SlideShare uma empresa Scribd logo
1 de 7
Baixar para ler offline
LOCAL FINANCE INSTITUTIONS
AND GREEN FINANCE
PROPARCO‘s Experience – S. LE ROY
AFD-IDB-OECD Workshop – 3rd November 2015
S I N C E 2 0 0 9 , P R O PAR C O P R O V I D E D € 4 5 0 M
TO WAR D S G R E E N F I N AN C E T H R O U G H L F I
» €450 M OF PROJECTS SIGNED BETWEEN 2010- 2015
» 5 COUNTRIES AND 1 MULTI- COUNTRY PROJECT IN LATIN AMERICA, ASIA AND MIDDLE EAST
» 14 CLIENTS
LATIN AMERICA &
THE CARIBBEAN
€ 120m
MEDITERRANEAN &
MIDDLE EAST
€ 170m
ASIA
€ 160m
» RENEWABLE ENERGY PROJECTS: HYDRO, WIND,
BIOMASS, SOLAR…
PROPARCO is involved in several renewable energy projects for more than €330M,
as:
- Hydro power and wind turbine in Turkey with Garanti Bank for € 50m,
- Hydro or wind power plants in Sri Lank with NDB for $ 60m,
- Hydro power plant in Panama with Banco Aliado for $ 20m
» ENERGY EFFICIENCY: GREEN BUILDING,
COGENERATION, TRANSPORT, …
PROPARCO supports the financing of energy efficiency projects in Turkey and
China with:
- AKLEASE: financing energy efficiency projects by way of lease contracts:
finance a tri-generation system to provide electricity, heating and cooling
energy for a shopping center
- IS BANK: € 50m dedicated to housing loans meeting Turkish energy efficiency
standards
- FEH in China: € 25m to finance clean buses via a guaranty
G R E E N F I N AN C E I S D E F I N E D AS R E N E WAB L E
E N E R G Y O R E N E R G Y E F F I C I E N C Y
F I N AN C I N G V I A L O N G T E R M C R E D I T
FAC I L I T Y
 Amount: $ 15- 60M
 Currency: EUR or USD
 Term: up to 10 years with grace
period
 Commercial terms: market related
terms (Euribor/ Libor + margin)
 Eligible projects: renewable
energy or energy efficiency
 E&S Requirement:
implementation of an ESMS
CONDITIONS
 Currency mismatch- projects
must generate EUR or USD income
or swap market must be available
 Resource adequacy: credit
terms (rates), timeline for
disbursment…
 Need for technical assistance
to better identify and assess the
projects in the field of energy
efficiency
 Reputational risk:
Responsibility of E&S DD and
impacts?
LIMITS
C AS E S T U D Y 1 - E N E R G Y E F F I C I E N C Y I N
T U R K E Y
One of the few countries where we have been able to finance
energy efficiency projects
» Housing loans for new houses complying with local EE regulation
» Financing of tri-generation equipment for a shopping center
Drivers:
 Primary demand for energy is growing rapidly due to
demographic growth as well as economic growth.
 Turkey is a net importer of energy, which relies on imports of
fossil fuel for its thermal production
Public policy promoting energy efficiency to reduce the growing
demand of energy
But generally, those projects are hardly financed without technical
assistance to support LFI
for energy audits, project structuring, assessment of projects
eligibility…
C AS E S T U D Y 2 - F I N AN C I N G O F R E N E WAB L E
E N E R G Y I N PAN A M A
A country with important potential for renewable energy
» $20m facility: 3 hydro power plants on Rio Piedra in Chiriqui Province
» $30m facility : 4 hydro power plants in Chiriqui Province and 1 wind power
project
Rationale
 Willingness of the government to promote these new sources of
energy
 Strong involvement of commercial banks in financing those
projects
However, hydro projects are considered as high risk project from
an E&S point of view and Chiriqui river a sensitive area
E&S REQUIREMENTS
» Development and implementation of an ESMS according with E&S
action plans negociated between the borrower and Proparco
» Assessment criteria and action plans for high risk projects more
restrictive than those laid down by the ANAM (local agency for the
environment)
» Definition of eligibility criteria for hydro power plants (capicity max
of 20MW – height of dam limited to 15m)
E n t r e p r e n d r e p o u r u n a v e n i r d u r a b l e
THANK YOU

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

2.1 obeso sep2015_nafin_re_geothermal
2.1 obeso sep2015_nafin_re_geothermal2.1 obeso sep2015_nafin_re_geothermal
2.1 obeso sep2015_nafin_re_geothermal
 
5.3 ruhweza undp
5.3 ruhweza undp5.3 ruhweza undp
5.3 ruhweza undp
 
4.2 frei oldenburg-giz_2
4.2 frei oldenburg-giz_24.2 frei oldenburg-giz_2
4.2 frei oldenburg-giz_2
 
3.2 wetherill ndf
3.2 wetherill ndf3.2 wetherill ndf
3.2 wetherill ndf
 
Session 2 - Presentation by Christopher Knowles, Green for Growth Fund
Session 2 - Presentation by Christopher Knowles, Green for Growth FundSession 2 - Presentation by Christopher Knowles, Green for Growth Fund
Session 2 - Presentation by Christopher Knowles, Green for Growth Fund
 
4.1 bernadat afd
4.1 bernadat afd4.1 bernadat afd
4.1 bernadat afd
 
Session 6 - Presentation by Manuel Adamini, Climate Bonds Initiative
Session 6 - Presentation by Manuel Adamini, Climate Bonds InitiativeSession 6 - Presentation by Manuel Adamini, Climate Bonds Initiative
Session 6 - Presentation by Manuel Adamini, Climate Bonds Initiative
 
Session 6 - Preasentation by Hulya Kurt, Industrial Development Bank of Turkey
Session 6 - Preasentation by Hulya Kurt, Industrial Development Bank of TurkeySession 6 - Preasentation by Hulya Kurt, Industrial Development Bank of Turkey
Session 6 - Preasentation by Hulya Kurt, Industrial Development Bank of Turkey
 
5.1 coello unep
5.1 coello unep5.1 coello unep
5.1 coello unep
 
London - London Greenfunds by Matthew Pencharz at GIB Summit
London - London Greenfunds by Matthew Pencharz at GIB SummitLondon - London Greenfunds by Matthew Pencharz at GIB Summit
London - London Greenfunds by Matthew Pencharz at GIB Summit
 
5.2 corfee morlot-oecd
5.2 corfee morlot-oecd5.2 corfee morlot-oecd
5.2 corfee morlot-oecd
 
Meridiam - ESG Approach by Julia Prescot at GIB Summit
Meridiam - ESG Approach by Julia Prescot at GIB SummitMeridiam - ESG Approach by Julia Prescot at GIB Summit
Meridiam - ESG Approach by Julia Prescot at GIB Summit
 
Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014
Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014
Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014
 
Building the Energy Efficiency Financing Market
Building the Energy Efficiency Financing MarketBuilding the Energy Efficiency Financing Market
Building the Energy Efficiency Financing Market
 
4.3 kasterine itc
4.3 kasterine itc4.3 kasterine itc
4.3 kasterine itc
 
EPA H2020 SC5 Info Day: Horizon 2020 – Societal Challenge 5 Can we improve ...
 EPA H2020 SC5 Info Day: Horizon 2020 – Societal Challenge 5 Can we improve ... EPA H2020 SC5 Info Day: Horizon 2020 – Societal Challenge 5 Can we improve ...
EPA H2020 SC5 Info Day: Horizon 2020 – Societal Challenge 5 Can we improve ...
 
EPA H2020 SC5 Info Day: Reflections on Coordinating a Successful H2020 Applic...
EPA H2020 SC5 Info Day: Reflections on Coordinating a Successful H2020 Applic...EPA H2020 SC5 Info Day: Reflections on Coordinating a Successful H2020 Applic...
EPA H2020 SC5 Info Day: Reflections on Coordinating a Successful H2020 Applic...
 
EPA H2020 SC5 Info Day: Involving stakeholders to ask the right questions, H...
 EPA H2020 SC5 Info Day: Involving stakeholders to ask the right questions, H... EPA H2020 SC5 Info Day: Involving stakeholders to ask the right questions, H...
EPA H2020 SC5 Info Day: Involving stakeholders to ask the right questions, H...
 
Ethiopia CRGE and SRM - Challenges, lessons learnt and good practice in regar...
Ethiopia CRGE and SRM - Challenges, lessons learnt and good practice in regar...Ethiopia CRGE and SRM - Challenges, lessons learnt and good practice in regar...
Ethiopia CRGE and SRM - Challenges, lessons learnt and good practice in regar...
 
EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:...
 EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:... EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:...
EPA H2020 SC5 Info Day: Research and Innovation Needs and potential Impacts:...
 

Semelhante a 2.4 le roy_présentation workshop green finance

New Energy Conference-Haitham Kamhiyeh's Speech
New Energy Conference-Haitham Kamhiyeh's SpeechNew Energy Conference-Haitham Kamhiyeh's Speech
New Energy Conference-Haitham Kamhiyeh's Speech
EDAMA
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
Matt Meaker
 

Semelhante a 2.4 le roy_présentation workshop green finance (20)

From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...
From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...
From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...
 
Abengoa project finance
Abengoa project financeAbengoa project finance
Abengoa project finance
 
Blue economy investment facility
Blue economy investment facility Blue economy investment facility
Blue economy investment facility
 
Example
ExampleExample
Example
 
Cantabria Sea of Innovation Conference Invitation
Cantabria Sea of Innovation Conference InvitationCantabria Sea of Innovation Conference Invitation
Cantabria Sea of Innovation Conference Invitation
 
Renewable Energy 2018_FMO Dutch Development bank
Renewable Energy 2018_FMO Dutch Development bankRenewable Energy 2018_FMO Dutch Development bank
Renewable Energy 2018_FMO Dutch Development bank
 
Into the Future - Energy Efficient Mortgages? - Dublin 24.11.2016
Into the Future - Energy Efficient Mortgages? - Dublin 24.11.2016Into the Future - Energy Efficient Mortgages? - Dublin 24.11.2016
Into the Future - Energy Efficient Mortgages? - Dublin 24.11.2016
 
Renewable energy-in-egypt-the-green-opportunity
Renewable energy-in-egypt-the-green-opportunityRenewable energy-in-egypt-the-green-opportunity
Renewable energy-in-egypt-the-green-opportunity
 
Current Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBPCurrent Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBP
 
New Energy Conference-Haitham Kamhiyeh's Speech
New Energy Conference-Haitham Kamhiyeh's SpeechNew Energy Conference-Haitham Kamhiyeh's Speech
New Energy Conference-Haitham Kamhiyeh's Speech
 
Innovative Financing Mechanisms and Tools
Innovative Financing Mechanisms and ToolsInnovative Financing Mechanisms and Tools
Innovative Financing Mechanisms and Tools
 
Innovative Financing Mechnisms and Tools
Innovative Financing Mechnisms and ToolsInnovative Financing Mechnisms and Tools
Innovative Financing Mechnisms and Tools
 
20160323 EEP opens calls for proposals
20160323 EEP opens calls for proposals20160323 EEP opens calls for proposals
20160323 EEP opens calls for proposals
 
Energy Savings Insurance: Ivo Besselink, Green Climate Fund.pdf
Energy Savings Insurance: Ivo Besselink, Green Climate Fund.pdfEnergy Savings Insurance: Ivo Besselink, Green Climate Fund.pdf
Energy Savings Insurance: Ivo Besselink, Green Climate Fund.pdf
 
Water Management Financing in the Caribbean - Part 4
Water Management Financing in the Caribbean - Part 4 Water Management Financing in the Caribbean - Part 4
Water Management Financing in the Caribbean - Part 4
 
Presentation of Mr. José Manuel Fernández Riveiro - Secretariat of the Union ...
Presentation of Mr. José Manuel Fernández Riveiro - Secretariat of the Union ...Presentation of Mr. José Manuel Fernández Riveiro - Secretariat of the Union ...
Presentation of Mr. José Manuel Fernández Riveiro - Secretariat of the Union ...
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
 
afdb_presentation.pptx
afdb_presentation.pptxafdb_presentation.pptx
afdb_presentation.pptx
 
Public financial mechanisms that enhance the viability of ESCO projects, Alex...
Public financial mechanisms that enhance the viability of ESCO projects, Alex...Public financial mechanisms that enhance the viability of ESCO projects, Alex...
Public financial mechanisms that enhance the viability of ESCO projects, Alex...
 
BUILD UPON: Luca Bertalot - Road Map for an Energy Efficient Mortgage
BUILD UPON: Luca Bertalot - Road Map for an Energy Efficient MortgageBUILD UPON: Luca Bertalot - Road Map for an Energy Efficient Mortgage
BUILD UPON: Luca Bertalot - Road Map for an Energy Efficient Mortgage
 

Mais de Development Co-operation Directorate (DCD-DAC)

Mais de Development Co-operation Directorate (DCD-DAC) (20)

TOSSD 2020 Data - Key Figures
TOSSD 2020 Data - Key FiguresTOSSD 2020 Data - Key Figures
TOSSD 2020 Data - Key Figures
 
TOSSD 2020 data - Key Figures
TOSSD 2020 data - Key FiguresTOSSD 2020 data - Key Figures
TOSSD 2020 data - Key Figures
 
OECD Financing for Sustainable Development
OECD Financing for Sustainable Development OECD Financing for Sustainable Development
OECD Financing for Sustainable Development
 
Summary DSI OECD seminar on triangular co-operation
Summary DSI OECD seminar on triangular co-operation Summary DSI OECD seminar on triangular co-operation
Summary DSI OECD seminar on triangular co-operation
 
Market Place on Triangular Co-operation Projects
Market Place on Triangular Co-operation ProjectsMarket Place on Triangular Co-operation Projects
Market Place on Triangular Co-operation Projects
 
PF4SD 2020 expert discussions key takeaways
PF4SD 2020 expert discussions key takeawaysPF4SD 2020 expert discussions key takeaways
PF4SD 2020 expert discussions key takeaways
 
Summary 2019 International Meeting on Triangular Co-operation
Summary 2019 International Meeting on Triangular Co-operationSummary 2019 International Meeting on Triangular Co-operation
Summary 2019 International Meeting on Triangular Co-operation
 
Agenda 2019 International Meeting on Triangular Co-operation
Agenda 2019 International Meeting on Triangular Co-operationAgenda 2019 International Meeting on Triangular Co-operation
Agenda 2019 International Meeting on Triangular Co-operation
 
Arab Concessional Financing for Development
Arab Concessional Financing for DevelopmentArab Concessional Financing for Development
Arab Concessional Financing for Development
 
Financing for Development Series: ECIS
 Financing for Development Series: ECIS Financing for Development Series: ECIS
Financing for Development Series: ECIS
 
Reporting issues. Providers of development co-operation beyond the DAC.
Reporting issues. Providers of development co-operation beyond the DAC.Reporting issues. Providers of development co-operation beyond the DAC.
Reporting issues. Providers of development co-operation beyond the DAC.
 
OECD 2019 Civil Society Days Conference Programme
OECD 2019 Civil Society Days Conference ProgrammeOECD 2019 Civil Society Days Conference Programme
OECD 2019 Civil Society Days Conference Programme
 
Conference highlights - OECD Civil Society Days 2019
Conference highlights - OECD Civil Society Days 2019Conference highlights - OECD Civil Society Days 2019
Conference highlights - OECD Civil Society Days 2019
 
Amountsmobilisedfromtheprivatesectorbydevelopmentfinanceinterventionsin201217...
Amountsmobilisedfromtheprivatesectorbydevelopmentfinanceinterventionsin201217...Amountsmobilisedfromtheprivatesectorbydevelopmentfinanceinterventionsin201217...
Amountsmobilisedfromtheprivatesectorbydevelopmentfinanceinterventionsin201217...
 
Enabling Civil Society for Sustainable Development: Select Survey Findings
Enabling Civil Society for Sustainable Development: Select Survey FindingsEnabling Civil Society for Sustainable Development: Select Survey Findings
Enabling Civil Society for Sustainable Development: Select Survey Findings
 
Engaging Civil Society Organisations through Triangular Co-operation
Engaging Civil Society Organisations through Triangular Co-operationEngaging Civil Society Organisations through Triangular Co-operation
Engaging Civil Society Organisations through Triangular Co-operation
 
Summary GPI side-event in BAPA+40 (2019)
Summary GPI side-event in BAPA+40 (2019)Summary GPI side-event in BAPA+40 (2019)
Summary GPI side-event in BAPA+40 (2019)
 
Factsheet - Private sector engagement through triangular co-operation
Factsheet - Private sector engagement through triangular co-operationFactsheet - Private sector engagement through triangular co-operation
Factsheet - Private sector engagement through triangular co-operation
 
Summary GPI side-event in Global South-South Development Expo (2018)
Summary GPI side-event in Global South-South Development Expo (2018)Summary GPI side-event in Global South-South Development Expo (2018)
Summary GPI side-event in Global South-South Development Expo (2018)
 
Trilateral Cooperation Experiences and Challenges - Seminar Brasilia 2017
Trilateral Cooperation Experiences and Challenges - Seminar Brasilia 2017Trilateral Cooperation Experiences and Challenges - Seminar Brasilia 2017
Trilateral Cooperation Experiences and Challenges - Seminar Brasilia 2017
 

Último

💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
nirzagarg
 

Último (20)

Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programs
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 

2.4 le roy_présentation workshop green finance

  • 1. LOCAL FINANCE INSTITUTIONS AND GREEN FINANCE PROPARCO‘s Experience – S. LE ROY AFD-IDB-OECD Workshop – 3rd November 2015
  • 2. S I N C E 2 0 0 9 , P R O PAR C O P R O V I D E D € 4 5 0 M TO WAR D S G R E E N F I N AN C E T H R O U G H L F I » €450 M OF PROJECTS SIGNED BETWEEN 2010- 2015 » 5 COUNTRIES AND 1 MULTI- COUNTRY PROJECT IN LATIN AMERICA, ASIA AND MIDDLE EAST » 14 CLIENTS LATIN AMERICA & THE CARIBBEAN € 120m MEDITERRANEAN & MIDDLE EAST € 170m ASIA € 160m
  • 3. » RENEWABLE ENERGY PROJECTS: HYDRO, WIND, BIOMASS, SOLAR… PROPARCO is involved in several renewable energy projects for more than €330M, as: - Hydro power and wind turbine in Turkey with Garanti Bank for € 50m, - Hydro or wind power plants in Sri Lank with NDB for $ 60m, - Hydro power plant in Panama with Banco Aliado for $ 20m » ENERGY EFFICIENCY: GREEN BUILDING, COGENERATION, TRANSPORT, … PROPARCO supports the financing of energy efficiency projects in Turkey and China with: - AKLEASE: financing energy efficiency projects by way of lease contracts: finance a tri-generation system to provide electricity, heating and cooling energy for a shopping center - IS BANK: € 50m dedicated to housing loans meeting Turkish energy efficiency standards - FEH in China: € 25m to finance clean buses via a guaranty G R E E N F I N AN C E I S D E F I N E D AS R E N E WAB L E E N E R G Y O R E N E R G Y E F F I C I E N C Y
  • 4. F I N AN C I N G V I A L O N G T E R M C R E D I T FAC I L I T Y  Amount: $ 15- 60M  Currency: EUR or USD  Term: up to 10 years with grace period  Commercial terms: market related terms (Euribor/ Libor + margin)  Eligible projects: renewable energy or energy efficiency  E&S Requirement: implementation of an ESMS CONDITIONS  Currency mismatch- projects must generate EUR or USD income or swap market must be available  Resource adequacy: credit terms (rates), timeline for disbursment…  Need for technical assistance to better identify and assess the projects in the field of energy efficiency  Reputational risk: Responsibility of E&S DD and impacts? LIMITS
  • 5. C AS E S T U D Y 1 - E N E R G Y E F F I C I E N C Y I N T U R K E Y One of the few countries where we have been able to finance energy efficiency projects » Housing loans for new houses complying with local EE regulation » Financing of tri-generation equipment for a shopping center Drivers:  Primary demand for energy is growing rapidly due to demographic growth as well as economic growth.  Turkey is a net importer of energy, which relies on imports of fossil fuel for its thermal production Public policy promoting energy efficiency to reduce the growing demand of energy But generally, those projects are hardly financed without technical assistance to support LFI for energy audits, project structuring, assessment of projects eligibility…
  • 6. C AS E S T U D Y 2 - F I N AN C I N G O F R E N E WAB L E E N E R G Y I N PAN A M A A country with important potential for renewable energy » $20m facility: 3 hydro power plants on Rio Piedra in Chiriqui Province » $30m facility : 4 hydro power plants in Chiriqui Province and 1 wind power project Rationale  Willingness of the government to promote these new sources of energy  Strong involvement of commercial banks in financing those projects However, hydro projects are considered as high risk project from an E&S point of view and Chiriqui river a sensitive area E&S REQUIREMENTS » Development and implementation of an ESMS according with E&S action plans negociated between the borrower and Proparco » Assessment criteria and action plans for high risk projects more restrictive than those laid down by the ANAM (local agency for the environment) » Definition of eligibility criteria for hydro power plants (capicity max of 20MW – height of dam limited to 15m)
  • 7. E n t r e p r e n d r e p o u r u n a v e n i r d u r a b l e THANK YOU