SlideShare uma empresa Scribd logo
1 de 1
Associate Name:   Director of Engineerin  g     Employee ID:       Date: 3/30/16
Dept. Manager: General Manager       Dept: Engineering Location Twin Falls, ID
RATING DEFINITIONS
O = Outstanding (Consistently exceeds expectations in all areas)
AE = Above Expectations (Exceeds most job requirements)
ME = Meets Expectations (Solid Performer)
BE = Below Expectations (Below acceptable performance)
N = New (Associate is too new to evaluate-less than 3 months in position)
AREAS TO BE EVALUATED ASSOCIATE SELF-EVALUATION MANAGER’S EVALUATION
1) Listener Focused (The director has
successfully maintained a consistent broadcast
in all locations.)
O AE ME BE N O AE ME BE N
2) Maintenance and repairs (The director has
overseen the repairs and improvements on all
locations successfully.)
O AE ME BE N O AE ME BE N
3) Hiring, training and management of
engineers and technicians (The director has
provided leadership and training to staff. The
director has trained staff on new technology.)
O AE ME BE N O AE ME BE N
4) Roles & Responsibilities (The directors has
maintained the budget by interacting with
vendors and awareness of constraints. The
director has kept current with all FCC
regulations.)
O AE ME BE N O AE ME BE N
5) Initiative / Effectiveness (The director has
researched new technology and implemented it
with budgetary awareness.)
O AE ME BE N O AE ME BE N
Overall Performance Rating by MANAGER O AE ME BE N
What the Associate does well (Manager completes):
Areas of improvement opportunity--including personal development. (Manager completes): The director could spend more time
interacting with his staff to improve the culture of the department.
Associate Comments/Career Goals (Associate completes):
           
Associate Signature Date (mm/dd/yyyy) Department Manager Signature Date (mm/dd/yyyy)
     
Signature acknowledges the associate has reviewed this information, but does
not imply that he/she agrees with its contents or imply any promise of
advancement.
PERFORMANCE REVIEW FORM
(Give a copy of review to the associate, place a copy in the associate’s file)

Mais conteúdo relacionado

Mais procurados

Richard O'Neill Resume
Richard O'Neill ResumeRichard O'Neill Resume
Richard O'Neill Resumerichard oneill
 
Charles-Smith Resume
Charles-Smith ResumeCharles-Smith Resume
Charles-Smith ResumeCharles Smith
 
James_Stinson_Resume_82416
James_Stinson_Resume_82416James_Stinson_Resume_82416
James_Stinson_Resume_82416James Stinson
 
Resume - Alden Onoya
Resume - Alden OnoyaResume - Alden Onoya
Resume - Alden OnoyaAlden Onoya
 
Darren Strawn Resume-9-5-2015
Darren Strawn Resume-9-5-2015Darren Strawn Resume-9-5-2015
Darren Strawn Resume-9-5-2015Darren Strawn
 
RESUME 2015 A GROMER.docx
RESUME 2015 A GROMER.docxRESUME 2015 A GROMER.docx
RESUME 2015 A GROMER.docxTony Gromer
 
Assignment 2
Assignment 2Assignment 2
Assignment 2Momo Poyi
 
Resume December 2015
Resume December 2015Resume December 2015
Resume December 2015Eric Oja
 
measurement tadika Assignment no.2
measurement tadika Assignment no.2 measurement tadika Assignment no.2
measurement tadika Assignment no.2 Sheng Zhe
 

Mais procurados (12)

Richard O'Neill Resume
Richard O'Neill ResumeRichard O'Neill Resume
Richard O'Neill Resume
 
Charles-Smith Resume
Charles-Smith ResumeCharles-Smith Resume
Charles-Smith Resume
 
Jerry Metts
Jerry MettsJerry Metts
Jerry Metts
 
James_Stinson_Resume_82416
James_Stinson_Resume_82416James_Stinson_Resume_82416
James_Stinson_Resume_82416
 
Senior Project-Manager
Senior Project-ManagerSenior Project-Manager
Senior Project-Manager
 
Resume - Alden Onoya
Resume - Alden OnoyaResume - Alden Onoya
Resume - Alden Onoya
 
Darren Strawn Resume-9-5-2015
Darren Strawn Resume-9-5-2015Darren Strawn Resume-9-5-2015
Darren Strawn Resume-9-5-2015
 
RESUME 2015 A GROMER.docx
RESUME 2015 A GROMER.docxRESUME 2015 A GROMER.docx
RESUME 2015 A GROMER.docx
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
Resume December 2015
Resume December 2015Resume December 2015
Resume December 2015
 
My Resume 2-10-16
My Resume 2-10-16My Resume 2-10-16
My Resume 2-10-16
 
measurement tadika Assignment no.2
measurement tadika Assignment no.2 measurement tadika Assignment no.2
measurement tadika Assignment no.2
 

Destaque

стратегічні партнери кнеу
стратегічні партнери кнеустратегічні партнери кнеу
стратегічні партнери кнеуЛера Волкова
 
Ashok php
Ashok phpAshok php
Ashok phpashok s
 
Elaboración de un proyecto de investigación
Elaboración de un proyecto de investigación Elaboración de un proyecto de investigación
Elaboración de un proyecto de investigación innovalabcun
 
Naturaleza Fragil
Naturaleza FragilNaturaleza Fragil
Naturaleza Fragilpetete1999
 
How to Do Cross-Selling: Top Tips and Tricks
How to Do Cross-Selling: Top Tips and TricksHow to Do Cross-Selling: Top Tips and Tricks
How to Do Cross-Selling: Top Tips and TricksAndriy Popov
 
B2B Sales Prospecting Methods
B2B Sales Prospecting MethodsB2B Sales Prospecting Methods
B2B Sales Prospecting MethodsAndriy Popov
 
Inicios salud o cupacional en colombia
Inicios salud o cupacional en colombiaInicios salud o cupacional en colombia
Inicios salud o cupacional en colombiaEliana Gallego
 
Contabilidad Gubernamental
Contabilidad Gubernamental Contabilidad Gubernamental
Contabilidad Gubernamental uigv
 
Inocencio meléndez julio. nación. el comportamiento de la economí colombia...
Inocencio meléndez julio. nación. el comportamiento de la economí colombia...Inocencio meléndez julio. nación. el comportamiento de la economí colombia...
Inocencio meléndez julio. nación. el comportamiento de la economí colombia...INOCENCIO MELÉNDEZ JULIO
 

Destaque (12)

стратегічні партнери кнеу
стратегічні партнери кнеустратегічні партнери кнеу
стратегічні партнери кнеу
 
Ashok php
Ashok phpAshok php
Ashok php
 
Pres
PresPres
Pres
 
Nat's cat
Nat's catNat's cat
Nat's cat
 
My classClck to Edit
My classClck to EditMy classClck to Edit
My classClck to Edit
 
Elaboración de un proyecto de investigación
Elaboración de un proyecto de investigación Elaboración de un proyecto de investigación
Elaboración de un proyecto de investigación
 
Naturaleza Fragil
Naturaleza FragilNaturaleza Fragil
Naturaleza Fragil
 
How to Do Cross-Selling: Top Tips and Tricks
How to Do Cross-Selling: Top Tips and TricksHow to Do Cross-Selling: Top Tips and Tricks
How to Do Cross-Selling: Top Tips and Tricks
 
B2B Sales Prospecting Methods
B2B Sales Prospecting MethodsB2B Sales Prospecting Methods
B2B Sales Prospecting Methods
 
Inicios salud o cupacional en colombia
Inicios salud o cupacional en colombiaInicios salud o cupacional en colombia
Inicios salud o cupacional en colombia
 
Contabilidad Gubernamental
Contabilidad Gubernamental Contabilidad Gubernamental
Contabilidad Gubernamental
 
Inocencio meléndez julio. nación. el comportamiento de la economí colombia...
Inocencio meléndez julio. nación. el comportamiento de la economí colombia...Inocencio meléndez julio. nación. el comportamiento de la economí colombia...
Inocencio meléndez julio. nación. el comportamiento de la economí colombia...
 

Semelhante a Performance Review Director of Engineering

MGMT2718 Human Resource Management.docx
MGMT2718 Human Resource Management.docxMGMT2718 Human Resource Management.docx
MGMT2718 Human Resource Management.docxstirlingvwriters
 
Management science
Management scienceManagement science
Management scienceShane Ah
 
IDENTIFYING INFORMATION EMPLOYEE’S NAMEPOSITION FORMDR.docx
IDENTIFYING INFORMATION EMPLOYEE’S NAMEPOSITION FORMDR.docxIDENTIFYING INFORMATION EMPLOYEE’S NAMEPOSITION FORMDR.docx
IDENTIFYING INFORMATION EMPLOYEE’S NAMEPOSITION FORMDR.docxsheronlewthwaite
 
PM skillz [jz]
PM skillz [jz]PM skillz [jz]
PM skillz [jz]Jo Zaarour
 
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahMohamed Bamadhaf
 
Timothy Neal resume-7-05-16
Timothy Neal resume-7-05-16Timothy Neal resume-7-05-16
Timothy Neal resume-7-05-16Tim Neal
 
Timothy neal resume 7-05-16
Timothy neal resume 7-05-16Timothy neal resume 7-05-16
Timothy neal resume 7-05-16Tim Neal
 
Personal appraisal form
Personal appraisal formPersonal appraisal form
Personal appraisal formLuther Akyoo
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.pptMohd Zulhairi Mohd Noor
 
Performance management
Performance managementPerformance management
Performance managementdrgurudutta
 
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales DirectorMy Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales DirectorElmo B. Joseph
 
Scope Management Powerpoint Presentation Slides
Scope Management Powerpoint Presentation SlidesScope Management Powerpoint Presentation Slides
Scope Management Powerpoint Presentation SlidesSlideTeam
 
Annual Review - Jonathan Fuller - 2014
Annual Review - Jonathan Fuller - 2014Annual Review - Jonathan Fuller - 2014
Annual Review - Jonathan Fuller - 2014Jonathan Fuller
 
Puneet Green Belt(13th feb).pptx
Puneet Green Belt(13th feb).pptxPuneet Green Belt(13th feb).pptx
Puneet Green Belt(13th feb).pptxPuneet Gupta
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfProject Cubicle
 

Semelhante a Performance Review Director of Engineering (20)

Earned Effort Analysis
Earned Effort AnalysisEarned Effort Analysis
Earned Effort Analysis
 
MGMT2718 Human Resource Management.docx
MGMT2718 Human Resource Management.docxMGMT2718 Human Resource Management.docx
MGMT2718 Human Resource Management.docx
 
90 Day Review
90 Day Review90 Day Review
90 Day Review
 
Management science
Management scienceManagement science
Management science
 
IDENTIFYING INFORMATION EMPLOYEE’S NAMEPOSITION FORMDR.docx
IDENTIFYING INFORMATION EMPLOYEE’S NAMEPOSITION FORMDR.docxIDENTIFYING INFORMATION EMPLOYEE’S NAMEPOSITION FORMDR.docx
IDENTIFYING INFORMATION EMPLOYEE’S NAMEPOSITION FORMDR.docx
 
PM skillz [jz]
PM skillz [jz]PM skillz [jz]
PM skillz [jz]
 
Proect Review
Proect ReviewProect Review
Proect Review
 
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS Bamadefah
 
Dynamic methods solution
Dynamic methods solutionDynamic methods solution
Dynamic methods solution
 
Timothy Neal resume-7-05-16
Timothy Neal resume-7-05-16Timothy Neal resume-7-05-16
Timothy Neal resume-7-05-16
 
Timothy neal resume 7-05-16
Timothy neal resume 7-05-16Timothy neal resume 7-05-16
Timothy neal resume 7-05-16
 
Personal appraisal form
Personal appraisal formPersonal appraisal form
Personal appraisal form
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt
 
Performance management
Performance managementPerformance management
Performance management
 
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales DirectorMy Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
 
HRM REPORT
HRM REPORTHRM REPORT
HRM REPORT
 
Scope Management Powerpoint Presentation Slides
Scope Management Powerpoint Presentation SlidesScope Management Powerpoint Presentation Slides
Scope Management Powerpoint Presentation Slides
 
Annual Review - Jonathan Fuller - 2014
Annual Review - Jonathan Fuller - 2014Annual Review - Jonathan Fuller - 2014
Annual Review - Jonathan Fuller - 2014
 
Puneet Green Belt(13th feb).pptx
Puneet Green Belt(13th feb).pptxPuneet Green Belt(13th feb).pptx
Puneet Green Belt(13th feb).pptx
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 

Performance Review Director of Engineering

  • 1. Associate Name:   Director of Engineerin  g     Employee ID:       Date: 3/30/16 Dept. Manager: General Manager       Dept: Engineering Location Twin Falls, ID RATING DEFINITIONS O = Outstanding (Consistently exceeds expectations in all areas) AE = Above Expectations (Exceeds most job requirements) ME = Meets Expectations (Solid Performer) BE = Below Expectations (Below acceptable performance) N = New (Associate is too new to evaluate-less than 3 months in position) AREAS TO BE EVALUATED ASSOCIATE SELF-EVALUATION MANAGER’S EVALUATION 1) Listener Focused (The director has successfully maintained a consistent broadcast in all locations.) O AE ME BE N O AE ME BE N 2) Maintenance and repairs (The director has overseen the repairs and improvements on all locations successfully.) O AE ME BE N O AE ME BE N 3) Hiring, training and management of engineers and technicians (The director has provided leadership and training to staff. The director has trained staff on new technology.) O AE ME BE N O AE ME BE N 4) Roles & Responsibilities (The directors has maintained the budget by interacting with vendors and awareness of constraints. The director has kept current with all FCC regulations.) O AE ME BE N O AE ME BE N 5) Initiative / Effectiveness (The director has researched new technology and implemented it with budgetary awareness.) O AE ME BE N O AE ME BE N Overall Performance Rating by MANAGER O AE ME BE N What the Associate does well (Manager completes): Areas of improvement opportunity--including personal development. (Manager completes): The director could spend more time interacting with his staff to improve the culture of the department. Associate Comments/Career Goals (Associate completes):             Associate Signature Date (mm/dd/yyyy) Department Manager Signature Date (mm/dd/yyyy)       Signature acknowledges the associate has reviewed this information, but does not imply that he/she agrees with its contents or imply any promise of advancement. PERFORMANCE REVIEW FORM (Give a copy of review to the associate, place a copy in the associate’s file)