SlideShare uma empresa Scribd logo
1 de 8
@Author : Đoàn Đức Đề dedoan@gmail.com
1
Author : Đoàn Đức Đề
E-mail: dedoan@gmail.com
Cell phone: (+084)938491888
GUIDANCE
FOR
IMPLEMENTATION
@Author : Đoàn Đức Đề dedoan@gmail.com
2
2
EFFORT
Effort : Increasing from 15 – 20 % effort for
implementation because the reasons below :
Project team need more time to study and understand
new QMS
There are some gaps between new QMS and project’s
situation, it need to be discussed during
implementation
Take time to collect evidences
@Author : Đoàn Đức Đề dedoan@gmail.com
3
3
TRAINING
Provide necessary training to project team to make sure
they understand and can apply in the real work.
Beside the training, the Process owner team and QA
should provide some supports for project team
@Author : Đoàn Đức Đề dedoan@gmail.com
4
4
EVIDENCE
All the output work product should be collected and
stored.
The evidence should be aligned with the project activities
Make sure that project team have same understand about
the project evidences
@Author : Đoàn Đức Đề dedoan@gmail.com
5
5
COMMUNICATION
All stakeholders need progress updates
Make sure communications are regular, consistent and
clear
Report issues and risks as they occur or are identified
Show progress as it occurs
@Author : Đoàn Đức Đề dedoan@gmail.com
6
6
RECOMMENDATION
Consultant is a good friend – share with him all your
problem.
Implement in right way to avoid the rework later
PM should pay more attention to monitoring and checking
project team
QA should audit project more regularly than usual
@Author : Đoàn Đức Đề dedoan@gmail.com
7
7
KEY TO SUCCESS
 Maximum use of new QMS
 Assign Responsibility to One and not Everyone.
 Training, Training, Training…
 SEPG Head should responsible to encourage each
stakeholder
 Regular status meetings with Senior Management
 Regular communication on progress to everyone
@Author : Đoàn Đức Đề dedoan@gmail.com
8
QUESTIONS AND ANSWERS

Mais conteúdo relacionado

Semelhante a CMMI Guidance

Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
Leidy Ramirez
 
Project Management Best Practices - Tips and Techniques
Project Management Best Practices  - Tips and TechniquesProject Management Best Practices  - Tips and Techniques
Project Management Best Practices - Tips and Techniques
Invensis Learning
 
Assessment report leatty shanghai
Assessment report   leatty shanghaiAssessment report   leatty shanghai
Assessment report leatty shanghai
cem90
 
Assessment report leatty shanghai
Assessment report   leatty shanghaiAssessment report   leatty shanghai
Assessment report leatty shanghai
cem90
 

Semelhante a CMMI Guidance (20)

Efficient Teams Do Not Happen. They are Designed. It's called DesignOps
Efficient Teams Do Not Happen. They are Designed. It's called DesignOpsEfficient Teams Do Not Happen. They are Designed. It's called DesignOps
Efficient Teams Do Not Happen. They are Designed. It's called DesignOps
 
Formato
FormatoFormato
Formato
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Project Management Best Practices - Tips and Techniques
Project Management Best Practices  - Tips and TechniquesProject Management Best Practices  - Tips and Techniques
Project Management Best Practices - Tips and Techniques
 
Tri-State Generation and Transmission intranet transformation case study at T...
Tri-State Generation and Transmission intranet transformation case study at T...Tri-State Generation and Transmission intranet transformation case study at T...
Tri-State Generation and Transmission intranet transformation case study at T...
 
Tri-State Generation and Transmission Intranet Case Study oct 2015
Tri-State Generation and Transmission Intranet Case Study oct 2015Tri-State Generation and Transmission Intranet Case Study oct 2015
Tri-State Generation and Transmission Intranet Case Study oct 2015
 
Web-developmentInternship.docx
Web-developmentInternship.docxWeb-developmentInternship.docx
Web-developmentInternship.docx
 
CV-CalvinTan
CV-CalvinTanCV-CalvinTan
CV-CalvinTan
 
Training presentation .pptx
Training presentation .pptxTraining presentation .pptx
Training presentation .pptx
 
project-management-1.pptx
project-management-1.pptxproject-management-1.pptx
project-management-1.pptx
 
What to Expect When in Implementation
What to Expect When in ImplementationWhat to Expect When in Implementation
What to Expect When in Implementation
 
CIP Ecoinnovation – Tips & Tricks from a project partner
CIP Ecoinnovation – Tips & Tricks from a project partnerCIP Ecoinnovation – Tips & Tricks from a project partner
CIP Ecoinnovation – Tips & Tricks from a project partner
 
The Effective Management of Time
The Effective Management of TimeThe Effective Management of Time
The Effective Management of Time
 
SHAHUL HAMEED
SHAHUL HAMEEDSHAHUL HAMEED
SHAHUL HAMEED
 
Assessment report leatty shanghai
Assessment report   leatty shanghaiAssessment report   leatty shanghai
Assessment report leatty shanghai
 
Assessment report leatty shanghai
Assessment report   leatty shanghaiAssessment report   leatty shanghai
Assessment report leatty shanghai
 
Re-Aligning Project-Stakeholders Expectations
Re-Aligning Project-Stakeholders ExpectationsRe-Aligning Project-Stakeholders Expectations
Re-Aligning Project-Stakeholders Expectations
 
The importance of a PMO in supporting digital strategy
The importance of a PMO in supporting digital strategyThe importance of a PMO in supporting digital strategy
The importance of a PMO in supporting digital strategy
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management Details
 
Vehiculo solar
Vehiculo solarVehiculo solar
Vehiculo solar
 

Último

Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
UXDXConf
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
FIDO Alliance
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
FIDO Alliance
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
UK Journal
 

Último (20)

Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
 
Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream Processing
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
 
Your enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4jYour enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4j
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджера
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
 

CMMI Guidance

  • 1. @Author : Đoàn Đức Đề dedoan@gmail.com 1 Author : Đoàn Đức Đề E-mail: dedoan@gmail.com Cell phone: (+084)938491888 GUIDANCE FOR IMPLEMENTATION
  • 2. @Author : Đoàn Đức Đề dedoan@gmail.com 2 2 EFFORT Effort : Increasing from 15 – 20 % effort for implementation because the reasons below : Project team need more time to study and understand new QMS There are some gaps between new QMS and project’s situation, it need to be discussed during implementation Take time to collect evidences
  • 3. @Author : Đoàn Đức Đề dedoan@gmail.com 3 3 TRAINING Provide necessary training to project team to make sure they understand and can apply in the real work. Beside the training, the Process owner team and QA should provide some supports for project team
  • 4. @Author : Đoàn Đức Đề dedoan@gmail.com 4 4 EVIDENCE All the output work product should be collected and stored. The evidence should be aligned with the project activities Make sure that project team have same understand about the project evidences
  • 5. @Author : Đoàn Đức Đề dedoan@gmail.com 5 5 COMMUNICATION All stakeholders need progress updates Make sure communications are regular, consistent and clear Report issues and risks as they occur or are identified Show progress as it occurs
  • 6. @Author : Đoàn Đức Đề dedoan@gmail.com 6 6 RECOMMENDATION Consultant is a good friend – share with him all your problem. Implement in right way to avoid the rework later PM should pay more attention to monitoring and checking project team QA should audit project more regularly than usual
  • 7. @Author : Đoàn Đức Đề dedoan@gmail.com 7 7 KEY TO SUCCESS  Maximum use of new QMS  Assign Responsibility to One and not Everyone.  Training, Training, Training…  SEPG Head should responsible to encourage each stakeholder  Regular status meetings with Senior Management  Regular communication on progress to everyone
  • 8. @Author : Đoàn Đức Đề dedoan@gmail.com 8 QUESTIONS AND ANSWERS

Notas do Editor

  1. Module 8: Product Development 2 Review the class schedule for recommended timing for this module. Module Summary This module presents the Technical Solution, Product Integration, Verification, and Validation process areas. Note It includes one exercise at the end of the module (Exercise 4: Impact of an Engineering Change) Show this page at the beginning of the module.