2. A Gantt chart is
a type of bar
chart.
Developed
by Henry
Gantt, that
illustrates a
project schedule.
Illustrate the start
and finish dates of
the terminal
elements and
summary elements
of a project.
Bar Chart
or Gantt
Chart
Henry Laurence Gantt, A.B., M.E. (1861 – 23
November 1919) was an American mechanical
engineer and management consultant who is
best known for developing the Gantt chart in
the 1910s.
3.
4. When scheduling
and monitoring
tasks within a
project.
When it’s not
necessary to show
which tasks
depend on
completion of
previous tasks.
USAGE OF BAR
CHART AND
GANTT CHART
When the steps of the project
or process, their sequence
and their duration are
known.
When
communicating
plans or status of
a project.
5.
6.
7. It is used for
scheduling
activities in a
project plan.
Is a network
diagramming
technique in which
activities are
represented by
arrows.
The precedence
relation between
activities is
represented by circles
connecting to one or
more arrows. The
length of the arrow
represents the
duration of the
relevant activity.
Arrow Method in Site
Planning
8.
9. Be presented in the
form of a network
diagram that shows
the first and last
events and the
critical path.
Performed on a
time scale or
calendar in the form
of a bar chart
For larger projects and are
considered
complex, computer analyses.
10.
11. Require the planner to think
logically.
Benefit of CPM
Activities that contractors
must focus its efforts during
the implementation of
projects identified during the
planning process.
Non-critical activities, were
identified and facilitate the
adjustment of resources.
12.
13. Record, record activities of the
project every day in site diary
Arrange joinery or construction
worker
Regulate supervise work on site
Control and check work quality
Monitor work from building method
aspect, installation way, finish
14.
15. Assistant
Engineer
Technician
Engineers tend to go to
work applying the
science and mathematics
knowledge to solve
problems and design
processes and products.
Technicians tend to start
their careers performing
tests, collecting
data, and assisting
engineers.
Engineers with NDT
backgrounds work on
developing new
inspection equipment
and procedures.
Technician becomes more
knowledgeable about the
work he or she is doing.
16.
17. Materials
delivered to the
site, the quantity
used and retained
Items of plant on
site, working or
idling, including
reasons for being
idle.
Any work carried
out in connection
with the utility
service.
The number of
workers in various
trades
The date and
weather
conditions
This
document
usually
includes
Instructions
issued to the
contractor.
18. Minimizes
liability by
providing
accurate records
and valuable
evidence in the
event of a
dispute.
A comprehensive
tool for Site
Managers to
fulfill statuary
obligations.
Quality and
integrity of
information is
assured and
accurate.
Full transparency
of site activities.