Principles of R.C.C.
R.C.C. – the Cement concrete in which Steel reinforcement is embedded for taking tensile
stress is called R.C.C.
In this type of concrete , the steel is used generally in the form of round bars, 6mm – 32 mm. dia.
Steel.
This concrete is equally strong in taking tensile, compressive and shear stresses.
R.C.C. –
•1 part - cement
•1-2 parts - sand
•2-4 parts - crushed stones or gravel.
RCC Use in Foundation
Uses :-
RCC commonly used in
Columns, Beams, Foundations,
Slabs, Precast Concrete
Cement concrete Proportion used in Framed Structure
Load transfer in RCC Construction
Load transfer in RCC Construction
Type of Load transfer in RCC Construction
Mixing of Concrete
Ideally, the mixing should be done in a mechanical mixer.
The concrete mixer should be allowed to rotate for at least 2 minutes. Pouring
Concrete
Mixing of Concrete
Mixing of Concrete
METHODS OF PROPORTIONING CONCRETE:-
(1) Arbitrary Method
The general expression for the proportions of cement, sand and coarse
aggregate is 1 : n : 2n by volume.
1 : 1 : 2 and 1 : 1.2 : 2.4 for very high strength.
1 : 1.5 : 3 and 1 : 2 : 4 for normal works.
1 : 3 : 6 and 1 : 4 : 8 for foundations and mass concrete works.
M10 1 : 3 : 6
M15 1 : 2 : 4
M20 1 : 1.5 : 3
M25 1 : 1 : 2
Recommended Mixes of Concrete :-
The concrete as per IS 456: 2000, the grades of concrete lower than M20 are not to be
used in RCC work.
Mixing of Concrete
(2) Fineness Modulus Method:-
The term fineness modulus is used to indicate an index number which is roughly
proportional to the average size of the particle in the entire quantity of aggregates.
The fineness modulus is obtained by adding the percentage of weight of the material
retained on the following sieve and divided by 100.
The coarser the aggregates, the higher the fineness modulus.
Sieve is adopted for:-
All aggregates : 80 mm, 40 mm, 20 mm, 10 mm, and Nos. 480, 240, 120, 60, 30 and 15.
Coarse aggregates : mm, 40 mm, 20 mm, 10 mm, and No. 480.
Fine aggregates : Nos. 480, 240, 120, 60, 30 and 15.
Mixing of Concrete
(3) Minimum Void Method (Does not give satisfactory result)
The quantity of sand used should be such that it completely fills the voids of coarse
aggregate.
Similarly, the quantity of cement used shown such that it fills the voids of sand, so
that a dense mix the minimum voids is obtained.
In actual practice, the quantity of fine aggregate used in the mix is about 10% more
than the voids in the coarse aggregate and the quantity of cement is kept as about
15% more than the voids in the fine aggregate.
Mixing of Concrete
(5) Water – Cement Ratio Method:
According to the water – cement ratio law given by Abram as a result of many
experiments, the strength of well compacted concrete with good workability is
dependent only on the ratio.
The lower water content produces stiff paste having greater binding property and hence
the lowering the water-cement ratio within certain limits results in the increased
strength.
Similarly, the higher water content increases the workability, but lower the strength of
concrete.
The optimum water-cement ratio for the concrete of required compressive strength is
decided from graphs and expressions developed from various experiments.
Amount of water less than the optimum water decreases the strength and about 10%
less may be insufficient to ensure complete setting of cement. An increase of 10% above
the optimum may decrease the strength approximately by 15% while an increase in 50%
may decrease the strength to one-half.
Mixing of Concrete
Thumb Rules for deciding the quantity of water in concrete:
(i) Weight of water = 28% of the weight of cement + 4% of the weight of total
aggregate
(ii) Weight of water = 30% of the weight of cement + 5% of the weight of total
aggregate
Some practical values of water cement ratio for structure reinforced concrete
0.45 for 1 : 1 : 2 concrete
0.5 for 1 : 1.5 : 3 concrete
0.5 to 0.6 for 1 : 2 : 4 concrete.
Concrete vibrated by efficient mechanical vibrators require less water cement
ratio, and hence have more strength.
Formwork for RCC Framed Construction
Image showing Formwork for placing Concrete in RCC column
Formwork for RCC Framed Construction
Materials used for the formwork
The formwork is commonly built from wooden planks and boards, plastic, or
steel. On commercial building sites today, plastic and steel are more common
as they save labour.
On low-budget sites, for instance when laying a concrete garden path,
wooden planks are very common. After the concrete has set the wood may be
removed, or left there permanently.
In some cases formwork is not necessary – for instance, a ground slab
surrounded by brick or block foundation walls, where the walls act as the
sides of the tray and hardcore acts as the base.
Formwork for RCC Framed Construction
What is Formwork ?
Materials used for RCC Formwork.
Requirements of Formwork for RCC Framed Construction
Objectives considered in Formwork
Stages in process of Formwork
Formwork for different structural member of RCC Framed Construction
Formwork for RCC Framed Construction
Formwork for Walls :-
Formwork for Walls :-
Formwork for Walls :-
Formwork for Square Columns :-
Column Formwork - Timber yoke used as a
column clamp
Formwork for Columns :-
Formwork for RCC Framed Construction
Formwork for Columns :-
Formwork for Columns :-
Formwork for Slabs & Beams :-
Formwork for RCC Framed Construction
Formwork for Beams &Lintels :-
Formwork for Beams &Lintels :-
Roof Beam formwork fabricated at
construction site. The formwork verticality and
horizontality supported by series of wooden
support and scaffoldings. The formwork was
completed and ready to receive concrete
Steel formwork use in construction site for
ground beam beam formwork
Formwork for Slabs :-
Time for Removal of Formwork for RCC Framed Construction
Types of Steel Bars used in RCC Construction
Generally there are two types of steel bars ("Sariya" in hindi) available in
the market.
Mild steel bars
Deformed steel bars
Steel bars used for construction work
Types of Steel Bars used in RCC Construction
Mild steel bars (as per IS: 432, part-I -1982)
Mild steel bars are used for tensile stress of RCC (Reinforced cement concrete) slab beams etc.
in reinforced cement concrete work. These steel bars are plain in surface and are round sections
of diameter from 6 to 50 mm. These rods are manufactured in long lengths and can be cut
quickly and be bent easily without damage.
Deformed steel bars (as per IS: 1786-1985)
As deformed bars are rods of steels provided with lugs, ribs or deformation on the surface of
bar, these bars minimize slippage in concrete and increases the bond between the two
materials. Deformed bars have more tensile stresses than that of mild steel plain bars. These
bars can be used without end hooks. The deformation should be spaced along the bar at
substantially uniform distances. To limit cracks that may develop in reinforced concrete around
mild steel bars due to stretching of bars and some lose of bond under load; it is common to
use deformed bars that have projecting ribs or are twisted to improve the bond with concrete.
These bars are produced in sections from 6 mm to 50 mm dia.
In addition the strength of bonds of deformed bars calculated should be 40 to 80 % higher than
that of plain round bars of same nominal size. And it has more tensile stress than that of plain
round bars of same nominal size.
Cold twisted deformed (Ribbed or Tor Steel Bars) bars are recommended as best quality steel
bars for construction work by structural Engineer.
Types of Steel Bars used in RCC Construction
Various Grades of Mild Steel Bars
Reinforcement bars in accordance with standard IS No. 432 part-I can be classified
into following types.
1) Mild Steel Bars: Mild steel bars can be supplied in two grades
a)Mild steel bars grade-I designated as Fe 410-S or Grade 60
b) Mild steel bars grade-II designated as Fe-410-o or Grade 40
2) Medium Tensile Steel Bars designated as Fe- 540-w-ht or Grade
Grade II Mild steel bar are not recommended for use in structures located in earth quake
zones subject to severe damage and for structures subject to dynamic loading (other than
wind loading) such as railways and highways bridges.
Every lot or consignment of mild steel bars brought at the site of work should be tested in
laboratory before use in the work. However for small work one can use mild steel bars on
the basis of verifying tests results made by manufacturer in his own laboratory; which are
available with supplier.
Some of manufacturers stamped MS bars grade with their make /name and also give
certification of test and grade. On the basis of the above information you can store mild
steel bars grade-wise at the site of work.
Types of Steel Bars used in RCC Construction
Types of Steel Bars used in RCC Construction
Steel Bars for RCC Work
All finished steel bars for reinforced work should be neatly rolled to the dimension and
weights as specified.
They should be sound, free from cracks, surface flaws, laminations, rough, jagged and
imperfect edges and other defects.
It should be finished in a work like manner.
Column made of steel bars
General Precautions for Steel Bars used in RCC Construction
General precautions for steel bars in reinforcement
Steel bars are clear, free from loose mil scales, dust and loose rust coats of paints, oil
or other coatings which may destroy or reduce bond strength.
Steel bars should be stored in such a way as to avoid distortion and to prevent
deterioration and corrosion.
Steel bars should not be clean by oily substance to remove the rust.
The bar is bent correctly and accurately to the size and shape as shown in drawings.
If possible, the bar of full length is used.
Overlapping bars do not touch each other and these should be kept apart with
concrete.
The overlap if given should be staggered.
The cranks in the bar at the end should be kept in position by using spots.
The steel bars should not be disturbed while lying cements concrete.
Required cover under steel bars should be given before laying the cement concrete.
Weight of Different Steel Bars
When we want to purchase Mild steel members from the market, the shopkeeper
quotes the price of steel members in weight.
When any type of steel members for use in house construction is required, we
calculate the length of steel member in feet or meter but we are ignorant about the
weight of steel. Here are details of weight per meter for various types of steel
members:-
This will help us for estimated weight and cost. It will also help at the time of purchase
to avoid pilferage in weight.
Types of Steel Bars used in RCC Construction
HSD Steel Bars (High Strength Deformed Bars)
High strength deformed bars IS: 1786-1985 are steel bars which are provided with lugs,
ribs, projection or deformation on the surface and are produced in form of cold twisted
deformed bars. These bars are extensively used for reinforcement purposes in a
construction. Due to ribs or projections on the surface, these steel bars minimize slippage
in concrete and increase the bond between two materials i.e. between cement concrete
and steel bars.
The deformed bars have more compressive and tensile stress than that of mild steel plain
bars. High strength deformed bars have improved anchorage; therefore they can be used
without end hooks or bent up ends of bars. This reduces labor for fabrication of steel
reinforcement. The deformation is spaced on bar at uniform distances. These bars are
produced in sizes or sections from 4 mm to 50 mm in diameter.
Generally cracks develop in reinforced concrete around mild steel bars due to stretching of
bars, loss of bond under the load. To minimize this problem, deformed bars having
projecting ribs or twisted surface which improves the bond with the concrete should be
used in RCC work.
Features of HSD Bars
Low carbon value: HSD Bars have lower carbon level, resulting in good ductility, strength
and welding ability.
Superior bonding strength: HSD bars are well known for their excellent bonding strength
when used with concrete.
Welding capability: Since these bars have lower carbon content, they have 100% welding
capability than conventional bars.
High tensile strength: HSD bars feature high tensile strength. They offer great asset in
construction process, where a lot of bending and re bending is required.
Wide application range: These bars have wide application range like in building
residential, commercial and industrial structures, bridges, etc.
Satisfactorily malleability, minimum weight and maximum strength and suitable for both
compression and tension reinforcement.
Process of production of bars
The main process for production of bars is hot rolling followed by cold twisting. Latest
technological advances in the field of micro-alloying of steel and thermo-mechanical
treatment process have resulted in the production of deformed bars as reinforcement for
use in cement concrete in three grades namely Fe 415, Fe 500 and Fe 550.
The strength of bonds of deformed bars
In addition, the calculated strength of bonds of deformed bars should be 40 to 80 % higher
than that of plain round bars of same nominal size. Tor steel possesses the strength of 1.5 to
2.0 times of mild steel in compression as well as in tension, whereas it costs only 10% more
than mild steel.
Process of production of bars
The main process for production of bars is hot rolling followed by cold twisting. Latest
technological advances in the field of micro-alloying of steel and thermo-mechanical
treatment process have resulted in the production of deformed bars as reinforcement for
use in cement concrete in three grades namely Fe 415, Fe 500 and Fe 550.
The strength of bonds of deformed bars
In addition, the calculated strength of bonds of deformed bars should be 40 to 80 % higher
than that of plain round bars of same nominal size. Tor steel possesses the strength of 1.5 to
2.0 times of mild steel in compression as well as in tension, whereas it costs only 10% more
than mild steel.
Laying of Reinforcement in RCC Construction
Casting of Reinforcement in RCC Construction
Typical Slab Reinforcement in RCC Construction
Laying of Reinforcement in RCC Construction
Curing plays an important role on strength
development and durability of concrete.
Curing takes place immediately after concrete
placing and finishing
Deshuttering and Curing of RCC Structure
R.C.C. Details :
Column & Plinth Beam Layout
Footing Layout
Footing Detail
Column Footing -Beam
Curing
The curing shall be started immediately after thumb set of the concrete laid.
Hessian clothe /Plastic shall be covered over the set concrete to reduce moisture
evaporation from the concrete during hardening and thus to minimize shrinkage
crazy cracks. These cracks are inheriting property of the concrete specially
appears during casting of flat surfaces.
Final curing shall be done by ponding and stacking water for minimum period of 7
Curing:-
The curing shall be started immediately after thumb set of the concrete
laid. Hessian clothe /Plastic shall be covered over the set concrete to
reduce moisture evaporation from the concrete during hardening and thus
to minimize shrinkage crazy cracks.
These cracks are inheriting property of the concrete specially appears
during casting of flat surfaces.
Final curing shall be done by ponding and stacking water for minimum
period of 7 days.
Concrete form work stripping time :-
In general stripping of form work should not be done unless otherwise concrete
has achieve strength equal to double the stress it may imposed while stripping the
form work. Before stripping of form work, compressivestrength of concrete is to
be checked. If desire compressive strength of concrete is not achieved then the
stripping time should be extended.
Following article provide guide lines for minimum stripping time as per Indian
standard 456 when
 concreting is done under normal circumstances
 cement used is Ordinary Portland Cement
 Adequate curing is done
 Ambient temperature is not fall below 15 degree
For vertical members such as columns, beams, shear walls etc – 16 -24 hrs
soffit form work to slabs – 3 days (care to be taken so that props to be fixed
immediately after removing form work)
soffit form work to beam – 7 days (care to be taken so that props to be fixed
immediately after removing form work)
Props left under slab can be removed after 7 days if spanning is less than
4.5 m and 14 days for spanning over 4.5 m
Props left under slab can be removed after 14 days if spanning is less than 6
m and 21 days for spanning over than 6 m
Testing of Concrete
What is workability of concrete? Which test is generally performed at site for its
determination? And what are its recommended values for different purposes?
Workability of concrete describes the ease or difficulty with which the concrete is handled,
transported and placed between the forms with minimum loss of homogeneity.
Workability is important because, if
i. the concrete mixture is too wet, coarse aggregates settle at the bottom of concrete
mass and as a result concrete becomes non-uniform composition,
ii. the concrete mixture is too dry, it will be difficult to handle and place it in position.
Workability of concrete mixture is measured by:
a) Vee-bee consistometer test
b) Compaction factor test
c) Slump test
Suitability of Slump Test:
The slump test is suitable only for the concrete
of high or medium workability.
Slump Test
This test is carried out with a mould called slump cone whose top diameter is 10cm,
bottom diameter is 20 cm and height is 30 cm. the test may be performed in the
following steps:
1. Place the slump mould on a smooth flat and non-absorbent surface.
2. Mix the dry ingredients of the concrete thoroughly till a uniform colour is obtained
and then add the required quantity of water.
3. Place the mixed concrete in the mould to about one-fourth of its height.
4. Compact the concrete 25 times with the help of a tamping rod uniformly all over
the area.
5. Place the concrete in the mould about half of its height and compact it again.
6. Place the concrete upto its three fourth height and then upto its top. Compact each
layer 25 times with the help of tamping rod uniformly. For the second subsequent
layers, the tamping rod should penetrate into underlying layers.
7. Strike off the top surface of mould with a trowel or tamping rod so that the mould
is filled to its top.
8. Remove the mould immediately, ensuring its movement in vertical direction.
9. When the settlement of concrete stops, measure the subsidence of the concrete in
millimeters which is the required slump of the concrete
RCC Specifications
Shuttering shall be done using seasoned wooden boards of thickness not less than 30mm.
Surface contact with concrete shall be free from adhering grout, nails, splits and other defects.
All the joints are perfectly closed and lined up.
The shuttering and framing is sufficiently braced.
Nowadays timber shuttering is replaced by steel plates.
All the props of approved sizes are supported on double wedges and when taken out, these
wedges are eased and not knocked out.
All the framework is removed after 21 days of curing without any shocks or vibrations.
All reinforcement bars conform IS specifications and are free from rust, grease oil etc.
The steel grills are perfectly as per detailed specifications.
The covers to concrete are perfectly maintained as per code.
Bars of diameter beyond 25mm diameter are bent when red hot.
The materials proportion should be as per the specifications of the concrete.
Number of Cement bags required for a specific cement concrete ratios:-
For cement concrete of ratio 1:1:2(1 cement:1sand/coarse sand:2graded stone
aggregate) require 11no bags of 50kg.
For cement concrete of ratio 1:1.5:3 require 7.8no bags of 50kg.
For cement concrete of ratio 1:2:4 require 6 no bags of 50kg.
For cement concrete of ratio 1:3:6 require 4.25no bags of 50kg.
For cement concrete of ratio 1:4:8 require 3.2 no bags of 50kg.
For cement concrete of ratio 1:5:10 require 2.50 no bags of 50kg.
For cement concrete of ratio 1:6:12 require 2.25 no bags of 50kg.
Thumb rule no1:
Size of the Columns
The size of the columns are 9″x9″ with the use of M20 grade of concrete.
Thumb rule no.2:
Distance between the columns:
The distance between the columns does not exceed 4.5m.
Thumb rule no.3:
Alignment of Columns
The Columns have been arranged on a iron grid pattern. So there is absolutely
no question of zigzag walls and zigzag beams which reducing complications in
the structure.
Construction process in RCC Building
Construction
A concrete slab can be cast in two ways: It could either be prefabricated or cast in situ.
Prefabricated concrete slabs are cast in a factory and then transported to the site ready
to be lowered into place between steel or concrete beams.
They may be pre-stressed (in the factory), post-stressed (on site), or unstressed. Care
should be taken to see that the supporting structure is built to the correct dimensions to
avoid trouble with the fitting of slabs over the supporting structure.
In situ concrete slabs are built on the building site using formwork. Formwork is a box-like
setup in which concrete is poured for the construction of slabs.
For reinforced concrete slabs, reinforcing steel bars are placed within the formwork and
then the concrete is poured.
Plastic tipped metal, or plastic bar chairs are used to hold the reinforcing steel bars away
from the bottom and sides of the form-work, so that when the concrete sets it completely
envelops the reinforcement.
Formwork differs with the kind of slab. For a ground slab, the form-work may consist only
of sidewalls pushed into the ground whereas for a suspended slab, the form-work is
shaped like a tray, often supported by a temporary scaffold until the concrete sets.
Construction process in RCC Building
Construction
A concrete slab can be cast in two ways: It could either be prefabricated or cast in situ.
Prefabricated concrete slabs are cast in a factory and then transported to the site ready
to be lowered into place between steel or concrete beams.
They may be pre-stressed (in the factory), post-stressed (on site), or unstressed. Care
should be taken to see that the supporting structure is built to the correct dimensions to
avoid trouble with the fitting of slabs over the supporting structure.
In situ concrete slabs are built on the building site using formwork. Formwork is a box-like
setup in which concrete is poured for the construction of slabs.
For reinforced concrete slabs, reinforcing steel bars are placed within the formwork and
then the concrete is poured.
Plastic tipped metal, or plastic bar chairs are used to hold the reinforcing steel bars away
from the bottom and sides of the form-work, so that when the concrete sets it completely
envelops the reinforcement.
Formwork differs with the kind of slab. For a ground slab, the form-work may consist only
of sidewalls pushed into the ground whereas for a suspended slab, the form-work is
shaped like a tray, often supported by a temporary scaffold until the concrete sets.
Reinforced Cement Concrete Slab
A Reinforced Concrete Slab is the one of the most important component in a
building. It is a structural element of modern buildings. Slabs are supported on
Columns and Beams.
RCC Slabs whose thickness ranges from 10 to 50 centimetres are most often
used for the construction of floors and ceilings.
Thin concrete slabs are also used for exterior paving purpose.
In many domestic and industrial buildings a
thick concrete slab, supported on
foundations or directly on the sub soil, is used
to construct the ground floor of a building.
In high rises buildings and skyscrapers, thinner,
pre-cast concrete slabs are slung between the
steel frames to form the floors and ceilings on
each level.
While making structural drawings of the
reinforced concrete slab, the slabs are
abbreviated to “r.c.slab” or simply “r.c.”
Design of various types of slabs and their reinforcement
For a suspended slab, there are a number of designs to improve the strength-to-
weight ratio. In all cases the top surface remains flat, and the underside is
modulated:
Corrugated, usually where the concrete is poured into a corrugated steel tray.
This improves strength and prevents the slab bending under its own weight. The
corrugations run across the short dimension, from side to side.
A ribbed slab, giving considerable extra strength on one direction.
A waffle slab, giving added strength in both directions.
Solid Slab spanning in two directions
When a slab is supported on all four of its sides, it effectively spans in both directions, and
it is sometimes more economical to design the slab on this basis. The moment of bending
in each direction will depend on the ratio of the two spans and the conditions of restraint
at each support.
If the slab is square and the restraint is similar along the four sides, then the load will span
equally in both directions. If the slab is rectangular, then more than one-half of the load
will be carried in the shorter direction and lesser load will be imposed on the longer
direction.
If one span is much longer than the other, a large portion of the load will be carried in the
shorter direction and the slab may as well be designed as spanning in only one direction.
Moments in each direction of span are generally calculated using co-efficients which are
tabulated in the code.
The slab is reinforced with the bars in both directions parallel to the spans with the steel
for the shorter span placed farthest from the natural acis to five the greater effective
depth.
The span-efective depths are based on the shorter span and the percentage of the
reinforcement in that direction.

Mais conteúdo relacionado

Semelhante a RCC-.pdf

STEEL_REINFORCEMENT_An_Overview_A_PRESEN.pdf
STEEL_REINFORCEMENT_An_Overview_A_PRESEN.pdfSTEEL_REINFORCEMENT_An_Overview_A_PRESEN.pdf
STEEL_REINFORCEMENT_An_Overview_A_PRESEN.pdfManoj288873
 
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxPDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxChristopherThomas578171
 
Steel reinforcement
Steel reinforcement Steel reinforcement
Steel reinforcement Subho Mistri
 
Types of pavement construction procedure
Types of pavement construction procedureTypes of pavement construction procedure
Types of pavement construction procedureBhavik A Shah
 
Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial VIKAS4210607
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleKailash Chander
 
INTRODUCTION TO R.C.C by MEET JOSHI
INTRODUCTION TO R.C.C by MEET JOSHIINTRODUCTION TO R.C.C by MEET JOSHI
INTRODUCTION TO R.C.C by MEET JOSHImeetjoshi38
 
Concrete Road
Concrete RoadConcrete Road
Concrete RoadKp Ahm
 
Composite girde-WPS Office (1).pptx
Composite girde-WPS Office (1).pptxComposite girde-WPS Office (1).pptx
Composite girde-WPS Office (1).pptxSatyaprakashPrasad2
 
Experimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short ColumnsExperimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short ColumnsIRJET Journal
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefitPerwez Ahmad
 
Profiled deck composite floors
Profiled deck composite floorsProfiled deck composite floors
Profiled deck composite floorsElamathy Murugan
 
Ceramic coating and frp coating on pavement reinforcement
Ceramic coating and frp coating on pavement reinforcementCeramic coating and frp coating on pavement reinforcement
Ceramic coating and frp coating on pavement reinforcementDhrubajyoti Majumdar
 
Maintenance & repair of steel bridges
Maintenance & repair of steel bridgesMaintenance & repair of steel bridges
Maintenance & repair of steel bridgesnaveen kumar
 

Semelhante a RCC-.pdf (20)

STEEL_REINFORCEMENT_An_Overview_A_PRESEN.pdf
STEEL_REINFORCEMENT_An_Overview_A_PRESEN.pdfSTEEL_REINFORCEMENT_An_Overview_A_PRESEN.pdf
STEEL_REINFORCEMENT_An_Overview_A_PRESEN.pdf
 
Formwork
FormworkFormwork
Formwork
 
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxPDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
 
RCC
RCCRCC
RCC
 
Steel reinforcement
Steel reinforcement Steel reinforcement
Steel reinforcement
 
Types of pavement construction procedure
Types of pavement construction procedureTypes of pavement construction procedure
Types of pavement construction procedure
 
Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending Schedule
 
INTRODUCTION TO R.C.C by MEET JOSHI
INTRODUCTION TO R.C.C by MEET JOSHIINTRODUCTION TO R.C.C by MEET JOSHI
INTRODUCTION TO R.C.C by MEET JOSHI
 
Concrete Road
Concrete RoadConcrete Road
Concrete Road
 
Speedy construction
Speedy constructionSpeedy construction
Speedy construction
 
Composite girde-WPS Office (1).pptx
Composite girde-WPS Office (1).pptxComposite girde-WPS Office (1).pptx
Composite girde-WPS Office (1).pptx
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Experimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short ColumnsExperimental Study of Concrete Filled Tubular Short Columns
Experimental Study of Concrete Filled Tubular Short Columns
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
Chapter 2 hh.pptx
Chapter 2 hh.pptxChapter 2 hh.pptx
Chapter 2 hh.pptx
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefit
 
Profiled deck composite floors
Profiled deck composite floorsProfiled deck composite floors
Profiled deck composite floors
 
Ceramic coating and frp coating on pavement reinforcement
Ceramic coating and frp coating on pavement reinforcementCeramic coating and frp coating on pavement reinforcement
Ceramic coating and frp coating on pavement reinforcement
 
Maintenance & repair of steel bridges
Maintenance & repair of steel bridgesMaintenance & repair of steel bridges
Maintenance & repair of steel bridges
 

Mais de NehaPaliwal31

asana Software and define their uses as software
asana Software and define their uses as softwareasana Software and define their uses as software
asana Software and define their uses as softwareNehaPaliwal31
 
FLOORING for construction field for sites
FLOORING for construction field for sitesFLOORING for construction field for sites
FLOORING for construction field for sitesNehaPaliwal31
 
Project managemnt about and broad Aim of Construction management
Project managemnt about and broad Aim of Construction managementProject managemnt about and broad Aim of Construction management
Project managemnt about and broad Aim of Construction managementNehaPaliwal31
 
Asphaltic Sheet1.pptx
Asphaltic Sheet1.pptxAsphaltic Sheet1.pptx
Asphaltic Sheet1.pptxNehaPaliwal31
 
Roof and roofing material .pdf
Roof and roofing material .pdfRoof and roofing material .pdf
Roof and roofing material .pdfNehaPaliwal31
 
UNIT 1 Construction of Reinforced Masonry Walls, Pillars and Lintels.pdf
UNIT 1 Construction of Reinforced Masonry Walls, Pillars and Lintels.pdfUNIT 1 Construction of Reinforced Masonry Walls, Pillars and Lintels.pdf
UNIT 1 Construction of Reinforced Masonry Walls, Pillars and Lintels.pdfNehaPaliwal31
 
Galvanized Iron Sheet.pdf
Galvanized Iron Sheet.pdfGalvanized Iron Sheet.pdf
Galvanized Iron Sheet.pdfNehaPaliwal31
 
ALUMINIUM ROOFING.pdf
ALUMINIUM ROOFING.pdfALUMINIUM ROOFING.pdf
ALUMINIUM ROOFING.pdfNehaPaliwal31
 
piechart Example.pdf
piechart Example.pdfpiechart Example.pdf
piechart Example.pdfNehaPaliwal31
 
History of Architecture.pdf
History of Architecture.pdfHistory of Architecture.pdf
History of Architecture.pdfNehaPaliwal31
 
SITE ANALYSIS- example .pdf
SITE ANALYSIS- example .pdfSITE ANALYSIS- example .pdf
SITE ANALYSIS- example .pdfNehaPaliwal31
 

Mais de NehaPaliwal31 (18)

asana Software and define their uses as software
asana Software and define their uses as softwareasana Software and define their uses as software
asana Software and define their uses as software
 
FLOORING for construction field for sites
FLOORING for construction field for sitesFLOORING for construction field for sites
FLOORING for construction field for sites
 
Project managemnt about and broad Aim of Construction management
Project managemnt about and broad Aim of Construction managementProject managemnt about and broad Aim of Construction management
Project managemnt about and broad Aim of Construction management
 
CLIMATE.pptx
CLIMATE.pptxCLIMATE.pptx
CLIMATE.pptx
 
Asphaltic Sheet1.pptx
Asphaltic Sheet1.pptxAsphaltic Sheet1.pptx
Asphaltic Sheet1.pptx
 
Roof and roofing material .pdf
Roof and roofing material .pdfRoof and roofing material .pdf
Roof and roofing material .pdf
 
UNIT 1 Construction of Reinforced Masonry Walls, Pillars and Lintels.pdf
UNIT 1 Construction of Reinforced Masonry Walls, Pillars and Lintels.pdfUNIT 1 Construction of Reinforced Masonry Walls, Pillars and Lintels.pdf
UNIT 1 Construction of Reinforced Masonry Walls, Pillars and Lintels.pdf
 
BAMBOO pdf.pdf
BAMBOO pdf.pdfBAMBOO pdf.pdf
BAMBOO pdf.pdf
 
paving_.pdf
paving_.pdfpaving_.pdf
paving_.pdf
 
Thatch Roof.pdf
Thatch Roof.pdfThatch Roof.pdf
Thatch Roof.pdf
 
Galvanized Iron Sheet.pdf
Galvanized Iron Sheet.pdfGalvanized Iron Sheet.pdf
Galvanized Iron Sheet.pdf
 
FLOORING.pdf
FLOORING.pdfFLOORING.pdf
FLOORING.pdf
 
ALUMINIUM ROOFING.pdf
ALUMINIUM ROOFING.pdfALUMINIUM ROOFING.pdf
ALUMINIUM ROOFING.pdf
 
Material Study
Material StudyMaterial Study
Material Study
 
Acoustics I PPT.pdf
Acoustics I PPT.pdfAcoustics I PPT.pdf
Acoustics I PPT.pdf
 
piechart Example.pdf
piechart Example.pdfpiechart Example.pdf
piechart Example.pdf
 
History of Architecture.pdf
History of Architecture.pdfHistory of Architecture.pdf
History of Architecture.pdf
 
SITE ANALYSIS- example .pdf
SITE ANALYSIS- example .pdfSITE ANALYSIS- example .pdf
SITE ANALYSIS- example .pdf
 

Último

VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funneljen_giacalone
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 

Último (20)

VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
VVIP Pune Call Girls Dange Chowk (8250192130) Pune Escorts Nearby with Comple...
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Paharganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funnel
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 

RCC-.pdf

  • 2. R.C.C. – the Cement concrete in which Steel reinforcement is embedded for taking tensile stress is called R.C.C. In this type of concrete , the steel is used generally in the form of round bars, 6mm – 32 mm. dia. Steel. This concrete is equally strong in taking tensile, compressive and shear stresses. R.C.C. – •1 part - cement •1-2 parts - sand •2-4 parts - crushed stones or gravel.
  • 3. RCC Use in Foundation Uses :- RCC commonly used in Columns, Beams, Foundations, Slabs, Precast Concrete
  • 4. Cement concrete Proportion used in Framed Structure
  • 5. Load transfer in RCC Construction
  • 6. Load transfer in RCC Construction
  • 7. Type of Load transfer in RCC Construction
  • 8. Mixing of Concrete Ideally, the mixing should be done in a mechanical mixer. The concrete mixer should be allowed to rotate for at least 2 minutes. Pouring Concrete
  • 10. Mixing of Concrete METHODS OF PROPORTIONING CONCRETE:- (1) Arbitrary Method The general expression for the proportions of cement, sand and coarse aggregate is 1 : n : 2n by volume. 1 : 1 : 2 and 1 : 1.2 : 2.4 for very high strength. 1 : 1.5 : 3 and 1 : 2 : 4 for normal works. 1 : 3 : 6 and 1 : 4 : 8 for foundations and mass concrete works. M10 1 : 3 : 6 M15 1 : 2 : 4 M20 1 : 1.5 : 3 M25 1 : 1 : 2 Recommended Mixes of Concrete :- The concrete as per IS 456: 2000, the grades of concrete lower than M20 are not to be used in RCC work.
  • 11. Mixing of Concrete (2) Fineness Modulus Method:- The term fineness modulus is used to indicate an index number which is roughly proportional to the average size of the particle in the entire quantity of aggregates. The fineness modulus is obtained by adding the percentage of weight of the material retained on the following sieve and divided by 100. The coarser the aggregates, the higher the fineness modulus. Sieve is adopted for:- All aggregates : 80 mm, 40 mm, 20 mm, 10 mm, and Nos. 480, 240, 120, 60, 30 and 15. Coarse aggregates : mm, 40 mm, 20 mm, 10 mm, and No. 480. Fine aggregates : Nos. 480, 240, 120, 60, 30 and 15.
  • 12. Mixing of Concrete (3) Minimum Void Method (Does not give satisfactory result) The quantity of sand used should be such that it completely fills the voids of coarse aggregate. Similarly, the quantity of cement used shown such that it fills the voids of sand, so that a dense mix the minimum voids is obtained. In actual practice, the quantity of fine aggregate used in the mix is about 10% more than the voids in the coarse aggregate and the quantity of cement is kept as about 15% more than the voids in the fine aggregate.
  • 13. Mixing of Concrete (5) Water – Cement Ratio Method: According to the water – cement ratio law given by Abram as a result of many experiments, the strength of well compacted concrete with good workability is dependent only on the ratio. The lower water content produces stiff paste having greater binding property and hence the lowering the water-cement ratio within certain limits results in the increased strength. Similarly, the higher water content increases the workability, but lower the strength of concrete. The optimum water-cement ratio for the concrete of required compressive strength is decided from graphs and expressions developed from various experiments. Amount of water less than the optimum water decreases the strength and about 10% less may be insufficient to ensure complete setting of cement. An increase of 10% above the optimum may decrease the strength approximately by 15% while an increase in 50% may decrease the strength to one-half.
  • 14. Mixing of Concrete Thumb Rules for deciding the quantity of water in concrete: (i) Weight of water = 28% of the weight of cement + 4% of the weight of total aggregate (ii) Weight of water = 30% of the weight of cement + 5% of the weight of total aggregate Some practical values of water cement ratio for structure reinforced concrete 0.45 for 1 : 1 : 2 concrete 0.5 for 1 : 1.5 : 3 concrete 0.5 to 0.6 for 1 : 2 : 4 concrete. Concrete vibrated by efficient mechanical vibrators require less water cement ratio, and hence have more strength.
  • 15. Formwork for RCC Framed Construction Image showing Formwork for placing Concrete in RCC column
  • 16. Formwork for RCC Framed Construction Materials used for the formwork The formwork is commonly built from wooden planks and boards, plastic, or steel. On commercial building sites today, plastic and steel are more common as they save labour. On low-budget sites, for instance when laying a concrete garden path, wooden planks are very common. After the concrete has set the wood may be removed, or left there permanently. In some cases formwork is not necessary – for instance, a ground slab surrounded by brick or block foundation walls, where the walls act as the sides of the tray and hardcore acts as the base.
  • 17. Formwork for RCC Framed Construction What is Formwork ?
  • 18. Materials used for RCC Formwork.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. Requirements of Formwork for RCC Framed Construction
  • 25. Stages in process of Formwork
  • 26. Formwork for different structural member of RCC Framed Construction
  • 27. Formwork for RCC Framed Construction Formwork for Walls :-
  • 30. Formwork for Square Columns :- Column Formwork - Timber yoke used as a column clamp
  • 32. Formwork for RCC Framed Construction Formwork for Columns :-
  • 34. Formwork for Slabs & Beams :-
  • 35. Formwork for RCC Framed Construction Formwork for Beams &Lintels :-
  • 36. Formwork for Beams &Lintels :-
  • 37. Roof Beam formwork fabricated at construction site. The formwork verticality and horizontality supported by series of wooden support and scaffoldings. The formwork was completed and ready to receive concrete Steel formwork use in construction site for ground beam beam formwork
  • 39.
  • 40.
  • 41.
  • 42.
  • 43. Time for Removal of Formwork for RCC Framed Construction
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49. Types of Steel Bars used in RCC Construction Generally there are two types of steel bars ("Sariya" in hindi) available in the market. Mild steel bars Deformed steel bars Steel bars used for construction work
  • 50. Types of Steel Bars used in RCC Construction Mild steel bars (as per IS: 432, part-I -1982) Mild steel bars are used for tensile stress of RCC (Reinforced cement concrete) slab beams etc. in reinforced cement concrete work. These steel bars are plain in surface and are round sections of diameter from 6 to 50 mm. These rods are manufactured in long lengths and can be cut quickly and be bent easily without damage. Deformed steel bars (as per IS: 1786-1985) As deformed bars are rods of steels provided with lugs, ribs or deformation on the surface of bar, these bars minimize slippage in concrete and increases the bond between the two materials. Deformed bars have more tensile stresses than that of mild steel plain bars. These bars can be used without end hooks. The deformation should be spaced along the bar at substantially uniform distances. To limit cracks that may develop in reinforced concrete around mild steel bars due to stretching of bars and some lose of bond under load; it is common to use deformed bars that have projecting ribs or are twisted to improve the bond with concrete. These bars are produced in sections from 6 mm to 50 mm dia. In addition the strength of bonds of deformed bars calculated should be 40 to 80 % higher than that of plain round bars of same nominal size. And it has more tensile stress than that of plain round bars of same nominal size. Cold twisted deformed (Ribbed or Tor Steel Bars) bars are recommended as best quality steel bars for construction work by structural Engineer.
  • 51. Types of Steel Bars used in RCC Construction Various Grades of Mild Steel Bars Reinforcement bars in accordance with standard IS No. 432 part-I can be classified into following types. 1) Mild Steel Bars: Mild steel bars can be supplied in two grades a)Mild steel bars grade-I designated as Fe 410-S or Grade 60 b) Mild steel bars grade-II designated as Fe-410-o or Grade 40 2) Medium Tensile Steel Bars designated as Fe- 540-w-ht or Grade Grade II Mild steel bar are not recommended for use in structures located in earth quake zones subject to severe damage and for structures subject to dynamic loading (other than wind loading) such as railways and highways bridges. Every lot or consignment of mild steel bars brought at the site of work should be tested in laboratory before use in the work. However for small work one can use mild steel bars on the basis of verifying tests results made by manufacturer in his own laboratory; which are available with supplier. Some of manufacturers stamped MS bars grade with their make /name and also give certification of test and grade. On the basis of the above information you can store mild steel bars grade-wise at the site of work.
  • 52. Types of Steel Bars used in RCC Construction
  • 53. Types of Steel Bars used in RCC Construction Steel Bars for RCC Work All finished steel bars for reinforced work should be neatly rolled to the dimension and weights as specified. They should be sound, free from cracks, surface flaws, laminations, rough, jagged and imperfect edges and other defects. It should be finished in a work like manner.
  • 54. Column made of steel bars
  • 55. General Precautions for Steel Bars used in RCC Construction General precautions for steel bars in reinforcement Steel bars are clear, free from loose mil scales, dust and loose rust coats of paints, oil or other coatings which may destroy or reduce bond strength. Steel bars should be stored in such a way as to avoid distortion and to prevent deterioration and corrosion. Steel bars should not be clean by oily substance to remove the rust. The bar is bent correctly and accurately to the size and shape as shown in drawings. If possible, the bar of full length is used. Overlapping bars do not touch each other and these should be kept apart with concrete. The overlap if given should be staggered. The cranks in the bar at the end should be kept in position by using spots. The steel bars should not be disturbed while lying cements concrete. Required cover under steel bars should be given before laying the cement concrete.
  • 56. Weight of Different Steel Bars When we want to purchase Mild steel members from the market, the shopkeeper quotes the price of steel members in weight. When any type of steel members for use in house construction is required, we calculate the length of steel member in feet or meter but we are ignorant about the weight of steel. Here are details of weight per meter for various types of steel members:- This will help us for estimated weight and cost. It will also help at the time of purchase to avoid pilferage in weight.
  • 57. Types of Steel Bars used in RCC Construction HSD Steel Bars (High Strength Deformed Bars) High strength deformed bars IS: 1786-1985 are steel bars which are provided with lugs, ribs, projection or deformation on the surface and are produced in form of cold twisted deformed bars. These bars are extensively used for reinforcement purposes in a construction. Due to ribs or projections on the surface, these steel bars minimize slippage in concrete and increase the bond between two materials i.e. between cement concrete and steel bars. The deformed bars have more compressive and tensile stress than that of mild steel plain bars. High strength deformed bars have improved anchorage; therefore they can be used without end hooks or bent up ends of bars. This reduces labor for fabrication of steel reinforcement. The deformation is spaced on bar at uniform distances. These bars are produced in sizes or sections from 4 mm to 50 mm in diameter. Generally cracks develop in reinforced concrete around mild steel bars due to stretching of bars, loss of bond under the load. To minimize this problem, deformed bars having projecting ribs or twisted surface which improves the bond with the concrete should be used in RCC work.
  • 58. Features of HSD Bars Low carbon value: HSD Bars have lower carbon level, resulting in good ductility, strength and welding ability. Superior bonding strength: HSD bars are well known for their excellent bonding strength when used with concrete. Welding capability: Since these bars have lower carbon content, they have 100% welding capability than conventional bars. High tensile strength: HSD bars feature high tensile strength. They offer great asset in construction process, where a lot of bending and re bending is required. Wide application range: These bars have wide application range like in building residential, commercial and industrial structures, bridges, etc. Satisfactorily malleability, minimum weight and maximum strength and suitable for both compression and tension reinforcement.
  • 59. Process of production of bars The main process for production of bars is hot rolling followed by cold twisting. Latest technological advances in the field of micro-alloying of steel and thermo-mechanical treatment process have resulted in the production of deformed bars as reinforcement for use in cement concrete in three grades namely Fe 415, Fe 500 and Fe 550. The strength of bonds of deformed bars In addition, the calculated strength of bonds of deformed bars should be 40 to 80 % higher than that of plain round bars of same nominal size. Tor steel possesses the strength of 1.5 to 2.0 times of mild steel in compression as well as in tension, whereas it costs only 10% more than mild steel. Process of production of bars The main process for production of bars is hot rolling followed by cold twisting. Latest technological advances in the field of micro-alloying of steel and thermo-mechanical treatment process have resulted in the production of deformed bars as reinforcement for use in cement concrete in three grades namely Fe 415, Fe 500 and Fe 550. The strength of bonds of deformed bars In addition, the calculated strength of bonds of deformed bars should be 40 to 80 % higher than that of plain round bars of same nominal size. Tor steel possesses the strength of 1.5 to 2.0 times of mild steel in compression as well as in tension, whereas it costs only 10% more than mild steel.
  • 60. Laying of Reinforcement in RCC Construction
  • 61. Casting of Reinforcement in RCC Construction Typical Slab Reinforcement in RCC Construction
  • 62.
  • 63.
  • 64. Laying of Reinforcement in RCC Construction
  • 65. Curing plays an important role on strength development and durability of concrete. Curing takes place immediately after concrete placing and finishing Deshuttering and Curing of RCC Structure
  • 66.
  • 67.
  • 69. Column & Plinth Beam Layout
  • 73. Curing The curing shall be started immediately after thumb set of the concrete laid. Hessian clothe /Plastic shall be covered over the set concrete to reduce moisture evaporation from the concrete during hardening and thus to minimize shrinkage crazy cracks. These cracks are inheriting property of the concrete specially appears during casting of flat surfaces. Final curing shall be done by ponding and stacking water for minimum period of 7
  • 74. Curing:- The curing shall be started immediately after thumb set of the concrete laid. Hessian clothe /Plastic shall be covered over the set concrete to reduce moisture evaporation from the concrete during hardening and thus to minimize shrinkage crazy cracks. These cracks are inheriting property of the concrete specially appears during casting of flat surfaces. Final curing shall be done by ponding and stacking water for minimum period of 7 days.
  • 75.
  • 76. Concrete form work stripping time :- In general stripping of form work should not be done unless otherwise concrete has achieve strength equal to double the stress it may imposed while stripping the form work. Before stripping of form work, compressivestrength of concrete is to be checked. If desire compressive strength of concrete is not achieved then the stripping time should be extended. Following article provide guide lines for minimum stripping time as per Indian standard 456 when  concreting is done under normal circumstances  cement used is Ordinary Portland Cement  Adequate curing is done  Ambient temperature is not fall below 15 degree
  • 77. For vertical members such as columns, beams, shear walls etc – 16 -24 hrs soffit form work to slabs – 3 days (care to be taken so that props to be fixed immediately after removing form work) soffit form work to beam – 7 days (care to be taken so that props to be fixed immediately after removing form work) Props left under slab can be removed after 7 days if spanning is less than 4.5 m and 14 days for spanning over 4.5 m Props left under slab can be removed after 14 days if spanning is less than 6 m and 21 days for spanning over than 6 m
  • 78. Testing of Concrete What is workability of concrete? Which test is generally performed at site for its determination? And what are its recommended values for different purposes? Workability of concrete describes the ease or difficulty with which the concrete is handled, transported and placed between the forms with minimum loss of homogeneity. Workability is important because, if i. the concrete mixture is too wet, coarse aggregates settle at the bottom of concrete mass and as a result concrete becomes non-uniform composition, ii. the concrete mixture is too dry, it will be difficult to handle and place it in position. Workability of concrete mixture is measured by: a) Vee-bee consistometer test b) Compaction factor test c) Slump test Suitability of Slump Test: The slump test is suitable only for the concrete of high or medium workability.
  • 79. Slump Test This test is carried out with a mould called slump cone whose top diameter is 10cm, bottom diameter is 20 cm and height is 30 cm. the test may be performed in the following steps: 1. Place the slump mould on a smooth flat and non-absorbent surface. 2. Mix the dry ingredients of the concrete thoroughly till a uniform colour is obtained and then add the required quantity of water. 3. Place the mixed concrete in the mould to about one-fourth of its height. 4. Compact the concrete 25 times with the help of a tamping rod uniformly all over the area. 5. Place the concrete in the mould about half of its height and compact it again. 6. Place the concrete upto its three fourth height and then upto its top. Compact each layer 25 times with the help of tamping rod uniformly. For the second subsequent layers, the tamping rod should penetrate into underlying layers. 7. Strike off the top surface of mould with a trowel or tamping rod so that the mould is filled to its top. 8. Remove the mould immediately, ensuring its movement in vertical direction. 9. When the settlement of concrete stops, measure the subsidence of the concrete in millimeters which is the required slump of the concrete
  • 80. RCC Specifications Shuttering shall be done using seasoned wooden boards of thickness not less than 30mm. Surface contact with concrete shall be free from adhering grout, nails, splits and other defects. All the joints are perfectly closed and lined up. The shuttering and framing is sufficiently braced. Nowadays timber shuttering is replaced by steel plates. All the props of approved sizes are supported on double wedges and when taken out, these wedges are eased and not knocked out. All the framework is removed after 21 days of curing without any shocks or vibrations. All reinforcement bars conform IS specifications and are free from rust, grease oil etc. The steel grills are perfectly as per detailed specifications. The covers to concrete are perfectly maintained as per code. Bars of diameter beyond 25mm diameter are bent when red hot. The materials proportion should be as per the specifications of the concrete.
  • 81. Number of Cement bags required for a specific cement concrete ratios:- For cement concrete of ratio 1:1:2(1 cement:1sand/coarse sand:2graded stone aggregate) require 11no bags of 50kg. For cement concrete of ratio 1:1.5:3 require 7.8no bags of 50kg. For cement concrete of ratio 1:2:4 require 6 no bags of 50kg. For cement concrete of ratio 1:3:6 require 4.25no bags of 50kg. For cement concrete of ratio 1:4:8 require 3.2 no bags of 50kg. For cement concrete of ratio 1:5:10 require 2.50 no bags of 50kg. For cement concrete of ratio 1:6:12 require 2.25 no bags of 50kg.
  • 82. Thumb rule no1: Size of the Columns The size of the columns are 9″x9″ with the use of M20 grade of concrete. Thumb rule no.2: Distance between the columns: The distance between the columns does not exceed 4.5m. Thumb rule no.3: Alignment of Columns The Columns have been arranged on a iron grid pattern. So there is absolutely no question of zigzag walls and zigzag beams which reducing complications in the structure.
  • 83.
  • 84.
  • 85. Construction process in RCC Building Construction A concrete slab can be cast in two ways: It could either be prefabricated or cast in situ. Prefabricated concrete slabs are cast in a factory and then transported to the site ready to be lowered into place between steel or concrete beams. They may be pre-stressed (in the factory), post-stressed (on site), or unstressed. Care should be taken to see that the supporting structure is built to the correct dimensions to avoid trouble with the fitting of slabs over the supporting structure. In situ concrete slabs are built on the building site using formwork. Formwork is a box-like setup in which concrete is poured for the construction of slabs. For reinforced concrete slabs, reinforcing steel bars are placed within the formwork and then the concrete is poured. Plastic tipped metal, or plastic bar chairs are used to hold the reinforcing steel bars away from the bottom and sides of the form-work, so that when the concrete sets it completely envelops the reinforcement. Formwork differs with the kind of slab. For a ground slab, the form-work may consist only of sidewalls pushed into the ground whereas for a suspended slab, the form-work is shaped like a tray, often supported by a temporary scaffold until the concrete sets.
  • 86. Construction process in RCC Building Construction A concrete slab can be cast in two ways: It could either be prefabricated or cast in situ. Prefabricated concrete slabs are cast in a factory and then transported to the site ready to be lowered into place between steel or concrete beams. They may be pre-stressed (in the factory), post-stressed (on site), or unstressed. Care should be taken to see that the supporting structure is built to the correct dimensions to avoid trouble with the fitting of slabs over the supporting structure. In situ concrete slabs are built on the building site using formwork. Formwork is a box-like setup in which concrete is poured for the construction of slabs. For reinforced concrete slabs, reinforcing steel bars are placed within the formwork and then the concrete is poured. Plastic tipped metal, or plastic bar chairs are used to hold the reinforcing steel bars away from the bottom and sides of the form-work, so that when the concrete sets it completely envelops the reinforcement. Formwork differs with the kind of slab. For a ground slab, the form-work may consist only of sidewalls pushed into the ground whereas for a suspended slab, the form-work is shaped like a tray, often supported by a temporary scaffold until the concrete sets.
  • 87. Reinforced Cement Concrete Slab A Reinforced Concrete Slab is the one of the most important component in a building. It is a structural element of modern buildings. Slabs are supported on Columns and Beams. RCC Slabs whose thickness ranges from 10 to 50 centimetres are most often used for the construction of floors and ceilings. Thin concrete slabs are also used for exterior paving purpose. In many domestic and industrial buildings a thick concrete slab, supported on foundations or directly on the sub soil, is used to construct the ground floor of a building. In high rises buildings and skyscrapers, thinner, pre-cast concrete slabs are slung between the steel frames to form the floors and ceilings on each level. While making structural drawings of the reinforced concrete slab, the slabs are abbreviated to “r.c.slab” or simply “r.c.”
  • 88. Design of various types of slabs and their reinforcement For a suspended slab, there are a number of designs to improve the strength-to- weight ratio. In all cases the top surface remains flat, and the underside is modulated: Corrugated, usually where the concrete is poured into a corrugated steel tray. This improves strength and prevents the slab bending under its own weight. The corrugations run across the short dimension, from side to side. A ribbed slab, giving considerable extra strength on one direction. A waffle slab, giving added strength in both directions.
  • 89. Solid Slab spanning in two directions When a slab is supported on all four of its sides, it effectively spans in both directions, and it is sometimes more economical to design the slab on this basis. The moment of bending in each direction will depend on the ratio of the two spans and the conditions of restraint at each support. If the slab is square and the restraint is similar along the four sides, then the load will span equally in both directions. If the slab is rectangular, then more than one-half of the load will be carried in the shorter direction and lesser load will be imposed on the longer direction. If one span is much longer than the other, a large portion of the load will be carried in the shorter direction and the slab may as well be designed as spanning in only one direction. Moments in each direction of span are generally calculated using co-efficients which are tabulated in the code. The slab is reinforced with the bars in both directions parallel to the spans with the steel for the shorter span placed farthest from the natural acis to five the greater effective depth. The span-efective depths are based on the shorter span and the percentage of the reinforcement in that direction.