Marine Corps Installations East
                NCMBC Federal Construction and
                    Infrastructure Summit
                                   11 OCT 2012
Tony Sholar, P.E.
Facilities Manager
(GF) Installations & Environment
Marine Corps Installations East                    1
MCIEAST Installations


                  MCIEAST
                 Camp Lejeune


                MCAF Quantico
                MCAS Cherry Point
                MCAS New River
                MCB Camp Lejeune
                MCAS Beaufort
                MCLB Albany
                MCSF Blount Island
                                     2
Construction Opportunities

• Traditional construction projects
    Military Construction
       New construction and development
           ‣ These projects are multi-million dollar contracts
           ‣ Each project approved by Congress
    Renovation, maintenance and repair
       Projects can range from a few thousand to several million
        dollars
           ‣ Includes complete building renovations and utility plant and
             infrastructure repairs
           ‣ Funding managed within the Marine Corps
           ‣ History of consistent funding levels to sustain facilities
• Architectural and Engineering Services
    Design drawings (DB and DBB)
    Wide range of consulting services
                                                                            3
Camp Lejeune, New River and
                      Cherry Point MILCON History

                                              Record
                                               Year
Millions of Dollars




                                Fiscal Year

                                                       4
MCIEAST North Carolina
              Military Construction Funding

• FY11 ~ Largest MILCON year
for Camp Lejeune, New River, and
Cherry Point.

• FY12 shows a significant decline
in MILCON.

•FY13 pre-award packages are
nearing completion .
                                                                       *       **
•FY14 have been authorized for
design and continue through the
budget approval process.
                                     * Waiting for PRESBUD to be passed.
                                     ** Submitted in budget process to Congress.


       Future projections return to “normal” funding levels.
                                                                                    5
P1382B BER                P1378/1330 Wounded


MCB Camp Lejeune
                                                            Ramps & Bridge            Warrior H&C and HQ
                                                            Cost: $10.5M              Cost: $15.3M
                                                            CCD: Feb 13               CCD: Jun 12
                                                                                                                                         P1331/1857 Hospital Addition & Renovation
              P1268 SOI East Facilities                                                                                                  Cost: $57.5M, CCD: Jan 15
              Cost: $22.2M, CCD: Apr 13

     P1268B Camp Geiger Access
     Cost: $8.3M CCD: Jan 14
                                               P1382 New Base Entry Point
                                               & Road, PH 1
                                               Cost: $43.9M, CCD: Jan 13

                                                                                                                                         P1304 MP Working Dog Kennel
                                                                      FY 09 BEQ (11 Buildings)                                           Cost: $4.7M, CCD: Jun 12
         P1269 TECOM (SOI) Devil Dog                                  Cost: $199.5M, CCD: Sep 12
         Cost: $9.5M, CCD: Dec 12
                                                                                                                                    Wallace Creek Ph II
                                                                                                                                    Cost: $142.1M, CCD: Oct 12

                                                                                                                                         P1160 Physical Fitness Center
                                   P1269B Verona Loop &                                                                                  Cost: $19.6M, CCD: Jun 12
                                   K-Range Water Line
                                   Cost: $6.2M                                                                                              P1310 Pre-Trial Detainee Fac.
                                   CCD: May 13                                                                                              Cost: $13.6M, CCD: Jun 12
                                                                                                   P1311 Infotech/Telecom Complex
                                                                                                   Cost: $30.9M, CCD: Jul 14

                                          P1136 Mod. K Range Ph. II
                                          Cost: $12.4M, CCD: Apr 12
    P032 Infantry Plt
    Battle Course                                                                                                              P1357 ARRA CDC
    Cost: $15.3M                                                                                                               Cost: $7.5M, CCD: Feb 12
    CCD: Mar 13


                                    P1187B Stone Bay                                                                                                             P031 Multi-Purpose
                                    Exchange                                                                                                                     Machine Gun Range
                                    Cost: $1.6M                                                                                                                  Cost: $15.4M
                                    CCD: Dec 12                                                                                                                  CCD: Dec 11

                                                       P1266 Utilities Upgrades CHB
FY07-10 MILCON PROJECTS                                Cost: $16.6M, CCD: Jul 13                                       P1266B Steam Plant Modifications
                                                                                                                       Cost: $1.5M, CCD: Mar 12
          Under Construction

          Funded Awaiting Award



6
MCB Camp Lejeune
                                                           P1319 Camp Johnson BEQ
                                                           Cost: $39.9M
                                                           CCD: Sep 13



                          P004 SOI Motor
                          Trans./Com Maint.
                          Cost: $10.9M                                                                                                     FY-12 P1383
                          CCD: Dec 12                               P1400 Energy Initiative – PV
                                                                    Cost: $7.5M                                                            New Entry Road, PH 2
                                                                    CCD: Dec 12                                                            Cost: $80.3M
              MILCON Program                                                                            P1249/1322/1323 Wallace
                                                                                                        Creek North BEQs & Armory
                                                                   P1240/1034 Anglico/Intel
FY-13                                                                                                   Cost: $78.5M
                                                                   Maint/Ops Complex
                                                                                                        CCD: Dec 13
P-003 Staff NCO Academy Facilities $30M                            Cost: $92.6M
P-1218 SOF MSOB-Company/Team Fac. $53M                             CCD: Mar 14
P-1384 New Base Entry Road, PH 3 $44M
P-1393 SOF SERE Training Facilities $5M                             FY-12 P138
P-1425 Overhead Range Baffle System $3M                             Wallace Creek, BEQ                                               P1264/1265 HP & FC Utility Expansion
                                                                    Cost: $23.9M                                                     Cost: $65.8M, CCD: Oct 13
FY-14                                                                                                                                     P1246 EOD Addition
P-1346 Simulator Center and Range Dev. $50M                           P1267 French Creek
                                                                      Mess Hall                                                           Cost: $5.2M, CCD: Aug 12
P-1349 Special Ops Training Complex $23M                              Cost: $14.8M
P-1353 Landfill, Phase IV $24M                                                                                                             FY-11 P1264B
                                                                      CCD: Feb 13
                                                                                                                                           Elevated Water Storage Tanks
P-1445 Steam Decentralization – Camp Johnson $2.6M                                                                                         Cost: $18.8M
P-1447 Steam Decentralization – Hadnot Point $13.4M                             P1317 French Creek BEQ
                                                                                Cost: $31.6M
P-1448 Steam Decentralization – BEQ Nodes $18.7M                                                                                        FY-11 P1265B
                                                                                CCD: Aug 13                                             French Creek WWTP Upgrades
P-1362 SOF Perf Resiliency Center $11M
                                                                                                                                        Cost: $17.4M
P-1391 SOF Sustainment Training Complex $28.6M
                                                                                              P1256 Mess Hall Addition
                                                                                              Cost: $1.2M
                                                                                                                                                        FY-12 P030
                                                                                              CCD: Nov 12
                                                                                                                                                        Squad Battle Course
                                                                                                                                                        Cost: $14.0M
                              FY-11 PQ419
                              Battalion Aid Station                                                                      FY-12 P1253
                              Expansion                                                                                  2D Combat Eng. Maint/OPS
                              Cost: $1.6M                                                                                Cost: $66.8M


               P1286 Stone Bay BEQ &                  FY-12 P1285
                                                      SOF Armory Expansion             P1251/1254 BEQ
               Connector Rd.
               Cost: $49.1M                           Cost: $6.6M                      Cost: $67.7M                                   FY11-12 MILCON PROJECTS
                                                      CCD” Sept 13                     CCD: Oct 13
               CCD: Sep 13
                                                                                                                                                    Under Construction

                                                                                                                                                    Funded Awaiting Award
 7
MCAS New River

               FY-12 P025
               Replace Delalio Elementary School
               Cost: $20.4M
                                                                                        P652 VMMT-204 Hangar,
                                                                                        Phase III
                                                                                        Cost: $24.9M
                                                                                        CCD: Sep 13
            P714 Physical
            Fitness Center
            Cost: $11.7M
            CCD: Aug 12




                                      FY-12 P705
                                      Maint Hangar & Apron
                                      Cost: $57.6M

        MILCON Program
                                              FY-12 P710 Ordnance
FY-13
                                              Loading Area Addition
P-711 Personnel Admin Center $34.0M
                                              Cost: $8.2M
FY14
P-674 Corrosion Control Hangar $16M
P-676 CH-53K Maint. Train Fac. $14M                                    P311/683/687/688 V-22 Hangars,
P-726 Regional Comm. Station $22M                                      Parallel Taxiway & Apron Expansion
                                                                       Cost: $138.8M
                                                                       CCD: May 14

                                               Under Construction

                                               Funded awaiting award
8
MILCON Program
FY-13
P-163 Marine Air Support Squadron Compound $34M
                                                                               MCAS Cherry Point
P-601 Armory $14M




                                                      Station Infrastructure
                                                      Upgrades
                                                      Cost: $5.2M
                                                      CCD: Nov 12
                     Ordnance & Missile
                     Magazines
                     Cost: $7.2M
                     CCD: Jul 12 / Dec 12
                                                  BEQ
                                                  Cost: $38.0M
                                                  CCD: Jul 13

                                                                                      Facilities & Facilities
                                                                                      Upgrades (F/A-18 E/F)
                                                                                      Cost: $14.8M
                                                                                      CCD: Feb 12 **
                                                                                      (Suspension of Work I/P)




                                                                                      FY-12 P-991
                                                                                      H-1 Y/Z Gearbox Repair
                                                                                      & Test Facility
      Under Construction                                                              (FRC-E)
                                                                                      Cost: $17.1M
     Funded Awaiting Award

9
FY12 “Maintenance and Repair”
          Construction Program
• MCIEAST North Carolina installations
    Ranges from painting to complete building renovation
    $160 million awarded for more than 500 projects
        Projects range from a few thousand to several million dollars
    Camp Lejeune
        $80 million awarded
    New River
        $24 million awarded
    Cherry Point
        $56 million awarded
• FY13 funding will be similar to last year
    Projects typically approved in November
• Funding projections beyond FY13 remain steady



                                                                         10
Energy Opportunities
• Energy has become a significant focus for the Marine Corps
• Energy Independence and Security Act (EISA) signed December
     2007
       30% reduction in energy intensity
              By end of 2015 based on FY03 baseline
       Expanded use of renewable energy
              25% renewable energy by 2025
• Over $150 million for Marine Corps energy projects in FY13
              Designs
              Audits
              Construction
• Contractor selection criteria will incorporate energy efficiency
     experience as an evaluation factor
       LEED Silver is the standard for FY13 with focus on energy points




10/10/2012                    Marine Corps Installations East              11
Take Aways…

•More than $300 million in construction opportunities in
Eastern NC this year.
    Project size varies widely, from a few thousand dollars to tens of
      millions each.
        FY11 was a “record setting” year
        FY12 was the last “larger than normal” year.
        FY13 and beyond returning to “normal” .
• Energy has become a significant focus for the Marine
Corps
•Still more than $2 billion currently under construction
   In various stages of construction
• Record years behind us but still significant work ahead
   Approximately $300 million each year over next few years




                                                                          12

Mais conteúdo relacionado

Mais de NC Military Business Center

Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14NC Military Business Center
 
FEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction ProjectsFEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction ProjectsNC Military Business Center
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysNC Military Business Center
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysNC Military Business Center
 
FEDCON Summit: Department of Transportation Construction Opportunities
FEDCON Summit:  Department of Transportation Construction OpportunitiesFEDCON Summit:  Department of Transportation Construction Opportunities
FEDCON Summit: Department of Transportation Construction OpportunitiesNC Military Business Center
 
FEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal ContractsFEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal ContractsNC Military Business Center
 
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...NC Military Business Center
 
FEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry ExperienceFEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry ExperienceNC Military Business Center
 
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...NC Military Business Center
 
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelFEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelNC Military Business Center
 
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsHuman/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsNC Military Business Center
 

Mais de NC Military Business Center (20)

Camp Lejeune Small Business Outreach Event
Camp Lejeune Small Business Outreach EventCamp Lejeune Small Business Outreach Event
Camp Lejeune Small Business Outreach Event
 
Spawar slides
Spawar slidesSpawar slides
Spawar slides
 
Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14
 
FEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction ProjectsFEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction Projects
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/Delays
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/Delays
 
FEDCON Summit: Department of Transportation Construction Opportunities
FEDCON Summit:  Department of Transportation Construction OpportunitiesFEDCON Summit:  Department of Transportation Construction Opportunities
FEDCON Summit: Department of Transportation Construction Opportunities
 
FEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal ContractsFEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
 
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
 
FEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry ExperienceFEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry Experience
 
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
 
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelFEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
 
FEDCON Summit: NCMBC Tools for Contractors
FEDCON Summit: NCMBC Tools for ContractorsFEDCON Summit: NCMBC Tools for Contractors
FEDCON Summit: NCMBC Tools for Contractors
 
FEDCON Summit: Public Private Ventures
FEDCON Summit: Public Private VenturesFEDCON Summit: Public Private Ventures
FEDCON Summit: Public Private Ventures
 
FEDCON Summit: Teaming Arrangements
FEDCON Summit: Teaming ArrangementsFEDCON Summit: Teaming Arrangements
FEDCON Summit: Teaming Arrangements
 
FEDCON Summit: Veterans Affairs
FEDCON Summit: Veterans AffairsFEDCON Summit: Veterans Affairs
FEDCON Summit: Veterans Affairs
 
Medical Technologies
Medical TechnologiesMedical Technologies
Medical Technologies
 
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsHuman/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
 
Ground Vehicle and Robotics
Ground Vehicle and RoboticsGround Vehicle and Robotics
Ground Vehicle and Robotics
 
Cyber Security
Cyber SecurityCyber Security
Cyber Security
 

Marine Corps Installations East

  • 1. Marine Corps Installations East NCMBC Federal Construction and Infrastructure Summit 11 OCT 2012 Tony Sholar, P.E. Facilities Manager (GF) Installations & Environment Marine Corps Installations East 1
  • 2. MCIEAST Installations MCIEAST Camp Lejeune MCAF Quantico MCAS Cherry Point MCAS New River MCB Camp Lejeune MCAS Beaufort MCLB Albany MCSF Blount Island 2
  • 3. Construction Opportunities • Traditional construction projects  Military Construction  New construction and development ‣ These projects are multi-million dollar contracts ‣ Each project approved by Congress  Renovation, maintenance and repair  Projects can range from a few thousand to several million dollars ‣ Includes complete building renovations and utility plant and infrastructure repairs ‣ Funding managed within the Marine Corps ‣ History of consistent funding levels to sustain facilities • Architectural and Engineering Services  Design drawings (DB and DBB)  Wide range of consulting services 3
  • 4. Camp Lejeune, New River and Cherry Point MILCON History Record Year Millions of Dollars Fiscal Year 4
  • 5. MCIEAST North Carolina Military Construction Funding • FY11 ~ Largest MILCON year for Camp Lejeune, New River, and Cherry Point. • FY12 shows a significant decline in MILCON. •FY13 pre-award packages are nearing completion . * ** •FY14 have been authorized for design and continue through the budget approval process. * Waiting for PRESBUD to be passed. ** Submitted in budget process to Congress. Future projections return to “normal” funding levels. 5
  • 6. P1382B BER P1378/1330 Wounded MCB Camp Lejeune Ramps & Bridge Warrior H&C and HQ Cost: $10.5M Cost: $15.3M CCD: Feb 13 CCD: Jun 12 P1331/1857 Hospital Addition & Renovation P1268 SOI East Facilities Cost: $57.5M, CCD: Jan 15 Cost: $22.2M, CCD: Apr 13 P1268B Camp Geiger Access Cost: $8.3M CCD: Jan 14 P1382 New Base Entry Point & Road, PH 1 Cost: $43.9M, CCD: Jan 13 P1304 MP Working Dog Kennel FY 09 BEQ (11 Buildings) Cost: $4.7M, CCD: Jun 12 P1269 TECOM (SOI) Devil Dog Cost: $199.5M, CCD: Sep 12 Cost: $9.5M, CCD: Dec 12 Wallace Creek Ph II Cost: $142.1M, CCD: Oct 12 P1160 Physical Fitness Center P1269B Verona Loop & Cost: $19.6M, CCD: Jun 12 K-Range Water Line Cost: $6.2M P1310 Pre-Trial Detainee Fac. CCD: May 13 Cost: $13.6M, CCD: Jun 12 P1311 Infotech/Telecom Complex Cost: $30.9M, CCD: Jul 14 P1136 Mod. K Range Ph. II Cost: $12.4M, CCD: Apr 12 P032 Infantry Plt Battle Course P1357 ARRA CDC Cost: $15.3M Cost: $7.5M, CCD: Feb 12 CCD: Mar 13 P1187B Stone Bay P031 Multi-Purpose Exchange Machine Gun Range Cost: $1.6M Cost: $15.4M CCD: Dec 12 CCD: Dec 11 P1266 Utilities Upgrades CHB FY07-10 MILCON PROJECTS Cost: $16.6M, CCD: Jul 13 P1266B Steam Plant Modifications Cost: $1.5M, CCD: Mar 12 Under Construction Funded Awaiting Award 6
  • 7. MCB Camp Lejeune P1319 Camp Johnson BEQ Cost: $39.9M CCD: Sep 13 P004 SOI Motor Trans./Com Maint. Cost: $10.9M FY-12 P1383 CCD: Dec 12 P1400 Energy Initiative – PV Cost: $7.5M New Entry Road, PH 2 CCD: Dec 12 Cost: $80.3M MILCON Program P1249/1322/1323 Wallace Creek North BEQs & Armory P1240/1034 Anglico/Intel FY-13 Cost: $78.5M Maint/Ops Complex CCD: Dec 13 P-003 Staff NCO Academy Facilities $30M Cost: $92.6M P-1218 SOF MSOB-Company/Team Fac. $53M CCD: Mar 14 P-1384 New Base Entry Road, PH 3 $44M P-1393 SOF SERE Training Facilities $5M FY-12 P138 P-1425 Overhead Range Baffle System $3M Wallace Creek, BEQ P1264/1265 HP & FC Utility Expansion Cost: $23.9M Cost: $65.8M, CCD: Oct 13 FY-14 P1246 EOD Addition P-1346 Simulator Center and Range Dev. $50M P1267 French Creek Mess Hall Cost: $5.2M, CCD: Aug 12 P-1349 Special Ops Training Complex $23M Cost: $14.8M P-1353 Landfill, Phase IV $24M FY-11 P1264B CCD: Feb 13 Elevated Water Storage Tanks P-1445 Steam Decentralization – Camp Johnson $2.6M Cost: $18.8M P-1447 Steam Decentralization – Hadnot Point $13.4M P1317 French Creek BEQ Cost: $31.6M P-1448 Steam Decentralization – BEQ Nodes $18.7M FY-11 P1265B CCD: Aug 13 French Creek WWTP Upgrades P-1362 SOF Perf Resiliency Center $11M Cost: $17.4M P-1391 SOF Sustainment Training Complex $28.6M P1256 Mess Hall Addition Cost: $1.2M FY-12 P030 CCD: Nov 12 Squad Battle Course Cost: $14.0M FY-11 PQ419 Battalion Aid Station FY-12 P1253 Expansion 2D Combat Eng. Maint/OPS Cost: $1.6M Cost: $66.8M P1286 Stone Bay BEQ & FY-12 P1285 SOF Armory Expansion P1251/1254 BEQ Connector Rd. Cost: $49.1M Cost: $6.6M Cost: $67.7M FY11-12 MILCON PROJECTS CCD” Sept 13 CCD: Oct 13 CCD: Sep 13 Under Construction Funded Awaiting Award 7
  • 8. MCAS New River FY-12 P025 Replace Delalio Elementary School Cost: $20.4M P652 VMMT-204 Hangar, Phase III Cost: $24.9M CCD: Sep 13 P714 Physical Fitness Center Cost: $11.7M CCD: Aug 12 FY-12 P705 Maint Hangar & Apron Cost: $57.6M MILCON Program FY-12 P710 Ordnance FY-13 Loading Area Addition P-711 Personnel Admin Center $34.0M Cost: $8.2M FY14 P-674 Corrosion Control Hangar $16M P-676 CH-53K Maint. Train Fac. $14M P311/683/687/688 V-22 Hangars, P-726 Regional Comm. Station $22M Parallel Taxiway & Apron Expansion Cost: $138.8M CCD: May 14 Under Construction Funded awaiting award 8
  • 9. MILCON Program FY-13 P-163 Marine Air Support Squadron Compound $34M MCAS Cherry Point P-601 Armory $14M Station Infrastructure Upgrades Cost: $5.2M CCD: Nov 12 Ordnance & Missile Magazines Cost: $7.2M CCD: Jul 12 / Dec 12 BEQ Cost: $38.0M CCD: Jul 13 Facilities & Facilities Upgrades (F/A-18 E/F) Cost: $14.8M CCD: Feb 12 ** (Suspension of Work I/P) FY-12 P-991 H-1 Y/Z Gearbox Repair & Test Facility Under Construction (FRC-E) Cost: $17.1M Funded Awaiting Award 9
  • 10. FY12 “Maintenance and Repair” Construction Program • MCIEAST North Carolina installations  Ranges from painting to complete building renovation  $160 million awarded for more than 500 projects  Projects range from a few thousand to several million dollars  Camp Lejeune  $80 million awarded  New River  $24 million awarded  Cherry Point  $56 million awarded • FY13 funding will be similar to last year  Projects typically approved in November • Funding projections beyond FY13 remain steady 10
  • 11. Energy Opportunities • Energy has become a significant focus for the Marine Corps • Energy Independence and Security Act (EISA) signed December 2007  30% reduction in energy intensity  By end of 2015 based on FY03 baseline  Expanded use of renewable energy  25% renewable energy by 2025 • Over $150 million for Marine Corps energy projects in FY13  Designs  Audits  Construction • Contractor selection criteria will incorporate energy efficiency experience as an evaluation factor  LEED Silver is the standard for FY13 with focus on energy points 10/10/2012 Marine Corps Installations East 11
  • 12. Take Aways… •More than $300 million in construction opportunities in Eastern NC this year.  Project size varies widely, from a few thousand dollars to tens of millions each.  FY11 was a “record setting” year  FY12 was the last “larger than normal” year.  FY13 and beyond returning to “normal” . • Energy has become a significant focus for the Marine Corps •Still more than $2 billion currently under construction In various stages of construction • Record years behind us but still significant work ahead Approximately $300 million each year over next few years 12