Critical Path Method
Critical Path Method
▪ Scheduling and Project Management tool developed in the 1950’s

▪ Allow us to plan all tasks which must be completed in a project
▪ Aids time scheduling and resource planning

▪ They allow progress towards project goals to be tracked
Using the Critical Path Method
▪ Some activities cannot be started until previous activities have been completed

▪ Activities in a critical path method need to be completed in sequence
▪ These activities are known as sequential activities
▪ In addition to these, other tasks can be completed at any time
▪ These activities are known as non-dependent or parallel tasks
Drawing a CPM Chart: Step 1

• This can be done using a Work Breakdown Structure
• For each task state:
• The earliest start date
•The estimated time it will take
Drawing a CPM Chart: Step 2

Establish sequence by looking at:
• Which tasks should take place before this task happens.
• Which tasks should be completed at the same time as this task.

• Which tasks should happen immediately after this task.
Drawing a CPM Chart: Step 3

▪ Each circle/node should show a task within the project;
▪ Each circle/node should give start and finish times;
▪ Each circle/node should be numbered;
▪ The arrows/arcs should the sequence of the tasks;
▪ A description and duration of the task should be written under the arrows;

▪ Arrows should always run left to right
Examples of Critical Path Method
Drawing a CPM Chart: Step 4
▪ Determining the four parameters of each task in the network
1.
2.
3.
4.

Earliest start time (ES) - The earliest time an activity can start once the previous dependent
activities are over.
Earliest finish time (EF) - ES + activity duration.
Latest finish time (LF) - The latest time an activity can finish without delaying the project.
Latest start time (LS) - LF - activity duration.

▪ The float time for an activity is the time between the earliest (ES) and the latest (LS)
start time or between the earliest (EF) and latest (LF) finish times.
▪ During the float time, an activity can be delayed without delaying the project finish
date.
▪ The activities in the critical path have an effect on the deadline of the project.
▪ If an activity of this path is delayed, the project will be delayed.
Benefits of the Critical Path Method
▪ Visual representation
▪ The project plan can be tested to ensure it is well thought out

▪ It identifies key tasks which could cause delays to the project if not completed
on time
▪ It identifies tasks which could be delayed in order to complete other tasks which
are more time crucial

▪ It identifies the minimum amount of time a project will take to complete
▪ It identifies any project steps which can be completed faster in order to
complete the project on time
Disadvantages of Critical Path Method

▪ Can be more difficult to understand than Gantt Charts
▪ The time needed for tasks is not as clear as with Gantt Charts
More Information on Critical Path Method
This is a useful video which sums the information given in the slides and
will aid understanding of the critical path method

http://www.youtube.com/watch?v=SF53ZZsP4ik
Further Reading
▪ Kelley, J. E. (1963). The critical-path method: Resources planning and
scheduling. Industrial scheduling, 347-365.
▪ Leach, L. P. (1999). Critical chain project management improves
project performance. Project Management Journal, 30, 39-51.
▪ Maylor, Project Management. Chapter 7
References
▪ Maylor, H., 2010. Project Management. 4th Ed. Chester: Pearson.

▪ MindTools, 2013. Critical Path Analysis and PERT Charts. [Online] Available at:
http://www.mindtools.com/critpath.html [Accessed on 07/11/13]
▪ Margaret Rouse, 2011. Critical Path Method (CPM). [Online] Available at:
http://whatis.techtarget.com/definition/critical-path-method-CPM [Accessed
on 07/11/13]
▪ Tutorialspoint, 2013. Critical Path Method. [Online] Available at:
http://www.tutorialspoint.com/management_concepts/critical_path_method.h
tm [Accessed on 07/11/13]

Mais conteúdo relacionado

Mais procurados (20)

Critical path method (cpm)
Critical path method (cpm)Critical path method (cpm)
Critical path method (cpm)
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENT
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Cpm critical path method
Cpm   critical path methodCpm   critical path method
Cpm critical path method
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time Analysis
 
Use of forward pass and backward pass in primavera
Use of forward pass and backward pass in primaveraUse of forward pass and backward pass in primavera
Use of forward pass and backward pass in primavera
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Critical Path Method(CPM)
Critical Path Method(CPM)Critical Path Method(CPM)
Critical Path Method(CPM)
 
Project Implementation.pptx
Project Implementation.pptxProject Implementation.pptx
Project Implementation.pptx
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)
 
Module :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levellingModule :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levelling
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
 
Critical path method(cpm)
Critical path method(cpm)Critical path method(cpm)
Critical path method(cpm)
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
Critical Path Ppt
Critical Path PptCritical Path Ppt
Critical Path Ppt
 
05 critical path analysis
05 critical path analysis05 critical path analysis
05 critical path analysis
 

Destaque

Internal Auditing - Performance Standards
Internal Auditing - Performance StandardsInternal Auditing - Performance Standards
Internal Auditing - Performance Standardsaldenmae
 
Advantages of swot analysis
Advantages of swot analysisAdvantages of swot analysis
Advantages of swot analysisDhivya S Dhvi
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)Areef Khan
 
Establishing performance standards
Establishing performance standardsEstablishing performance standards
Establishing performance standardsRajendra Nabar
 
Swot analysis , its importance and limitations
Swot analysis , its importance and limitationsSwot analysis , its importance and limitations
Swot analysis , its importance and limitationsSuleyman Ally
 
Eindtermen en leerplannen wo natuur - Walter Dons
Eindtermen en leerplannen wo natuur - Walter DonsEindtermen en leerplannen wo natuur - Walter Dons
Eindtermen en leerplannen wo natuur - Walter DonsPIME
 
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applicationsAmrit Mty
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)El Moro
 
Management and it's functions
Management and it's functionsManagement and it's functions
Management and it's functionsGeorge Cherian
 
Program evaluation review technique (pert)
Program evaluation review technique (pert)Program evaluation review technique (pert)
Program evaluation review technique (pert)tomeh
 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review TechniqueRaymund Sanchez
 
Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)Abhishek Pachisia
 

Destaque (20)

Internal Auditing - Performance Standards
Internal Auditing - Performance StandardsInternal Auditing - Performance Standards
Internal Auditing - Performance Standards
 
Advantages of swot analysis
Advantages of swot analysisAdvantages of swot analysis
Advantages of swot analysis
 
Critical Path Method presentation.
Critical Path Method presentation.Critical Path Method presentation.
Critical Path Method presentation.
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
Establishing performance standards
Establishing performance standardsEstablishing performance standards
Establishing performance standards
 
P E R T
P E R TP E R T
P E R T
 
Swot analysis , its importance and limitations
Swot analysis , its importance and limitationsSwot analysis , its importance and limitations
Swot analysis , its importance and limitations
 
Eindtermen en leerplannen wo natuur - Walter Dons
Eindtermen en leerplannen wo natuur - Walter DonsEindtermen en leerplannen wo natuur - Walter Dons
Eindtermen en leerplannen wo natuur - Walter Dons
 
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applications
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
Management and it's functions
Management and it's functionsManagement and it's functions
Management and it's functions
 
Posdcorb
PosdcorbPosdcorb
Posdcorb
 
Posdcorb
PosdcorbPosdcorb
Posdcorb
 
Program evaluation review technique (pert)
Program evaluation review technique (pert)Program evaluation review technique (pert)
Program evaluation review technique (pert)
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review Technique
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
POSDCORB
POSDCORBPOSDCORB
POSDCORB
 

Semelhante a Critical path method

The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path MethodNicola2903
 
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementCPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementAmit Kumbar
 
Unit v mha project evaluation review technique (pert)
Unit  v  mha project evaluation review technique (pert)Unit  v  mha project evaluation review technique (pert)
Unit v mha project evaluation review technique (pert)anjalatchi
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterpreetidamakale
 
Project-Time-Line.pdf
Project-Time-Line.pdfProject-Time-Line.pdf
Project-Time-Line.pdfNabeel Ahmad
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling DiagramsSaqib Raza
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 
PM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptxPM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptxMdSabujHossen2
 
PM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptxPM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptxMdSabujHossen2
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management UploadBhuWan Khadka
 
C03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfC03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfssuser8babb7
 
Lecture -19 & 20.ppt.pdf
Lecture -19 & 20.ppt.pdfLecture -19 & 20.ppt.pdf
Lecture -19 & 20.ppt.pdfnarmeen11
 
Project managemen PERT VS CPM
Project managemen  PERT VS CPMProject managemen  PERT VS CPM
Project managemen PERT VS CPMPadamNepal1
 
Critical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docxCritical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docxannettsparrow
 

Semelhante a Critical path method (20)

The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
 
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementCPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource management
 
pm--basic.pptx
pm--basic.pptxpm--basic.pptx
pm--basic.pptx
 
Unit v mha project evaluation review technique (pert)
Unit  v  mha project evaluation review technique (pert)Unit  v  mha project evaluation review technique (pert)
Unit v mha project evaluation review technique (pert)
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptx
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
Project-Time-Line.pdf
Project-Time-Line.pdfProject-Time-Line.pdf
Project-Time-Line.pdf
 
PM-Problems.pptx
PM-Problems.pptxPM-Problems.pptx
PM-Problems.pptx
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling Diagrams
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Pmp study: time
Pmp study: timePmp study: time
Pmp study: time
 
Unit IV-Project Management
Unit IV-Project ManagementUnit IV-Project Management
Unit IV-Project Management
 
PM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptxPM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptx
 
PM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptxPM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptx
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management Upload
 
C03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfC03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdf
 
Lecture -19 & 20.ppt.pdf
Lecture -19 & 20.ppt.pdfLecture -19 & 20.ppt.pdf
Lecture -19 & 20.ppt.pdf
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Project managemen PERT VS CPM
Project managemen  PERT VS CPMProject managemen  PERT VS CPM
Project managemen PERT VS CPM
 
Critical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docxCritical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docx
 

Mais de Nicola2903

Network diagrams
Network diagramsNetwork diagrams
Network diagramsNicola2903
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown StructureNicola2903
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart Nicola2903
 
Resource Scheduling
Resource Scheduling  Resource Scheduling
Resource Scheduling Nicola2903
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structureNicola2903
 
Network Diagrams
Network DiagramsNetwork Diagrams
Network DiagramsNicola2903
 
Estimating in Project Scheduling
Estimating in Project SchedulingEstimating in Project Scheduling
Estimating in Project SchedulingNicola2903
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource SchedulingNicola2903
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt ChartNicola2903
 

Mais de Nicola2903 (11)

Network diagrams
Network diagramsNetwork diagrams
Network diagrams
 
Estimating
EstimatingEstimating
Estimating
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
 
Resource Scheduling
Resource Scheduling  Resource Scheduling
Resource Scheduling
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Network Diagrams
Network DiagramsNetwork Diagrams
Network Diagrams
 
Estimating
EstimatingEstimating
Estimating
 
Estimating in Project Scheduling
Estimating in Project SchedulingEstimating in Project Scheduling
Estimating in Project Scheduling
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt Chart
 

Último

Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024Stephen Perrenod
 
What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024Stephanie Beckett
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimaginedpanagenda
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe中 央社
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeCzechDreamin
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutesconfluent
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Julian Hyde
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...panagenda
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPTiSEO AI
 
Powerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaPowerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaCzechDreamin
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfFIDO Alliance
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastUXDXConf
 
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone KomSalesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone KomCzechDreamin
 
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo DiehlFuture Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo DiehlPeter Udo Diehl
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfSrushith Repakula
 
Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfUK Journal
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...FIDO Alliance
 

Último (20)

Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024
 
What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutes
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
 
Powerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaPowerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara Laskowska
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at Comcast
 
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone KomSalesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
 
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo DiehlFuture Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdf
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 

Critical path method

  • 2. Critical Path Method ▪ Scheduling and Project Management tool developed in the 1950’s ▪ Allow us to plan all tasks which must be completed in a project ▪ Aids time scheduling and resource planning ▪ They allow progress towards project goals to be tracked
  • 3. Using the Critical Path Method ▪ Some activities cannot be started until previous activities have been completed ▪ Activities in a critical path method need to be completed in sequence ▪ These activities are known as sequential activities ▪ In addition to these, other tasks can be completed at any time ▪ These activities are known as non-dependent or parallel tasks
  • 4. Drawing a CPM Chart: Step 1 • This can be done using a Work Breakdown Structure • For each task state: • The earliest start date •The estimated time it will take
  • 5. Drawing a CPM Chart: Step 2 Establish sequence by looking at: • Which tasks should take place before this task happens. • Which tasks should be completed at the same time as this task. • Which tasks should happen immediately after this task.
  • 6. Drawing a CPM Chart: Step 3 ▪ Each circle/node should show a task within the project; ▪ Each circle/node should give start and finish times; ▪ Each circle/node should be numbered; ▪ The arrows/arcs should the sequence of the tasks; ▪ A description and duration of the task should be written under the arrows; ▪ Arrows should always run left to right
  • 7. Examples of Critical Path Method
  • 8. Drawing a CPM Chart: Step 4 ▪ Determining the four parameters of each task in the network 1. 2. 3. 4. Earliest start time (ES) - The earliest time an activity can start once the previous dependent activities are over. Earliest finish time (EF) - ES + activity duration. Latest finish time (LF) - The latest time an activity can finish without delaying the project. Latest start time (LS) - LF - activity duration. ▪ The float time for an activity is the time between the earliest (ES) and the latest (LS) start time or between the earliest (EF) and latest (LF) finish times. ▪ During the float time, an activity can be delayed without delaying the project finish date. ▪ The activities in the critical path have an effect on the deadline of the project. ▪ If an activity of this path is delayed, the project will be delayed.
  • 9. Benefits of the Critical Path Method ▪ Visual representation ▪ The project plan can be tested to ensure it is well thought out ▪ It identifies key tasks which could cause delays to the project if not completed on time ▪ It identifies tasks which could be delayed in order to complete other tasks which are more time crucial ▪ It identifies the minimum amount of time a project will take to complete ▪ It identifies any project steps which can be completed faster in order to complete the project on time
  • 10. Disadvantages of Critical Path Method ▪ Can be more difficult to understand than Gantt Charts ▪ The time needed for tasks is not as clear as with Gantt Charts
  • 11. More Information on Critical Path Method This is a useful video which sums the information given in the slides and will aid understanding of the critical path method http://www.youtube.com/watch?v=SF53ZZsP4ik
  • 12. Further Reading ▪ Kelley, J. E. (1963). The critical-path method: Resources planning and scheduling. Industrial scheduling, 347-365. ▪ Leach, L. P. (1999). Critical chain project management improves project performance. Project Management Journal, 30, 39-51. ▪ Maylor, Project Management. Chapter 7
  • 13. References ▪ Maylor, H., 2010. Project Management. 4th Ed. Chester: Pearson. ▪ MindTools, 2013. Critical Path Analysis and PERT Charts. [Online] Available at: http://www.mindtools.com/critpath.html [Accessed on 07/11/13] ▪ Margaret Rouse, 2011. Critical Path Method (CPM). [Online] Available at: http://whatis.techtarget.com/definition/critical-path-method-CPM [Accessed on 07/11/13] ▪ Tutorialspoint, 2013. Critical Path Method. [Online] Available at: http://www.tutorialspoint.com/management_concepts/critical_path_method.h tm [Accessed on 07/11/13]