The document outlines a trail project in Eatonville, Washington that will be completed in two phases. Phase 1 will be a volunteer project in September 2012. Phase 2 will include stabilizing a river bank, removing a bridge pier, and installing a prefabricated bridge. The project received $500,000 in donations and a $700,000 grant requiring $702,000 in matching funds to reach the total $1,402,000 budget. Designs for Phase 2 will be completed by October 2012 with construction slated to begin in June 2013.