2013 FIRST QUARTER &
PROJECT UPDATE




                                                   APRIL 11, 2013
                                                                    1
            NYSE-MKT, TSX: NG   www.novagold.com
CONFERENCE CALL ATTENDEES

  ▸   Introduction
         Mélanie Hennessy (Vice President Corporate Communications)

  ▸   Corporate Update
         Greg Lang (President & Chief Executive Officer)

  ▸   First Quarter Financials & 2013 Budget
         David Ottewell (Vice President & Chief Financial Officer)

  ▸   Closing Remarks
         Greg Lang (President & Chief Executive Officer)

  ▸   Question & Answer Session
         Greg Lang & David Ottewell


                                                                      2
                  NYSE-MKT, TSX: NG   www.novagold.com
CAUTIONARY STATEMENTS
 REGARDING FORWARD-LOOKING STATEMENTS
 This presentation includes certain “forward-looking statements” within the meaning of applicable securities laws, including the United States Private Securities Litigation Reform Act of
 1995. All statements, other than statements of historical fact, included herein including, without limitation, statements relating to Donlin Gold’s and Galore Creek’s future operating or
 financial performance, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “plans”, “expects”, “anticipates”,
 “believes”, “intends”, “estimates”, “potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could”, or “should” occur or be achieved.
 These forward-looking statements are set forth in the slides pertaining to the implementation of the Donlin Gold second updated Feasibility Study and the Galore Creek Pre-Feasibility
 Study. Froward-looking statements may include statements regarding perceived merit of properties; exploration results and budgets; mineral reserves and resource estimates; work
 programs; capital expenditures; timelines; strategic plans; completion of transactions; market price of precious base metals; or other statements that are not statements of fact. Forward-
 looking statements involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ
 materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from our expectations include the uncertainties involving the
 need for additional financing to explore and develop properties and availability of financing in the debt and capital markets; uncertainties involved in the interpretation of drilling results
 and geological tests and the estimation of reserves and resources; the need for continued cooperation between NOVAGOLD and Barrick Gold in the exploration and development of the
 Donlin Gold property; between NOVAGOLD and Teck Resources Ltd. in the exploration and development of the Galore Creek property; the need for cooperation of government
 agencies and native groups in the development and operation of properties; the need to obtain permits and governmental approvals; risks of construction and mining projects such as
 accidents, equipment breakdowns, bad weather, non-compliance with environmental and permit requirements, unanticipated variation in geological structures, ore grades or recovery
 rates; unexpected cost increases; fluctuations in metal prices and currency exchange rates; and other risk and uncertainties disclosed in reports and documents filed by NOVAGOLD
 with applicable securities regulatory authorities from time to time. The forward-looking statements made herein reflect management’s beliefs, opinions and projections on the date the
 statements are made. Except as required by law, the Company assumes no obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should
 they change.

 REGARDING SCIENTIFIC AND TECHNICAL INFORMATION
 Unless otherwise indicated, all reserve and resource estimates included in this presentation have been prepared in accordance with Canadian National Instrument 43-101 Standards of
 Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards for Mineral Resources and Mineral Reserves (“CIM
 Definition Standards”). Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange Commission (“SEC”), and
 reserve and resource information in this presentation may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the
 foregoing, the term “resource” does not equate to the term “‘reserves”. Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination has been
 made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. The SEC’s disclosure standards normally do not
 permit the inclusion of information concerning “measured mineral resources”, “indicated mineral resources” or “inferred mineral resources” or other descriptions of the amount of
 mineralization in mineral deposits that do not constitute “reserves” by U.S. standards in documents filed with the SEC. U.S. investors should also understand that “inferred mineral
 resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an
 “inferred mineral resource” will ever be upgraded to a higher category. Under Canadian rules, estimated “inferred mineral resources” may not form the basis of feasibility or pre-feasibility
 studies except in rare cases. Investors are cautioned not to assume that all or any part of an “inferred mineral resource” exists or is economically or legally mineable. Disclosure of
 “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute
 “reserves” by SEC standards as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of “reserves” are also not the same as
 those of the SEC, and reserves reported in compliance with NI 43-101 may not qualify as “reserves” under SEC standards. Accordingly, information concerning mineral deposits set
 forth herein may not be comparable to information made public by companies that report in accordance with United States standards.




                                                                                                                                                                                        3
                                                    NYSE-MKT, TSX: NG                       www.novagold.com
2013 GOALS AND MILESTONES
Focused on Advancing Our Projects On Time and On Budget

                                                                                          Q4 - 13
                                                                           Q4 - 13
                                                               Q3 - 13                   Update on
                                                                                         Donlin Gold
                                                  Q2 - 13                Donlin Gold     Preliminary
                                                                         cost            Draft EIS
                                  Q1 - 13                   Galore       reduction       progress
                                                            Creek        opportunities
                 Q1 - 13                      Complete      endowment    update
                                              public        update
    Q1 - 13                   Appointed       scoping for
                              Richard         Donlin Gold
              Galore          Williams VP     EIS
              Creek           Engineering &
              exploration     Development
Received
              drill results   strengthening
$54.0 M
proceeds                      technical
from in the                   expertise
money
warrants




                                                                                                  4
                              NYSE-MKT, TSX: NG    www.novagold.com
THE RIGHT PROJECT – DONLIN GOLD
Arguably the World’s Most Significant Gold Project




                   Largest gold project in development




                    Among the highest grade large-scale open-pit deposits




                    Excellent expansion potential along strike & at depth




                   Poised to be world’s largest gold producer, one of only six >1Moz/year




                    Safe: In Alaska, 2nd largest gold producing state in U.S.

                                                                                        5
                         NYSE-MKT, TSX: NG   www.novagold.com
www.novagold.com




                   2013 FIRST-QUARTER
                   FINANCIALS

                   DAVID OTTEWELL, VICE PRESIDENT & CFO
Q1 2013 – PROJECT ACTIVITY
▸ Donlin Gold
  > Held public scoping meetings around project area
  > Compiled and presented all environmental and social baseline data to the Corps to facilitate
    preparation of the EIS
  > Project funding (NG 50% share)
    > FY-2013: US$15.0 million to continue permitting
    > Q1-2013: US$2.4 million


▸ Galore Creek
  > Exploration and geotechnical drilling in 2013
  > Project funding (NG 50% share)
    > FY-2013: $8.0 million for follow-up drilling and new targets (exploration season May-Oct.)
    > Q1-2013: $0.7 million




                                                                                                   7
                              NYSE-MKT, TSX: NG     www.novagold.com
Q1 2013 – OPERATING PERFORMANCE ANALYSIS
                                                                                               in thousands of Canadian dollars

                                                                          Three months                   Three months
                                                                                  ended                          ended
   Highlights
                                                                       February 28, 2013              February 29, 2012
                                                                                       $                              $
    Expenses(1)                                                                          3,474                         5,866
    Share-based payments                                                                 5,526                        10,088
    Project care and maintenance                                                                -                      2,574
    Mineral properties                                                                          -                         907
    Decommissioning expense                                                                     -                      1,651
    Foreign exchange (gain) loss                                                       (7,883)                       (1,411)
    Share of losses – Donlin Gold                                                        2,986                         3,623
    Share of losses – Galore Creek                                                       2,482                         4,065
    Other (gains) losses                                                                    (9)                           25
   Operating loss                                                                      (6,576)                      (27,388)




  (1) General and administrative, salaries and severance, professional fees, corporate and development expenses
                                                                                                                                  8
                                     NYSE-MKT, TSX: NG              www.novagold.com
Q1 2013 – CASH FLOW HIGHLIGHTS
                                                                   in thousands of Canadian dollars
                                                 Three months ended     Three months ended
  Highlights                                       February 28, 2013      February 29, 2012
                                                                   $                      $
  Cash used in operating activities                          (9,307)               (24,649)
  Cash from financing activities                             54,014                    320,100
  Cash used in investing activities                                 -                 (13,625)
  Foreign exchange effect on cash                            11,601                         178
  Increase (decrease) in cash                                56,308                    282,004
  Cash and cash equivalents
       Beginning                                            253,037                     60,572
       Ending                                               309,345                    342,576
       Ending US$                                           299,941                    346,207




                                                                                                      9
                            NYSE-MKT, TSX: NG   www.novagold.com
NOVAGOLD’S FUTURE FINANCIAL OBLIGATIONS HAVE DECREASED
SUBSTANTIALLY
Clear Focus Begins with Strong Funding to Execute on All Fronts

 Highlights:                                                                                                   40
                                                                                                                          $3
 ▸     US$300M in cash and cash
       equivalents1                                                                                                       $8

 ▸     US$95M cash available for convertible                                                                   30
       notes2




                                                                                              US$ (Millions)
 2013:                                                                                                                    $15
                                                                                                               20
 ▸     62% spending reduction
 ▸     Donlin Gold Q1-2013 spending
       US$2.4M (NOVAGOLD 50%-share)
                                                                                                               10                                     $0.7
 ▸     Galore Creek Q1-2013 spending                                                                                      $15                         $2.4
       US$0.7M (NOVAGOLD 50%-share)
                                                                                                                                                      $6.1
 ▸     Administrative expenses US$3.5M and                                                                     0
                                                                                                                    2013 Budget3               Q1-2013 Spending
       working capital US$2.6M
 1) Cash and cash equivalents as of February 28, 2013
 2) The Notes mature on May 1, 2015. The holders of the Notes have the right to require the                         Donlin Gold    G&A and Miscellaneous
    Company to repurchase all or part of their Notes on May 1, 2013 (“put option”)
                                                                                                                    Galore Creek   Interest4
 3) 2013 anticipated budget expenditure disclosed on February 12, 2013
 4) Assuming full repayment of US$95M in convertible notes

                                                                                                                                                             10
                                                   NYSE-MKT, TSX: NG                    www.novagold.com
DONLIN GOLD PUBLIC COMMENT PERIOD
Communication on all Levels is a Core Value

     ▸    U.S. Army Corps of Engineers (“the Corps”) launched website for the EIS
          project: www.donlingoldeis.com
     ▸    Public scoping is 2nd phase of the EIS process
          ▸    Important opportunity to ask questions, identify concerns, and offer ideas
               related to the proposed project and its environmental effects
          ▸    Helps shape the direction of the EIS analysis
     ▸    Donlin Gold public comment period (Dec. 14/12 - March 29/13)
          ▸    13 public meetings in villages/communities in Western Alaska and
               Anchorage
          ▸    Very well attended with knowledgeable audience and overall positive
               feedback on the Project
          ▸    The Corps received constructive comments that will be beneficial in
               developing a robust EIS
     ▸    Public scoping summary document will be available on the EIS website
     ▸    Core focus is the development of an environmentally responsible Project
          design, and spending significant time working with communities in the region



                                                                                               11
                           NYSE-MKT, TSX: NG   www.novagold.com                     12-07-26
DONLIN GOLD PERMITTING PROCESS
Regulatory Process Currently Focused on Environmental Impact Statement (“EIS”)
                                     What is an EIS?
                             A disclosure document that is part
                             of the regulatory process and led
                             by the U.S. Army Corps of                                      What is the Permitting Process?
                             Engineers that       provides the           Concurrent with and supported by the EIS process, the Federal and
                             agencies and the public with                State regulatory agencies will consider all of the required permits and
                             information needed to make                  authorizations for the project.
                             permitting decisions on the project




                                                                                                                                      Record of
                                          Preliminary                                                                                  Decision
        Notice of         Public                                                            Public                       Final
                                           Draft EIS                 Draft EIS                                                        subject to
         Intent          Scoping                                                           Comment                    EIS/Permit
                                                                                                                                        30-Day
                                                                                            Period                     Issuance
                                                                                                                                        Appeal
        Submitted                                                                                                                       Period
                          Ended
        12/14/12         03/29/13


 2012                                                                                                                                         2016
                                                                   Permitting Process ~3-4
              Impacts Discussed in the EIS                                  years

          •   Hydrology              •   Fish & Aquatic Habitat
          •   Air & Water Quality    •   Wildlife                                • Cultural Resources
          •   Noise                  •   Socioeconomics                          • Visual Resources
          •   Wetlands               •   Threatened & Endangered Species         • Recreation, Safety & Feasibility
          •   Cumulative Impacts     •   Land Use and Subsistence

                                                                                                                                                   12
                                           NYSE-MKT, TSX: NG              www.novagold.com
GALORE CREEK
2012 Drilling Program Extended Mineralization Substantially Beyond Pit Limit
  ▸   Completed 27,873-meter drilling program
  ▸   Significant intercepts, including 86 meters grading 1.31%Cu and 0.46g/t Au, lead
      to the discovery of the new Legacy zone, a 700 -meter long mineralized zone,
      currently open in all directions and adjacent to the Central Pit
  ▸   Results expected to increased endowment and enhance the mine plan




                                                                                         13
                         NYSE-MKT, TSX: NG   www.novagold.com
GALORE CREEK
Well Positioned to Update Resource Model and Improve Overall Economics
▸   NOVAGOLD continues to consider the potential sale of its share of Galore Creek
    meanwhile enhancing its value through exploration and technical studies on a reduced
    budget
▸   2013 work and exploration program
    ▸   Update resource model with 2012 drill results in Q3-2013
    ▸   Drilling to define the extent of the Legacy mineralization, and assess its impact on
        future mine design
▸   Once in production, as envisioned by the Pre-Feasibility Study, Galore Creek is
    expected to be the largest and lowest cash cost copper mine in Canada




                                                                                          14
                          NYSE-MKT, TSX: NG   www.novagold.com
THE NOVAGOLD TEAM
Senior Industry Leaders to Bring Donlin Gold through Permitting and Beyond

 MANAGEMENT
                                    ▸   Former President of Barrick Gold North America
  Gregory A. Lang
                                    ▸   35 years experience building & operating major mines
  President & CEO                   ▸   Intimate knowledge of Donlin Gold
                                    ▸   Former EVP and General Counsel of Goldcorp
  David Deisley                     ▸   Regional General Counsel for Barrick Gold North America
  Executive Vice President and      ▸   Extensive track record in project permitting, corporate social responsibility,
  General Counsel                       mergers and acquisitions and corporate development
                                    ▸   25 years of mining industry experience

  David Ottewell                    ▸   Former VP and Corporate Controller of Newmont Mining Corporation
                                    ▸   25 years of mining industry experience
  Vice President and Chief          ▸   Diverse experience in all facets of financial management, from mine operations
  Financial Officer                     to executive corporate financial management of premier gold producers
  Mélanie Hennessey                 ▸   Held variety of senior IR & corporate communication positions with Goldcorp
  Vice President, Corporate             Inc., New Gold Inc., and Hecla Mining Company
  Communications                    ▸   Leading NOVAGOLD’s internal and external communications functions

  Ron Rimelman                      ▸   25 years of environmental experience , managing environmental impact
                                        assessments and permitting activities world-wide
  Vice President, Environment,      ▸   Leadership role on mine permitting and NEPA evaluations for mine projects in
  Health, Safety & Sustainability       Alaska since 1993
  Richard Williams                  ▸   Former Project Director for the Pueblo Viejo project in the Dominican Republic
  Vice President, Engineering       ▸   30 years of experience developing and operating major mines world-wide
  and Development                   ▸   Particular expertise in autoclave technology


                                                                                                                         15
                                    NYSE-MKT, TSX: NG        www.novagold.com
2013 - AN EXCITING YEAR AHEAD
NOVAGOLD Well Positioned to Deliver on All Corporate Objectives


   A simplified corporate structure
   resulting in reduced ongoing
   expenditures


   Experienced team and
                                                               Focused on advancing
   committed stakeholders
                                                               Donlin Gold up the
   represent the right foundation
                                                               value chain
   to execute on all fronts


   Strong cash balance to take
   Donlin Gold through expected
   3-4 years of permitting



                                                                                  16
                        NYSE-MKT, TSX: NG   www.novagold.com
APPENDIX




                                                  17
           NYSE-MKT, TSX: NG   www.novagold.com
MAJOR DISCOVERIES ARE INCREASINGLY RARE
Very Few and No Easy Quality Development Assets Left




Significant
decline in gold
discoveries
since 2006

Gold reserves
are being mined
out at a high rate




                     Source: Metals Economics Group – Strategies for Gold Reserves Replacement 2012

                     Note: Major gold discoveries based on a cut off of 2 M/oz of gold in total reserves, resources and past production (or at
                     least 1 M/oz in defined reserves)

                                                                                                                                                 18
                     NYSE-MKT, TSX: NG                            www.novagold.com
THE CLIMATE OF DECLINING GRADE AND ESCALATING COSTS
Donlin Gold Has Among the Highest Grade for an Open-Pit Deposit

                      Grade, g/t                                                                                                                            Cost US$/oz
                      2.5                                                                                                                                         1,200

Donlin Gold                                                                                                                 Mining
                                                                                1
2.24 g/t average                                              Mined grade
M&I grade             2.0
                                                                                                                          36%                                    1,000


                                                                                                               above reserve grade
“Reserve grade are
                                                                                                                                                                 800
down 50% over 10                                                     Reserve grade
                      1.5
years negatively
impacting                                                                                                                                                        600
production cost
and capex which       1.0

have tripled in the                                                                                                                                              400
same time period”
                      0.5
Pierre Lassonde,                                                                                                                                                 200

DGF 2012
                      0.0                                                                                                                                        0
                              2002       2003          2004          2005           2006         2007          2008          2009          2010          2011

                                        Total cash cost        Depreciation         Exploration & sustaining capex          Other and administrative 2

                                      Source: GFMS Mine Economics, LBMA, World Gold Council
                                      1)   2002-2004 data set includes primary gold mines only, 2005 onwards, includes porphyry copper gold mines
                                      2)   Includes exceptional items

                                                                                                                                                                       19
                                   NYSE-MKT, TSX: NG                     www.novagold.com
DONLIN GOLD: THE LARGEST DEVELOPMENT-STAGE GOLD DEPOSIT
Feasibility Study in Place and Permitting Underway

                            45


                            40           39.0


                            35


                            30
 M&I Au Resources (Moz)




                                                         25.8
                            25


                            20                                                          19.0
                                                                                                                       16.5
                                                                                                                                                     14.6                           14.0
                            15


                            10


                             5


                             --
                                      Donlin Gold    Detour Lake                      Metates                      Livengood                   Rosia Montana                       Kibali

                          LOCATION:      USA          CANADA                          MEXICO                           USA                       ROMANIA                         D.R. CONGO




   Source: Donlin Gold data as per Donlin Creek Gold Project Alaska, USA, NI 43-101 Technical Report on Second “Updated Feasibility Study”, effective November 18, 2011, as amended January 20,
   2012 (the “Updated Feasibility Study”). Measured and Indicated resources are inclusive of Proven and Probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and
   “Reserve & Resource Base” with footnotes in the appendix. RBC peer group data based on large, open pit, gold focused development projects.

                                                                                                                                                                                                  20
                                                          NYSE-MKT, TSX: NG                          www.novagold.com
DONLIN GOLD: AMONG HIGHEST-GRADE DEPOSITS IN THE WORLD
            Large-Scale Open-Pit Gold Development

                      4.00


                      3.50             3.38


                      3.00


                      2.50
 M&I Au Grade (g/t)




                                                                      2.24

                      2.00


                      1.50
                                                                                                     1.30
                                                                                                                                   1.04
                      1.00

                                                                                                                                                                  0.55                           0.50
                      0.50


                        --
                                       Kibali                     Donlin Gold                  Rosia Montana                   Detour Lake                     Livengood                       Metates

LOCATION:                           D.R. CONGO                        USA                       ROMANIA                         CANADA                            USA                          MEXICO




              Source: Donlin Gold data as per the Updated Feasibility Study. Measured and Indicated resources are inclusive of Proven and Probable reserves. See “Cautionary Note Concerning Reserve & Resource
              Estimates” and “Reserve & Resource Base” with footnotes in the appendix. RBC peer group data based on large, open pit, gold focused development projects.

                                                                                                                                                                                                                  21
                                                                      NYSE-MKT, TSX: NG                          www.novagold.com
DONLIN GOLD: SUBSTANTIAL EXPLORATION POTENTIAL
Multiple Drill Prospects and Targets Exist Along 8km Trend

                                                                                                                                 ▸   Future mine situated in 3km
                                                                                                                                     segment of 8km mineralized
                                                                                                                                     trend
                                                                                                                                 ▸   Over the last six years, the
                                                                                                                                     mineral endowment has more
                                                                                                                                     than doubled
                                                                                                                                 ▸   Located largely on private land,
                                                                                                                                     designated for mining
                                                                                                                                 ▸   Gold-bearing drill holes along
                                                                                                                                     the 8km trend
                                                                                                                                 ▸   Exploration upside:
                                                                                                                                     • In-pit resource conversion
                                                                                                                                     • In-pit/deep-pit exploration
                                                                                                                                     • Near-pit targets (East ACMA,
                   3km = 39 Moz M&I (including 34 Moz P&P), 6 Moz Inferred1                                                            Akivik Zone and Snow)
                                                                                                                                     • Area resource potential
1) See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix.

                                                                                                                                                                      22
                                                                   NYSE-MKT, TSX: NG                                www.novagold.com
DONLIN GOLD: ANTICIPATED TO BE TOP-TIER PRODUCER
                       By Far the Largest Evolving Gold Producer from Existing Projects
                                         1.60
                                                                     1
                                                              1.50


                                         1.40



                                         1.20
LOM Average Annual Au Production (Moz)




                                                                     2
                                                              1.10
                                         1.00



                                         0.80                                                0.76

                                                                                                                            0.66
                                                                                                                                                           0.60
                                         0.60                                                                                                                                              0.56
                                                                                                                                                                                                                          0.51


                                         0.40



                                         0.20



                                         0.00
                                                          Donlin Gold                      Metates                      Detour Lake                        Kibali                      Livengood                    Rosia Montana

             LOCATION:                                       USA                           MEXICO                         CANADA                         D.R. CONGO                       USA                         ROMANIA



                                                Source: Donlin Gold data: Updated Feasibility Study. Measured and Indicated resources are inclusive of Proven and Probable reserves. See “Cautionary Note Concerning Reserve & Resource
                                                Estimates” and “Reserve & Resource Base” with footnotes in the appendix. RBC peer group data based on large, open pit, gold focused development projects.
                                                1)   Projected annual gold production during first five full years of mine life
                                                2)   Projected annual gold production during full life of mine

                                                                                                                                                                                                                                          23
                                                                                                 NYSE-MKT, TSX: NG                         www.novagold.com
JURISDICTIONAL SAFETY BECOMING THE “EXISTENTIAL” INVESTMENT
CRITERION
“Large-Scale Quality Assets” Raising the Question “Where in the World Are You?”




  •   Recently highlighted regions/countries
      with heightened geopolitical risk




 ▸       Accelerated industry focus on jurisdictional safety and resource nationalism in
         many of the largest gold and copper-producing countries
 ▸       Countries such as Mongolia, Kyrgyzstan, Peru, Indonesia and Ghana have all
         stated their intentions to seek higher mining taxes and royalties
 ▸       Civil and labor unrest in South Africa and Greece with countries looking to get
         an increased stake in mining companies
 ▸       Very limited number of quality assets in low geo-political risk jurisdictions


                                                                                         24
                                               NYSE-MKT, TSX: NG   www.novagold.com
GALORE CREEK
High-Grade Mineral Inventory in a Safe, Mining-Friendly Jurisdiction
                                                                                         Copper (M&I)               Copper (Inf)           Gold (M&I)         Gold (Inf)
                                                  71.4             89.7                  64.0
                                            20                                                                                                                                                                             20
                                                                           17.1

                                                                                                                                                       14.1




                                                                                                                                                                                                                                Millions of Au Oz.
                      Billions of Cu Lbs.




                                            15                                                                                                                                        13.3                                 15
                                                                                                  12.8
                                                                                                                         12.0

                                            10                                                                                      9.1                                                                                    10
                                                                                                                                                                                                                     7.1
                                                                                                                                                                 5.3
                                            5                                                                                                                                                 2.9                          5


                                            0                                                                                                                                                                              0
                                                   Pebble




                                                                            KSM




                                                                                                                                     El Morro




                                                                                                                                                                  Prosperity




                                                                                                                                                                                               Mt. Milligan
                                                                                                   Galore Creek
          Project Name                                  Pebble                    KSM                       Galore                      El Morro                  Prosperity                  Mt. Milligan
                                                                                                            Creek1

          Grade Cu (%)                                      0.41%                 0.20%                           0.48%                         0.53%                          0.24%                          0.18%

          Grade Au (g/t)                                    0.35                  0.51                            0.31                          0.56                           0.41                           0.32

          Grade Ag (g/t)                                     N/A                  2.94                            5.18                           N/A                            N/A                            N/A

                                                 • N. Dynasty
                                                                                                                                   • Goldcorp
                                                   (50%)                                        • NOVAGOLD
                                                                          • Seabridge                                                (70%)                      • Taseko                     • Thompson
          Owner(s)                               • Anglo-                                         (50%)
                                                                            (100%)                                                 • New Gold                     (100%)                       Creek (100%)
                                                   American                                     • Teck (50%)
                                                                                                                                     (30%)
                                                   (50%)

          Location                                          USA              Canada                      Canada                                 Chile                   Canada                        Canada

1) Represents 100% of Galore Creek, of which NOVAGOLD owns 50%, and 100% of Copper Canyon, of which NOVAGOLD owns 70%. See slides 12 and 13 for additional information.
Source: Metals Economics Group, company websites, and NOVAGOLD. Peer projects were selected on the basis of their primary copper endowment and are ranked by the size of their
MI&I copper resources. Measured and Indicated resources include Proven and Probable Reserves. See “Cautionary Note Concerning Reserve and Resource Estimates” and “Reserve and
Resource Table” with footnotes.
                                                                                                                                                                                                                                                     25
                                                                          NYSE-MKT, TSX: NG                                     www.novagold.com
GALORE CREEK
Flagship of the Next Generation of North American Copper-Gold Mines
     ▸       Potentially the largest copper producer in Canada:
             ▸         Forecast to produce 6.2B lbs Cu, 4.0M oz Au and 65.8M oz Ag over an 18-year
                       mine life; fourth largest copper producer in North America
     ▸       Potential to be lowest cost copper producer in Canada:
             ▸         Cash costs average $0.80/lb Cu at PFS Base Case metal price assumptions and
                       $0.42/lb Cu at PFS Upside Case metal prices1
     ▸       Project concept simplified – mining in the Galore Valley and processing in the
             West More Valley
     ▸       Open pit
     ▸       2.2:1 strip ratio
     ▸       Truck and shovel operation
     ▸       14km tunnel for conveying crushed ore
     ▸       Designed to accommodate future expansions
     ▸       Standard flotation circuit – 95,000 tpd nominal design
     ▸       Single copper concentrate with significant gold value
1)   Cash costs net of by-product credits. Base Case utilizes metal prices of US$2.65/lb copper, US$1,100/oz gold and US$18.50/oz silver and a foreign exchange rate of 1.11 CAD/USD.
     Upside Case metal prices are closing prices on July 27, 2011 of US$4.44/lb Cu, US$1,613/oz Au and US$40.34/oz Ag respectively and foreign exchange rate of 0.949 CAD/USD.


                                                                                                                                                                                 26
                                                      NYSE-MKT, TSX: NG                     www.novagold.com
NOVAGOLD RESERVE/RESOURCE TABLE
   At April 30, 2012
   Donlin Gold (NOVAGOLD 50%)
                                                      Tonnage    Grade*    Metal content   NOVAGOLD share**
   GOLD
                                                        Mt         g/t         Moz              Moz
   Reserves   (100%)1
   Proven                                               7.7       2.32         0.57              0.29
   Probable                                            497.1      2.08         33.28             16.64
   P&P                                                 504.8      2.09         33.85             16.93
   Resources (100%)3 inclusive of reserves
   Measured                                             7.7       2.52         0.63              0.31
   Indicated                                           533.6      2.24         38.38             19.19
   M&I                                                 541.3      2.24         39.01             19.50
   Inferred                                             92.2      2.02         5.99              3.00

   Galore Creek (NOVAGOLD 50%)
                                                      Tonnage    Grade*    Metal content   NOVAGOLD share**
   COPPER
                                                        Mt        %Cu         Mlbs              Mlbs
   Reserves (100%)2
   Proven                                              69.0       0.61         900.0             450.0
   Probable                                            459.1      0.58        5,900.0           2,950.0
   P&P                                                 528.0      0.59        6,800.0           3,400.0
   Resources (100%)4 inclusive of reserves
   Measured                                            108.4      0.48        1,147.0            573.5
   Indicated                                           706.3      0.50        7,786.0           3,893.0
   M&I                                                 814.7      0.50        8,933.0           4,466.5
   Inferred                                            346.6      0.42        3,230.0           1,615.0
                                                        Mt         g/t         Moz               Moz
   GOLD
   Reserves (100%)2
   Proven                                              69.0       0.52         1.15              0.58
   Probable                                            459.1      0.29         4.30              2.15
   P&P                                                 528.0      0.32         5.45              2.73
   Resources (100%)4 inclusive of reserves
   Measured                                            108.4      0.48         1.70              0.85
   Indicated                                           706.3      0.28         6.40              3.20
   M&I                                                 814.7      0.31         8.00              4.00
   Inferred                                            346.6      0.24         2.70              1.35
                                                        Mt         g/t         Moz               Moz
   SILVER
   Reserves (100%)2
   Proven                                              69.0       4.94         11.0               5.5
   Probable                                            459.1      6.18         91.2              45.6
   P&P                                                 528.0      6.02         102.2             51.1
   Resources (100%)4 inclusive of reserves
   Measured                                            108.4      4.10         14.30             7.15
   Indicated                                           706.3      5.38        122.10             61.05
   M&I                                                 814.7      5.21        136.40             68.20
   Inferred                                            346.6      4.28         47.73             23.87


                                                                                                              27
                                             NYSE-MKT, TSX: NG     www.novagold.com
RESERVE/RESOURCE TABLE (CON’T)

   Copper Canyon (NOVAGOLD 70%)
                                                        Tonnage             Grade*             Metal content        NOVAGOLD share**
   Resources (100%)5,6
   COPPER                                                  Mt                %Cu                   Mlbs                   Mlbs
   Inferred                                               53.7                0.50                 592.0                  414.4
   GOLD                                                    Mt                 g/t                  Moz                    Moz
   Inferred                                               53.7                0.73                 1.26                   0.88
   SILVER                                                  Mt                 g/t                  Moz                    Moz
   Inferred                                               53.7               10.60                 18.36                  12.85




   t = metric tonne                          Approximate cut-off grades (see Resource Footnotes below):
   M = million                               Donlin Gold          Reserves1: 0.57 g/t gold
   g/t = grams/tonne                                                                    Resources3: 0.46 g/t gold
   * Reserve grade is diluted; resource      Galore Creek         Reserves2: C$10.08 NSR
   grade is in situ.                                                                    Resources4: C$10.08 NSR
   ** NOVAGOLD share net after earn-ins      Copper Canyon        Resources5,6: 0.6% copper equivalent




                                                                                                                                       28
                                          NYSE-MKT, TSX: NG                   www.novagold.com
RESERVE/RESOURCE TABLE (CON’T)
Notes:
a. These resource estimates have been prepared in accordance with NI43-101 and the CIM Definition Standard, unless otherwise noted.
b. See numbered footnotes below on resource information.
c. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content
d. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces, contained copper pounds as imperial pounds

Resource Footnotes:
Mineral Reserves are contained within Measured and Indicated pit designs, and supported by a mine plan, featuring variable throughput rates, stockpiling and cut-off optimization. The pit designs and mine plan were optimized on diluted grades using the following economic and technical parameters: Metal price for
gold of US$975/oz; reference mining cost of US$1.67/t incremented US$0.0031/t/m with depth from the 220 m elevation (equates to an average mining cost of US$2.14/t), variable processing cost based on the formula 2.1874 x (S%) + 10.65 for each US$/t processed; general and administrative cost of US$2.27/t
processed; stockpile rehandle costs of US$0.19/t processed assuming that 45% of mill feed is rehandled; variable recoveries by rock type, ranging from 86.66% in shale to 94.17% in intrusive rocks in the Akivik domain; refining and freight charges of US$1.78/oz gold; royalty considerations of 4.5%; and variable pit
slope angles, ranging from 23º to 43º. Mineral Reserves are reported using an optimized net sales return value based on the following equation: Net Sales Return = Au grade * Recovery * (US$975/oz – (1.78 + (US$975/oz – 1.78) * 0.045)) - (10.65 + 2.1874 * (S%) + 2.27 + 0.19) and reported in US$/tonne. Assuming
an average recovery of 89.54% and an average S% grade of 1.07%, the marginal gold cutoff grade would be approximately 0.57 g/t, or the gold grade that would equate to a 0.001 NSR cutoff at these same values. The life of mine strip ratio is 5.48. The assumed life-of-mine throughput rate is 53.5 kt/d.

Mineral Reserves are contained within Measured and Indicated pit designs using metal prices for copper, gold and silver of US$2.50/lb, US$1,050/oz, and US$16.85/oz, respectively. Appropriate mining costs, processing costs, metal recoveries and inter ramp pit slope angles varing from 42º to 55º were used to
generate the pit phase designs. Mineral Reserves have been calculated using a 'cashflow grade' ($NSR/SAG mill hr) cut-off which was varied from year to year to optimize NPV. The net smelter return (NSR) was calculated as follows: NSR = Recoverable Revenue – TCRC (on a per tonne basis), where: NSR = Net
Smelter Return; TCRC = Transportation and Refining Costs; Recoverable Revenue = Revenue in Canadian dollars for recoverable copper, recoverable gold, and recoverable silver using metal prices of US$2.50/lb, US$1,050/oz, and US$16.85/oz for copper, gold, and silver, respectively, at an exchange rate of
CDN$1.1 to US$1.0; Cu Recovery = Recovery for copper based on mineral zone and total copper grade; for Mineral Reserves this NSR calculation includes mining dilution. SAG throughputs were modeled by correlation with alteration types. Cash flow grades were calculated as the product of NSR value in $/t and
throughput in t/hr. The life of mine strip ratio is 2.16.

Mineral Resources are contained within a conceptual Measured, Indicated and Inferred optimized pit shell using the following assumptions: gold price of US$1,200/oz; variable process cost based on 2.1874 * (sulphur grade) + 10.6485; administration cost of US$2.29/t; refining, freight & marketing (selling costs) of
US$1.85/oz recovered; stockpile rehandle costs of US$0.20/t processed assuming that 45% of mill feed is rehandled; variable royalty rate, based on royalty of 4.5% * (Au price – selling cost). Mineral Resources have been estimated using a constant Net Sales Return cut-off of US$0.001/t milled. The Net Sales Return
was calculated using the formula: Net Sales Return = Au grade * Recovery * (US$1200/oz – (1.85 + ((US$1200/oz – 1.85) * 0.045)) - (10.65 + 2.1874 * (S%) + 2.29 + 0.20)) and reported in US$/tonne. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have
demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred Resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever
be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates".

Mineral resources are contained within a conceptual Measured, Indicated and Inferred optimized pit shell using the same economic and technical parameters as used for Mineral Reserves. Tonnages are assigned based on proportion of the block below topography. The overburden/bedrock boundary has been
assigned on a whole block basis. Mineral resources have been estimated using a constant NSR cut-off of C$10.08/t milled. The Net Smelter Return (NSR) was calculated as follows: NSR = Recoverable Revenue – TCRC (on a per tonne basis), where: NSR = Diluted Net Smelter Return; TCRC = Transportation and
Refining Costs; Recoverable Revenue = Revenue in Canadian dollars for recoverable copper, recoverable gold, and recoverable silver using silver using the economic and technical parameters mentioned above. The mineral resource includes material within the conceptual M,I&I pit that is not scheduled for processing
in the mine plan but is above cutoff. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred Resources have a great amount of uncertainty
as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates".

The copper-equivalent grade was calculated as follows: CuEq = Recoverable Revenue ÷ 2204.62 * 100 ÷ 1.55. Where: CuEq = Copper equivalent grade; Recoverable Revenue = Revenue in US dollars for recoverable copper, recoverable gold and recoverable silver using metal prices of US$1.55/lb, US$650/oz, and
US$11/oz for copper, gold, and silver, respectively; for the purposes of the equivalency formula, Cu Recovery is assumed to be 100%. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred
Resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates".

NOVAGOLD Canada Inc. has agreed to transfer its 60% joint venture interest in the Copper Canyon property to the Galore Creek Partnership, which is equally owned by NOVAGOLD Canada Inc. and a subsidiary of Teck Resources Limited. The remaining 40% joint venture interest in the Copper Canyon property is
owned by another wholly owned subsidiary of NOVAGOLD.

Cautionary Note Concerning Reserve & Resource Estimates
This summary table uses the term “resources”, “measured resources”, “indicated resources” and “inferred resources”. United States investors are advised that, while such terms are recognized and required by Canadian securities laws, the United States Securities and Exchange Commission (the “SEC”) does not
recognize them. Under United States standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Mineral resources that are not mineral reserves
do not have demonstrated economic viability. United States investors are cautioned not to assume that all or any part of measured or indicated resources will ever be converted into reserves. Further, inferred resources have a great amount of uncertainty as to their existence and as to whether they can be mined
legally or economically. It cannot be assumed that all or any part of the inferred resources will ever be upgraded to a higher category. Therefore, United States investors are also cautioned not to assume that all or any part of the inferred resources exist, or that they can be mined legally or economically. Disclosure of
“contained ounces” is permitted disclosure under Canadian regulations, however, the SEC normally only permits issuers to report “resources” as in place tonnage and grade without reference to unit measures. Accordingly, information concerning descriptions of mineralization and resources contained in this release
may not be comparable to information made public by United States companies subject to the reporting and disclosure requirements of the SEC.

NI 43-101 is a rule developed by the Canadian Securities Administrators, which established standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Unless otherwise indicated, all resource estimates contained in this circular have been prepared in
accordance with NI 43-101 and the CIM Definition Standards.

Technical Reports and Qualified Persons

The documents referenced below provide supporting technical information for each of NOVAGOLD's projects.


Project                          Qualified Person(s)         Most Recent Disclosure & Filing Date
Donlin Gold                      Tony Lipiec, P. Eng., AMEC  Donlin Creek Gold Project
                                 Gordon Seibel R.M. SME, AMEC                              Alaska, USA

                                 Kirk Hanson P.E., AMEC            NI 43-101 Technical Report on Second Updated Feasibility Study amended filing on January 23, 2012


Galore Creek                     Robert Gill, P.Eng., AMEC         Galore Creek Copper–Gold Project,

                                 Jay Melnyk, P.Eng., AMEC       British Columbia, NI 43-101 Technical Report on Pre-Feasibility Study,
                                 Greg Kulla, P.Geo., AMEC       filed on September 12, 2011
                                 Greg Wortman, P.Eng., AMEC
                                 Dana Rogers, P.Eng., Lemley International


Heather White, B.Sc., P.Eng., who is a consultant to NOVAGOLD and a “qualified person” under NI 43-101, has approved the scientific and technical information included in this section related to: (i) Donlin Gold since the issuance of the technical report filed on January 23, 2012, and (ii) Galore Creek since the
issuance of the technical report filed on September 12, 2011.


                                                                                                                                                                                                                                                                                                               29
                                                                                           NYSE-MKT, TSX: NG                                                www.novagold.com
CONTACT US

NOVAGOLD RESOURCES INC.
200 Granville St., Suite 2300
Vancouver, BC
Canada V6C 1S4



T 604 669 6227 TF 1 866 669 6227 F 604 669 6272
www.novagold.com
info@novagold.com




Mélanie Hennessey                     Erin O’Toole
VP, Corporate Communications          Analyst, Investor Relations
melanie.hennessey@novagold.com        erin.otoole@novagold.com




                                                                           30
                                 NYSE-MKT, TSX: NG      www.novagold.com

Mais conteúdo relacionado

Mais procurados

October pp 2021 short
October pp 2021 shortOctober pp 2021 short
October pp 2021 short
AdnetNew
 
21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference
HudbayMinerals
 
December 2021 - Riley Gold Corporate Presentation
December 2021  - Riley Gold Corporate PresentationDecember 2021  - Riley Gold Corporate Presentation
December 2021 - Riley Gold Corporate Presentation
ZhalaRahim1
 
Pinecrest corporatepresentation july2015
Pinecrest corporatepresentation july2015Pinecrest corporatepresentation july2015
Pinecrest corporatepresentation july2015
Adnet Communications
 
ROMARCO - Corporate Presentation September 2012
ROMARCO - Corporate Presentation September 2012ROMARCO - Corporate Presentation September 2012
ROMARCO - Corporate Presentation September 2012
Romarco Minerals Inc.
 

Mais procurados (15)

Silver One Resources Corporate Presentation September 2021
Silver One Resources Corporate Presentation September 2021Silver One Resources Corporate Presentation September 2021
Silver One Resources Corporate Presentation September 2021
 
October pp 2021 short
October pp 2021 shortOctober pp 2021 short
October pp 2021 short
 
NAR Corporate Update - wide screen presentation (july 2021)
NAR Corporate Update - wide screen presentation (july 2021)NAR Corporate Update - wide screen presentation (july 2021)
NAR Corporate Update - wide screen presentation (july 2021)
 
Corporate Presentation - November 2015
Corporate Presentation - November 2015Corporate Presentation - November 2015
Corporate Presentation - November 2015
 
Millrock Presentation - Fall 2021
Millrock Presentation - Fall 2021Millrock Presentation - Fall 2021
Millrock Presentation - Fall 2021
 
GoldQuest Corporate Presentation - October 2015
GoldQuest Corporate Presentation - October 2015GoldQuest Corporate Presentation - October 2015
GoldQuest Corporate Presentation - October 2015
 
Aurora Gold Corporate Update (March 2014)
Aurora Gold Corporate Update (March 2014)Aurora Gold Corporate Update (March 2014)
Aurora Gold Corporate Update (March 2014)
 
21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference
 
December 2021 - Riley Gold Corporate Presentation
December 2021  - Riley Gold Corporate PresentationDecember 2021  - Riley Gold Corporate Presentation
December 2021 - Riley Gold Corporate Presentation
 
Pinecrest corporatepresentation july2015
Pinecrest corporatepresentation july2015Pinecrest corporatepresentation july2015
Pinecrest corporatepresentation july2015
 
North Arrow Corporate Presentation (december 2021) final
North Arrow Corporate Presentation (december 2021) finalNorth Arrow Corporate Presentation (december 2021) final
North Arrow Corporate Presentation (december 2021) final
 
Zinc One Presentation March 2019
Zinc One Presentation March 2019Zinc One Presentation March 2019
Zinc One Presentation March 2019
 
Delta Gold Corporation
Delta Gold CorporationDelta Gold Corporation
Delta Gold Corporation
 
ROMARCO - Corporate Presentation September 2012
ROMARCO - Corporate Presentation September 2012ROMARCO - Corporate Presentation September 2012
ROMARCO - Corporate Presentation September 2012
 
Seabridge Gold Inc. - Corporate Presentation
Seabridge Gold Inc. - Corporate Presentation Seabridge Gold Inc. - Corporate Presentation
Seabridge Gold Inc. - Corporate Presentation
 

Semelhante a 2013 First Quarter and Project Update

Vancouver Resource investment Conference 2014
Vancouver Resource investment Conference 2014Vancouver Resource investment Conference 2014
Vancouver Resource investment Conference 2014
Company Spotlight
 
NOVAGold Corporate Presentation Nov 2013
NOVAGold Corporate Presentation Nov 2013NOVAGold Corporate Presentation Nov 2013
NOVAGold Corporate Presentation Nov 2013
Company Spotlight
 
Nova goldvancouverresouceconf
Nova goldvancouverresouceconfNova goldvancouverresouceconf
Nova goldvancouverresouceconf
Company Spotlight
 

Semelhante a 2013 First Quarter and Project Update (20)

Nova goldye2012
Nova goldye2012Nova goldye2012
Nova goldye2012
 
Vancouver Resource Investment Conference 2014
Vancouver Resource Investment Conference 2014Vancouver Resource Investment Conference 2014
Vancouver Resource Investment Conference 2014
 
Vancouver Resource investment Conference 2014
Vancouver Resource investment Conference 2014Vancouver Resource investment Conference 2014
Vancouver Resource investment Conference 2014
 
2013 Precious Metals Summit, Zurich
2013 Precious Metals Summit, Zurich 2013 Precious Metals Summit, Zurich
2013 Precious Metals Summit, Zurich
 
NOVAGold Corporate Presentation Nov 2013
NOVAGold Corporate Presentation Nov 2013NOVAGold Corporate Presentation Nov 2013
NOVAGold Corporate Presentation Nov 2013
 
Cowen and Company 4th Annual Global Metals, Mining and Materials Conference
Cowen and Company 4th Annual Global Metals, Mining and Materials ConferenceCowen and Company 4th Annual Global Metals, Mining and Materials Conference
Cowen and Company 4th Annual Global Metals, Mining and Materials Conference
 
International Precious Metals & Commodities Show, Munich
International Precious Metals & Commodities Show, MunichInternational Precious Metals & Commodities Show, Munich
International Precious Metals & Commodities Show, Munich
 
2013 Metals & Minerals Investment Conference, San Francisco
2013 Metals & Minerals Investment Conference, San Francisco2013 Metals & Minerals Investment Conference, San Francisco
2013 Metals & Minerals Investment Conference, San Francisco
 
NOVAGOLD Third Quarter 2015 Conference Call and Webcast
NOVAGOLD Third Quarter 2015 Conference Call and WebcastNOVAGOLD Third Quarter 2015 Conference Call and Webcast
NOVAGOLD Third Quarter 2015 Conference Call and Webcast
 
Nova goldvancouverresouceconf
Nova goldvancouverresouceconfNova goldvancouverresouceconf
Nova goldvancouverresouceconf
 
Nova goldtd miningsecconf
Nova goldtd miningsecconfNova goldtd miningsecconf
Nova goldtd miningsecconf
 
TD Securities Mining Conference 2013
TD Securities Mining Conference 2013TD Securities Mining Conference 2013
TD Securities Mining Conference 2013
 
Nova goldprecmetalsummit
Nova goldprecmetalsummitNova goldprecmetalsummit
Nova goldprecmetalsummit
 
Precious Metals Summit Hong Kong 2013
Precious Metals Summit Hong Kong 2013Precious Metals Summit Hong Kong 2013
Precious Metals Summit Hong Kong 2013
 
Ng q2 2013
Ng q2 2013Ng q2 2013
Ng q2 2013
 
2013 NOVAGOLD Second Quarter & Project Update
2013 NOVAGOLD Second Quarter & Project Update2013 NOVAGOLD Second Quarter & Project Update
2013 NOVAGOLD Second Quarter & Project Update
 
Ngppt q2 2013
Ngppt q2 2013Ngppt q2 2013
Ngppt q2 2013
 
NOVAGOLD Q3 2013 Conference Call & Webcast
NOVAGOLD Q3 2013 Conference Call & Webcast  NOVAGOLD Q3 2013 Conference Call & Webcast
NOVAGOLD Q3 2013 Conference Call & Webcast
 
NOVAGOLD 2013 Annual General and Special Meeting of Shareholders
NOVAGOLD 2013 Annual General and Special Meeting of ShareholdersNOVAGOLD 2013 Annual General and Special Meeting of Shareholders
NOVAGOLD 2013 Annual General and Special Meeting of Shareholders
 
NOVAGOLD Q2-2015 Financials and Project Update
NOVAGOLD Q2-2015 Financials and Project Update NOVAGOLD Q2-2015 Financials and Project Update
NOVAGOLD Q2-2015 Financials and Project Update
 

Mais de NOVAGOLD

Mais de NOVAGOLD (20)

NOVAGOLD - Canaccord Genuity presentation, April 2021
NOVAGOLD - Canaccord Genuity presentation, April 2021NOVAGOLD - Canaccord Genuity presentation, April 2021
NOVAGOLD - Canaccord Genuity presentation, April 2021
 
NOVAGOLD - World Gold Forum, April 2021
NOVAGOLD - World Gold Forum, April 2021NOVAGOLD - World Gold Forum, April 2021
NOVAGOLD - World Gold Forum, April 2021
 
NOVAGOLD 2021 First-Quarter Financial Results & Project Update
NOVAGOLD 2021 First-Quarter Financial Results & Project UpdateNOVAGOLD 2021 First-Quarter Financial Results & Project Update
NOVAGOLD 2021 First-Quarter Financial Results & Project Update
 
2021 03-22 ngppt-swiss mining institute conference_final
2021 03-22 ngppt-swiss mining institute conference_final2021 03-22 ngppt-swiss mining institute conference_final
2021 03-22 ngppt-swiss mining institute conference_final
 
NOVAGOLD - 2021 PDAC Convention (virtual)
NOVAGOLD - 2021 PDAC Convention (virtual)NOVAGOLD - 2021 PDAC Convention (virtual)
NOVAGOLD - 2021 PDAC Convention (virtual)
 
NOVAGOLD - BMO Global Metals and Mining Conference, March 2021
NOVAGOLD - BMO Global Metals and Mining Conference, March 2021NOVAGOLD - BMO Global Metals and Mining Conference, March 2021
NOVAGOLD - BMO Global Metals and Mining Conference, March 2021
 
NOVAGOLD - 2020 Year-End Financial Results and Project Update
NOVAGOLD - 2020 Year-End Financial Results and Project UpdateNOVAGOLD - 2020 Year-End Financial Results and Project Update
NOVAGOLD - 2020 Year-End Financial Results and Project Update
 
NOVAGOLD - RBC Global Mining Conference, November 2020
NOVAGOLD - RBC Global Mining Conference, November 2020NOVAGOLD - RBC Global Mining Conference, November 2020
NOVAGOLD - RBC Global Mining Conference, November 2020
 
NOVAGOLD - Amvest Capital Webinar Presentation, November 2020
NOVAGOLD - Amvest Capital Webinar Presentation, November 2020NOVAGOLD - Amvest Capital Webinar Presentation, November 2020
NOVAGOLD - Amvest Capital Webinar Presentation, November 2020
 
NOVAGOLD - Precious Metals Summit Europe 2020
NOVAGOLD - Precious Metals Summit Europe 2020NOVAGOLD - Precious Metals Summit Europe 2020
NOVAGOLD - Precious Metals Summit Europe 2020
 
NOVAGOLD - Bloor Street Capital Presentation, October 2020
NOVAGOLD - Bloor Street Capital Presentation, October 2020NOVAGOLD - Bloor Street Capital Presentation, October 2020
NOVAGOLD - Bloor Street Capital Presentation, October 2020
 
2020-10-01 NOVAGOLD Q3 2020 Results and Project Update
2020-10-01 NOVAGOLD Q3 2020 Results and Project Update2020-10-01 NOVAGOLD Q3 2020 Results and Project Update
2020-10-01 NOVAGOLD Q3 2020 Results and Project Update
 
NOVAGOLD Gold Forum Americas Conference 2020
NOVAGOLD Gold Forum Americas Conference 2020NOVAGOLD Gold Forum Americas Conference 2020
NOVAGOLD Gold Forum Americas Conference 2020
 
NOVAGOLD - Precious Metals Summit 2020
NOVAGOLD - Precious Metals Summit 2020NOVAGOLD - Precious Metals Summit 2020
NOVAGOLD - Precious Metals Summit 2020
 
2020-07-23 ngppt-novagold corporate presentation_amvest capital_final
2020-07-23 ngppt-novagold corporate presentation_amvest capital_final2020-07-23 ngppt-novagold corporate presentation_amvest capital_final
2020-07-23 ngppt-novagold corporate presentation_amvest capital_final
 
2020 06-25 ngppt-novagold q2 2020 results and project update_final
2020 06-25 ngppt-novagold q2 2020 results and project update_final2020 06-25 ngppt-novagold q2 2020 results and project update_final
2020 06-25 ngppt-novagold q2 2020 results and project update_final
 
NOVAGOLD Annual Meeting of Shareholders 2020 presentation
NOVAGOLD Annual Meeting of Shareholders 2020 presentationNOVAGOLD Annual Meeting of Shareholders 2020 presentation
NOVAGOLD Annual Meeting of Shareholders 2020 presentation
 
NOVAGOLD presentation at the World Gold Forum 2020
NOVAGOLD presentation at the World Gold Forum 2020NOVAGOLD presentation at the World Gold Forum 2020
NOVAGOLD presentation at the World Gold Forum 2020
 
NOVAGOLD First Quarter 2020 Results & Project Update
NOVAGOLD First Quarter 2020 Results & Project UpdateNOVAGOLD First Quarter 2020 Results & Project Update
NOVAGOLD First Quarter 2020 Results & Project Update
 
2020 02-26 ngppt-bmo global metals conference_final
2020 02-26 ngppt-bmo global metals conference_final2020 02-26 ngppt-bmo global metals conference_final
2020 02-26 ngppt-bmo global metals conference_final
 

Último

Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
only4webmaster01
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
anilsa9823
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
hanshkumar9870
 
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Sheetaleventcompany
 

Último (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
 
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
 
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service  🧦
CALL ON ➥8923113531 🔝Call Girls Vineet Khand Lucknow best Night Fun service 🧦
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 

2013 First Quarter and Project Update

  • 1. 2013 FIRST QUARTER & PROJECT UPDATE APRIL 11, 2013 1 NYSE-MKT, TSX: NG www.novagold.com
  • 2. CONFERENCE CALL ATTENDEES ▸ Introduction Mélanie Hennessy (Vice President Corporate Communications) ▸ Corporate Update Greg Lang (President & Chief Executive Officer) ▸ First Quarter Financials & 2013 Budget David Ottewell (Vice President & Chief Financial Officer) ▸ Closing Remarks Greg Lang (President & Chief Executive Officer) ▸ Question & Answer Session Greg Lang & David Ottewell 2 NYSE-MKT, TSX: NG www.novagold.com
  • 3. CAUTIONARY STATEMENTS REGARDING FORWARD-LOOKING STATEMENTS This presentation includes certain “forward-looking statements” within the meaning of applicable securities laws, including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, included herein including, without limitation, statements relating to Donlin Gold’s and Galore Creek’s future operating or financial performance, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “plans”, “expects”, “anticipates”, “believes”, “intends”, “estimates”, “potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could”, or “should” occur or be achieved. These forward-looking statements are set forth in the slides pertaining to the implementation of the Donlin Gold second updated Feasibility Study and the Galore Creek Pre-Feasibility Study. Froward-looking statements may include statements regarding perceived merit of properties; exploration results and budgets; mineral reserves and resource estimates; work programs; capital expenditures; timelines; strategic plans; completion of transactions; market price of precious base metals; or other statements that are not statements of fact. Forward- looking statements involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from our expectations include the uncertainties involving the need for additional financing to explore and develop properties and availability of financing in the debt and capital markets; uncertainties involved in the interpretation of drilling results and geological tests and the estimation of reserves and resources; the need for continued cooperation between NOVAGOLD and Barrick Gold in the exploration and development of the Donlin Gold property; between NOVAGOLD and Teck Resources Ltd. in the exploration and development of the Galore Creek property; the need for cooperation of government agencies and native groups in the development and operation of properties; the need to obtain permits and governmental approvals; risks of construction and mining projects such as accidents, equipment breakdowns, bad weather, non-compliance with environmental and permit requirements, unanticipated variation in geological structures, ore grades or recovery rates; unexpected cost increases; fluctuations in metal prices and currency exchange rates; and other risk and uncertainties disclosed in reports and documents filed by NOVAGOLD with applicable securities regulatory authorities from time to time. The forward-looking statements made herein reflect management’s beliefs, opinions and projections on the date the statements are made. Except as required by law, the Company assumes no obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change. REGARDING SCIENTIFIC AND TECHNICAL INFORMATION Unless otherwise indicated, all reserve and resource estimates included in this presentation have been prepared in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards for Mineral Resources and Mineral Reserves (“CIM Definition Standards”). Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange Commission (“SEC”), and reserve and resource information in this presentation may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the foregoing, the term “resource” does not equate to the term “‘reserves”. Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. The SEC’s disclosure standards normally do not permit the inclusion of information concerning “measured mineral resources”, “indicated mineral resources” or “inferred mineral resources” or other descriptions of the amount of mineralization in mineral deposits that do not constitute “reserves” by U.S. standards in documents filed with the SEC. U.S. investors should also understand that “inferred mineral resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an “inferred mineral resource” will ever be upgraded to a higher category. Under Canadian rules, estimated “inferred mineral resources” may not form the basis of feasibility or pre-feasibility studies except in rare cases. Investors are cautioned not to assume that all or any part of an “inferred mineral resource” exists or is economically or legally mineable. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of “reserves” are also not the same as those of the SEC, and reserves reported in compliance with NI 43-101 may not qualify as “reserves” under SEC standards. Accordingly, information concerning mineral deposits set forth herein may not be comparable to information made public by companies that report in accordance with United States standards. 3 NYSE-MKT, TSX: NG www.novagold.com
  • 4. 2013 GOALS AND MILESTONES Focused on Advancing Our Projects On Time and On Budget Q4 - 13 Q4 - 13 Q3 - 13 Update on Donlin Gold Q2 - 13 Donlin Gold Preliminary cost Draft EIS Q1 - 13 Galore reduction progress Creek opportunities Q1 - 13 Complete endowment update public update Q1 - 13 Appointed scoping for Richard Donlin Gold Galore Williams VP EIS Creek Engineering & exploration Development Received drill results strengthening $54.0 M proceeds technical from in the expertise money warrants 4 NYSE-MKT, TSX: NG www.novagold.com
  • 5. THE RIGHT PROJECT – DONLIN GOLD Arguably the World’s Most Significant Gold Project Largest gold project in development Among the highest grade large-scale open-pit deposits Excellent expansion potential along strike & at depth Poised to be world’s largest gold producer, one of only six >1Moz/year Safe: In Alaska, 2nd largest gold producing state in U.S. 5 NYSE-MKT, TSX: NG www.novagold.com
  • 6. www.novagold.com 2013 FIRST-QUARTER FINANCIALS DAVID OTTEWELL, VICE PRESIDENT & CFO
  • 7. Q1 2013 – PROJECT ACTIVITY ▸ Donlin Gold > Held public scoping meetings around project area > Compiled and presented all environmental and social baseline data to the Corps to facilitate preparation of the EIS > Project funding (NG 50% share) > FY-2013: US$15.0 million to continue permitting > Q1-2013: US$2.4 million ▸ Galore Creek > Exploration and geotechnical drilling in 2013 > Project funding (NG 50% share) > FY-2013: $8.0 million for follow-up drilling and new targets (exploration season May-Oct.) > Q1-2013: $0.7 million 7 NYSE-MKT, TSX: NG www.novagold.com
  • 8. Q1 2013 – OPERATING PERFORMANCE ANALYSIS in thousands of Canadian dollars Three months Three months ended ended Highlights February 28, 2013 February 29, 2012 $ $ Expenses(1) 3,474 5,866 Share-based payments 5,526 10,088 Project care and maintenance - 2,574 Mineral properties - 907 Decommissioning expense - 1,651 Foreign exchange (gain) loss (7,883) (1,411) Share of losses – Donlin Gold 2,986 3,623 Share of losses – Galore Creek 2,482 4,065 Other (gains) losses (9) 25 Operating loss (6,576) (27,388) (1) General and administrative, salaries and severance, professional fees, corporate and development expenses 8 NYSE-MKT, TSX: NG www.novagold.com
  • 9. Q1 2013 – CASH FLOW HIGHLIGHTS in thousands of Canadian dollars Three months ended Three months ended Highlights February 28, 2013 February 29, 2012 $ $ Cash used in operating activities (9,307) (24,649) Cash from financing activities 54,014 320,100 Cash used in investing activities - (13,625) Foreign exchange effect on cash 11,601 178 Increase (decrease) in cash 56,308 282,004 Cash and cash equivalents Beginning 253,037 60,572 Ending 309,345 342,576 Ending US$ 299,941 346,207 9 NYSE-MKT, TSX: NG www.novagold.com
  • 10. NOVAGOLD’S FUTURE FINANCIAL OBLIGATIONS HAVE DECREASED SUBSTANTIALLY Clear Focus Begins with Strong Funding to Execute on All Fronts Highlights: 40 $3 ▸ US$300M in cash and cash equivalents1 $8 ▸ US$95M cash available for convertible 30 notes2 US$ (Millions) 2013: $15 20 ▸ 62% spending reduction ▸ Donlin Gold Q1-2013 spending US$2.4M (NOVAGOLD 50%-share) 10 $0.7 ▸ Galore Creek Q1-2013 spending $15 $2.4 US$0.7M (NOVAGOLD 50%-share) $6.1 ▸ Administrative expenses US$3.5M and 0 2013 Budget3 Q1-2013 Spending working capital US$2.6M 1) Cash and cash equivalents as of February 28, 2013 2) The Notes mature on May 1, 2015. The holders of the Notes have the right to require the Donlin Gold G&A and Miscellaneous Company to repurchase all or part of their Notes on May 1, 2013 (“put option”) Galore Creek Interest4 3) 2013 anticipated budget expenditure disclosed on February 12, 2013 4) Assuming full repayment of US$95M in convertible notes 10 NYSE-MKT, TSX: NG www.novagold.com
  • 11. DONLIN GOLD PUBLIC COMMENT PERIOD Communication on all Levels is a Core Value ▸ U.S. Army Corps of Engineers (“the Corps”) launched website for the EIS project: www.donlingoldeis.com ▸ Public scoping is 2nd phase of the EIS process ▸ Important opportunity to ask questions, identify concerns, and offer ideas related to the proposed project and its environmental effects ▸ Helps shape the direction of the EIS analysis ▸ Donlin Gold public comment period (Dec. 14/12 - March 29/13) ▸ 13 public meetings in villages/communities in Western Alaska and Anchorage ▸ Very well attended with knowledgeable audience and overall positive feedback on the Project ▸ The Corps received constructive comments that will be beneficial in developing a robust EIS ▸ Public scoping summary document will be available on the EIS website ▸ Core focus is the development of an environmentally responsible Project design, and spending significant time working with communities in the region 11 NYSE-MKT, TSX: NG www.novagold.com 12-07-26
  • 12. DONLIN GOLD PERMITTING PROCESS Regulatory Process Currently Focused on Environmental Impact Statement (“EIS”) What is an EIS? A disclosure document that is part of the regulatory process and led by the U.S. Army Corps of What is the Permitting Process? Engineers that provides the Concurrent with and supported by the EIS process, the Federal and agencies and the public with State regulatory agencies will consider all of the required permits and information needed to make authorizations for the project. permitting decisions on the project Record of Preliminary Decision Notice of Public Public Final Draft EIS Draft EIS subject to Intent Scoping Comment EIS/Permit 30-Day Period Issuance Appeal Submitted Period Ended 12/14/12 03/29/13 2012 2016 Permitting Process ~3-4 Impacts Discussed in the EIS years • Hydrology • Fish & Aquatic Habitat • Air & Water Quality • Wildlife • Cultural Resources • Noise • Socioeconomics • Visual Resources • Wetlands • Threatened & Endangered Species • Recreation, Safety & Feasibility • Cumulative Impacts • Land Use and Subsistence 12 NYSE-MKT, TSX: NG www.novagold.com
  • 13. GALORE CREEK 2012 Drilling Program Extended Mineralization Substantially Beyond Pit Limit ▸ Completed 27,873-meter drilling program ▸ Significant intercepts, including 86 meters grading 1.31%Cu and 0.46g/t Au, lead to the discovery of the new Legacy zone, a 700 -meter long mineralized zone, currently open in all directions and adjacent to the Central Pit ▸ Results expected to increased endowment and enhance the mine plan 13 NYSE-MKT, TSX: NG www.novagold.com
  • 14. GALORE CREEK Well Positioned to Update Resource Model and Improve Overall Economics ▸ NOVAGOLD continues to consider the potential sale of its share of Galore Creek meanwhile enhancing its value through exploration and technical studies on a reduced budget ▸ 2013 work and exploration program ▸ Update resource model with 2012 drill results in Q3-2013 ▸ Drilling to define the extent of the Legacy mineralization, and assess its impact on future mine design ▸ Once in production, as envisioned by the Pre-Feasibility Study, Galore Creek is expected to be the largest and lowest cash cost copper mine in Canada 14 NYSE-MKT, TSX: NG www.novagold.com
  • 15. THE NOVAGOLD TEAM Senior Industry Leaders to Bring Donlin Gold through Permitting and Beyond MANAGEMENT ▸ Former President of Barrick Gold North America Gregory A. Lang ▸ 35 years experience building & operating major mines President & CEO ▸ Intimate knowledge of Donlin Gold ▸ Former EVP and General Counsel of Goldcorp David Deisley ▸ Regional General Counsel for Barrick Gold North America Executive Vice President and ▸ Extensive track record in project permitting, corporate social responsibility, General Counsel mergers and acquisitions and corporate development ▸ 25 years of mining industry experience David Ottewell ▸ Former VP and Corporate Controller of Newmont Mining Corporation ▸ 25 years of mining industry experience Vice President and Chief ▸ Diverse experience in all facets of financial management, from mine operations Financial Officer to executive corporate financial management of premier gold producers Mélanie Hennessey ▸ Held variety of senior IR & corporate communication positions with Goldcorp Vice President, Corporate Inc., New Gold Inc., and Hecla Mining Company Communications ▸ Leading NOVAGOLD’s internal and external communications functions Ron Rimelman ▸ 25 years of environmental experience , managing environmental impact assessments and permitting activities world-wide Vice President, Environment, ▸ Leadership role on mine permitting and NEPA evaluations for mine projects in Health, Safety & Sustainability Alaska since 1993 Richard Williams ▸ Former Project Director for the Pueblo Viejo project in the Dominican Republic Vice President, Engineering ▸ 30 years of experience developing and operating major mines world-wide and Development ▸ Particular expertise in autoclave technology 15 NYSE-MKT, TSX: NG www.novagold.com
  • 16. 2013 - AN EXCITING YEAR AHEAD NOVAGOLD Well Positioned to Deliver on All Corporate Objectives A simplified corporate structure resulting in reduced ongoing expenditures Experienced team and Focused on advancing committed stakeholders Donlin Gold up the represent the right foundation value chain to execute on all fronts Strong cash balance to take Donlin Gold through expected 3-4 years of permitting 16 NYSE-MKT, TSX: NG www.novagold.com
  • 17. APPENDIX 17 NYSE-MKT, TSX: NG www.novagold.com
  • 18. MAJOR DISCOVERIES ARE INCREASINGLY RARE Very Few and No Easy Quality Development Assets Left Significant decline in gold discoveries since 2006 Gold reserves are being mined out at a high rate Source: Metals Economics Group – Strategies for Gold Reserves Replacement 2012 Note: Major gold discoveries based on a cut off of 2 M/oz of gold in total reserves, resources and past production (or at least 1 M/oz in defined reserves) 18 NYSE-MKT, TSX: NG www.novagold.com
  • 19. THE CLIMATE OF DECLINING GRADE AND ESCALATING COSTS Donlin Gold Has Among the Highest Grade for an Open-Pit Deposit Grade, g/t Cost US$/oz 2.5 1,200 Donlin Gold Mining 1 2.24 g/t average Mined grade M&I grade 2.0 36% 1,000 above reserve grade “Reserve grade are 800 down 50% over 10 Reserve grade 1.5 years negatively impacting 600 production cost and capex which 1.0 have tripled in the 400 same time period” 0.5 Pierre Lassonde, 200 DGF 2012 0.0 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Total cash cost Depreciation Exploration & sustaining capex Other and administrative 2 Source: GFMS Mine Economics, LBMA, World Gold Council 1) 2002-2004 data set includes primary gold mines only, 2005 onwards, includes porphyry copper gold mines 2) Includes exceptional items 19 NYSE-MKT, TSX: NG www.novagold.com
  • 20. DONLIN GOLD: THE LARGEST DEVELOPMENT-STAGE GOLD DEPOSIT Feasibility Study in Place and Permitting Underway 45 40 39.0 35 30 M&I Au Resources (Moz) 25.8 25 20 19.0 16.5 14.6 14.0 15 10 5 -- Donlin Gold Detour Lake Metates Livengood Rosia Montana Kibali LOCATION: USA CANADA MEXICO USA ROMANIA D.R. CONGO Source: Donlin Gold data as per Donlin Creek Gold Project Alaska, USA, NI 43-101 Technical Report on Second “Updated Feasibility Study”, effective November 18, 2011, as amended January 20, 2012 (the “Updated Feasibility Study”). Measured and Indicated resources are inclusive of Proven and Probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix. RBC peer group data based on large, open pit, gold focused development projects. 20 NYSE-MKT, TSX: NG www.novagold.com
  • 21. DONLIN GOLD: AMONG HIGHEST-GRADE DEPOSITS IN THE WORLD Large-Scale Open-Pit Gold Development 4.00 3.50 3.38 3.00 2.50 M&I Au Grade (g/t) 2.24 2.00 1.50 1.30 1.04 1.00 0.55 0.50 0.50 -- Kibali Donlin Gold Rosia Montana Detour Lake Livengood Metates LOCATION: D.R. CONGO USA ROMANIA CANADA USA MEXICO Source: Donlin Gold data as per the Updated Feasibility Study. Measured and Indicated resources are inclusive of Proven and Probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix. RBC peer group data based on large, open pit, gold focused development projects. 21 NYSE-MKT, TSX: NG www.novagold.com
  • 22. DONLIN GOLD: SUBSTANTIAL EXPLORATION POTENTIAL Multiple Drill Prospects and Targets Exist Along 8km Trend ▸ Future mine situated in 3km segment of 8km mineralized trend ▸ Over the last six years, the mineral endowment has more than doubled ▸ Located largely on private land, designated for mining ▸ Gold-bearing drill holes along the 8km trend ▸ Exploration upside: • In-pit resource conversion • In-pit/deep-pit exploration • Near-pit targets (East ACMA, 3km = 39 Moz M&I (including 34 Moz P&P), 6 Moz Inferred1 Akivik Zone and Snow) • Area resource potential 1) See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix. 22 NYSE-MKT, TSX: NG www.novagold.com
  • 23. DONLIN GOLD: ANTICIPATED TO BE TOP-TIER PRODUCER By Far the Largest Evolving Gold Producer from Existing Projects 1.60 1 1.50 1.40 1.20 LOM Average Annual Au Production (Moz) 2 1.10 1.00 0.80 0.76 0.66 0.60 0.60 0.56 0.51 0.40 0.20 0.00 Donlin Gold Metates Detour Lake Kibali Livengood Rosia Montana LOCATION: USA MEXICO CANADA D.R. CONGO USA ROMANIA Source: Donlin Gold data: Updated Feasibility Study. Measured and Indicated resources are inclusive of Proven and Probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix. RBC peer group data based on large, open pit, gold focused development projects. 1) Projected annual gold production during first five full years of mine life 2) Projected annual gold production during full life of mine 23 NYSE-MKT, TSX: NG www.novagold.com
  • 24. JURISDICTIONAL SAFETY BECOMING THE “EXISTENTIAL” INVESTMENT CRITERION “Large-Scale Quality Assets” Raising the Question “Where in the World Are You?” • Recently highlighted regions/countries with heightened geopolitical risk ▸ Accelerated industry focus on jurisdictional safety and resource nationalism in many of the largest gold and copper-producing countries ▸ Countries such as Mongolia, Kyrgyzstan, Peru, Indonesia and Ghana have all stated their intentions to seek higher mining taxes and royalties ▸ Civil and labor unrest in South Africa and Greece with countries looking to get an increased stake in mining companies ▸ Very limited number of quality assets in low geo-political risk jurisdictions 24 NYSE-MKT, TSX: NG www.novagold.com
  • 25. GALORE CREEK High-Grade Mineral Inventory in a Safe, Mining-Friendly Jurisdiction Copper (M&I) Copper (Inf) Gold (M&I) Gold (Inf) 71.4 89.7 64.0 20 20 17.1 14.1 Millions of Au Oz. Billions of Cu Lbs. 15 13.3 15 12.8 12.0 10 9.1 10 7.1 5.3 5 2.9 5 0 0 Pebble KSM El Morro Prosperity Mt. Milligan Galore Creek Project Name Pebble KSM Galore El Morro Prosperity Mt. Milligan Creek1 Grade Cu (%) 0.41% 0.20% 0.48% 0.53% 0.24% 0.18% Grade Au (g/t) 0.35 0.51 0.31 0.56 0.41 0.32 Grade Ag (g/t) N/A 2.94 5.18 N/A N/A N/A • N. Dynasty • Goldcorp (50%) • NOVAGOLD • Seabridge (70%) • Taseko • Thompson Owner(s) • Anglo- (50%) (100%) • New Gold (100%) Creek (100%) American • Teck (50%) (30%) (50%) Location USA Canada Canada Chile Canada Canada 1) Represents 100% of Galore Creek, of which NOVAGOLD owns 50%, and 100% of Copper Canyon, of which NOVAGOLD owns 70%. See slides 12 and 13 for additional information. Source: Metals Economics Group, company websites, and NOVAGOLD. Peer projects were selected on the basis of their primary copper endowment and are ranked by the size of their MI&I copper resources. Measured and Indicated resources include Proven and Probable Reserves. See “Cautionary Note Concerning Reserve and Resource Estimates” and “Reserve and Resource Table” with footnotes. 25 NYSE-MKT, TSX: NG www.novagold.com
  • 26. GALORE CREEK Flagship of the Next Generation of North American Copper-Gold Mines ▸ Potentially the largest copper producer in Canada: ▸ Forecast to produce 6.2B lbs Cu, 4.0M oz Au and 65.8M oz Ag over an 18-year mine life; fourth largest copper producer in North America ▸ Potential to be lowest cost copper producer in Canada: ▸ Cash costs average $0.80/lb Cu at PFS Base Case metal price assumptions and $0.42/lb Cu at PFS Upside Case metal prices1 ▸ Project concept simplified – mining in the Galore Valley and processing in the West More Valley ▸ Open pit ▸ 2.2:1 strip ratio ▸ Truck and shovel operation ▸ 14km tunnel for conveying crushed ore ▸ Designed to accommodate future expansions ▸ Standard flotation circuit – 95,000 tpd nominal design ▸ Single copper concentrate with significant gold value 1) Cash costs net of by-product credits. Base Case utilizes metal prices of US$2.65/lb copper, US$1,100/oz gold and US$18.50/oz silver and a foreign exchange rate of 1.11 CAD/USD. Upside Case metal prices are closing prices on July 27, 2011 of US$4.44/lb Cu, US$1,613/oz Au and US$40.34/oz Ag respectively and foreign exchange rate of 0.949 CAD/USD. 26 NYSE-MKT, TSX: NG www.novagold.com
  • 27. NOVAGOLD RESERVE/RESOURCE TABLE At April 30, 2012 Donlin Gold (NOVAGOLD 50%) Tonnage Grade* Metal content NOVAGOLD share** GOLD Mt g/t Moz Moz Reserves (100%)1 Proven 7.7 2.32 0.57 0.29 Probable 497.1 2.08 33.28 16.64 P&P 504.8 2.09 33.85 16.93 Resources (100%)3 inclusive of reserves Measured 7.7 2.52 0.63 0.31 Indicated 533.6 2.24 38.38 19.19 M&I 541.3 2.24 39.01 19.50 Inferred 92.2 2.02 5.99 3.00 Galore Creek (NOVAGOLD 50%) Tonnage Grade* Metal content NOVAGOLD share** COPPER Mt %Cu Mlbs Mlbs Reserves (100%)2 Proven 69.0 0.61 900.0 450.0 Probable 459.1 0.58 5,900.0 2,950.0 P&P 528.0 0.59 6,800.0 3,400.0 Resources (100%)4 inclusive of reserves Measured 108.4 0.48 1,147.0 573.5 Indicated 706.3 0.50 7,786.0 3,893.0 M&I 814.7 0.50 8,933.0 4,466.5 Inferred 346.6 0.42 3,230.0 1,615.0 Mt g/t Moz Moz GOLD Reserves (100%)2 Proven 69.0 0.52 1.15 0.58 Probable 459.1 0.29 4.30 2.15 P&P 528.0 0.32 5.45 2.73 Resources (100%)4 inclusive of reserves Measured 108.4 0.48 1.70 0.85 Indicated 706.3 0.28 6.40 3.20 M&I 814.7 0.31 8.00 4.00 Inferred 346.6 0.24 2.70 1.35 Mt g/t Moz Moz SILVER Reserves (100%)2 Proven 69.0 4.94 11.0 5.5 Probable 459.1 6.18 91.2 45.6 P&P 528.0 6.02 102.2 51.1 Resources (100%)4 inclusive of reserves Measured 108.4 4.10 14.30 7.15 Indicated 706.3 5.38 122.10 61.05 M&I 814.7 5.21 136.40 68.20 Inferred 346.6 4.28 47.73 23.87 27 NYSE-MKT, TSX: NG www.novagold.com
  • 28. RESERVE/RESOURCE TABLE (CON’T) Copper Canyon (NOVAGOLD 70%) Tonnage Grade* Metal content NOVAGOLD share** Resources (100%)5,6 COPPER Mt %Cu Mlbs Mlbs Inferred 53.7 0.50 592.0 414.4 GOLD Mt g/t Moz Moz Inferred 53.7 0.73 1.26 0.88 SILVER Mt g/t Moz Moz Inferred 53.7 10.60 18.36 12.85 t = metric tonne Approximate cut-off grades (see Resource Footnotes below): M = million Donlin Gold Reserves1: 0.57 g/t gold g/t = grams/tonne Resources3: 0.46 g/t gold * Reserve grade is diluted; resource Galore Creek Reserves2: C$10.08 NSR grade is in situ. Resources4: C$10.08 NSR ** NOVAGOLD share net after earn-ins Copper Canyon Resources5,6: 0.6% copper equivalent 28 NYSE-MKT, TSX: NG www.novagold.com
  • 29. RESERVE/RESOURCE TABLE (CON’T) Notes: a. These resource estimates have been prepared in accordance with NI43-101 and the CIM Definition Standard, unless otherwise noted. b. See numbered footnotes below on resource information. c. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content d. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces, contained copper pounds as imperial pounds Resource Footnotes: Mineral Reserves are contained within Measured and Indicated pit designs, and supported by a mine plan, featuring variable throughput rates, stockpiling and cut-off optimization. The pit designs and mine plan were optimized on diluted grades using the following economic and technical parameters: Metal price for gold of US$975/oz; reference mining cost of US$1.67/t incremented US$0.0031/t/m with depth from the 220 m elevation (equates to an average mining cost of US$2.14/t), variable processing cost based on the formula 2.1874 x (S%) + 10.65 for each US$/t processed; general and administrative cost of US$2.27/t processed; stockpile rehandle costs of US$0.19/t processed assuming that 45% of mill feed is rehandled; variable recoveries by rock type, ranging from 86.66% in shale to 94.17% in intrusive rocks in the Akivik domain; refining and freight charges of US$1.78/oz gold; royalty considerations of 4.5%; and variable pit slope angles, ranging from 23º to 43º. Mineral Reserves are reported using an optimized net sales return value based on the following equation: Net Sales Return = Au grade * Recovery * (US$975/oz – (1.78 + (US$975/oz – 1.78) * 0.045)) - (10.65 + 2.1874 * (S%) + 2.27 + 0.19) and reported in US$/tonne. Assuming an average recovery of 89.54% and an average S% grade of 1.07%, the marginal gold cutoff grade would be approximately 0.57 g/t, or the gold grade that would equate to a 0.001 NSR cutoff at these same values. The life of mine strip ratio is 5.48. The assumed life-of-mine throughput rate is 53.5 kt/d. Mineral Reserves are contained within Measured and Indicated pit designs using metal prices for copper, gold and silver of US$2.50/lb, US$1,050/oz, and US$16.85/oz, respectively. Appropriate mining costs, processing costs, metal recoveries and inter ramp pit slope angles varing from 42º to 55º were used to generate the pit phase designs. Mineral Reserves have been calculated using a 'cashflow grade' ($NSR/SAG mill hr) cut-off which was varied from year to year to optimize NPV. The net smelter return (NSR) was calculated as follows: NSR = Recoverable Revenue – TCRC (on a per tonne basis), where: NSR = Net Smelter Return; TCRC = Transportation and Refining Costs; Recoverable Revenue = Revenue in Canadian dollars for recoverable copper, recoverable gold, and recoverable silver using metal prices of US$2.50/lb, US$1,050/oz, and US$16.85/oz for copper, gold, and silver, respectively, at an exchange rate of CDN$1.1 to US$1.0; Cu Recovery = Recovery for copper based on mineral zone and total copper grade; for Mineral Reserves this NSR calculation includes mining dilution. SAG throughputs were modeled by correlation with alteration types. Cash flow grades were calculated as the product of NSR value in $/t and throughput in t/hr. The life of mine strip ratio is 2.16. Mineral Resources are contained within a conceptual Measured, Indicated and Inferred optimized pit shell using the following assumptions: gold price of US$1,200/oz; variable process cost based on 2.1874 * (sulphur grade) + 10.6485; administration cost of US$2.29/t; refining, freight & marketing (selling costs) of US$1.85/oz recovered; stockpile rehandle costs of US$0.20/t processed assuming that 45% of mill feed is rehandled; variable royalty rate, based on royalty of 4.5% * (Au price – selling cost). Mineral Resources have been estimated using a constant Net Sales Return cut-off of US$0.001/t milled. The Net Sales Return was calculated using the formula: Net Sales Return = Au grade * Recovery * (US$1200/oz – (1.85 + ((US$1200/oz – 1.85) * 0.045)) - (10.65 + 2.1874 * (S%) + 2.29 + 0.20)) and reported in US$/tonne. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred Resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates". Mineral resources are contained within a conceptual Measured, Indicated and Inferred optimized pit shell using the same economic and technical parameters as used for Mineral Reserves. Tonnages are assigned based on proportion of the block below topography. The overburden/bedrock boundary has been assigned on a whole block basis. Mineral resources have been estimated using a constant NSR cut-off of C$10.08/t milled. The Net Smelter Return (NSR) was calculated as follows: NSR = Recoverable Revenue – TCRC (on a per tonne basis), where: NSR = Diluted Net Smelter Return; TCRC = Transportation and Refining Costs; Recoverable Revenue = Revenue in Canadian dollars for recoverable copper, recoverable gold, and recoverable silver using silver using the economic and technical parameters mentioned above. The mineral resource includes material within the conceptual M,I&I pit that is not scheduled for processing in the mine plan but is above cutoff. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred Resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates". The copper-equivalent grade was calculated as follows: CuEq = Recoverable Revenue ÷ 2204.62 * 100 ÷ 1.55. Where: CuEq = Copper equivalent grade; Recoverable Revenue = Revenue in US dollars for recoverable copper, recoverable gold and recoverable silver using metal prices of US$1.55/lb, US$650/oz, and US$11/oz for copper, gold, and silver, respectively; for the purposes of the equivalency formula, Cu Recovery is assumed to be 100%. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred Resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates". NOVAGOLD Canada Inc. has agreed to transfer its 60% joint venture interest in the Copper Canyon property to the Galore Creek Partnership, which is equally owned by NOVAGOLD Canada Inc. and a subsidiary of Teck Resources Limited. The remaining 40% joint venture interest in the Copper Canyon property is owned by another wholly owned subsidiary of NOVAGOLD. Cautionary Note Concerning Reserve & Resource Estimates This summary table uses the term “resources”, “measured resources”, “indicated resources” and “inferred resources”. United States investors are advised that, while such terms are recognized and required by Canadian securities laws, the United States Securities and Exchange Commission (the “SEC”) does not recognize them. Under United States standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Mineral resources that are not mineral reserves do not have demonstrated economic viability. United States investors are cautioned not to assume that all or any part of measured or indicated resources will ever be converted into reserves. Further, inferred resources have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. It cannot be assumed that all or any part of the inferred resources will ever be upgraded to a higher category. Therefore, United States investors are also cautioned not to assume that all or any part of the inferred resources exist, or that they can be mined legally or economically. Disclosure of “contained ounces” is permitted disclosure under Canadian regulations, however, the SEC normally only permits issuers to report “resources” as in place tonnage and grade without reference to unit measures. Accordingly, information concerning descriptions of mineralization and resources contained in this release may not be comparable to information made public by United States companies subject to the reporting and disclosure requirements of the SEC. NI 43-101 is a rule developed by the Canadian Securities Administrators, which established standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Unless otherwise indicated, all resource estimates contained in this circular have been prepared in accordance with NI 43-101 and the CIM Definition Standards. Technical Reports and Qualified Persons The documents referenced below provide supporting technical information for each of NOVAGOLD's projects. Project Qualified Person(s) Most Recent Disclosure & Filing Date Donlin Gold Tony Lipiec, P. Eng., AMEC Donlin Creek Gold Project Gordon Seibel R.M. SME, AMEC Alaska, USA Kirk Hanson P.E., AMEC NI 43-101 Technical Report on Second Updated Feasibility Study amended filing on January 23, 2012 Galore Creek Robert Gill, P.Eng., AMEC Galore Creek Copper–Gold Project, Jay Melnyk, P.Eng., AMEC British Columbia, NI 43-101 Technical Report on Pre-Feasibility Study, Greg Kulla, P.Geo., AMEC filed on September 12, 2011 Greg Wortman, P.Eng., AMEC Dana Rogers, P.Eng., Lemley International Heather White, B.Sc., P.Eng., who is a consultant to NOVAGOLD and a “qualified person” under NI 43-101, has approved the scientific and technical information included in this section related to: (i) Donlin Gold since the issuance of the technical report filed on January 23, 2012, and (ii) Galore Creek since the issuance of the technical report filed on September 12, 2011. 29 NYSE-MKT, TSX: NG www.novagold.com
  • 30. CONTACT US NOVAGOLD RESOURCES INC. 200 Granville St., Suite 2300 Vancouver, BC Canada V6C 1S4 T 604 669 6227 TF 1 866 669 6227 F 604 669 6272 www.novagold.com info@novagold.com Mélanie Hennessey Erin O’Toole VP, Corporate Communications Analyst, Investor Relations melanie.hennessey@novagold.com erin.otoole@novagold.com 30 NYSE-MKT, TSX: NG www.novagold.com