Development of Self-Installing
Deepwater Spar
Ashit Jadav
February 2017
Contents
• Introduction & Background
• ACE Spar breakdown
• Installation Sequence
• Main particulars, Hull design and Weight control
• Stability & Motion response
• Construction advantages
• Cost break-down
• Further work
• Summary
Arup’s ACE platforms
• Arup has successfully designed and installed the award
winning ACE (Arup Concept Elevator) range of fixed
platforms.
Policy
Concept /
Feasibility
Define
(Pre-FEED –
FEED)
Detailed
design
Execute Operate Decommission
Arup’s ACE platforms
• Self-installing fixed platforms
• Re-locatable
• Less intensive offshore campaign
• Strand Jacks used for lifting
and lowering
• Comprehensive offshore solution
• Drilling, production, wellhead
facilities, offshore wind
Conventional Spar platforms
• Classic type
• Truss type
• Cell type
The main components of a
Truss Spar platform are:
• Topsides
• Hard Tank
• Truss structure
• Soft Tank
Hard
Tank
Topsides
Soft
Tank
Truss
Structure
Arup’s Deepwater solution
The best of both worlds!
• ACE platform
 Enhanced Project Economics due to various reasons
 Self-installing and re-locatable
 Minimal requirement of a specialist heavy lift vessel
 Lifting and lowering system proven in harsh installation conditions
 Vertical stacking construction for ease of fabrication
• Spar platform
 Supports dry and wet trees
 Low heave motions
 Suitable for deep to ultra-deep water depths
 Provide product storage
Contents
• Introduction & Background
• ACE Spar breakdown
• Installation Sequence
• Main particulars, Hull design and Weight control
• Stability & Motion response
• Construction advantages
• Cost break-down
• Further work
• Summary
ACE Spar breakdown
Barge deck
Hard Tank
Truss
Soft Tank
Barge deck
• Primary support for the Topsides
• Buoyancy during the wet-tow
Hard Tank
• Providing buoyancy or tanks for ballast
during Installation & In-place condition
• Store product in the Operational phase
Soft Tank
• Forms the heave plate
• To be used for water ballast + solid
ballast if required to maintain a positive
GM during Transportation, Installation
and In-place condition
Topsides
96m
Installation Sequence
The Self-Installing sequence for
ACE Spar platform will utilize
Strand Jacks and can be divided
into three main stages:
• Float-out
• Lowering
• Deck raising
Float-out
Lowering
Deck-raising
In-place
Installation sequence (cont.)
Float-out Lowering Deck raising In-place
Ballasting Hard Tank, Soft
Tank and Truss
De-ballasting Hard
Tank
Hook-up &
Commissioning
Contents
• Introduction & Background
• ACE Spar breakdown
• Installation Sequence
• Main particulars, Hull design and Weight control
• Stability & Motion response
• Construction advantages
• Cost break-down
• Further work
• Summary
Main Particulars
A typical deep-water Spar platform has been considered to
estimate the initial sizing of the sub-structure for meeting the
following criteria:
• Topsides weight: ~18,500t Topsides (with supporting barge)
• Storage capacity: up to 18,000 bopd capacity
• Operational water depth: up to 1,500m water depth
• Centre well slot: 15m x 15m centre well slot
• Air-gap: Minimum ~25m in operational condition and remain positive in storm
condition
• Metacentric height (GM): Positive in all conditions including Operational,
Transportation & Installation
Spar Hull design
The basic hull dimensions have been calculated for the concept:
• Barge deck (and sponsons if required)
 Designed to form the primary support for the topsides modules
 Provide adequate buoyancy during the Float-out stage and maintain
appropriate freeboard
• Hard Tank & Soft Tank
 Hard Tank: Provide adequate buoyancy during Operational condition to
maintain sufficient air-gap
 Soft Tank: Provide sufficient ballast (water or solid) during the Operational
condition in order to maintain a positive GM.
Hull Dimensions
Barge Deck
• Length/width: ~75 to 80m
• Height: 10 to 15m
• Well-bay to sit inside deck’s slot OR a moon-pool
Hard Tank
• Diameter: 30 to 35m
• Length: 100 to 120m
• 15-20 sq. m center well slot for buoyancy cans, conductors & risers
Soft Tank
• 60-70 sq. m, 3-10m high
• 20-25 sq. m center well slot to accommodate the risers
Truss Structure
• 30-35 sq. m, 30-40m high
Weight control
Current ACE Spar configuration designed to handle a total payload of ~25,000t.
*From bottom of the Soft Tank
Description
Weight
(t)
XCG
(m)
YCG
(m)
ZCG*
(m)
Topsides 9,000 0.00 0.00 174.00
Barge Deck ~9,500
Wellhead bay
Hard Tank
Truss
Soft Tank
TOTAL ~34,000 0.00 0.00 128.23
Hull Design features
Various factors affecting the Hull design:
• Type of Topsides facility (production, drilling or both)
• Number of conductors (will dictate the center well and hence Soft tank and Deck
size)
• Need for storage capacity (will drive the size of the Hard tank)
• Type of tensioning to be used for the risers (buoyancy cans, hydro-pneumatic,
ram type)
• Presence of VIV strakes on the Hard tank (might lead to change in deck design)
• Fabrication method to be used (Vertical stacking preferred)
• Installation sequence (load-out or float-off)
• Fabrication location & capability (dry-dock, shipyard etc.)
• Well-head bay size & layout
Contents
• Introduction & Background
• ACE Spar breakdown
• Installation Sequence
• Main particulars, Hull design and Weight control
• Stability & Motion response
• Construction advantages
• Cost break-down
• Further work
• Summary
Stability
As per ABS Rules for Floating Production Installations, Part
5B, Ch3 Sec 2,
the GM should remain positive during the Installation phase.
GM achieved during different Installation stages:
• Float-off GM = 33m Freeboard: 10m Floating stability range: 32°
• Lowering GM = 57m Freeboard: 7m
• In-place GM = 3m Draught: 130m Air-gap: 25m
Float-out model (DNV Sesam)
• Structural model prepared in DNV Sesam module, Genie. The model comprised of barge
deck, ballast compartments and auxiliary buoyancy aids in form of Sponsons
• Meshing done in Genie
• Stability check in HydroD
• Hard Tank accounted for as a point mass
• Trim ballast used to level the platform
• Required freeboard, stability range and positive GM achieved
Lowering model
• Structural model was prepared in Genie. Model comprised of hard tank, barge deck, ballast
compartments and auxiliary buoyancy Sponsons
• Stability check done in HydroD
• Trim ballast used to level the platform
• Required freeboard and positive GM achieved
In-place model
• Structural model was prepared in Genie. The model comprised of hard tank and
ballast/product compartments
• Meshing done in Genie
• Stability check in HydroD
• Required air-gap and positive GM achieved
• Only Hard Tank was modelled to get the correct water-plane area
Motion Response
Natural Frequency:
• Roll: 92.4 sec
• Pitch: 92.3 sec
• Heave: 32.1 sec
Frequency domain analysis was
carried out to estimate the
natural frequencies and the peak
response of the platform using
DNV Sesam modules Hydro and
Wadam.
Motion Response (cont.)
Heave natural frequency is sufficiently far from crest of the wave spectrum and
hence gives a peak response of upto 0.6m.
Pitch and Roll motion response are minimal.
-
5.0
10.0
15.0
20.0
25.0
30.0
0
100
200
300
400
500
600
700
800
5 10 15 20 25 30 35 40
Amplitude(m/m)
PSDsurfaceelevation(m^2/Hz)
Tp (sec)
Overlay of wave spectrum and RAOs for heave
Wave power spectrum
Heave response (w.dir. =
0deg)
Motion response checked in a Gulf of Mexico 100 year RP storm condition.
Similar or less worse met-ocean conditions for WA region.
Hs = ~16 m Tp = ~15 sec
Motions model
• Genie model was used with Soft Tank for In-place condition
• Total mass of the structure was distributed using point masses to account for the
inertia including the Topsides, barge deck and truss members
• Permanent water ballast in soft tank has been modelled in HydroD
Contents
• Introduction & Background
• ACE Spar breakdown
• Installation Sequence
• Main particulars, Hull design and Weight control
• Stability & Motion response
• Construction advantages
• Cost break-down
• Further work
• Summary
Construction advantages
Conventional Spar ACE Spar
• Built in half or quarter sections and
joined before transporting to the
offshore site.
• Vertical stacking construction configuration
similar to what is used for constructing oil
terminal/refinery oil storage tanks.
• Top-tensioned riser system or buoyancy
cans hook-up and commissioning
offshore.
• Top-tensioned riser system or buoyancy cans
can be pre-commissioned during the
fabrication stage onshore, saving significant
costs for offshore installation.
• Conventional fabrication method used
of connecting structure blocks
horizontally.
• Strand Jacks to be used to construct and erect
the hard tank vertically.
Contents
• Introduction & Background
• ACE Spar breakdown
• Installation Sequence
• Main particulars, Hull design and Weight control
• Stability & Motion response
• Construction advantages
• Cost break-down
• Further work
• Summary
Cost break-down
A bottom-up cost estimation and comparison has been carried out for the ACE Spar
platform.
Cost – Transportation & Installation
The T&I costs can be reduced significantly compared to a conventional deep-water
spar platform.
T&I phase Conventional Spar ACE Spar
Sub-structure tow Semi-submersible vessel Semi-submersible vessel
Sub-structure installation Semi-sub vessel, tugs Semi-sub vessel, tugs
Topsides load-out Barge Semi-sub vessel
Topsides tow Barge Semi-sub vessel
Topsides installation Barge, HLV, tugs Semi-sub vessel, tugs
Hook-up & Commissioning HLV, tugs Tugs
Contents
• Introduction & Background
• ACE Spar breakdown
• Installation Sequence
• Main particulars, Hull design and Weight control
• Stability & Motion response
• Construction advantages
• Cost break-down
• Further work
• Summary
Further work..
• Model Testing for motion response assessment and moorings
• Effect of viscous drag (soft tank & additional heave plate if required) on the
motion response of the Spar
• Mooring design including dynamics of mooring lines and a coupled analysis to
estimate the spar motions due to mooring stiffness
• Effect of different type of TTRs (top-tensioned riser) on the design of Spar
• Transportation motion response of the Spar
• Refine the Structural design to reduce the amount of steel required
• Stability & motion assessment for a CG offset
• Sensitivity checks on Auxiliary buoyancy requirement in form of Caissons
• Effect of current; requirement & design of VIV strakes on overall Spar design
Summary – Why ACE Spar?
Self-Installing
Less intensive
offshore
campaign
Reduced
requirement of
specialist
vessels
Un-interrupted
deck space
Re-locatable
De-
commissionable
Improved
constructability
Enhanced
Project
Economics
Thank you
Questions?

Mais conteúdo relacionado

Mais procurados

Offshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentOffshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentAijaz Ahmed
 
Design & operation of topsides gas field
Design & operation of topsides gas fieldDesign & operation of topsides gas field
Design & operation of topsides gas fieldashutoshgugnani
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
July 8th 2014 - Key note speech by Martin Fischer: "The main recent areas of ...
July 8th 2014 - Key note speech by Martin Fischer: "The main recent areas of ...July 8th 2014 - Key note speech by Martin Fischer: "The main recent areas of ...
July 8th 2014 - Key note speech by Martin Fischer: "The main recent areas of ...Foiling Week™
 
Foundationnotes 121120064719-phpapp01
Foundationnotes 121120064719-phpapp01Foundationnotes 121120064719-phpapp01
Foundationnotes 121120064719-phpapp01bala murugesan
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO RedeploymentDan Benson
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Hassan Moursy
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling amrhaggag
 
Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...
Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...
Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...Foiling Week™
 
Topsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systemsTopsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systemsNiels Haakman
 
Offshore pile design according to international practice
Offshore pile design according to international practiceOffshore pile design according to international practice
Offshore pile design according to international practiceWeb2Present
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2Zaharah Kasim
 
High Performance Catamaran Design & Optimisation with HyperWorks
High Performance Catamaran Design & Optimisation with HyperWorksHigh Performance Catamaran Design & Optimisation with HyperWorks
High Performance Catamaran Design & Optimisation with HyperWorksAltair
 
July 8th 2014 - Presentation by Doug Schicler and Davide Tagliapietra
July 8th 2014 - Presentation by Doug Schicler and Davide TagliapietraJuly 8th 2014 - Presentation by Doug Schicler and Davide Tagliapietra
July 8th 2014 - Presentation by Doug Schicler and Davide TagliapietraFoiling Week™
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing SystempetroEDGE
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDDDemzy George
 

Mais procurados (20)

Offshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentOffshore Drilling Rig Equipment
Offshore Drilling Rig Equipment
 
Design & operation of topsides gas field
Design & operation of topsides gas fieldDesign & operation of topsides gas field
Design & operation of topsides gas field
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
July 8th 2014 - Key note speech by Martin Fischer: "The main recent areas of ...
July 8th 2014 - Key note speech by Martin Fischer: "The main recent areas of ...July 8th 2014 - Key note speech by Martin Fischer: "The main recent areas of ...
July 8th 2014 - Key note speech by Martin Fischer: "The main recent areas of ...
 
Foundationnotes 121120064719-phpapp01
Foundationnotes 121120064719-phpapp01Foundationnotes 121120064719-phpapp01
Foundationnotes 121120064719-phpapp01
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV )
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling
 
Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...
Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...
Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...
 
Topsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systemsTopsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systems
 
Dariush.resume
Dariush.resumeDariush.resume
Dariush.resume
 
Offshore pile design according to international practice
Offshore pile design according to international practiceOffshore pile design according to international practice
Offshore pile design according to international practice
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
 
High Performance Catamaran Design & Optimisation with HyperWorks
High Performance Catamaran Design & Optimisation with HyperWorksHigh Performance Catamaran Design & Optimisation with HyperWorks
High Performance Catamaran Design & Optimisation with HyperWorks
 
July 8th 2014 - Presentation by Doug Schicler and Davide Tagliapietra
July 8th 2014 - Presentation by Doug Schicler and Davide TagliapietraJuly 8th 2014 - Presentation by Doug Schicler and Davide Tagliapietra
July 8th 2014 - Presentation by Doug Schicler and Davide Tagliapietra
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing System
 
2015 CRW - Jack & Roll Techniques
2015 CRW - Jack & Roll Techniques2015 CRW - Jack & Roll Techniques
2015 CRW - Jack & Roll Techniques
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
Oil & gas
Oil & gasOil & gas
Oil & gas
 
Introduction to offshore structure
Introduction to offshore structure Introduction to offshore structure
Introduction to offshore structure
 

Semelhante a RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashit Jadav

Offshore Support Vessels Design
Offshore Support Vessels DesignOffshore Support Vessels Design
Offshore Support Vessels DesignAhmed Taha
 
Essentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designersEssentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designersjose bonifacio de souza leite cuadros
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PaulOkafor6
 
94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptx94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptxPraveenPrajapati29
 
Metode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.pptMetode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.pptMFaridGeonova
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Aijaz Ali Mooro
 
MULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKINGMULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKINGManoj Navneeth
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfIsmailKatun1
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004David Seow
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfAZLANAiyub
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling ProjectAndika Mahardika
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
Global Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyGlobal Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyConference_Presentations
 

Semelhante a RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashit Jadav (20)

Offshore Support Vessels Design
Offshore Support Vessels DesignOffshore Support Vessels Design
Offshore Support Vessels Design
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
 
Riser Design Overview
Riser Design  OverviewRiser Design  Overview
Riser Design Overview
 
Essentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designersEssentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designers
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)
 
94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptx94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptx
 
Metode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.pptMetode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.ppt
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4
 
MULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKINGMULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKING
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdf
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 
Coastal Research Vessel
Coastal Research VesselCoastal Research Vessel
Coastal Research Vessel
 
Oil and Gas Applications & Innovations
Oil and Gas Applications & InnovationsOil and Gas Applications & Innovations
Oil and Gas Applications & Innovations
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Global Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyGlobal Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea Technology
 
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
 

Mais de Nick Bentley

RINA - SHELL Prelude FLNG Innovations - Mike Efthymiou - UWA
RINA - SHELL Prelude FLNG Innovations - Mike Efthymiou - UWARINA - SHELL Prelude FLNG Innovations - Mike Efthymiou - UWA
RINA - SHELL Prelude FLNG Innovations - Mike Efthymiou - UWANick Bentley
 
RINA - AOG 2017 - Ian Milne - River LAB Wave Basin
RINA - AOG 2017 - Ian Milne - River LAB Wave BasinRINA - AOG 2017 - Ian Milne - River LAB Wave Basin
RINA - AOG 2017 - Ian Milne - River LAB Wave BasinNick Bentley
 
RINA - AOG 2017 - Numerical Modelling of Marine Structure Behaviours in Steep...
RINA - AOG 2017 - Numerical Modelling of Marine Structure Behaviours in Steep...RINA - AOG 2017 - Numerical Modelling of Marine Structure Behaviours in Steep...
RINA - AOG 2017 - Numerical Modelling of Marine Structure Behaviours in Steep...Nick Bentley
 
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...Nick Bentley
 
RINA - AOG 2017 - Acceptance of performance based inspection - AMSA - Rob Geh...
RINA - AOG 2017 - Acceptance of performance based inspection - AMSA - Rob Geh...RINA - AOG 2017 - Acceptance of performance based inspection - AMSA - Rob Geh...
RINA - AOG 2017 - Acceptance of performance based inspection - AMSA - Rob Geh...Nick Bentley
 
RINA - AOG 2017 - LGS technology for drilling risers - AMOG - Adrian Eassom
RINA - AOG 2017 - LGS  technology for drilling risers - AMOG - Adrian Eassom RINA - AOG 2017 - LGS  technology for drilling risers - AMOG - Adrian Eassom
RINA - AOG 2017 - LGS technology for drilling risers - AMOG - Adrian Eassom Nick Bentley
 
RINA - AOG 2017 - FOI compliance lessons learned and future tools - Lloyds Re...
RINA - AOG 2017 - FOI compliance lessons learned and future tools - Lloyds Re...RINA - AOG 2017 - FOI compliance lessons learned and future tools - Lloyds Re...
RINA - AOG 2017 - FOI compliance lessons learned and future tools - Lloyds Re...Nick Bentley
 
RINA AOG 2017 - Advancement in numerical analyses of heavy lifts - AMOG - Stu...
RINA AOG 2017 - Advancement in numerical analyses of heavy lifts - AMOG - Stu...RINA AOG 2017 - Advancement in numerical analyses of heavy lifts - AMOG - Stu...
RINA AOG 2017 - Advancement in numerical analyses of heavy lifts - AMOG - Stu...Nick Bentley
 
AOG 2017 RINA - Adrian Eassom - LGS technology for Drilling Risers
AOG 2017 RINA - Adrian Eassom - LGS technology for Drilling RisersAOG 2017 RINA - Adrian Eassom - LGS technology for Drilling Risers
AOG 2017 RINA - Adrian Eassom - LGS technology for Drilling RisersNick Bentley
 
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future toolsAOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future toolsNick Bentley
 

Mais de Nick Bentley (10)

RINA - SHELL Prelude FLNG Innovations - Mike Efthymiou - UWA
RINA - SHELL Prelude FLNG Innovations - Mike Efthymiou - UWARINA - SHELL Prelude FLNG Innovations - Mike Efthymiou - UWA
RINA - SHELL Prelude FLNG Innovations - Mike Efthymiou - UWA
 
RINA - AOG 2017 - Ian Milne - River LAB Wave Basin
RINA - AOG 2017 - Ian Milne - River LAB Wave BasinRINA - AOG 2017 - Ian Milne - River LAB Wave Basin
RINA - AOG 2017 - Ian Milne - River LAB Wave Basin
 
RINA - AOG 2017 - Numerical Modelling of Marine Structure Behaviours in Steep...
RINA - AOG 2017 - Numerical Modelling of Marine Structure Behaviours in Steep...RINA - AOG 2017 - Numerical Modelling of Marine Structure Behaviours in Steep...
RINA - AOG 2017 - Numerical Modelling of Marine Structure Behaviours in Steep...
 
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
 
RINA - AOG 2017 - Acceptance of performance based inspection - AMSA - Rob Geh...
RINA - AOG 2017 - Acceptance of performance based inspection - AMSA - Rob Geh...RINA - AOG 2017 - Acceptance of performance based inspection - AMSA - Rob Geh...
RINA - AOG 2017 - Acceptance of performance based inspection - AMSA - Rob Geh...
 
RINA - AOG 2017 - LGS technology for drilling risers - AMOG - Adrian Eassom
RINA - AOG 2017 - LGS  technology for drilling risers - AMOG - Adrian Eassom RINA - AOG 2017 - LGS  technology for drilling risers - AMOG - Adrian Eassom
RINA - AOG 2017 - LGS technology for drilling risers - AMOG - Adrian Eassom
 
RINA - AOG 2017 - FOI compliance lessons learned and future tools - Lloyds Re...
RINA - AOG 2017 - FOI compliance lessons learned and future tools - Lloyds Re...RINA - AOG 2017 - FOI compliance lessons learned and future tools - Lloyds Re...
RINA - AOG 2017 - FOI compliance lessons learned and future tools - Lloyds Re...
 
RINA AOG 2017 - Advancement in numerical analyses of heavy lifts - AMOG - Stu...
RINA AOG 2017 - Advancement in numerical analyses of heavy lifts - AMOG - Stu...RINA AOG 2017 - Advancement in numerical analyses of heavy lifts - AMOG - Stu...
RINA AOG 2017 - Advancement in numerical analyses of heavy lifts - AMOG - Stu...
 
AOG 2017 RINA - Adrian Eassom - LGS technology for Drilling Risers
AOG 2017 RINA - Adrian Eassom - LGS technology for Drilling RisersAOG 2017 RINA - Adrian Eassom - LGS technology for Drilling Risers
AOG 2017 RINA - Adrian Eassom - LGS technology for Drilling Risers
 
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future toolsAOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
AOG 2017 RINA - Jeff Baker - FOI compliance lessons learned and future tools
 

Último

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 

Último (20)

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 

RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashit Jadav

  • 1. Development of Self-Installing Deepwater Spar Ashit Jadav February 2017
  • 2. Contents • Introduction & Background • ACE Spar breakdown • Installation Sequence • Main particulars, Hull design and Weight control • Stability & Motion response • Construction advantages • Cost break-down • Further work • Summary
  • 3. Arup’s ACE platforms • Arup has successfully designed and installed the award winning ACE (Arup Concept Elevator) range of fixed platforms. Policy Concept / Feasibility Define (Pre-FEED – FEED) Detailed design Execute Operate Decommission
  • 4. Arup’s ACE platforms • Self-installing fixed platforms • Re-locatable • Less intensive offshore campaign • Strand Jacks used for lifting and lowering • Comprehensive offshore solution • Drilling, production, wellhead facilities, offshore wind
  • 5. Conventional Spar platforms • Classic type • Truss type • Cell type The main components of a Truss Spar platform are: • Topsides • Hard Tank • Truss structure • Soft Tank Hard Tank Topsides Soft Tank Truss Structure
  • 6. Arup’s Deepwater solution The best of both worlds! • ACE platform  Enhanced Project Economics due to various reasons  Self-installing and re-locatable  Minimal requirement of a specialist heavy lift vessel  Lifting and lowering system proven in harsh installation conditions  Vertical stacking construction for ease of fabrication • Spar platform  Supports dry and wet trees  Low heave motions  Suitable for deep to ultra-deep water depths  Provide product storage
  • 7. Contents • Introduction & Background • ACE Spar breakdown • Installation Sequence • Main particulars, Hull design and Weight control • Stability & Motion response • Construction advantages • Cost break-down • Further work • Summary
  • 8. ACE Spar breakdown Barge deck Hard Tank Truss Soft Tank Barge deck • Primary support for the Topsides • Buoyancy during the wet-tow Hard Tank • Providing buoyancy or tanks for ballast during Installation & In-place condition • Store product in the Operational phase Soft Tank • Forms the heave plate • To be used for water ballast + solid ballast if required to maintain a positive GM during Transportation, Installation and In-place condition Topsides 96m
  • 9. Installation Sequence The Self-Installing sequence for ACE Spar platform will utilize Strand Jacks and can be divided into three main stages: • Float-out • Lowering • Deck raising
  • 14. Installation sequence (cont.) Float-out Lowering Deck raising In-place Ballasting Hard Tank, Soft Tank and Truss De-ballasting Hard Tank Hook-up & Commissioning
  • 15. Contents • Introduction & Background • ACE Spar breakdown • Installation Sequence • Main particulars, Hull design and Weight control • Stability & Motion response • Construction advantages • Cost break-down • Further work • Summary
  • 16. Main Particulars A typical deep-water Spar platform has been considered to estimate the initial sizing of the sub-structure for meeting the following criteria: • Topsides weight: ~18,500t Topsides (with supporting barge) • Storage capacity: up to 18,000 bopd capacity • Operational water depth: up to 1,500m water depth • Centre well slot: 15m x 15m centre well slot • Air-gap: Minimum ~25m in operational condition and remain positive in storm condition • Metacentric height (GM): Positive in all conditions including Operational, Transportation & Installation
  • 17. Spar Hull design The basic hull dimensions have been calculated for the concept: • Barge deck (and sponsons if required)  Designed to form the primary support for the topsides modules  Provide adequate buoyancy during the Float-out stage and maintain appropriate freeboard • Hard Tank & Soft Tank  Hard Tank: Provide adequate buoyancy during Operational condition to maintain sufficient air-gap  Soft Tank: Provide sufficient ballast (water or solid) during the Operational condition in order to maintain a positive GM.
  • 18. Hull Dimensions Barge Deck • Length/width: ~75 to 80m • Height: 10 to 15m • Well-bay to sit inside deck’s slot OR a moon-pool Hard Tank • Diameter: 30 to 35m • Length: 100 to 120m • 15-20 sq. m center well slot for buoyancy cans, conductors & risers Soft Tank • 60-70 sq. m, 3-10m high • 20-25 sq. m center well slot to accommodate the risers Truss Structure • 30-35 sq. m, 30-40m high
  • 19. Weight control Current ACE Spar configuration designed to handle a total payload of ~25,000t. *From bottom of the Soft Tank Description Weight (t) XCG (m) YCG (m) ZCG* (m) Topsides 9,000 0.00 0.00 174.00 Barge Deck ~9,500 Wellhead bay Hard Tank Truss Soft Tank TOTAL ~34,000 0.00 0.00 128.23
  • 20. Hull Design features Various factors affecting the Hull design: • Type of Topsides facility (production, drilling or both) • Number of conductors (will dictate the center well and hence Soft tank and Deck size) • Need for storage capacity (will drive the size of the Hard tank) • Type of tensioning to be used for the risers (buoyancy cans, hydro-pneumatic, ram type) • Presence of VIV strakes on the Hard tank (might lead to change in deck design) • Fabrication method to be used (Vertical stacking preferred) • Installation sequence (load-out or float-off) • Fabrication location & capability (dry-dock, shipyard etc.) • Well-head bay size & layout
  • 21. Contents • Introduction & Background • ACE Spar breakdown • Installation Sequence • Main particulars, Hull design and Weight control • Stability & Motion response • Construction advantages • Cost break-down • Further work • Summary
  • 22. Stability As per ABS Rules for Floating Production Installations, Part 5B, Ch3 Sec 2, the GM should remain positive during the Installation phase. GM achieved during different Installation stages: • Float-off GM = 33m Freeboard: 10m Floating stability range: 32° • Lowering GM = 57m Freeboard: 7m • In-place GM = 3m Draught: 130m Air-gap: 25m
  • 23. Float-out model (DNV Sesam) • Structural model prepared in DNV Sesam module, Genie. The model comprised of barge deck, ballast compartments and auxiliary buoyancy aids in form of Sponsons • Meshing done in Genie • Stability check in HydroD • Hard Tank accounted for as a point mass • Trim ballast used to level the platform • Required freeboard, stability range and positive GM achieved
  • 24. Lowering model • Structural model was prepared in Genie. Model comprised of hard tank, barge deck, ballast compartments and auxiliary buoyancy Sponsons • Stability check done in HydroD • Trim ballast used to level the platform • Required freeboard and positive GM achieved
  • 25. In-place model • Structural model was prepared in Genie. The model comprised of hard tank and ballast/product compartments • Meshing done in Genie • Stability check in HydroD • Required air-gap and positive GM achieved • Only Hard Tank was modelled to get the correct water-plane area
  • 26. Motion Response Natural Frequency: • Roll: 92.4 sec • Pitch: 92.3 sec • Heave: 32.1 sec Frequency domain analysis was carried out to estimate the natural frequencies and the peak response of the platform using DNV Sesam modules Hydro and Wadam.
  • 27. Motion Response (cont.) Heave natural frequency is sufficiently far from crest of the wave spectrum and hence gives a peak response of upto 0.6m. Pitch and Roll motion response are minimal. - 5.0 10.0 15.0 20.0 25.0 30.0 0 100 200 300 400 500 600 700 800 5 10 15 20 25 30 35 40 Amplitude(m/m) PSDsurfaceelevation(m^2/Hz) Tp (sec) Overlay of wave spectrum and RAOs for heave Wave power spectrum Heave response (w.dir. = 0deg) Motion response checked in a Gulf of Mexico 100 year RP storm condition. Similar or less worse met-ocean conditions for WA region. Hs = ~16 m Tp = ~15 sec
  • 28. Motions model • Genie model was used with Soft Tank for In-place condition • Total mass of the structure was distributed using point masses to account for the inertia including the Topsides, barge deck and truss members • Permanent water ballast in soft tank has been modelled in HydroD
  • 29. Contents • Introduction & Background • ACE Spar breakdown • Installation Sequence • Main particulars, Hull design and Weight control • Stability & Motion response • Construction advantages • Cost break-down • Further work • Summary
  • 30. Construction advantages Conventional Spar ACE Spar • Built in half or quarter sections and joined before transporting to the offshore site. • Vertical stacking construction configuration similar to what is used for constructing oil terminal/refinery oil storage tanks. • Top-tensioned riser system or buoyancy cans hook-up and commissioning offshore. • Top-tensioned riser system or buoyancy cans can be pre-commissioned during the fabrication stage onshore, saving significant costs for offshore installation. • Conventional fabrication method used of connecting structure blocks horizontally. • Strand Jacks to be used to construct and erect the hard tank vertically.
  • 31. Contents • Introduction & Background • ACE Spar breakdown • Installation Sequence • Main particulars, Hull design and Weight control • Stability & Motion response • Construction advantages • Cost break-down • Further work • Summary
  • 32. Cost break-down A bottom-up cost estimation and comparison has been carried out for the ACE Spar platform.
  • 33. Cost – Transportation & Installation The T&I costs can be reduced significantly compared to a conventional deep-water spar platform. T&I phase Conventional Spar ACE Spar Sub-structure tow Semi-submersible vessel Semi-submersible vessel Sub-structure installation Semi-sub vessel, tugs Semi-sub vessel, tugs Topsides load-out Barge Semi-sub vessel Topsides tow Barge Semi-sub vessel Topsides installation Barge, HLV, tugs Semi-sub vessel, tugs Hook-up & Commissioning HLV, tugs Tugs
  • 34. Contents • Introduction & Background • ACE Spar breakdown • Installation Sequence • Main particulars, Hull design and Weight control • Stability & Motion response • Construction advantages • Cost break-down • Further work • Summary
  • 35. Further work.. • Model Testing for motion response assessment and moorings • Effect of viscous drag (soft tank & additional heave plate if required) on the motion response of the Spar • Mooring design including dynamics of mooring lines and a coupled analysis to estimate the spar motions due to mooring stiffness • Effect of different type of TTRs (top-tensioned riser) on the design of Spar • Transportation motion response of the Spar • Refine the Structural design to reduce the amount of steel required • Stability & motion assessment for a CG offset • Sensitivity checks on Auxiliary buoyancy requirement in form of Caissons • Effect of current; requirement & design of VIV strakes on overall Spar design
  • 36. Summary – Why ACE Spar? Self-Installing Less intensive offshore campaign Reduced requirement of specialist vessels Un-interrupted deck space Re-locatable De- commissionable Improved constructability Enhanced Project Economics