOS & HERREROS ESPIGA-MONEO ARCHITECTURES OVE ARUP PARTNERS ACP ESTUDIO ARQ. JORGE SALVAT PASCUAL I ARGENTÉ, JOAN ALIA ESTUDIO LAMELA PICH-AGUILERA ARCHITECTURES ALLENDE ARCHITECTURES ESTUDIO VILLARROEL POMAR MARIN. ÁNGEL M. ALONSO & BALAGUER FARGAS ASSOCIATS PRADA I JAÉN, PERE DE ARQUITECTURA ALTERNATIVA FERRATER, CARLOS PROYECTOS A+U ARQ-SOCIS FINA, PERE PERÁLVAREZ RUIZ, ANTONIO ARTEM ARCHITECTURES F.I.V.Z. RAVENTÓS, IGNASI ARTIGUES & SANABRIA F.O.A. REDONDO I DOMÍNGUEZ, ERNEST ARQUITECTURA OSCAR TUSQUETS FONT – VIÑOLAS ARCHITECTURES REID FENWICK. ARREMENTERIA, IÑAKI G.V. ARQUITECTES ASSOCIATS RELIMAC RGA (RIERA-GUTIÉRREZ & ARROYO, EDUARDO GOAR ASSOCIATS) AURREKOETXEA, IÑAKI GASULLA ARQUITECTURA ROBUFFO, ROBERTO B.S.T. (BONET, STEGMAN, GIBAULT-LAGACHE, ROMEU, ENRIQUE TIANA) ARCHITECTURES BADOSA/DOÑATE, GIMENO I GONZÁLEZ, PILAR ROS I BALLESTEROS, JORDI ARCHITECTURES BLANC-CONCA ARCHITECTURES GUALLART FURIÓ, VICENTE RUBIO&ALVAREZ-SALA BORO, J. GUIBERNAU, JOAN RUIZ, ELENA BORRELL ARCHITECTURES INDYA SALAZAR, JAVIER BRU, EDUARD JUNQUERA, JERÓNIMO SÁNCHEZ GIL, EMILIO BRULLET I ASSOCIATS, S.L. JUVANTENY I REIXACH, F. XAVIER SANS GIRONELLA, CÉSAR BRINGAS & BELLOD KATSURA, ARQUIT. Y URBANISMO SANTOS, JOSÉ ANGEL CALAFELL I LAFUENTE, EDUARD KM+P (KAUFMAN, MEEKS) SANZ RUEDA, ÁNGEL CALVO ONTORIA, ELADIO L35 SGA ESTUDIOS (VITORIA) CAPELLA I SAMPER, JULI LARROSA I PADRÓ, MANEL SISTERNAS I SURIS, JOSEP LLUIS CASADEVALL I DALMAU, JORDI LÁZARO, CARLOS SMITH, JOSÉ S.O.B. ARQUITECTES CHAPMAN TAYLOR LÓPEZ, FERNANDO (SOLER/BATALLA) CHURTICHAGA+CUADRA SALCEDO LÓPEZ, VÍCTOR SOLÀ I BUSQUETS, PERE CLOTET.PARICIO & ASSOCIATS LOSADA, RAMÓN SOLID ARQUITECTURA CÓDIGO ARQUITECTURA MARTÍN MIRANDA, JOSÉ MANUEL SUÁREZ, JUAN JOSÉ COLLADO, ÁNGEL MARTORELL BOHIGAS MACKAY SURÍS I SALA, JOAN S. COLMENARES, MIGUEL MATEO I MARTÍNEZ, JOSEP-LLUIS SUTRÍAS I FIGUERAS, JORDI COOT ARQUITECTURA MATEU POMAR, ELENA T.A.C. CROUS-GRABULEDA-RIERA METRICA TIP TDB ARQUITECTURA, CRUZ Y ORTIZ, ARCHITECTURES MESTRE ARAMENDIA, OCTAVIO T.D.A. TÉCNICA DAVID CHIPPERFIELD ARCHITECTS MINGO & ARCHITECTURES TYM ASOCIADOS DÍAZ, JOSÉ LUÍS MONEO, RAFAEL ÚBEDA, PASCUAL DOMÍNGUEZ, HORACIO MXC (MONSÓ, CONCEJAL) ECHEVARRÍA SAINZ, FEDERICO NADAL MARCÈ, ARCHITECTURES Página 30 de 31
  • 31. 7.-DEVELOPPERS ACCOR FORUM 2004 PRESTIGE HOTELS-HOTEL ROSINCS ACIEROID FUNDACIÓ PROMEDIC PRIMA INMOBILIARIA ADFINSA GALERIES TARRAGONA, S.A. PROCOM DESARROLLOS URBANOS AGBAR GAS NATURAL PROCREU, S.L. AGUIRRE NEWMAN GERENS PROINOSA ARQUITECTURA AIG LINCOLN ESPAÑA GENERALITAT DE CATALUNYA PROMODEICO AMENA GINKOPLANET CLIENTA TORMA APEX GIVAUDAN ROURE, S.A. PUNT DIARI ARQUITÈCNICS G.M.P. RAFAEL HOTELES ASEPEYO GOLF EMPORDÀ RED ELÉCTRICA DE ESPAÑA RESIDENCIAL PEDRALBES - CARRERAS, AUTOLICA-QUADIS GRUP FERRAN S.L. BLUENET GRUP TÈCNIC RETEVISIÓN MÓVILES, S.A. BOVIS LEND LEASE GRUPO PALOMO RETEVISIÓN S.A. BOUYGUES INMOBILIARIA GRUPO REYAL REYAL HOTELES BUY BUSINESS GRUPO V. MUÑOZ-POMER RIOFISA CAMPS MOTOR, S.A. HABITAT ROCKAL PROPERTIES CANDESA HEWLETT PACKARD RODAMCO CASER HINES S B GRUP – SUBIRATS BERENGUER, S.A. CENTRO INSULAR DE DEPORTES HOTUSA SAT-SUIS CHAMPION – GRUPO IDEA SEAT CONTINENTE CIMEX ING REAL STATE SEGURFONDO DE INVERSIÓN COBEGA INMOBILIARIA COLONIAL SELENIUM CONSTRUCT CODECSA, S.A. INMOBILIARIA PUIGSACALM SERVIHABITAT CONDEMINAS INMOBILIARIA URBIS SFERA JOVEN CONSTRUCTORA ÁVALOS JAIME MASCARÓ, S.A. SIMON, S.A. CONSTRUCTORA SAN JOSÉ JOYERÍA SUÁREZ TASINSA COPCISA LANDSCAPE TELEFÓNICA COPERFIL LAYETANA TERRASSA, S.L. TESTA INMUEBLES CORSAN - CORVIAM LAR GROSVENOR TIFSA COYMAR M & S MODE TORRA, S.A. DIAGONAL MAR RESIDENCIAL MANGO TORRE BONANOVA GRUP INMOBILIARI EDICSA MAXOR TRADE CENTER HOTEL, S.L. EL CORTE INGLÉS MERKAMUEBLE TRANSPORTES AZKAR ELECNOR MIGDIA PROMOCIÓ TRAVEL LODGE HOTELES E.M.V. MADRID MIQUEL ALIMENTACIÓ UGC CINE CITÉ ESPAÑA ENRESA M.J.C.M. INMOBILIARIA UNIVERSAL STUDIOS PORT AVENTURA ERALAN NATUR HOTEL CATALUNYA, S.L. UNIVERSIDAD DE DEUSTO ESPAIS NECSO UNIVERSITAT DE GIRONA FALGÀS NEXITY ESPAÑA VALLEHERMOSO FERROVIAL-AGROMAN NIKE VIAMED SALUD FERROVIAL INMOBILIARIA PANINI ESPAÑA, S.A. VILA-SABARICH, S.L. FINCAS PEDRALBES-STELGROC PERFUMERÍA GAL ZUMOS PAGO FIRA 2.000 PITNEY BOWNES FLEX P. FÚNEBRES B.LLOBREGAT Página 31 de 31