REPUBLIC OF MOLDOVA
6TH MEETING OF THE NATIONAL POLICY
DIALOGUE ON WATER
European Union Water Initiative Plus for Eastern Partnership countries
(EUWI+)
Environment Agency Austria, Alexander Zinke, virtual, 19 November 2020
The EU-funded programme “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD,
responsible for the implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3.
This document was produced by UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views
expressed herein can in no way be taken to reflect the official opinion of the European Union or the governments of the Eastern Partnership Countries. This
document and any map included herein are without prejudice to the status of, or sovereignty over, any territory, to the delimitation of international frontiers and
boundaries, and to the name of any territory, city or area.
RESULTS 2 COUNTRY SPECIFIC DISCUSSIONS
SESSION 1
MODERNISING NATIONAL WATER POLICY AND GOVERNANCE
UPGRADING THE WATER MONITORING CAPACITIES FOR
SURFACE AND GROUNDWATER BODIES
MAIN TASKS OF EAA
Output 2.1: Adequate infrastructure and analytical tools for sound
monitoring of water
• Assess capacities and needs
• Purchase equipment to upgrade existing laboratories
• Support laboratories for accreditation
Output 2.2: Strengthened capacity on chemical, hydro-morphological,
ecological and biological monitoring of surface and groundwaters
• Provide trainings
• Prepare Monitoring Development Plans
Output 2.3: Pilot river basins management plans implemented
• Delineate surface water/groundwater bodies
• Carry out biological, ecological, chemicals surveys
• Support completion of RBMP monitoring chapters 3
1. PROCUREMENT OF LABORATORY EQUIPMENT
COMPLETED PROCEDURES AS PER 16.11.2020
for SW Laboratory of Environmental Reference Laboratory of EAM in
Chisinau to fulfil its WFD monitoring obligations
• Microwave digestion system for sample preparation.
• Atomic absorption spectrometer for heavy metals such as Cadmium,
Lead, Mercury or Nickel.
• DOC/TOC device for assessing dissolved or total organic carbon in
waters.
• Water Purification System needed in laboratory for the above-
mentioned techniques.
4
1. PROCUREMENT OF LABORATORY EQUIPMENT
PENDING PROCEDURES PER 16.11.2020
for SW Laboratory of Environmental Reference Laboratory of EAM in
Chisinau to fulfil its WFD monitoring obligations
• Gas Chromatograph to measure priority substances such as pesticides,
industrial chemical or polycyclic aromatic carbon hydrogens.
• Bench freeze drier for sample preparation of biota and sediments.
• Small laboratory equipment: laboratory dishwasher, muffle furnace,
laboratory deep freezer, UV/VIS-spectrophotometer, solvent evaporator,
orbital shaker, multimeter (pH, conductivity, dissolved oxygen), titrator
• Consumables (chemical reference materials, solvents, glassware, GC-
columns, etc.)
5
1. LAB PROCUREMENT OVERVIEW
6
EQUIPMENT CONTRACT
AWARDED
STATUS
Gas Chromatograph
16.09.2019
Shimadzu
delivered (installation
and training pending)
Atomic absorption
spectrometer
03.10.2019
Analytik Jena
completed
Microwave digestion
20.08.2019
Milestone
completed
DOC/TOC device
25.08.2019
Analytik Jena
completed
Bench freeze dryer
22.11.2019
Martin Christ
delivered (installation
and training pending)
Water purification system
03.10.2019
Lokmera
completed
Small laboratory equipment
and consumables
Proposed: VWR offer received
Solvent evaporator Proposed: LabTech offer received
AAS
WPS
Photos © EAM
2. PROGRESS IN LABORATORY ACCREDITATION
SW Laboratory of Environmental Reference Laboratory of EAM
• Successfull participation in proficiency tests for metals, trace
elements and nutrients (major ions) in 2020
• Support of a local QM expert (EUWI+ service agreement) for new
initial laboratory accreditation, i.e. preparation of needed quality
management documentation or adaptation of existing QM
documents, training of lab staff on new edition of standard EN
ISO/IEC 17025:2017, internal system audit in EAM lab
• application documents for new initial accreditation documents
were submitted to MOLDAC 23 September 2020
Outlook
• Remote audit with EAM and EUWI+ lab experts on 19 November
(virtual meeting)
• Accreditation audit by MOLDAC planned for January 2021 7
3. SURFACE WATER MONITORING DEVELOPMENT
PROGRESS DURING EUWI+
• SW Survey (MZB+PHB)
• Diatom evaluation report
• Hydro-morphology Survey
• ICPDR-JDS4 support
• Procurement of biological equipment
and taxonomic keys
• ESCS training (+4 before Q3/2019)
• DPBSRB type-specific Ecological
Status Classification System (ESCS)
for MZB
• Investigative Monitoring: 10 sites at
Ialpug basin
New: 2 training videos on PHB (diatoms)
8
OUTLOOK UNTIL END OF EUWI+
(FEB 2021)
o Guidance Delineation of SWB
o Guidance ESCS
• DPBSRB Management Plan (SW
monitoring)
• Report on MD monitoring results
• SW Monitoring Development Plan
SW MONITORING – FUTURE NEEDS
9
• Increase monitoring capacities
(personnel + know-how)
• Continue trainings
• Biological monitoring in lakes
and reservoirs (HMWB/artific.)
• Expand HYMO surveys
• Develop ESCS for other BQEs
• When all ESCS available
 Intercalibration exercise for
biology, chemistry and HYMO
© Umweltnumdesamt/Maria Deweis
Steps MZB PHB PHP MAC FIS
1 Delineate SWB Completed during EUWI+
2 Define typology Completed during EUWI+
3 Risk assessment for
SWB
Completed during EUWI+
4 Establish a compliant
sampling method
Completed
during EUWI+
Started
during
EUWI+
Still needed
5 Establish a compliant
lab method
Completed
during EUWI+
Started
during
EUWI+
Still needed
6 Gather data on biology
in a consolidated
database
Completed
during EUWI+
Started
during
EUWI+
Still needed
7 Establish a pressure-
response-relationship
Completed
during EUWI+
Still needed
8 Define criteria for type-
specific reference
(benchmark)
conditions
Completed
during EUWI+
Still needed
9 Set class boundaries
(EQR)
Completed
during EUWI+
Still needed
10 Compile all methods to
a binding guidance
document (as a basis
for the monitoring)
Still needed
More information: SW Monitoring Development Plan MD
Photo © Zornig
4. GROUNDWATER MONITORING
Achivements since autumn 2019
• Groundwater chemical survey 2019 (pesticides): 18 sites, 2
laboratories (EHGeoM, Institute of Chemistry)
• Study (2020) on proposed improvement of GW monitoring
network in the DPBSRB RBMP, including survey.
 include 15 existing springs, drill 3 new wells.
• Summer 2020: Comprehensive preparatory work for the drilling
of 3 new wells including all administrative certificates.
• Oct 2020: Start of drilling the 3 wells by EHGeoM.
• Monitoring chapter for DPBSRB Management Plan.
10
GROUNDWATER MONITORING
Outlook until End of EUWI+ (Feb 2021)
• Finalisation of drilling the 3 wells
• GW Monitoring Development Plan
• Guidance document on GWB delineation
Future needs
• Raise and secure monitoring budgets (long-term)
• Clarify responsibility for laboratory analyses of GW (organic pollutants
etc.)
• Secure monitoring capacities (personnel + know-how)
• Frequent repetition of trainings
• Purchase more sampling and field measurement equipment
• Develop MD methodology for GW status assessment (quantity, quality).
11
Petrunea
village
New
monitoring well
Petrunea village
Chișinău
12
Site Hincesti (MDDBSGWQ220)
Site Aluatu (MDDBSGWQ220)
Site Costuleni (GWB MDPRTGWQ230)
Site Frasinesti (GWB MDPRTGWQ230)
Site Viisoara (GWB MDPRTGWQ230).
Site Bursuc (GWB MDPRTGWQ510).
Site Svetlii (MDDBSGWQ220)
CONTACT
13
www.facebook.com/euwiplus/
www.euwipluseast.eu
Alexander Zinke, TL of EU MS Consortium
Contact information
alexander.zinke@umweltbundesamt.at

Mais conteúdo relacionado

Mais procurados

13.s. smith sharing of results
13.s. smith sharing of results13.s. smith sharing of results
13.s. smith sharing of resultsBill Bly
 
Introduction: Air Quality and Ecological Impact Assessment
Introduction: Air Quality and Ecological Impact AssessmentIntroduction: Air Quality and Ecological Impact Assessment
Introduction: Air Quality and Ecological Impact AssessmentIES / IAQM
 
4th SEALNET meeting, Item 10: SEALNET position in GLOSOLAN
4th SEALNET meeting, Item 10:  SEALNET position in GLOSOLAN4th SEALNET meeting, Item 10:  SEALNET position in GLOSOLAN
4th SEALNET meeting, Item 10: SEALNET position in GLOSOLANSoils FAO-GSP
 
Study on Discharge Characteristics of Pollutant Load at Gyoungahn River with...
Study on Discharge Characteristics of Pollutant Load  at Gyoungahn River with...Study on Discharge Characteristics of Pollutant Load  at Gyoungahn River with...
Study on Discharge Characteristics of Pollutant Load at Gyoungahn River with...simrc
 
NPDES Phase II:How to Achieve Compliance
NPDES Phase II:How to Achieve ComplianceNPDES Phase II:How to Achieve Compliance
NPDES Phase II:How to Achieve Compliancemknysz
 
Item 14: Plenary Discussion and Decision Making
Item 14: Plenary Discussion and Decision MakingItem 14: Plenary Discussion and Decision Making
Item 14: Plenary Discussion and Decision MakingExternalEvents
 
Rețea România-Serbia pentru evaluarea evaluarea și diseminarea impactului act...
Rețea România-Serbia pentru evaluarea evaluarea și diseminarea impactului act...Rețea România-Serbia pentru evaluarea evaluarea și diseminarea impactului act...
Rețea România-Serbia pentru evaluarea evaluarea și diseminarea impactului act...Cornel Popovici Sturza
 
Development of the new Water Law and bylaws in Georgia
Development of the new Water Law and bylaws in GeorgiaDevelopment of the new Water Law and bylaws in Georgia
Development of the new Water Law and bylaws in GeorgiaOECD Environment
 
Gruppo di lavoro WMO-GAW Covid-19
Gruppo di lavoro WMO-GAW Covid-19Gruppo di lavoro WMO-GAW Covid-19
Gruppo di lavoro WMO-GAW Covid-19ARIANET
 
Download-manuals-surface water-software-processingofstreamflowdata
 Download-manuals-surface water-software-processingofstreamflowdata Download-manuals-surface water-software-processingofstreamflowdata
Download-manuals-surface water-software-processingofstreamflowdatahydrologyproject0
 

Mais procurados (17)

“Agenda Item 3. Key Milestones 2018” by EUWI+ team
“Agenda Item 3. Key Milestones 2018” by EUWI+ team“Agenda Item 3. Key Milestones 2018” by EUWI+ team
“Agenda Item 3. Key Milestones 2018” by EUWI+ team
 
2. TO_GHG Waste Croatia
2. TO_GHG Waste Croatia2. TO_GHG Waste Croatia
2. TO_GHG Waste Croatia
 
“Progress since May 2017” by EUWI+ team
“Progress since May 2017” by EUWI+ team“Progress since May 2017” by EUWI+ team
“Progress since May 2017” by EUWI+ team
 
13.s. smith sharing of results
13.s. smith sharing of results13.s. smith sharing of results
13.s. smith sharing of results
 
Introduction: Air Quality and Ecological Impact Assessment
Introduction: Air Quality and Ecological Impact AssessmentIntroduction: Air Quality and Ecological Impact Assessment
Introduction: Air Quality and Ecological Impact Assessment
 
GLOSOLAN
GLOSOLANGLOSOLAN
GLOSOLAN
 
test.pptx
test.pptxtest.pptx
test.pptx
 
4th SEALNET meeting, Item 10: SEALNET position in GLOSOLAN
4th SEALNET meeting, Item 10:  SEALNET position in GLOSOLAN4th SEALNET meeting, Item 10:  SEALNET position in GLOSOLAN
4th SEALNET meeting, Item 10: SEALNET position in GLOSOLAN
 
Study on Discharge Characteristics of Pollutant Load at Gyoungahn River with...
Study on Discharge Characteristics of Pollutant Load  at Gyoungahn River with...Study on Discharge Characteristics of Pollutant Load  at Gyoungahn River with...
Study on Discharge Characteristics of Pollutant Load at Gyoungahn River with...
 
NPDES Phase II:How to Achieve Compliance
NPDES Phase II:How to Achieve ComplianceNPDES Phase II:How to Achieve Compliance
NPDES Phase II:How to Achieve Compliance
 
Item 14: Plenary Discussion and Decision Making
Item 14: Plenary Discussion and Decision MakingItem 14: Plenary Discussion and Decision Making
Item 14: Plenary Discussion and Decision Making
 
Rețea România-Serbia pentru evaluarea evaluarea și diseminarea impactului act...
Rețea România-Serbia pentru evaluarea evaluarea și diseminarea impactului act...Rețea România-Serbia pentru evaluarea evaluarea și diseminarea impactului act...
Rețea România-Serbia pentru evaluarea evaluarea și diseminarea impactului act...
 
Design flow
Design flowDesign flow
Design flow
 
Development of the new Water Law and bylaws in Georgia
Development of the new Water Law and bylaws in GeorgiaDevelopment of the new Water Law and bylaws in Georgia
Development of the new Water Law and bylaws in Georgia
 
Gruppo di lavoro WMO-GAW Covid-19
Gruppo di lavoro WMO-GAW Covid-19Gruppo di lavoro WMO-GAW Covid-19
Gruppo di lavoro WMO-GAW Covid-19
 
Era2010
Era2010Era2010
Era2010
 
Download-manuals-surface water-software-processingofstreamflowdata
 Download-manuals-surface water-software-processingofstreamflowdata Download-manuals-surface water-software-processingofstreamflowdata
Download-manuals-surface water-software-processingofstreamflowdata
 

Semelhante a Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies

Master ppt whole project report 2021
Master ppt whole project report 2021Master ppt whole project report 2021
Master ppt whole project report 2021OECD Environment
 
Item 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalItem 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalOECD Environment
 
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1OECD Environment
 
EU4Environment water and data regional launch event
EU4Environment water and data regional launch eventEU4Environment water and data regional launch event
EU4Environment water and data regional launch eventOECD Environment
 
EU4Env water and data regional launch event
EU4Env water and data regional launch eventEU4Env water and data regional launch event
EU4Env water and data regional launch eventOECD Environment
 
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...OECD Environment
 
Session 1 euwi+ belarus_meeting_2021_03_04_master_final
Session 1 euwi+ belarus_meeting_2021_03_04_master_finalSession 1 euwi+ belarus_meeting_2021_03_04_master_final
Session 1 euwi+ belarus_meeting_2021_03_04_master_finalOECD Environment
 
Item 7. Discussion on PWB 2023-24 work related to adaptation
Item 7. Discussion on PWB 2023-24 work related to adaptationItem 7. Discussion on PWB 2023-24 work related to adaptation
Item 7. Discussion on PWB 2023-24 work related to adaptationOECD Environment
 
Item 6b. Strategic planning for delivering water sector reform and SDGs
Item 6b. Strategic planning for delivering water sector reform and SDGsItem 6b. Strategic planning for delivering water sector reform and SDGs
Item 6b. Strategic planning for delivering water sector reform and SDGsOECD Environment
 
Industrial landfill sites IMPEL inspections.pdf
Industrial landfill sites IMPEL inspections.pdfIndustrial landfill sites IMPEL inspections.pdf
Industrial landfill sites IMPEL inspections.pdfOECD Environment
 
Euwi+ Remarks and Questions
Euwi+ Remarks and QuestionsEuwi+ Remarks and Questions
Euwi+ Remarks and QuestionsOECD Environment
 
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...India-EU Water Partnership
 
Results of the monitoring activities for the last 15 years -increase of insti...
Results of the monitoring activities for the last 15 years -increase of insti...Results of the monitoring activities for the last 15 years -increase of insti...
Results of the monitoring activities for the last 15 years -increase of insti...Iwl Pcu
 

Semelhante a Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies (20)

Master ppt whole project report 2021
Master ppt whole project report 2021Master ppt whole project report 2021
Master ppt whole project report 2021
 
Item 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalItem 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_final
 
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
 
EU4Environment water and data regional launch event
EU4Environment water and data regional launch eventEU4Environment water and data regional launch event
EU4Environment water and data regional launch event
 
EU4Env water and data regional launch event
EU4Env water and data regional launch eventEU4Env water and data regional launch event
EU4Env water and data regional launch event
 
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
 
Session 1 euwi+ belarus_meeting_2021_03_04_master_final
Session 1 euwi+ belarus_meeting_2021_03_04_master_finalSession 1 euwi+ belarus_meeting_2021_03_04_master_final
Session 1 euwi+ belarus_meeting_2021_03_04_master_final
 
14a Conferenza Nazionale di Statistica
14a Conferenza Nazionale di Statistica14a Conferenza Nazionale di Statistica
14a Conferenza Nazionale di Statistica
 
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina BokalThird IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal
 
Item 7. Discussion on PWB 2023-24 work related to adaptation
Item 7. Discussion on PWB 2023-24 work related to adaptationItem 7. Discussion on PWB 2023-24 work related to adaptation
Item 7. Discussion on PWB 2023-24 work related to adaptation
 
Georgia
GeorgiaGeorgia
Georgia
 
Kutsch, Werner: RINGO highlight
Kutsch, Werner: RINGO highlightKutsch, Werner: RINGO highlight
Kutsch, Werner: RINGO highlight
 
Item 6b. Strategic planning for delivering water sector reform and SDGs
Item 6b. Strategic planning for delivering water sector reform and SDGsItem 6b. Strategic planning for delivering water sector reform and SDGs
Item 6b. Strategic planning for delivering water sector reform and SDGs
 
Industrial landfill sites IMPEL inspections.pdf
Industrial landfill sites IMPEL inspections.pdfIndustrial landfill sites IMPEL inspections.pdf
Industrial landfill sites IMPEL inspections.pdf
 
Launching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and AzerbaijanLaunching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and Azerbaijan
 
Moldova
MoldovaMoldova
Moldova
 
Euwi+ Remarks and Questions
Euwi+ Remarks and QuestionsEuwi+ Remarks and Questions
Euwi+ Remarks and Questions
 
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
Ms. marta Moren Abat IEWP @ Workshop on River Bassin Management Planning and ...
 
Results of the monitoring activities for the last 15 years -increase of insti...
Results of the monitoring activities for the last 15 years -increase of insti...Results of the monitoring activities for the last 15 years -increase of insti...
Results of the monitoring activities for the last 15 years -increase of insti...
 
12 increasing soil water holding capacity act. 5.1_bielek
12 increasing soil water holding capacity act. 5.1_bielek12 increasing soil water holding capacity act. 5.1_bielek
12 increasing soil water holding capacity act. 5.1_bielek
 

Mais de OECD Environment

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikOECD Environment
 

Mais de OECD Environment (20)

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël Jachnik
 

Último

VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Anamikakaur10
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxhossanmdjobayer103
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programsitadmin50
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 

Último (20)

VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programs
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Climate Change
Climate ChangeClimate Change
Climate Change
 

Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies

  • 1. REPUBLIC OF MOLDOVA 6TH MEETING OF THE NATIONAL POLICY DIALOGUE ON WATER European Union Water Initiative Plus for Eastern Partnership countries (EUWI+) Environment Agency Austria, Alexander Zinke, virtual, 19 November 2020
  • 2. The EU-funded programme “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area. RESULTS 2 COUNTRY SPECIFIC DISCUSSIONS SESSION 1 MODERNISING NATIONAL WATER POLICY AND GOVERNANCE UPGRADING THE WATER MONITORING CAPACITIES FOR SURFACE AND GROUNDWATER BODIES
  • 3. MAIN TASKS OF EAA Output 2.1: Adequate infrastructure and analytical tools for sound monitoring of water • Assess capacities and needs • Purchase equipment to upgrade existing laboratories • Support laboratories for accreditation Output 2.2: Strengthened capacity on chemical, hydro-morphological, ecological and biological monitoring of surface and groundwaters • Provide trainings • Prepare Monitoring Development Plans Output 2.3: Pilot river basins management plans implemented • Delineate surface water/groundwater bodies • Carry out biological, ecological, chemicals surveys • Support completion of RBMP monitoring chapters 3
  • 4. 1. PROCUREMENT OF LABORATORY EQUIPMENT COMPLETED PROCEDURES AS PER 16.11.2020 for SW Laboratory of Environmental Reference Laboratory of EAM in Chisinau to fulfil its WFD monitoring obligations • Microwave digestion system for sample preparation. • Atomic absorption spectrometer for heavy metals such as Cadmium, Lead, Mercury or Nickel. • DOC/TOC device for assessing dissolved or total organic carbon in waters. • Water Purification System needed in laboratory for the above- mentioned techniques. 4
  • 5. 1. PROCUREMENT OF LABORATORY EQUIPMENT PENDING PROCEDURES PER 16.11.2020 for SW Laboratory of Environmental Reference Laboratory of EAM in Chisinau to fulfil its WFD monitoring obligations • Gas Chromatograph to measure priority substances such as pesticides, industrial chemical or polycyclic aromatic carbon hydrogens. • Bench freeze drier for sample preparation of biota and sediments. • Small laboratory equipment: laboratory dishwasher, muffle furnace, laboratory deep freezer, UV/VIS-spectrophotometer, solvent evaporator, orbital shaker, multimeter (pH, conductivity, dissolved oxygen), titrator • Consumables (chemical reference materials, solvents, glassware, GC- columns, etc.) 5
  • 6. 1. LAB PROCUREMENT OVERVIEW 6 EQUIPMENT CONTRACT AWARDED STATUS Gas Chromatograph 16.09.2019 Shimadzu delivered (installation and training pending) Atomic absorption spectrometer 03.10.2019 Analytik Jena completed Microwave digestion 20.08.2019 Milestone completed DOC/TOC device 25.08.2019 Analytik Jena completed Bench freeze dryer 22.11.2019 Martin Christ delivered (installation and training pending) Water purification system 03.10.2019 Lokmera completed Small laboratory equipment and consumables Proposed: VWR offer received Solvent evaporator Proposed: LabTech offer received AAS WPS Photos © EAM
  • 7. 2. PROGRESS IN LABORATORY ACCREDITATION SW Laboratory of Environmental Reference Laboratory of EAM • Successfull participation in proficiency tests for metals, trace elements and nutrients (major ions) in 2020 • Support of a local QM expert (EUWI+ service agreement) for new initial laboratory accreditation, i.e. preparation of needed quality management documentation or adaptation of existing QM documents, training of lab staff on new edition of standard EN ISO/IEC 17025:2017, internal system audit in EAM lab • application documents for new initial accreditation documents were submitted to MOLDAC 23 September 2020 Outlook • Remote audit with EAM and EUWI+ lab experts on 19 November (virtual meeting) • Accreditation audit by MOLDAC planned for January 2021 7
  • 8. 3. SURFACE WATER MONITORING DEVELOPMENT PROGRESS DURING EUWI+ • SW Survey (MZB+PHB) • Diatom evaluation report • Hydro-morphology Survey • ICPDR-JDS4 support • Procurement of biological equipment and taxonomic keys • ESCS training (+4 before Q3/2019) • DPBSRB type-specific Ecological Status Classification System (ESCS) for MZB • Investigative Monitoring: 10 sites at Ialpug basin New: 2 training videos on PHB (diatoms) 8 OUTLOOK UNTIL END OF EUWI+ (FEB 2021) o Guidance Delineation of SWB o Guidance ESCS • DPBSRB Management Plan (SW monitoring) • Report on MD monitoring results • SW Monitoring Development Plan
  • 9. SW MONITORING – FUTURE NEEDS 9 • Increase monitoring capacities (personnel + know-how) • Continue trainings • Biological monitoring in lakes and reservoirs (HMWB/artific.) • Expand HYMO surveys • Develop ESCS for other BQEs • When all ESCS available  Intercalibration exercise for biology, chemistry and HYMO © Umweltnumdesamt/Maria Deweis Steps MZB PHB PHP MAC FIS 1 Delineate SWB Completed during EUWI+ 2 Define typology Completed during EUWI+ 3 Risk assessment for SWB Completed during EUWI+ 4 Establish a compliant sampling method Completed during EUWI+ Started during EUWI+ Still needed 5 Establish a compliant lab method Completed during EUWI+ Started during EUWI+ Still needed 6 Gather data on biology in a consolidated database Completed during EUWI+ Started during EUWI+ Still needed 7 Establish a pressure- response-relationship Completed during EUWI+ Still needed 8 Define criteria for type- specific reference (benchmark) conditions Completed during EUWI+ Still needed 9 Set class boundaries (EQR) Completed during EUWI+ Still needed 10 Compile all methods to a binding guidance document (as a basis for the monitoring) Still needed More information: SW Monitoring Development Plan MD Photo © Zornig
  • 10. 4. GROUNDWATER MONITORING Achivements since autumn 2019 • Groundwater chemical survey 2019 (pesticides): 18 sites, 2 laboratories (EHGeoM, Institute of Chemistry) • Study (2020) on proposed improvement of GW monitoring network in the DPBSRB RBMP, including survey.  include 15 existing springs, drill 3 new wells. • Summer 2020: Comprehensive preparatory work for the drilling of 3 new wells including all administrative certificates. • Oct 2020: Start of drilling the 3 wells by EHGeoM. • Monitoring chapter for DPBSRB Management Plan. 10
  • 11. GROUNDWATER MONITORING Outlook until End of EUWI+ (Feb 2021) • Finalisation of drilling the 3 wells • GW Monitoring Development Plan • Guidance document on GWB delineation Future needs • Raise and secure monitoring budgets (long-term) • Clarify responsibility for laboratory analyses of GW (organic pollutants etc.) • Secure monitoring capacities (personnel + know-how) • Frequent repetition of trainings • Purchase more sampling and field measurement equipment • Develop MD methodology for GW status assessment (quantity, quality). 11 Petrunea village New monitoring well Petrunea village Chișinău
  • 12. 12 Site Hincesti (MDDBSGWQ220) Site Aluatu (MDDBSGWQ220) Site Costuleni (GWB MDPRTGWQ230) Site Frasinesti (GWB MDPRTGWQ230) Site Viisoara (GWB MDPRTGWQ230). Site Bursuc (GWB MDPRTGWQ510). Site Svetlii (MDDBSGWQ220)
  • 13. CONTACT 13 www.facebook.com/euwiplus/ www.euwipluseast.eu Alexander Zinke, TL of EU MS Consortium Contact information alexander.zinke@umweltbundesamt.at