Agenda
• Department of Defense budget trends
• Army construction and engineering trends
• Army NC FY12/FY13 snapshot
• Navy construction and engineering trends
• Navy/USMC NC FY12/FY13 snapshot
• NCMBC resources, events and questions
DoD Budget
• Budget Control Act of 2011
  – $487b cuts over 10 years; higher than Bush budget
  – Sequestration: additional $500-$600b over 10 years
  – “Slowdown in spending – no procurement holiday”
• Strategic guidance (Jan 2012): shapes military post-
  IQ/AF, post-Budget Control Act
• President’s budget submittal, FY2013: $613 billion
  – $525b base; $88b overseas contingency operations
DoD Construction
• NCMBC.us, “Federal
  Construction” page
• SAME FY2013 DoD
  Program Briefings
  – NAVFAC
  – Army Corps of Engineers
  – USAF
  – DoD Energy Security
NAVFAC Trends
FY2013 Program:
• MILCON: $1.7b; Housing: $102m; BRAC: $165m
• MILCON: Down from $3.8b in FY2012
• 58% Navy, 42% USMC
• MIDLANT: 22% of workload, tied 1st (w/SW)
• Acquisition strategy:
  – “the method in the DD1391…is the way it will happen”
  – MACC TO’s: “if can’t negotiate to budget w/#1, go to #2”
NAVFAC Trends
Delivery method:
• Design build (60%), Design bid build (40%)
• Shift to more in-house (IH) design (shift AE to IH)
   – Maintain/enhance core competencies
   – Lowest cost; reduced funding for contracted services
   – Reduced workload facilitates transition
   – Design staff stay at FY2010 levels; 5% of design IH
   – IH RFP prep for all DB projects; IH design some DBB
NAVFAC Trends
BIM:
• Implementing “snale’s pace”
• Issue is Navy IT system inadequacies
• Two pilots: NAVFAC SE (FY12), NAVFAC SW (FY13)
• NAVFAC not only designs/acquires; must run and
  maintain facilities
NAVFAC Trends
Total Ownership Cost (TOC):
• New tri-service tool to evaluate TOC of DB proposals
• Uses automated Excel spreadsheets; replaces
  Energy and Sustainment technical factor
• Focus on 7 facility types and major cost drivers:
   – Initial design and construction; 40 year energy costs; 40
     year sustainment costs
• Two FY12 pilots; implement FY13
NAVFAC Trends
Energy Technology Clearinghouse
•   High demand for insertion of new technologies
•   Streamline integration of proven technologies
•   Help AEs/Government to select technologies
•   Regionally organized based on climate zones
•   Clearinghouse available APR 2012 (FBO.gov)
•   Future tri-services/DOE clearinghouse in
    development
NAVFAC Trends
Overall trends
• MILCON continue trend down to $1.2b to $1.7b
  annually (FY08 level)
• OICC MCIEast is “winding down”
• O&M-funded, SRM projects remain constant
• Heavy focus in O&M projects on:
  – Energy efficiency
  – Security
Remaining NAVFAC FY12
Project                     Location   Value          Acquisition Tool     Key Dates
PN138 BEQ Wallace Creek     Camp       $ 27,214,000   Stand Alone Single    Bids due 11 May
                            Lejeune                   Phase Price          anticipate award
                                                      Performance Trade-   June 12
                                                      Off
P705/710                    Camp       $79,000,000    Stand Alone          In final
                            Lejeune                                        discussions due 4
                                                                           May 12
P1285 SOF Armory Facility   Camp       $6,670,000     BVSS, LPTA           To be award late
Expansion                   Lejeune                                        May 12
P-30 Auto Infantry Squad    Camp       $16,821,000    BVSS, LPTA,          To be advertised
Battle Course               Lejeune                   anticipated award    1 May 12
                                                      early 4th qtr
Remaining NAVFAC FY12
Project                     Location   Value         Acquisition Tool       Key Dates

 P-Q1440 SOF G3X Training   Camp       $10,000,000   Acquisition MAC-       Anticipated
Facility                    Lejeune                  General Construction   award 1st Qtr FY
                                                                            13
NAVFAC FY13 Program
Project                    Location       Value          Acquisition Tool   Key Dates

 P003-Staff NCO Academy     Camp          $ 28,986,000                      To Be advertised
facilities                 Lejuene                                          Aug/Sept 13


P-601 Armory               MCAS           $ 11,581,000                       To be
                           Cherry Point                                     advertised Spring
                                                                            of FY 13
P-163 Marine Air Support    MCAS          $34,310,000                       To be advertised
Squadron Compound          Cherry Point                                     Nov/Dec 12

 P 711- Personnel Admin     New River     $8,525,000                        To be advertised
Center                                                                      Dec 12
NAVFAC FY13 Program
Project                        Location       Value          Acquisition Tool   Key Dates

P 1425 Overhead Range           Camp          $3,000,000                        To Be advertised
Baffle System                  Lejuene                                          Oct/12


Q1218 SOF Marine Battalion     MCAS           $ 53,399,000                       To be
Company/Team Facilities        Cherry Point                                     advertised Sept
                                                                                12
 SOF Survival Evasion Resist    Camp          $5465,0,000                       To be advertised
Escape Training Facility       Lejuene                                          Sept 12

P 8144 Medical Clinic           New River     $21,200,000                       To be advertised
Replacement Center                                                              Spring 2013
NAVFAC FY13 Program
Project                Location   Value         Acquisition Tool   Key Dates

P-25 Replace Delalio   MCAS New   $23,000,000                      Sometime in FY
Elementary School      River                                       13
USACE Trends
FY2013: “A Year of Transition”
• Mission, force structure changes driving strategies
• Facility Investment Strategies:
   –   Sustain required facilities
   –   Dispose of excess facilities
   –   Improve energy / cost savings
   –   Improve facility quality
   –   Build-out critical facility shortfalls
USACE Trends
FY2013 Program
• USACE MILCON program: $4.9b (FY12: $9.1b)
  – Army MILCON: $2.1b                  (FY12: 44.3b, -55%)
  – DoD MILCON: $2.4b                   (FY12: $3.3b, -6%)
    •   SOF, DeCA, DoDEA, DLA, Medical, etc.
  – Overseas contingency construction -80%
• O&M funded, SRM projects: stable from FY12
USACE Trends
Energy and Environmental
• Energy Initiatives Task Force (EITF):
   – Huntsville District lead
   – Engage private capital
   – Supports goal, 25% renewable energy by 2025
   – Purchase up to $7b in energy over 30 years
• Net Zero master planning initiative: energy, water
  and waste
USACE Trends
Project Delivery:
• Centers of standardization, MATOCs evolving
• Updating standard designs for energy
• Establishing IDIQs based on region, not facility type
• Multiple delivery methods: DB, DBB, adapt build
• Adapt build: moving to energy as driving factor
• LCCA: if provide enhancements, must provide LCCA
  for the enhancements
USACE Trends
Project Delivery:
• Life Cycle Cost Analysis (LCCA): required for all
  proposed enhancements
• LEED: FY12 National Defense Authorization Act
  prohibits government from paying above silver
• Congress wants competition, “Better Buying Power”
   – “More SB involvement, more local contractors”
   – If not two bidders on task order, will recompete
USACE Trends
“Paradigm Shift”
• Surge era to post-surge era
• MILCON focus to SRM focus
• Energy as consideration to energy as driver
• MILCON transformation to innovation
• Corps as service supplier to systems integrator
Remaining USACE FY12
Project                      Location     Value          Acquisition Tool      Key Dates

PN 70351 Hospital            Fort Bragg   $ 57,600,000   Stand alone            Projected award
Alteration (Grow the Army)                               Construction, est.    date 6/1/12
                                                         advertising date      (USACE
                                                         2/24/12/              Savannah)
 PN 60272 SOF                Fort Bragg   $10,758,000    MATOC, adv. 4/20/12   Projected award
Communications Training                                                        date 7/11/12
Facility
 PN 69758 SOF Brigade HQ     Fort Bragg   $19,000,000    MATOC adv. 4/13/12    Project award
Facility/95th CA                                                               date 7/4/12

 PN 71224 SOF Admin-         Fort Bragg   $ 26,000,000   MATOC adv 3/8/12      Project award
Company Ops Ph 2/4th                                                           date 5/28/12
MISOG
Remaining USACE FY12
Project                      Location     Value         Acquisition Tool      Key Dates

 PN 60821 SOF Squadron HQ    Fort Bragg   $11,000,000   MATOC adv. 1/18/12     Projected award
Addition                                                                      date 5/20/12
                                                                              (USACE
                                                                              Wilmington)
PN 76364 SOF Battalion Ops   Fort Bragg   $41,000,000   MATOC, adv. 4/13/12   Projected award
Complex                                                                       date 7/7/12

PN 69458 SOF Battalion Ops   Fort Bragg   $23,478,000   MATOC adv. 2/28/12    Project award
Complex (4th MISOG)                                                           date 6/7/12

PN 69277 SOF Access          Fort Bragg   $ 2,300,000   MATOC adv 4/9/12      Project award
Control point/SOTF                                                            date 6/14/12
Remaining USACE FY12
Project                      Location     Value         Acquisition Tool      Key Dates

 PN 43335 NCO Academy        Fort Bragg   $42,000,000   MATOC Adv. 4/15/12     Projected award
                                                                              date 5/30/12
                                                                              (USACE
                                                                              Savannah)
 PN 69835 Unmanned Aerial    Fort Bragg   $54,000,000   MATOC, adv. 4/30/12   Projected award
Vehicle Maintenance Hangar                                                    date 6/30/12

 PN 70751 (ACP) Brigade      Fort Bragg   $18,000,000   MATOC adv. 3/15/12    Project award
Complex Facility                                                              date 7/15/12
Remaining USACE FY12
Project                    Location     Value         Acquisition Tool    Key Dates

PN 76373 SOF USASOC HQ     Fort Bragg   $12,000,000   MATOC adv. 2/3/12    Projected award
Annex/USASOC                                                              date 5/25/12
                                                                          (USACE
                                                                          Wilmington)
P9770500 DDESS Facility    Fort Bragg   $ 3,138,000   MATOC, adv.6/1/12   Projected award
                                                                          date 8/30/12

P-AMD02051, Replace        Fort Bragg   $23,086,000   MATOC adv. 6/1/12   Project award
McNair Elem School                                                        date 8/30/12

P-AM10081 Replace Murray   Fort Bragg   $22,000,000   MATOC adv 6/1/12    Project award
Elementary                                                                date 8/30/12
Remaining USACE FY12
Project                      Location     Value          Acquisition Tool     Key Dates

 P80087 General Purpose      Fort Bragg   $13,800,000    MATOC adv. 7/2/12     Projected award
Warehouse                                                                     date 8/31/12
                                                                              (USACE
                                                                              Savannah)
P 371417, Transpired Solar   Fort Bragg   $ 1,500,000    MATOC, adv.5/11/12   Projected award
Collectors                                                                    date 7/18/12

Unrestricted DB/DBB          UNK          $499,000,000   Adv. 7/1/12          Project award
MATOC                                                                         date 9/30/12

Two 8(a) DB SATOC            UNK          $100,000,000    adv. 2nd QTR        Project award
                                                                              date 8/30/12
Remaining USACE FY12
Project                         Location   Value          Acquisition Tool   Key Dates

6 Unrestricted Full Service     UNK        $12,000,000    UNK
AE Design


Two restricted Full Service     UNK        $ 4,500,000    UNK
AE Design

Four Unrestricted Full          UNK        $ 12,500,000    UNK
Service Installation Specific
AE Design
One SB Environmental            UNK        $ 45,000,000   UNK
MATOC
USACE FY13 Program
Project                     Location     Value          Acquisition Tool   Key Dates

P-69287 SOF Battalion       Fort Bragg   $ 40,481,000                       March 2013
Operations Facility                                                        anticipated
                                                                           award date

 P-69493 SOF Sustainment    Fort Bragg   $ 24,693,000                      March 2012
Brigade Complex                                                            anticipated
                                                                           award date
P-69382 SOF Civil Affairs   Fort Bragg   $31,373,000                       March 2012
Battalion Complex                                                          anticipated
                                                                           award date

P-65052 SOF Support         Fort Bragg   $3,875,000                         March 2012
Addition                                                                   anticipated
                                                                           award date
USACE FY13 Program
Project                    Location     Value          Acquisition Tool   Key Dates

 P-55121 Aerial Gunnery    Fort Bragg   $ 42,000,000                       Dec 2012
Range                                                                     anticipated
                                                                          award date

P78499 Infrastructure      Fort Bragg   $ 30,000,000                      May 30 2013
                                                                          anticipated
                                                                          award date
P-80112 Unmanned Aerial    Fort Bragg   $31,373,000                       February 2013
Vehicle Complex, Phase 2                                                  anticipated
                                                                          award date
Agency FY13 Program
Project                   Location      Value         Acquisition Tool   Key Dates

 Replace Pipeline          DLA          $1,850,000
                          Seymour
                          Johnson AFB

 TRICARE Management        Seymour      $53,600,000
Activity Medical Clinic   Johnson AFB
Replacement
Senior Leader Perspective
Dorothy Robyn, Deputy Under Secretary of Defense
• Facility energy strategy: reduce demand, expand
  renewable supply, improve energy security
• DoD installations, test-beds for energy technologies
  – Microgrids, efficient integrated buildings, nano-
    technology HVAC, on-site generation
• DoD taking new technology risks ESCOs will not
• Civilian renewable energy siting challenges
Senior Leader Perspective
USACE and Air Force
• 3 good things:
  – SRM will remain 90% of current program
  – Major increase in investment in energy projects
  – Barracks and QOL are still priorities
• Worries
  – Cost, government buildings 35% higher than civilian
  – Selecting right technologies – and maintaining them
Senior Leader Perspective
Rear Admiral Mossey (NAVFAC)
• 3 good things:
  – SRM will remain 80% of current program
  – Major increase in investment in energy projects
  – MILCON is down – but $1.75b is still huge for Navy
• Worries
  – Government may not be ready to own technologies
    that industry can provide, or maintain the facilities
Upcoming NCMBC Events

• Consolidated Construction Teaming Forum (8 MAY)
• Defense Contractor Academy (JUN – AUG)
• NC Federal Environmental Symposium (13 JUN)
• NC Federal Advanced Technology Symposium (17 JUL)
• Defense Trade Show (7 AUG)
• NC Aerospace Supplier Conference (14 AUG)
• 2012 Federal Construction Summit (10-11 OCT)
Contact Information
• Scott Dorney, Executive Director, Phone: 910-678-
  0190, dorneys@ncmbc.us
• Sue Kranes, MILCON Initiative PM, 336-601-0446,
  kraness@ncmbc.us
• Paulanne Page, MILCON Specialist, 910-330-8560,
  pagep@ncmbc.us
• Carolyn Bunting, MatchForce Administrator, 910-
  578-2579, buntingc@ncmbc.us
NCMBC Resources
NCMBC Resources
•   Business Development Team
•   MILCON Specialists
•   Websites: MatchForce.org, ncmbc.us
•   Federal construction page (ncmbc.us)
    –   Market entry checklist
    –   Capability matrices (contractor, designer, supplier)
    –   Spreadsheets (Forecast, MACC/MATOC, Primes)
    –   Current bidding projects list
    –   Summit, other event materials
• Federal Construction Events
Checklist




 Presentations




     Spreadsheets
Forecast Spreadsheet



Justification Data
Future MILCON Projects
Current Prime Contracts
Current Multiple Award Contracts
Current AE IDIQ Contracts
Construction
 Opportunities
in NC - Updated
     Daily
Pre-Award
                    Support and Resources
• Notification to Contractors of Project Forecast
• Networking, Team Building and Strategic Planning
• Monitoring & Notification of Project Solicitations &
  Opportunities
• Solicitation Requirement Interpretation & Support
• Proposal Support & Review
• Proposal Revision and Clarification Support
• Debriefing Support for unsuccessful offers
Post Award
                           Support and Resources
• Project Management Team Execution Training & Support
  –   FARS/DFARS and Contract Requirement Interpretation
  –   Partnering and Client Communications
  –   Resources for subcontractors and vendors
  –   Quality Control Plans & Program Execution Support
  –   Safety Plans & Program Execution Support
  –   Submittals & Project Deliverable Requirements
  –   Schedule Development & Issues
  –   Schedule of Values Development
  – Invoicing, Change Orders, Certified Payroll & Project Admin Support

Mais conteúdo relacionado

Semelhante a Acec 050112

Sadler roicc cherry point brief for small business outreach march 2012
Sadler roicc cherry point brief for small business outreach   march 2012Sadler roicc cherry point brief for small business outreach   march 2012
Sadler roicc cherry point brief for small business outreach march 2012NC Military Business Center
 
Lecture 8 Costs H4D Stanford 2016
Lecture 8 Costs H4D Stanford 2016Lecture 8 Costs H4D Stanford 2016
Lecture 8 Costs H4D Stanford 2016Stanford University
 
Aqualink Week 9 H4D Stanford 2016
Aqualink Week 9 H4D Stanford 2016Aqualink Week 9 H4D Stanford 2016
Aqualink Week 9 H4D Stanford 2016Stanford University
 
77565239 13-cost-benefit-analysis
77565239 13-cost-benefit-analysis77565239 13-cost-benefit-analysis
77565239 13-cost-benefit-analysiskeruks
 
Aqualink Week 7 H4D Stanford 2016
Aqualink Week 7 H4D Stanford 2016Aqualink Week 7 H4D Stanford 2016
Aqualink Week 7 H4D Stanford 2016Stanford University
 
Northern Graphite Corporation - Research by Mackie Research Capital Corporation
Northern Graphite Corporation - Research by Mackie Research Capital CorporationNorthern Graphite Corporation - Research by Mackie Research Capital Corporation
Northern Graphite Corporation - Research by Mackie Research Capital CorporationGraphite Graphite
 
Lincoln Crowne Excellence in Oil & Gas M&A 120314 fnl
Lincoln Crowne Excellence in Oil & Gas M&A 120314 fnlLincoln Crowne Excellence in Oil & Gas M&A 120314 fnl
Lincoln Crowne Excellence in Oil & Gas M&A 120314 fnlLincoln Crowne & Company
 
Nick Assef Excellence in oil & gas m&a 120314fnl
Nick Assef Excellence in oil & gas m&a 120314fnlNick Assef Excellence in oil & gas m&a 120314fnl
Nick Assef Excellence in oil & gas m&a 120314fnlNick Assef
 

Semelhante a Acec 050112 (20)

FEDCON Summit: Marine Corps Installations East
FEDCON Summit: Marine Corps Installations EastFEDCON Summit: Marine Corps Installations East
FEDCON Summit: Marine Corps Installations East
 
MCIEast
MCIEast MCIEast
MCIEast
 
NAVFAC MID-ATLANTIC
NAVFAC MID-ATLANTICNAVFAC MID-ATLANTIC
NAVFAC MID-ATLANTIC
 
US Army Reserve - Tad Davis, SES
US Army Reserve - Tad Davis, SESUS Army Reserve - Tad Davis, SES
US Army Reserve - Tad Davis, SES
 
Sadler roicc cherry point brief for small business outreach march 2012
Sadler roicc cherry point brief for small business outreach   march 2012Sadler roicc cherry point brief for small business outreach   march 2012
Sadler roicc cherry point brief for small business outreach march 2012
 
Corps of Engineers - Savannah District
Corps of Engineers - Savannah DistrictCorps of Engineers - Savannah District
Corps of Engineers - Savannah District
 
Wilmington District Program Review
Wilmington District Program ReviewWilmington District Program Review
Wilmington District Program Review
 
Lecture 8 Costs H4D Stanford 2016
Lecture 8 Costs H4D Stanford 2016Lecture 8 Costs H4D Stanford 2016
Lecture 8 Costs H4D Stanford 2016
 
Corps of Engineers - Wilmington District
Corps of Engineers - Wilmington DistrictCorps of Engineers - Wilmington District
Corps of Engineers - Wilmington District
 
NC National Guard Brief
NC National Guard BriefNC National Guard Brief
NC National Guard Brief
 
NAVFAC
NAVFACNAVFAC
NAVFAC
 
Aqualink Week 9 H4D Stanford 2016
Aqualink Week 9 H4D Stanford 2016Aqualink Week 9 H4D Stanford 2016
Aqualink Week 9 H4D Stanford 2016
 
Water Management Financing in the Caribbean - Part 4
Water Management Financing in the Caribbean - Part 4 Water Management Financing in the Caribbean - Part 4
Water Management Financing in the Caribbean - Part 4
 
77565239 13-cost-benefit-analysis
77565239 13-cost-benefit-analysis77565239 13-cost-benefit-analysis
77565239 13-cost-benefit-analysis
 
Aqualink Week 7 H4D Stanford 2016
Aqualink Week 7 H4D Stanford 2016Aqualink Week 7 H4D Stanford 2016
Aqualink Week 7 H4D Stanford 2016
 
Career wise december 2009
Career wise december 2009Career wise december 2009
Career wise december 2009
 
Northern Graphite Corporation - Research by Mackie Research Capital Corporation
Northern Graphite Corporation - Research by Mackie Research Capital CorporationNorthern Graphite Corporation - Research by Mackie Research Capital Corporation
Northern Graphite Corporation - Research by Mackie Research Capital Corporation
 
Marine Corps Installations East
Marine Corps Installations EastMarine Corps Installations East
Marine Corps Installations East
 
Lincoln Crowne Excellence in Oil & Gas M&A 120314 fnl
Lincoln Crowne Excellence in Oil & Gas M&A 120314 fnlLincoln Crowne Excellence in Oil & Gas M&A 120314 fnl
Lincoln Crowne Excellence in Oil & Gas M&A 120314 fnl
 
Nick Assef Excellence in oil & gas m&a 120314fnl
Nick Assef Excellence in oil & gas m&a 120314fnlNick Assef Excellence in oil & gas m&a 120314fnl
Nick Assef Excellence in oil & gas m&a 120314fnl
 

Mais de NC Military Business Center

Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14NC Military Business Center
 
FEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction ProjectsFEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction ProjectsNC Military Business Center
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysNC Military Business Center
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysNC Military Business Center
 
FEDCON Summit: Department of Transportation Construction Opportunities
FEDCON Summit:  Department of Transportation Construction OpportunitiesFEDCON Summit:  Department of Transportation Construction Opportunities
FEDCON Summit: Department of Transportation Construction OpportunitiesNC Military Business Center
 
FEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal ContractsFEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal ContractsNC Military Business Center
 
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...NC Military Business Center
 
FEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry ExperienceFEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry ExperienceNC Military Business Center
 
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...NC Military Business Center
 
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelFEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelNC Military Business Center
 
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsHuman/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsNC Military Business Center
 

Mais de NC Military Business Center (20)

Camp Lejeune Small Business Outreach Event
Camp Lejeune Small Business Outreach EventCamp Lejeune Small Business Outreach Event
Camp Lejeune Small Business Outreach Event
 
MCAS Cherry Point Small Business Outreach Event
MCAS Cherry Point Small Business Outreach EventMCAS Cherry Point Small Business Outreach Event
MCAS Cherry Point Small Business Outreach Event
 
Spawar slides
Spawar slidesSpawar slides
Spawar slides
 
Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14Fort Bragg Small Business Outreach Event_March 18, 14
Fort Bragg Small Business Outreach Event_March 18, 14
 
FEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction ProjectsFEDCON Summit: Bonding & Surety for Federal Construction Projects
FEDCON Summit: Bonding & Surety for Federal Construction Projects
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/Delays
 
FEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/DelaysFEDCON Summit: Change Orders & Contract Disruptions/Delays
FEDCON Summit: Change Orders & Contract Disruptions/Delays
 
FEDCON Summit: Department of Transportation Construction Opportunities
FEDCON Summit:  Department of Transportation Construction OpportunitiesFEDCON Summit:  Department of Transportation Construction Opportunities
FEDCON Summit: Department of Transportation Construction Opportunities
 
FEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal ContractsFEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
FEDCON Summit: Labor Laws & Affirmative Action for Federal Contracts
 
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
FEDCON Summit: Waste and Pollution Reduction Programs, Projects & Industry Ex...
 
FEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry ExperienceFEDCON Summit: Installation Energy Programs, Projects & Industry Experience
FEDCON Summit: Installation Energy Programs, Projects & Industry Experience
 
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
FEDCON Summit: Water, Wastewater and Stormwater Programs, Projects & Industry...
 
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelFEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
 
FEDCON Summit: NCMBC Tools for Contractors
FEDCON Summit: NCMBC Tools for ContractorsFEDCON Summit: NCMBC Tools for Contractors
FEDCON Summit: NCMBC Tools for Contractors
 
FEDCON Summit: Public Private Ventures
FEDCON Summit: Public Private VenturesFEDCON Summit: Public Private Ventures
FEDCON Summit: Public Private Ventures
 
FEDCON Summit: Teaming Arrangements
FEDCON Summit: Teaming ArrangementsFEDCON Summit: Teaming Arrangements
FEDCON Summit: Teaming Arrangements
 
FEDCON Summit: Veterans Affairs
FEDCON Summit: Veterans AffairsFEDCON Summit: Veterans Affairs
FEDCON Summit: Veterans Affairs
 
Medical Technologies
Medical TechnologiesMedical Technologies
Medical Technologies
 
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsHuman/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
 
Ground Vehicle and Robotics
Ground Vehicle and RoboticsGround Vehicle and Robotics
Ground Vehicle and Robotics
 

Último

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 

Último (20)

A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 

Acec 050112

  • 1. NC Military Business Center DoD Military Construction Trends and NC Program May 1, 2012
  • 2. Agenda • Department of Defense budget trends • Army construction and engineering trends • Army NC FY12/FY13 snapshot • Navy construction and engineering trends • Navy/USMC NC FY12/FY13 snapshot • NCMBC resources, events and questions
  • 3. DoD Budget • Budget Control Act of 2011 – $487b cuts over 10 years; higher than Bush budget – Sequestration: additional $500-$600b over 10 years – “Slowdown in spending – no procurement holiday” • Strategic guidance (Jan 2012): shapes military post- IQ/AF, post-Budget Control Act • President’s budget submittal, FY2013: $613 billion – $525b base; $88b overseas contingency operations
  • 4. DoD Construction • NCMBC.us, “Federal Construction” page • SAME FY2013 DoD Program Briefings – NAVFAC – Army Corps of Engineers – USAF – DoD Energy Security
  • 5. NAVFAC Trends FY2013 Program: • MILCON: $1.7b; Housing: $102m; BRAC: $165m • MILCON: Down from $3.8b in FY2012 • 58% Navy, 42% USMC • MIDLANT: 22% of workload, tied 1st (w/SW) • Acquisition strategy: – “the method in the DD1391…is the way it will happen” – MACC TO’s: “if can’t negotiate to budget w/#1, go to #2”
  • 6.
  • 7. NAVFAC Trends Delivery method: • Design build (60%), Design bid build (40%) • Shift to more in-house (IH) design (shift AE to IH) – Maintain/enhance core competencies – Lowest cost; reduced funding for contracted services – Reduced workload facilitates transition – Design staff stay at FY2010 levels; 5% of design IH – IH RFP prep for all DB projects; IH design some DBB
  • 8. NAVFAC Trends BIM: • Implementing “snale’s pace” • Issue is Navy IT system inadequacies • Two pilots: NAVFAC SE (FY12), NAVFAC SW (FY13) • NAVFAC not only designs/acquires; must run and maintain facilities
  • 9. NAVFAC Trends Total Ownership Cost (TOC): • New tri-service tool to evaluate TOC of DB proposals • Uses automated Excel spreadsheets; replaces Energy and Sustainment technical factor • Focus on 7 facility types and major cost drivers: – Initial design and construction; 40 year energy costs; 40 year sustainment costs • Two FY12 pilots; implement FY13
  • 10. NAVFAC Trends Energy Technology Clearinghouse • High demand for insertion of new technologies • Streamline integration of proven technologies • Help AEs/Government to select technologies • Regionally organized based on climate zones • Clearinghouse available APR 2012 (FBO.gov) • Future tri-services/DOE clearinghouse in development
  • 11. NAVFAC Trends Overall trends • MILCON continue trend down to $1.2b to $1.7b annually (FY08 level) • OICC MCIEast is “winding down” • O&M-funded, SRM projects remain constant • Heavy focus in O&M projects on: – Energy efficiency – Security
  • 12. Remaining NAVFAC FY12 Project Location Value Acquisition Tool Key Dates PN138 BEQ Wallace Creek Camp $ 27,214,000 Stand Alone Single Bids due 11 May Lejeune Phase Price anticipate award Performance Trade- June 12 Off P705/710 Camp $79,000,000 Stand Alone In final Lejeune discussions due 4 May 12 P1285 SOF Armory Facility Camp $6,670,000 BVSS, LPTA To be award late Expansion Lejeune May 12 P-30 Auto Infantry Squad Camp $16,821,000 BVSS, LPTA, To be advertised Battle Course Lejeune anticipated award 1 May 12 early 4th qtr
  • 13. Remaining NAVFAC FY12 Project Location Value Acquisition Tool Key Dates P-Q1440 SOF G3X Training Camp $10,000,000 Acquisition MAC- Anticipated Facility Lejeune General Construction award 1st Qtr FY 13
  • 14. NAVFAC FY13 Program Project Location Value Acquisition Tool Key Dates P003-Staff NCO Academy Camp $ 28,986,000 To Be advertised facilities Lejuene Aug/Sept 13 P-601 Armory MCAS $ 11,581,000 To be Cherry Point advertised Spring of FY 13 P-163 Marine Air Support MCAS $34,310,000 To be advertised Squadron Compound Cherry Point Nov/Dec 12 P 711- Personnel Admin New River $8,525,000 To be advertised Center Dec 12
  • 15. NAVFAC FY13 Program Project Location Value Acquisition Tool Key Dates P 1425 Overhead Range Camp $3,000,000 To Be advertised Baffle System Lejuene Oct/12 Q1218 SOF Marine Battalion MCAS $ 53,399,000 To be Company/Team Facilities Cherry Point advertised Sept 12 SOF Survival Evasion Resist Camp $5465,0,000 To be advertised Escape Training Facility Lejuene Sept 12 P 8144 Medical Clinic New River $21,200,000 To be advertised Replacement Center Spring 2013
  • 16. NAVFAC FY13 Program Project Location Value Acquisition Tool Key Dates P-25 Replace Delalio MCAS New $23,000,000 Sometime in FY Elementary School River 13
  • 17. USACE Trends FY2013: “A Year of Transition” • Mission, force structure changes driving strategies • Facility Investment Strategies: – Sustain required facilities – Dispose of excess facilities – Improve energy / cost savings – Improve facility quality – Build-out critical facility shortfalls
  • 18. USACE Trends FY2013 Program • USACE MILCON program: $4.9b (FY12: $9.1b) – Army MILCON: $2.1b (FY12: 44.3b, -55%) – DoD MILCON: $2.4b (FY12: $3.3b, -6%) • SOF, DeCA, DoDEA, DLA, Medical, etc. – Overseas contingency construction -80% • O&M funded, SRM projects: stable from FY12
  • 19.
  • 20.
  • 21. USACE Trends Energy and Environmental • Energy Initiatives Task Force (EITF): – Huntsville District lead – Engage private capital – Supports goal, 25% renewable energy by 2025 – Purchase up to $7b in energy over 30 years • Net Zero master planning initiative: energy, water and waste
  • 22. USACE Trends Project Delivery: • Centers of standardization, MATOCs evolving • Updating standard designs for energy • Establishing IDIQs based on region, not facility type • Multiple delivery methods: DB, DBB, adapt build • Adapt build: moving to energy as driving factor • LCCA: if provide enhancements, must provide LCCA for the enhancements
  • 23. USACE Trends Project Delivery: • Life Cycle Cost Analysis (LCCA): required for all proposed enhancements • LEED: FY12 National Defense Authorization Act prohibits government from paying above silver • Congress wants competition, “Better Buying Power” – “More SB involvement, more local contractors” – If not two bidders on task order, will recompete
  • 24. USACE Trends “Paradigm Shift” • Surge era to post-surge era • MILCON focus to SRM focus • Energy as consideration to energy as driver • MILCON transformation to innovation • Corps as service supplier to systems integrator
  • 25. Remaining USACE FY12 Project Location Value Acquisition Tool Key Dates PN 70351 Hospital Fort Bragg $ 57,600,000 Stand alone Projected award Alteration (Grow the Army) Construction, est. date 6/1/12 advertising date (USACE 2/24/12/ Savannah) PN 60272 SOF Fort Bragg $10,758,000 MATOC, adv. 4/20/12 Projected award Communications Training date 7/11/12 Facility PN 69758 SOF Brigade HQ Fort Bragg $19,000,000 MATOC adv. 4/13/12 Project award Facility/95th CA date 7/4/12 PN 71224 SOF Admin- Fort Bragg $ 26,000,000 MATOC adv 3/8/12 Project award Company Ops Ph 2/4th date 5/28/12 MISOG
  • 26. Remaining USACE FY12 Project Location Value Acquisition Tool Key Dates PN 60821 SOF Squadron HQ Fort Bragg $11,000,000 MATOC adv. 1/18/12 Projected award Addition date 5/20/12 (USACE Wilmington) PN 76364 SOF Battalion Ops Fort Bragg $41,000,000 MATOC, adv. 4/13/12 Projected award Complex date 7/7/12 PN 69458 SOF Battalion Ops Fort Bragg $23,478,000 MATOC adv. 2/28/12 Project award Complex (4th MISOG) date 6/7/12 PN 69277 SOF Access Fort Bragg $ 2,300,000 MATOC adv 4/9/12 Project award Control point/SOTF date 6/14/12
  • 27. Remaining USACE FY12 Project Location Value Acquisition Tool Key Dates PN 43335 NCO Academy Fort Bragg $42,000,000 MATOC Adv. 4/15/12 Projected award date 5/30/12 (USACE Savannah) PN 69835 Unmanned Aerial Fort Bragg $54,000,000 MATOC, adv. 4/30/12 Projected award Vehicle Maintenance Hangar date 6/30/12 PN 70751 (ACP) Brigade Fort Bragg $18,000,000 MATOC adv. 3/15/12 Project award Complex Facility date 7/15/12
  • 28. Remaining USACE FY12 Project Location Value Acquisition Tool Key Dates PN 76373 SOF USASOC HQ Fort Bragg $12,000,000 MATOC adv. 2/3/12 Projected award Annex/USASOC date 5/25/12 (USACE Wilmington) P9770500 DDESS Facility Fort Bragg $ 3,138,000 MATOC, adv.6/1/12 Projected award date 8/30/12 P-AMD02051, Replace Fort Bragg $23,086,000 MATOC adv. 6/1/12 Project award McNair Elem School date 8/30/12 P-AM10081 Replace Murray Fort Bragg $22,000,000 MATOC adv 6/1/12 Project award Elementary date 8/30/12
  • 29. Remaining USACE FY12 Project Location Value Acquisition Tool Key Dates P80087 General Purpose Fort Bragg $13,800,000 MATOC adv. 7/2/12 Projected award Warehouse date 8/31/12 (USACE Savannah) P 371417, Transpired Solar Fort Bragg $ 1,500,000 MATOC, adv.5/11/12 Projected award Collectors date 7/18/12 Unrestricted DB/DBB UNK $499,000,000 Adv. 7/1/12 Project award MATOC date 9/30/12 Two 8(a) DB SATOC UNK $100,000,000 adv. 2nd QTR Project award date 8/30/12
  • 30. Remaining USACE FY12 Project Location Value Acquisition Tool Key Dates 6 Unrestricted Full Service UNK $12,000,000 UNK AE Design Two restricted Full Service UNK $ 4,500,000 UNK AE Design Four Unrestricted Full UNK $ 12,500,000 UNK Service Installation Specific AE Design One SB Environmental UNK $ 45,000,000 UNK MATOC
  • 31. USACE FY13 Program Project Location Value Acquisition Tool Key Dates P-69287 SOF Battalion Fort Bragg $ 40,481,000 March 2013 Operations Facility anticipated award date P-69493 SOF Sustainment Fort Bragg $ 24,693,000 March 2012 Brigade Complex anticipated award date P-69382 SOF Civil Affairs Fort Bragg $31,373,000 March 2012 Battalion Complex anticipated award date P-65052 SOF Support Fort Bragg $3,875,000 March 2012 Addition anticipated award date
  • 32. USACE FY13 Program Project Location Value Acquisition Tool Key Dates P-55121 Aerial Gunnery Fort Bragg $ 42,000,000 Dec 2012 Range anticipated award date P78499 Infrastructure Fort Bragg $ 30,000,000 May 30 2013 anticipated award date P-80112 Unmanned Aerial Fort Bragg $31,373,000 February 2013 Vehicle Complex, Phase 2 anticipated award date
  • 33. Agency FY13 Program Project Location Value Acquisition Tool Key Dates Replace Pipeline DLA $1,850,000 Seymour Johnson AFB TRICARE Management Seymour $53,600,000 Activity Medical Clinic Johnson AFB Replacement
  • 34. Senior Leader Perspective Dorothy Robyn, Deputy Under Secretary of Defense • Facility energy strategy: reduce demand, expand renewable supply, improve energy security • DoD installations, test-beds for energy technologies – Microgrids, efficient integrated buildings, nano- technology HVAC, on-site generation • DoD taking new technology risks ESCOs will not • Civilian renewable energy siting challenges
  • 35. Senior Leader Perspective USACE and Air Force • 3 good things: – SRM will remain 90% of current program – Major increase in investment in energy projects – Barracks and QOL are still priorities • Worries – Cost, government buildings 35% higher than civilian – Selecting right technologies – and maintaining them
  • 36. Senior Leader Perspective Rear Admiral Mossey (NAVFAC) • 3 good things: – SRM will remain 80% of current program – Major increase in investment in energy projects – MILCON is down – but $1.75b is still huge for Navy • Worries – Government may not be ready to own technologies that industry can provide, or maintain the facilities
  • 37. Upcoming NCMBC Events • Consolidated Construction Teaming Forum (8 MAY) • Defense Contractor Academy (JUN – AUG) • NC Federal Environmental Symposium (13 JUN) • NC Federal Advanced Technology Symposium (17 JUL) • Defense Trade Show (7 AUG) • NC Aerospace Supplier Conference (14 AUG) • 2012 Federal Construction Summit (10-11 OCT)
  • 38. Contact Information • Scott Dorney, Executive Director, Phone: 910-678- 0190, dorneys@ncmbc.us • Sue Kranes, MILCON Initiative PM, 336-601-0446, kraness@ncmbc.us • Paulanne Page, MILCON Specialist, 910-330-8560, pagep@ncmbc.us • Carolyn Bunting, MatchForce Administrator, 910- 578-2579, buntingc@ncmbc.us
  • 40. NCMBC Resources • Business Development Team • MILCON Specialists • Websites: MatchForce.org, ncmbc.us • Federal construction page (ncmbc.us) – Market entry checklist – Capability matrices (contractor, designer, supplier) – Spreadsheets (Forecast, MACC/MATOC, Primes) – Current bidding projects list – Summit, other event materials • Federal Construction Events
  • 41.
  • 42.
  • 43. Checklist Presentations Spreadsheets
  • 46.
  • 49. Current AE IDIQ Contracts
  • 51. Pre-Award Support and Resources • Notification to Contractors of Project Forecast • Networking, Team Building and Strategic Planning • Monitoring & Notification of Project Solicitations & Opportunities • Solicitation Requirement Interpretation & Support • Proposal Support & Review • Proposal Revision and Clarification Support • Debriefing Support for unsuccessful offers
  • 52. Post Award Support and Resources • Project Management Team Execution Training & Support – FARS/DFARS and Contract Requirement Interpretation – Partnering and Client Communications – Resources for subcontractors and vendors – Quality Control Plans & Program Execution Support – Safety Plans & Program Execution Support – Submittals & Project Deliverable Requirements – Schedule Development & Issues – Schedule of Values Development – Invoicing, Change Orders, Certified Payroll & Project Admin Support