SlideShare uma empresa Scribd logo
1 de 9
FINAL PROJECT DIGITAL ARTIFACT
ON
FINANCE FOR
DEVELOPMENT
7th December, 2015
DESIGNS/IMPLEMENTATIONS OF DONORS
PROJECT IN FINANCE FOR DEVELOPMENT
BY
NKORO, NKORO E.
12/8/2015
© Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development
1
WHO IS THE TARGET AUDIENCE
FOR THIS PROJECT?
• The General Public, Government Officials,
Policy Makers, International & National
Non- Governmental Organizations (NGO’s),
Multinational & Local Companies,
Philanthropists, Banks, Traditional Rulers
etc.
12/8/2015
© Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for
Development
2
OVRVIEW
• Finance for Development which is a new course or program from the
World Bank Group that seek to allow the individuals, groups, nations
and even the world to have a better understanding and knowledge
towards what is finance and how its being used in regards to
development especially as focus is now on Sustainable Development
Goals (SDGs) which had replace Minillium Development Goals
(MDGs).
• The sustainable development goals (SDGs) are a new, universal set
of goals, targets and indicators that UN member states will be
expected to use to frame their agendas and political policies over
the next 15 years.
• The SDGs follow and expand on the millennium development goals
(MDGs), which were agreed by governments in 2001 and are due to
expire at the end of this year.
• Finance for Development is how money and resources are being use
and utilized in managing funds used in donor projects/programmes
12/8/2015
© Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for
Development
3
LESSONS LEARNT
• That Finance for development should be
sustainable as coined from SDGs – concept of
Sustainable Development
• That Tax being another means of finance for
development
• Commercial finance as part of innovative
finance the World Bank Group and ODA uses
to finance development and investments
• Billions to Trillion concepts and our
contribution
12/8/2015
© Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for
Development
4
OBSERVATION/PROBLEMS
• As a Development worker in one of the Donor Project
in over 6 six years, and as part of my interactions,
trainings, workshops, etc regarding donor funded
projects, the designs and its implementation been a
great concern to me and even to others, especially
implementers of donor funded project.
• I have observed that the period between a project
design and its actual implementation time is always a
long gap that spanned from one year to almost 5 years
before the project eventual start
operation/implementation. This leads to some issues
associated with Exchange rate differences, under/over
budgeting, political environment instability/policy,
economical policies of the benefitting nations, etc.
12/8/2015
© Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for
Development
5
OBSERVATION/PROBLEMS (cont’d)
• Exchange rate differences: This causes the project during
implementation to have setbacks, because between the
project design and its implementation, a long gap had been
created causing either over loss/gain in exchange rate
difference
• Under/over budgeting: When Project(s) are either under or
over budgeted during project design, you discovered that
when its actual implementations commences, there are
always big gap/differences, and these affect cost and finance
management, that either what was costed before could be
over costed or under costed
• Political environment: the instability and or polictal policy of
the economy can hinder the gap between project design an
implementation
• Economics policies of the benefitting nations, etc. can also
be barriers to problem associated with the gap/difference
between project design and implementation.
12/8/2015
© Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for
Development
6
PROBLEMS ENCOUNTERED IN FUNDED DONOR
PROJECTS IN SOME DEVELOPING COUNTRIES
• Benefitting contribution by the benefitting
group/individuals
• Counterpart fund payment/contribution by
government
• Inadequate envelop to entertain all request
by communities
• Cost provided in the project document is
inadequate to finance projects/subprojects
• Sustainability of some activities arising out of
lack of cohesion of group members/groups
12/8/2015
© Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for
Development
7
RECOMMENDATIONS
• I do recommend that if these few issues I
have raised are met and resolve
strategically and innovative/creative
Monitoring and Evaluation towards donor
funded projects is also used, it will help to
actualize our aims towards SGDs and
finance for development will become
more effectively utilized and harness.
12/8/2015
© Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for
Development
8
for
© Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development
12/8/2015 9

Mais conteúdo relacionado

Mais procurados

Climate finance clapp(cicero) financial instruments-ccxg gf sep2014
Climate finance clapp(cicero) financial instruments-ccxg gf sep2014Climate finance clapp(cicero) financial instruments-ccxg gf sep2014
Climate finance clapp(cicero) financial instruments-ccxg gf sep2014OECD Environment
 
Climate Action Enhancement Package
Climate Action Enhancement PackageClimate Action Enhancement Package
Climate Action Enhancement PackageNAP Global Network
 
Mobilising private-sector investment to mitigate climate change in Africa
Mobilising private-sector investment to mitigate climate change in AfricaMobilising private-sector investment to mitigate climate change in Africa
Mobilising private-sector investment to mitigate climate change in AfricaFrancois Stepman
 
Leo Park GCF - Green Climate Fund: Developing a green finance facility to cat...
Leo Park GCF - Green Climate Fund: Developing a green finance facility to cat...Leo Park GCF - Green Climate Fund: Developing a green finance facility to cat...
Leo Park GCF - Green Climate Fund: Developing a green finance facility to cat...OECD Environment
 
Pcsd in post2015 agenda brussels 21oct2014
Pcsd in post2015 agenda brussels 21oct2014Pcsd in post2015 agenda brussels 21oct2014
Pcsd in post2015 agenda brussels 21oct2014PCDACCOUNT
 
Presentation at EU Focal Points Meeting_2 December 2015
Presentation at EU Focal Points Meeting_2 December 2015Presentation at EU Focal Points Meeting_2 December 2015
Presentation at EU Focal Points Meeting_2 December 2015PCDACCOUNT
 
Climate finance aoki (gef)scale up&replication-gef perspectives-ccxg gf march...
Climate finance aoki (gef)scale up&replication-gef perspectives-ccxg gf march...Climate finance aoki (gef)scale up&replication-gef perspectives-ccxg gf march...
Climate finance aoki (gef)scale up&replication-gef perspectives-ccxg gf march...OECD Environment
 
New options for CCS in the UNFCCC - Stefan Bakker, ECN
New options for CCS in the UNFCCC - Stefan Bakker, ECNNew options for CCS in the UNFCCC - Stefan Bakker, ECN
New options for CCS in the UNFCCC - Stefan Bakker, ECNGlobal CCS Institute
 
Presentation- Seventh Roundtable on Financing Agricultural Water - Richard co...
Presentation- Seventh Roundtable on Financing Agricultural Water - Richard co...Presentation- Seventh Roundtable on Financing Agricultural Water - Richard co...
Presentation- Seventh Roundtable on Financing Agricultural Water - Richard co...OECD Environment
 
Making blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarMaking blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarOECD Environment
 
The Role of the Private Sector in NAP Processes
The Role of the Private Sector in NAP ProcessesThe Role of the Private Sector in NAP Processes
The Role of the Private Sector in NAP ProcessesNAP Global Network
 
Public-Private Partnerships: An innovative approach to help meet adaptation p...
Public-Private Partnerships: An innovative approach to help meet adaptation p...Public-Private Partnerships: An innovative approach to help meet adaptation p...
Public-Private Partnerships: An innovative approach to help meet adaptation p...NAP Global Network
 
Engaging Private Sector for Financing the National Adaptation Plan
Engaging Private Sector for Financing the National Adaptation PlanEngaging Private Sector for Financing the National Adaptation Plan
Engaging Private Sector for Financing the National Adaptation PlanNAP Global Network
 
Practical approach to climate finance View from the donors: CIFF´s experience
Practical approach to climate finance View from the donors: CIFF´s experiencePractical approach to climate finance View from the donors: CIFF´s experience
Practical approach to climate finance View from the donors: CIFF´s experienceMedi Ambient. Generalitat de Catalunya
 

Mais procurados (20)

Climate finance clapp(cicero) financial instruments-ccxg gf sep2014
Climate finance clapp(cicero) financial instruments-ccxg gf sep2014Climate finance clapp(cicero) financial instruments-ccxg gf sep2014
Climate finance clapp(cicero) financial instruments-ccxg gf sep2014
 
Climate Action Enhancement Package
Climate Action Enhancement PackageClimate Action Enhancement Package
Climate Action Enhancement Package
 
Mobilising private-sector investment to mitigate climate change in Africa
Mobilising private-sector investment to mitigate climate change in AfricaMobilising private-sector investment to mitigate climate change in Africa
Mobilising private-sector investment to mitigate climate change in Africa
 
Leo Park GCF - Green Climate Fund: Developing a green finance facility to cat...
Leo Park GCF - Green Climate Fund: Developing a green finance facility to cat...Leo Park GCF - Green Climate Fund: Developing a green finance facility to cat...
Leo Park GCF - Green Climate Fund: Developing a green finance facility to cat...
 
Pcsd in post2015 agenda brussels 21oct2014
Pcsd in post2015 agenda brussels 21oct2014Pcsd in post2015 agenda brussels 21oct2014
Pcsd in post2015 agenda brussels 21oct2014
 
Presentation at EU Focal Points Meeting_2 December 2015
Presentation at EU Focal Points Meeting_2 December 2015Presentation at EU Focal Points Meeting_2 December 2015
Presentation at EU Focal Points Meeting_2 December 2015
 
Climate finance aoki (gef)scale up&replication-gef perspectives-ccxg gf march...
Climate finance aoki (gef)scale up&replication-gef perspectives-ccxg gf march...Climate finance aoki (gef)scale up&replication-gef perspectives-ccxg gf march...
Climate finance aoki (gef)scale up&replication-gef perspectives-ccxg gf march...
 
15 jan oecd_knowledge_exchange
15 jan oecd_knowledge_exchange15 jan oecd_knowledge_exchange
15 jan oecd_knowledge_exchange
 
New options for CCS in the UNFCCC - Stefan Bakker, ECN
New options for CCS in the UNFCCC - Stefan Bakker, ECNNew options for CCS in the UNFCCC - Stefan Bakker, ECN
New options for CCS in the UNFCCC - Stefan Bakker, ECN
 
Presentation- Seventh Roundtable on Financing Agricultural Water - Richard co...
Presentation- Seventh Roundtable on Financing Agricultural Water - Richard co...Presentation- Seventh Roundtable on Financing Agricultural Water - Richard co...
Presentation- Seventh Roundtable on Financing Agricultural Water - Richard co...
 
Session 10 Asger Garnak
Session 10 Asger GarnakSession 10 Asger Garnak
Session 10 Asger Garnak
 
Making blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinarMaking blended finance work for water and sanitation green talks webinar
Making blended finance work for water and sanitation green talks webinar
 
16 jan env_connecting_investors
16 jan env_connecting_investors16 jan env_connecting_investors
16 jan env_connecting_investors
 
The Role of the Private Sector in NAP Processes
The Role of the Private Sector in NAP ProcessesThe Role of the Private Sector in NAP Processes
The Role of the Private Sector in NAP Processes
 
Public-Private Partnerships: An innovative approach to help meet adaptation p...
Public-Private Partnerships: An innovative approach to help meet adaptation p...Public-Private Partnerships: An innovative approach to help meet adaptation p...
Public-Private Partnerships: An innovative approach to help meet adaptation p...
 
Engaging Private Sector for Financing the National Adaptation Plan
Engaging Private Sector for Financing the National Adaptation PlanEngaging Private Sector for Financing the National Adaptation Plan
Engaging Private Sector for Financing the National Adaptation Plan
 
Practical approach to climate finance View from the donors: CIFF´s experience
Practical approach to climate finance View from the donors: CIFF´s experiencePractical approach to climate finance View from the donors: CIFF´s experience
Practical approach to climate finance View from the donors: CIFF´s experience
 
Week1 intro
Week1 introWeek1 intro
Week1 intro
 
OECD making blended finance work for the sustainable development goals
OECD making blended finance work for the sustainable development goalsOECD making blended finance work for the sustainable development goals
OECD making blended finance work for the sustainable development goals
 
Session 9 Suk Huyn
Session 9 Suk HuynSession 9 Suk Huyn
Session 9 Suk Huyn
 

Semelhante a Design and implementation in finace for development

FINANCING FOR DEVELOPMENT IN CHAD
FINANCING FOR DEVELOPMENT IN CHADFINANCING FOR DEVELOPMENT IN CHAD
FINANCING FOR DEVELOPMENT IN CHADAndréas Koumato
 
Fmdv de log financing sd gs subnational level
Fmdv de log financing sd gs subnational levelFmdv de log financing sd gs subnational level
Fmdv de log financing sd gs subnational levelAntoine Rerolle
 
International Private Financing for Development in Africa
International Private Financing for Development in AfricaInternational Private Financing for Development in Africa
International Private Financing for Development in AfricaRhys Williams
 
Capacity Building Programme on Climate Change: Programme Overview
Capacity Building Programme on Climate Change: Programme OverviewCapacity Building Programme on Climate Change: Programme Overview
Capacity Building Programme on Climate Change: Programme OverviewCIFOR-ICRAF
 
Financing and Impletementing the Post 2015 Agenda
Financing and Impletementing the Post 2015 AgendaFinancing and Impletementing the Post 2015 Agenda
Financing and Impletementing the Post 2015 AgendaSDGsPlus
 
Consultant climate finance readiness colombia final for distribution
Consultant climate finance readiness colombia final for distributionConsultant climate finance readiness colombia final for distribution
Consultant climate finance readiness colombia final for distributionSebastian Lema
 
Budgeting for societal goals: Putting it all together - Andrew BLAZEY, OECD
Budgeting for societal goals:  Putting it all together - Andrew BLAZEY, OECDBudgeting for societal goals:  Putting it all together - Andrew BLAZEY, OECD
Budgeting for societal goals: Putting it all together - Andrew BLAZEY, OECDOECD Governance
 
The Importance of the Private Sector in Financing for Development
The Importance of the Private Sector in Financing for DevelopmentThe Importance of the Private Sector in Financing for Development
The Importance of the Private Sector in Financing for Developmentmbrixriisager
 
Sustainable Development Goals and Development Impact Bonds
Sustainable Development Goals and Development Impact Bonds Sustainable Development Goals and Development Impact Bonds
Sustainable Development Goals and Development Impact Bonds Taruna Gupta
 
Nokia Corporate Responsibility 1.0
Nokia Corporate Responsibility 1.0Nokia Corporate Responsibility 1.0
Nokia Corporate Responsibility 1.0Jorge Fernandez
 
BEAM - The Business with Impact Programme, Jyri Wuorisalo, Kuopio Innovation
BEAM - The Business with Impact Programme, Jyri Wuorisalo, Kuopio InnovationBEAM - The Business with Impact Programme, Jyri Wuorisalo, Kuopio Innovation
BEAM - The Business with Impact Programme, Jyri Wuorisalo, Kuopio InnovationBusiness Finland
 
Anibal Aguilar brochure Nssd
Anibal Aguilar brochure Nssd Anibal Aguilar brochure Nssd
Anibal Aguilar brochure Nssd Anibal AGuilar
 
Session.3.Yared_.Tsegay.Global forum VLR.pptx
Session.3.Yared_.Tsegay.Global forum VLR.pptxSession.3.Yared_.Tsegay.Global forum VLR.pptx
Session.3.Yared_.Tsegay.Global forum VLR.pptxxordan95
 
Session.3.Yared_.Tsegay.Global forum VLR.pptx
Session.3.Yared_.Tsegay.Global forum VLR.pptxSession.3.Yared_.Tsegay.Global forum VLR.pptx
Session.3.Yared_.Tsegay.Global forum VLR.pptxaryan524
 
Day 2: Plan to Project Process
Day 2: Plan to Project ProcessDay 2: Plan to Project Process
Day 2: Plan to Project ProcessNAP Global Network
 

Semelhante a Design and implementation in finace for development (20)

FINANCING FOR DEVELOPMENT IN CHAD
FINANCING FOR DEVELOPMENT IN CHADFINANCING FOR DEVELOPMENT IN CHAD
FINANCING FOR DEVELOPMENT IN CHAD
 
F4D_Final_Web_0
F4D_Final_Web_0F4D_Final_Web_0
F4D_Final_Web_0
 
Fmdv de log financing sd gs subnational level
Fmdv de log financing sd gs subnational levelFmdv de log financing sd gs subnational level
Fmdv de log financing sd gs subnational level
 
International Private Financing for Development in Africa
International Private Financing for Development in AfricaInternational Private Financing for Development in Africa
International Private Financing for Development in Africa
 
International Private Financing for Development in Africa: Challenges and Opp...
International Private Financing for Development in Africa: Challenges and Opp...International Private Financing for Development in Africa: Challenges and Opp...
International Private Financing for Development in Africa: Challenges and Opp...
 
4. WORKSHOP ON PARTNER COUNTRY PERSPECTIVES FOR TRACKING DOMESTIC AND INTERNA...
4. WORKSHOP ON PARTNER COUNTRY PERSPECTIVES FOR TRACKING DOMESTIC AND INTERNA...4. WORKSHOP ON PARTNER COUNTRY PERSPECTIVES FOR TRACKING DOMESTIC AND INTERNA...
4. WORKSHOP ON PARTNER COUNTRY PERSPECTIVES FOR TRACKING DOMESTIC AND INTERNA...
 
Capacity Building Programme on Climate Change: Programme Overview
Capacity Building Programme on Climate Change: Programme OverviewCapacity Building Programme on Climate Change: Programme Overview
Capacity Building Programme on Climate Change: Programme Overview
 
Financing and Impletementing the Post 2015 Agenda
Financing and Impletementing the Post 2015 AgendaFinancing and Impletementing the Post 2015 Agenda
Financing and Impletementing the Post 2015 Agenda
 
Consultant climate finance readiness colombia final for distribution
Consultant climate finance readiness colombia final for distributionConsultant climate finance readiness colombia final for distribution
Consultant climate finance readiness colombia final for distribution
 
Budgeting for societal goals: Putting it all together - Andrew BLAZEY, OECD
Budgeting for societal goals:  Putting it all together - Andrew BLAZEY, OECDBudgeting for societal goals:  Putting it all together - Andrew BLAZEY, OECD
Budgeting for societal goals: Putting it all together - Andrew BLAZEY, OECD
 
The Importance of the Private Sector in Financing for Development
The Importance of the Private Sector in Financing for DevelopmentThe Importance of the Private Sector in Financing for Development
The Importance of the Private Sector in Financing for Development
 
Sustainable Development Goals and Development Impact Bonds
Sustainable Development Goals and Development Impact Bonds Sustainable Development Goals and Development Impact Bonds
Sustainable Development Goals and Development Impact Bonds
 
Public Private Partnerships in the caribbean webinar presentation part 2
Public Private Partnerships in the caribbean webinar presentation part 2Public Private Partnerships in the caribbean webinar presentation part 2
Public Private Partnerships in the caribbean webinar presentation part 2
 
Nokia Corporate Responsibility 1.0
Nokia Corporate Responsibility 1.0Nokia Corporate Responsibility 1.0
Nokia Corporate Responsibility 1.0
 
BEAM - The Business with Impact Programme, Jyri Wuorisalo, Kuopio Innovation
BEAM - The Business with Impact Programme, Jyri Wuorisalo, Kuopio InnovationBEAM - The Business with Impact Programme, Jyri Wuorisalo, Kuopio Innovation
BEAM - The Business with Impact Programme, Jyri Wuorisalo, Kuopio Innovation
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
GIB2015_Closing Financing Gap in Resilient Infrastructure_ArikanGIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
GIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
 
Anibal Aguilar brochure Nssd
Anibal Aguilar brochure Nssd Anibal Aguilar brochure Nssd
Anibal Aguilar brochure Nssd
 
Session.3.Yared_.Tsegay.Global forum VLR.pptx
Session.3.Yared_.Tsegay.Global forum VLR.pptxSession.3.Yared_.Tsegay.Global forum VLR.pptx
Session.3.Yared_.Tsegay.Global forum VLR.pptx
 
Session.3.Yared_.Tsegay.Global forum VLR.pptx
Session.3.Yared_.Tsegay.Global forum VLR.pptxSession.3.Yared_.Tsegay.Global forum VLR.pptx
Session.3.Yared_.Tsegay.Global forum VLR.pptx
 
Day 2: Plan to Project Process
Day 2: Plan to Project ProcessDay 2: Plan to Project Process
Day 2: Plan to Project Process
 

Último

OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxhiddenlevers
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingMaristelaRamos12
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfGale Pooley
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free DeliveryPooja Nehwal
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja Nehwal
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spiritegoetzinger
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130Suhani Kapoor
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfGale Pooley
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 

Último (20)

OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of Marketing
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdf
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spirit
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 

Design and implementation in finace for development

  • 1. FINAL PROJECT DIGITAL ARTIFACT ON FINANCE FOR DEVELOPMENT 7th December, 2015 DESIGNS/IMPLEMENTATIONS OF DONORS PROJECT IN FINANCE FOR DEVELOPMENT BY NKORO, NKORO E. 12/8/2015 © Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development 1
  • 2. WHO IS THE TARGET AUDIENCE FOR THIS PROJECT? • The General Public, Government Officials, Policy Makers, International & National Non- Governmental Organizations (NGO’s), Multinational & Local Companies, Philanthropists, Banks, Traditional Rulers etc. 12/8/2015 © Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development 2
  • 3. OVRVIEW • Finance for Development which is a new course or program from the World Bank Group that seek to allow the individuals, groups, nations and even the world to have a better understanding and knowledge towards what is finance and how its being used in regards to development especially as focus is now on Sustainable Development Goals (SDGs) which had replace Minillium Development Goals (MDGs). • The sustainable development goals (SDGs) are a new, universal set of goals, targets and indicators that UN member states will be expected to use to frame their agendas and political policies over the next 15 years. • The SDGs follow and expand on the millennium development goals (MDGs), which were agreed by governments in 2001 and are due to expire at the end of this year. • Finance for Development is how money and resources are being use and utilized in managing funds used in donor projects/programmes 12/8/2015 © Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development 3
  • 4. LESSONS LEARNT • That Finance for development should be sustainable as coined from SDGs – concept of Sustainable Development • That Tax being another means of finance for development • Commercial finance as part of innovative finance the World Bank Group and ODA uses to finance development and investments • Billions to Trillion concepts and our contribution 12/8/2015 © Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development 4
  • 5. OBSERVATION/PROBLEMS • As a Development worker in one of the Donor Project in over 6 six years, and as part of my interactions, trainings, workshops, etc regarding donor funded projects, the designs and its implementation been a great concern to me and even to others, especially implementers of donor funded project. • I have observed that the period between a project design and its actual implementation time is always a long gap that spanned from one year to almost 5 years before the project eventual start operation/implementation. This leads to some issues associated with Exchange rate differences, under/over budgeting, political environment instability/policy, economical policies of the benefitting nations, etc. 12/8/2015 © Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development 5
  • 6. OBSERVATION/PROBLEMS (cont’d) • Exchange rate differences: This causes the project during implementation to have setbacks, because between the project design and its implementation, a long gap had been created causing either over loss/gain in exchange rate difference • Under/over budgeting: When Project(s) are either under or over budgeted during project design, you discovered that when its actual implementations commences, there are always big gap/differences, and these affect cost and finance management, that either what was costed before could be over costed or under costed • Political environment: the instability and or polictal policy of the economy can hinder the gap between project design an implementation • Economics policies of the benefitting nations, etc. can also be barriers to problem associated with the gap/difference between project design and implementation. 12/8/2015 © Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development 6
  • 7. PROBLEMS ENCOUNTERED IN FUNDED DONOR PROJECTS IN SOME DEVELOPING COUNTRIES • Benefitting contribution by the benefitting group/individuals • Counterpart fund payment/contribution by government • Inadequate envelop to entertain all request by communities • Cost provided in the project document is inadequate to finance projects/subprojects • Sustainability of some activities arising out of lack of cohesion of group members/groups 12/8/2015 © Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development 7
  • 8. RECOMMENDATIONS • I do recommend that if these few issues I have raised are met and resolve strategically and innovative/creative Monitoring and Evaluation towards donor funded projects is also used, it will help to actualize our aims towards SGDs and finance for development will become more effectively utilized and harness. 12/8/2015 © Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development 8
  • 9. for © Dec., 2015 Nkoro Nkoro (Final Project Digital Artifact – Finance for Development 12/8/2015 9