Acknowledgement
All praise is to Allah, The Lord of The Creation. Certainly Almighty Allah gave us
the strength & courage to make this report.
We are grateful to our teacher Miss Sultana, who gave us the opportunity to
implement our skills in making a report which surely was a great experience.
2 | P a g e
TABLE OF CONTENTS
 Introduction 3
 Name 4
 Location 4
 Concept, Design and Construction 5
 Main Bridge Concepts 6
 Pylon 6
 Deck 8
 Construction and Completion 8
 Trouble with Cable Links 9
 Monitoring System 9
 Records 10
 Conclusion 11
 Bibliography 12
3 | P a g e
Introduction
The Gulf of CorinthinGreece isdeep,wide andlong.Greatattributesformarine trafficbuta nightmare
for those travellingbyland.The Gulf of CorinthvirtuallychopsGreece intwo.The onlylandroute
betweensouthernGreece andthe WesternEurope is240 kmeast.Bridgingthe Gulf is beenagoal more
than a centurybut itis neverbeenpossibleuntil now.
The water istoo deep,the seabedtoosoftand an earthquake faultline comes inthe middle. Challenges
of buildingbridge here weremindboggling.The biggestproblemwasEarthquake.Bridgeshave been
builtinthe earthquake zone before,butthisbridge hadtocross an active faultline.Ontopof that the
waterhere isextremelydeepi.e.60 meters.Nootherbridge hasbeenbuiltwithfoundationslikethat.
In April 1996 the onlyway to crossThe Gulf of Corinthwasby meansof Ferryboat. Ina perfectweather
the journeywouldtake 45 minutes,a bridge will reduce thattofive. SofordecadesThe Greece
Governmenthasbeenlookingfornewbridge designs,the bridge will have tobe extraordinary.The
Designof the bridge looksverysimple.368 steel cables,4conical towersanda yellow ribbonof roadway
that glowsat night.
4 | P a g e
Mega Structure – Rio Antirio Bridge
Name
Its official name isthe CharilaosTrikoupisBridge. CharilaosTrikoupis wasa19th century Greekprime
minister,andsuggestedthe ideaof buildingabridge betweenRionandAntirion;however,the
endeavourwastoo expensive atthe time,whenGreece wastryingtogeta late footintothe Industrial
Revolution.
Location
The 2,880 m (9,449 ft) longbridge islocatedinGreece andit joinssouthernGreece tothe Western
Europe,makingthe journeyasshortas 5 minuteswhichusedtobe 45 minutesina ferryor viathe
isthmusof Corinth at itsextreme eastend.
5 | P a g e
Concept, Design, and Construction
All Bridge designsare basedonfourtypes:
Beam Bridges:
The longestbridgesinthe worldare beambridgesbutitwouldn’tworkhere because itwill blockthe
wayof shiptraffic.
Arch Bridges:
An Archbridge can stay clearof huge shiptrafficbuta span of Gulf Corinthwill require 4timesbigger
than anyarch bridge builtbefore.Thisdesignwastoorisky
Suspension Bridges:
A suspensionbridge canbe of longest distances,butsuspensionbridgesare tooexpensive.Greece
couldn'taffordto buildone.
6 | P a g e
Cable Stayed Bridges:
Thisleftonlyone possibleoption,A Cable StayedBridge.Inthisdesignthere are noexpensive main
cables(unlike SuspensionBridges), insteadthe smallercablesare directlylinkedtothe towers.Itwill be
able to fulfill the demandsof thisBridge.
Main Bridge Concepts:
Pylons
For challengeslike theseBridge made of 3
central spans, 560 m inlengthand2 side
spans,286 m longwasselected. The
correspondingfourpylonsreston large
concrete substructure foundations, 90m in
diameter,65mhigh,whichdistribute all the
forcesto the soil.Below thissubstructure,
the bearingcapacity of the heterogeneous
and weaksoil wasimprovedbymeansof
inclusions, whichconsistof 20mmthick steel
pipes,25 to 30 m longand 2m in diameter,
drivenata regularspacingof 7 or 8m. The
piersare not buriedintothe seabed,but
rather reston a bedof gravel whichwas
meticulouslyleveledtoanevensurface (adifficultendeavoratthisdepth).Duringanearthquake,the
piersshouldbe allowedtomove laterallyonthe seabedwiththe gravelbedabsorbingthe energy.
7 | P a g e
Initially,aconcrete blockwhichacts as the base of 4 concrete legs convergingatthe top of the pylons
and givingthemthe appropriate rigiditywassupported bythese huge foundationsthroughoctagonal
pylonshafts,pyramidal capitals andasophisticatedsetof bearingdevices, post-tensionedtendonsand
springdampers. Thiswasabsolutely necessarysince eachpylonsupporteda symmetricalcantilever510
m longand eachcantileverwasconnectedtothe adjacentone or tothe approachesbya simply
supporteddeckgirder50m long.Careful analysesof the behaviorof the reinforcedsoil and
improvementsof thisinnovative conceptledto givingupthe initial staticscheme of the mainbridge and
to adopta muchmore efficientstructure withacontinuouspylon (fromseabedtopylonhead) anda
continuousfullysuspendeddeck isolatedasmuchas possible fromthe pylons. Thisallowedthe depthof
the deckand therefore alsothe windeffectsonthe bridge tobe reduced.
8 | P a g e
Deck
The deck isa composite steel-concretestructure, 20m wide,consistingof a concrete slab,25 to 35 cm
thick,connected totwinlongitudinal steel I girders, 2,20m high,braced every4m by transverse cross
beams. Itis continuousoveritstotal lengthof 2252 m, withexpansionjointsatboth ends,andisfully
suspendedby8setsof 23 pairsof cables.Inthe longitudinaldirectionthe deckisfree toaccommodate
all movementsdue tothermal and seismicactionsandthe jointsare designed toaccommodate 2,5m
displacements underservice conditionsand movementsof upto 5,0m in an extreme seismicevent. In
the transverse directionitisconnected toeachpylonwith4 hydraulicdampersof 3500 KN capacity each
and a horizontal metallicstrutof 10 000KN capacity. The stay cablesare arranged intwoinclined planes
ina semi-fanconfiguration. Theyare made of 43 to 73 parallel galvanizedstrandsindividuallyprotected
by an HDPE sheath.
Construction and Completion
The leadarchitectwas Berdj Mikaelian.Site preparationanddredgingbeganinJuly1998, and
constructionof the massive supportingpylonsin 2000. With these complete in2003, workbeganon the
trafficdecksand supportingcables.OnMay21, 2004, the mainconstructionwascompleted;only
equipment(sidewalks,railings,etc.) andwaterproofingremainedtobe installed. The bridge wasfinally
inauguratedonAugust7, 2004, a weekbefore the openingof the 2004 SummerOlympics inAthens.The
total cost of the bridge wasabout€ 630,000,000, funded byGreekstate funds.
9 | P a g e
Trouble with cable links
On 28 January2005, six monthsafterthe openingof the bridge,one of the cable linksof the bridge
snappedfromthe top of the M3 pylonandcame crashing downonthe deck.Traffic wasimmediately
halted.The firstinvestigationclaimedthata fire hadbrokenouton the top of the M3 pylon,aftera
lightningstrike inone of the cables.The cable wasimmediatelyrestoredandthe bridge re-opened.
Monitoring System
A structural Healthmonitoringsystemwasinstalledduringconstructiononthe bridge.Itisstill inplace
todayand providesa24/7 surveillance of the structure.The systemhasmore than100 sensors,
including
 3D accelerometersonthe deck,pylons,staycables,andonthe groundto characterize wind
movementsandseismictremors
 Straingaugesand loadcellsonthe stay cablesandtheirgussets
 Displacementsensorsonthe expansionjointstomeasure the thermal expansionof the deck
 Water-levelsensorsonthe pylonbasestodetectinfiltration
 Temperature sensorsinthe decktodetectfreezingconditions
 Linearvariable differentialtransducer(LVDT) sensorsonthe staycablesto measure movement
 Load cellsonthe restrainersforrecalibrationinthe eventof anearthquake
 Two weatherstationstomeasure windintensity,direction,airtemperature,andrelative
humidity
One specificelementof the systemis the abilitytodetectandspecificallytreatEarthquake events.
10 | P a g e
Records
ThisBridge enteredthe recordbooks:
 It isthe longestcable stayedsuspensionbridgeinthe world.
 It has longestfullysuspendedcontinousdecki.e.2200 meters.
 It has the world’s largestbridge foundationsandthe deepest,sitting60 metersunderthe sea.
Innovative engineeringallowsthe RioAntirioBridgetosurvive wherethe otherdesignswouldfail.It
standsas one of the world’smegabridges.
A beautifulview at night
11 | P a g e
Conclusion
The Rio-Antirio Bridge is a major
and impressive link when compared to
other major cable-stayed bridges such
as the second Severn Bridge and even
to the Normandy Bridge. The design
and construction of this $ 750 million
project undertaken under a private
BOT (build-operate-transfer) scheme
could overcome an exceptional combination
of adverse environmental conditions
thanks to the choice of an appropriate
concept and seismic design philosophy.
The pylons are founded directly
on a gravel layer placed on the
sea bed allowing them to undergo controlled
displacements under the most
severe earthquake and, based on an innovative
concept, the top 20 m of soil
located under the large diameter bases
(90 m) of the pylons are reinforced by
means of steel inclusions to resist high
soil-structure interaction loads. The
2252 m long deck of the cable-stayed
bridge is continuous, fully suspended
and therefore isolated as much as possible
from the worst seismic motions.
12 | P a g e
Bibliography:
 Wikipedia
 National Geographic Documentary
 Google Images
 http://www.iabse.gr/support/LargeProjectsGreece/Bridges/Rio-Antirrio/

Mais conteúdo relacionado

Mais procurados

The cable in building structures
The cable in building structuresThe cable in building structures
The cable in building structuresWolfgang Schueller
 
Large span structures
Large span structuresLarge span structures
Large span structuresaduiti
 
Golconde ashram-pondechery-india
Golconde ashram-pondechery-indiaGolconde ashram-pondechery-india
Golconde ashram-pondechery-indiaaditya singh
 
Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acpJigar Shah
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)Waseem Akbar
 
dome and vault
dome and vaultdome and vault
dome and vaultkaiwan1996
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.Puneet Chhonker
 
Space frame , space structure and geodesic domes
Space frame , space structure and geodesic domesSpace frame , space structure and geodesic domes
Space frame , space structure and geodesic domesNarendra Shah
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesAkshey Sharma
 
Introduction to vierendeel structure system
Introduction to vierendeel structure systemIntroduction to vierendeel structure system
Introduction to vierendeel structure systemYaraHussein4
 
Space frames-modular construction technology
Space frames-modular construction technologySpace frames-modular construction technology
Space frames-modular construction technologyAnjith Augustine
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structuresAkash Matthew
 
The Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension BridgeThe Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension Bridgeelsayed ahmed
 
Cable and tensile structures
Cable and tensile structures Cable and tensile structures
Cable and tensile structures rohan joshi
 
Folded plate structure
Folded plate structureFolded plate structure
Folded plate structureVikas Mehta
 

Mais procurados (20)

The cable in building structures
The cable in building structuresThe cable in building structures
The cable in building structures
 
Large span structures
Large span structuresLarge span structures
Large span structures
 
LIGHTWEIGHT CONSTRUCTIONS-'CABLES' in Lightweight and Membrane structures
 LIGHTWEIGHT CONSTRUCTIONS-'CABLES' in Lightweight and Membrane structures  LIGHTWEIGHT CONSTRUCTIONS-'CABLES' in Lightweight and Membrane structures
LIGHTWEIGHT CONSTRUCTIONS-'CABLES' in Lightweight and Membrane structures
 
Tokyo Sky Tree
Tokyo Sky TreeTokyo Sky Tree
Tokyo Sky Tree
 
Golconde ashram-pondechery-india
Golconde ashram-pondechery-indiaGolconde ashram-pondechery-india
Golconde ashram-pondechery-india
 
Shell structure
Shell structureShell structure
Shell structure
 
Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acp
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
 
dome and vault
dome and vaultdome and vault
dome and vault
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
Space frame , space structure and geodesic domes
Space frame , space structure and geodesic domesSpace frame , space structure and geodesic domes
Space frame , space structure and geodesic domes
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologies
 
Introduction to vierendeel structure system
Introduction to vierendeel structure systemIntroduction to vierendeel structure system
Introduction to vierendeel structure system
 
Space frames-modular construction technology
Space frames-modular construction technologySpace frames-modular construction technology
Space frames-modular construction technology
 
Tokyo Sky Tree
Tokyo Sky TreeTokyo Sky Tree
Tokyo Sky Tree
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
 
The Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension BridgeThe Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension Bridge
 
Cable and tensile structures
Cable and tensile structures Cable and tensile structures
Cable and tensile structures
 
Folded plate structure
Folded plate structureFolded plate structure
Folded plate structure
 
Surface active systems
Surface active systems Surface active systems
Surface active systems
 

Semelhante a Rio Antirio Bridge - Report

20150421031337318
2015042103133731820150421031337318
20150421031337318James Prs
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelAglaia Connect
 
Submerged floating tunnel ppt
Submerged floating tunnel pptSubmerged floating tunnel ppt
Submerged floating tunnel pptjishnukpkp
 
Submerged floating tunnel
Submerged floating tunnelSubmerged floating tunnel
Submerged floating tunnelShaikh Ismail
 
H & d ppt 06 repair docks
H & d ppt 06 repair docksH & d ppt 06 repair docks
H & d ppt 06 repair docksHasna Hassan
 
Fib2010 article260 design & construction_rev_a
Fib2010 article260 design & construction_rev_aFib2010 article260 design & construction_rev_a
Fib2010 article260 design & construction_rev_agefyra-rion
 
S5c9 chapter 9-facts and figures related to surface and underground canals.
S5c9 chapter 9-facts and figures related to surface and underground canals.S5c9 chapter 9-facts and figures related to surface and underground canals.
S5c9 chapter 9-facts and figures related to surface and underground canals.Shivu P
 
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxTRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxSoulLoad
 
Golden gate bridge, San Francisco
Golden gate bridge, San Francisco Golden gate bridge, San Francisco
Golden gate bridge, San Francisco Ankur Saxena
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationunofficialdevil48
 
Enwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC BreakfastEnwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC BreakfastToronto 2030 District
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...John Grover
 

Semelhante a Rio Antirio Bridge - Report (20)

Transatlantic Tunnel
Transatlantic TunnelTransatlantic Tunnel
Transatlantic Tunnel
 
20150421031337318
2015042103133731820150421031337318
20150421031337318
 
1115
11151115
1115
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
Submerged floating tunnel ppt
Submerged floating tunnel pptSubmerged floating tunnel ppt
Submerged floating tunnel ppt
 
Submerged floating tunnel
Submerged floating tunnelSubmerged floating tunnel
Submerged floating tunnel
 
H & d ppt 06 repair docks
H & d ppt 06 repair docksH & d ppt 06 repair docks
H & d ppt 06 repair docks
 
Fib2010 article260 design & construction_rev_a
Fib2010 article260 design & construction_rev_aFib2010 article260 design & construction_rev_a
Fib2010 article260 design & construction_rev_a
 
S5c9 chapter 9-facts and figures related to surface and underground canals.
S5c9 chapter 9-facts and figures related to surface and underground canals.S5c9 chapter 9-facts and figures related to surface and underground canals.
S5c9 chapter 9-facts and figures related to surface and underground canals.
 
multi swing bridges
multi swing bridgesmulti swing bridges
multi swing bridges
 
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxTRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
 
Millau viaduct
Millau viaductMillau viaduct
Millau viaduct
 
Submerged tunnel ppt
Submerged tunnel pptSubmerged tunnel ppt
Submerged tunnel ppt
 
Golden gate bridge, San Francisco
Golden gate bridge, San Francisco Golden gate bridge, San Francisco
Golden gate bridge, San Francisco
 
field visit to Victoria dam
field visit to Victoria damfield visit to Victoria dam
field visit to Victoria dam
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentation
 
Lock
LockLock
Lock
 
Enwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC BreakfastEnwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC Breakfast
 
project
projectproject
project
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
 

Último

Call Girls Manjri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Manjri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Manjri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Manjri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls in Barasat | 7001035870 At Low Cost Cash Payment Booking
Call Girls in Barasat | 7001035870 At Low Cost Cash Payment BookingCall Girls in Barasat | 7001035870 At Low Cost Cash Payment Booking
Call Girls in Barasat | 7001035870 At Low Cost Cash Payment Bookingnoor ahmed
 
Call Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service NashikCall Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448ont65320
 
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser... Shivani Pandey
 
Russian Escorts Agency In Goa 💚 9316020077 💚 Russian Call Girl Goa
Russian Escorts Agency In Goa  💚 9316020077 💚 Russian Call Girl GoaRussian Escorts Agency In Goa  💚 9316020077 💚 Russian Call Girl Goa
Russian Escorts Agency In Goa 💚 9316020077 💚 Russian Call Girl Goasexy call girls service in goa
 
↑Top Model (Kolkata) Call Girls Salt Lake ⟟ 8250192130 ⟟ High Class Call Girl...
↑Top Model (Kolkata) Call Girls Salt Lake ⟟ 8250192130 ⟟ High Class Call Girl...↑Top Model (Kolkata) Call Girls Salt Lake ⟟ 8250192130 ⟟ High Class Call Girl...
↑Top Model (Kolkata) Call Girls Salt Lake ⟟ 8250192130 ⟟ High Class Call Girl...noor ahmed
 
Almora call girls 📞 8617697112 At Low Cost Cash Payment Booking
Almora call girls 📞 8617697112 At Low Cost Cash Payment BookingAlmora call girls 📞 8617697112 At Low Cost Cash Payment Booking
Almora call girls 📞 8617697112 At Low Cost Cash Payment BookingNitya salvi
 
👙 Kolkata Call Girls Sonagachi 💫💫7001035870 Model escorts Service
👙  Kolkata Call Girls Sonagachi 💫💫7001035870 Model escorts Service👙  Kolkata Call Girls Sonagachi 💫💫7001035870 Model escorts Service
👙 Kolkata Call Girls Sonagachi 💫💫7001035870 Model escorts Serviceanamikaraghav4
 
Call Girls Nashik Gayatri 7001305949 Independent Escort Service Nashik
Call Girls Nashik Gayatri 7001305949 Independent Escort Service NashikCall Girls Nashik Gayatri 7001305949 Independent Escort Service Nashik
Call Girls Nashik Gayatri 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girl Service Belur - 7001035870 with real photos and phone numbers
Call Girl Service Belur - 7001035870 with real photos and phone numbersCall Girl Service Belur - 7001035870 with real photos and phone numbers
Call Girl Service Belur - 7001035870 with real photos and phone numbersanamikaraghav4
 
Book Paid Sonagachi Call Girls Kolkata 𖠋 8250192130 𖠋Low Budget Full Independ...
Book Paid Sonagachi Call Girls Kolkata 𖠋 8250192130 𖠋Low Budget Full Independ...Book Paid Sonagachi Call Girls Kolkata 𖠋 8250192130 𖠋Low Budget Full Independ...
Book Paid Sonagachi Call Girls Kolkata 𖠋 8250192130 𖠋Low Budget Full Independ...noor ahmed
 
Dakshineswar Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Se...
Dakshineswar Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Se...Dakshineswar Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Se...
Dakshineswar Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Se...aamir
 
↑Top Model (Kolkata) Call Girls Rajpur ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Rajpur ⟟ 8250192130 ⟟ High Class Call Girl In...↑Top Model (Kolkata) Call Girls Rajpur ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Rajpur ⟟ 8250192130 ⟟ High Class Call Girl In...noor ahmed
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Último (20)

Call Girls Manjri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Manjri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Manjri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Manjri Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls in Barasat | 7001035870 At Low Cost Cash Payment Booking
Call Girls in Barasat | 7001035870 At Low Cost Cash Payment BookingCall Girls in Barasat | 7001035870 At Low Cost Cash Payment Booking
Call Girls in Barasat | 7001035870 At Low Cost Cash Payment Booking
 
Call Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service NashikCall Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
 
Goa Call "Girls Service 9316020077 Call "Girls in Goa
Goa Call "Girls  Service   9316020077 Call "Girls in GoaGoa Call "Girls  Service   9316020077 Call "Girls in Goa
Goa Call "Girls Service 9316020077 Call "Girls in Goa
 
Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448
 
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
 
Desi Bhabhi Call Girls In Goa 💃 730 02 72 001💃desi Bhabhi Escort Goa
Desi Bhabhi Call Girls  In Goa  💃 730 02 72 001💃desi Bhabhi Escort GoaDesi Bhabhi Call Girls  In Goa  💃 730 02 72 001💃desi Bhabhi Escort Goa
Desi Bhabhi Call Girls In Goa 💃 730 02 72 001💃desi Bhabhi Escort Goa
 
Goa Call Girls 9316020077 Call Girls In Goa By Russian Call Girl in goa
Goa Call Girls 9316020077 Call Girls  In Goa By Russian Call Girl in goaGoa Call Girls 9316020077 Call Girls  In Goa By Russian Call Girl in goa
Goa Call Girls 9316020077 Call Girls In Goa By Russian Call Girl in goa
 
Russian Escorts Agency In Goa 💚 9316020077 💚 Russian Call Girl Goa
Russian Escorts Agency In Goa  💚 9316020077 💚 Russian Call Girl GoaRussian Escorts Agency In Goa  💚 9316020077 💚 Russian Call Girl Goa
Russian Escorts Agency In Goa 💚 9316020077 💚 Russian Call Girl Goa
 
↑Top Model (Kolkata) Call Girls Salt Lake ⟟ 8250192130 ⟟ High Class Call Girl...
↑Top Model (Kolkata) Call Girls Salt Lake ⟟ 8250192130 ⟟ High Class Call Girl...↑Top Model (Kolkata) Call Girls Salt Lake ⟟ 8250192130 ⟟ High Class Call Girl...
↑Top Model (Kolkata) Call Girls Salt Lake ⟟ 8250192130 ⟟ High Class Call Girl...
 
Almora call girls 📞 8617697112 At Low Cost Cash Payment Booking
Almora call girls 📞 8617697112 At Low Cost Cash Payment BookingAlmora call girls 📞 8617697112 At Low Cost Cash Payment Booking
Almora call girls 📞 8617697112 At Low Cost Cash Payment Booking
 
Russian ℂall gIRLS In Goa 9316020077 ℂall gIRLS Service In Goa
Russian ℂall gIRLS In Goa 9316020077  ℂall gIRLS Service  In GoaRussian ℂall gIRLS In Goa 9316020077  ℂall gIRLS Service  In Goa
Russian ℂall gIRLS In Goa 9316020077 ℂall gIRLS Service In Goa
 
👙 Kolkata Call Girls Sonagachi 💫💫7001035870 Model escorts Service
👙  Kolkata Call Girls Sonagachi 💫💫7001035870 Model escorts Service👙  Kolkata Call Girls Sonagachi 💫💫7001035870 Model escorts Service
👙 Kolkata Call Girls Sonagachi 💫💫7001035870 Model escorts Service
 
Call Girls Nashik Gayatri 7001305949 Independent Escort Service Nashik
Call Girls Nashik Gayatri 7001305949 Independent Escort Service NashikCall Girls Nashik Gayatri 7001305949 Independent Escort Service Nashik
Call Girls Nashik Gayatri 7001305949 Independent Escort Service Nashik
 
Call Girl Service Belur - 7001035870 with real photos and phone numbers
Call Girl Service Belur - 7001035870 with real photos and phone numbersCall Girl Service Belur - 7001035870 with real photos and phone numbers
Call Girl Service Belur - 7001035870 with real photos and phone numbers
 
Book Paid Sonagachi Call Girls Kolkata 𖠋 8250192130 𖠋Low Budget Full Independ...
Book Paid Sonagachi Call Girls Kolkata 𖠋 8250192130 𖠋Low Budget Full Independ...Book Paid Sonagachi Call Girls Kolkata 𖠋 8250192130 𖠋Low Budget Full Independ...
Book Paid Sonagachi Call Girls Kolkata 𖠋 8250192130 𖠋Low Budget Full Independ...
 
Dakshineswar Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Se...
Dakshineswar Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Se...Dakshineswar Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Se...
Dakshineswar Call Girls ✔ 8005736733 ✔ Hot Model With Sexy Bhabi Ready For Se...
 
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
↑Top Model (Kolkata) Call Girls Rajpur ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Rajpur ⟟ 8250192130 ⟟ High Class Call Girl In...↑Top Model (Kolkata) Call Girls Rajpur ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Rajpur ⟟ 8250192130 ⟟ High Class Call Girl In...
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 

Rio Antirio Bridge - Report

  • 1.
  • 2. 1 | P a g e Acknowledgement All praise is to Allah, The Lord of The Creation. Certainly Almighty Allah gave us the strength & courage to make this report. We are grateful to our teacher Miss Sultana, who gave us the opportunity to implement our skills in making a report which surely was a great experience.
  • 3. 2 | P a g e TABLE OF CONTENTS  Introduction 3  Name 4  Location 4  Concept, Design and Construction 5  Main Bridge Concepts 6  Pylon 6  Deck 8  Construction and Completion 8  Trouble with Cable Links 9  Monitoring System 9  Records 10  Conclusion 11  Bibliography 12
  • 4. 3 | P a g e Introduction The Gulf of CorinthinGreece isdeep,wide andlong.Greatattributesformarine trafficbuta nightmare for those travellingbyland.The Gulf of CorinthvirtuallychopsGreece intwo.The onlylandroute betweensouthernGreece andthe WesternEurope is240 kmeast.Bridgingthe Gulf is beenagoal more than a centurybut itis neverbeenpossibleuntil now. The water istoo deep,the seabedtoosoftand an earthquake faultline comes inthe middle. Challenges of buildingbridge here weremindboggling.The biggestproblemwasEarthquake.Bridgeshave been builtinthe earthquake zone before,butthisbridge hadtocross an active faultline.Ontopof that the waterhere isextremelydeepi.e.60 meters.Nootherbridge hasbeenbuiltwithfoundationslikethat. In April 1996 the onlyway to crossThe Gulf of Corinthwasby meansof Ferryboat. Ina perfectweather the journeywouldtake 45 minutes,a bridge will reduce thattofive. SofordecadesThe Greece Governmenthasbeenlookingfornewbridge designs,the bridge will have tobe extraordinary.The Designof the bridge looksverysimple.368 steel cables,4conical towersanda yellow ribbonof roadway that glowsat night.
  • 5. 4 | P a g e Mega Structure – Rio Antirio Bridge Name Its official name isthe CharilaosTrikoupisBridge. CharilaosTrikoupis wasa19th century Greekprime minister,andsuggestedthe ideaof buildingabridge betweenRionandAntirion;however,the endeavourwastoo expensive atthe time,whenGreece wastryingtogeta late footintothe Industrial Revolution. Location The 2,880 m (9,449 ft) longbridge islocatedinGreece andit joinssouthernGreece tothe Western Europe,makingthe journeyasshortas 5 minuteswhichusedtobe 45 minutesina ferryor viathe isthmusof Corinth at itsextreme eastend.
  • 6. 5 | P a g e Concept, Design, and Construction All Bridge designsare basedonfourtypes: Beam Bridges: The longestbridgesinthe worldare beambridgesbutitwouldn’tworkhere because itwill blockthe wayof shiptraffic. Arch Bridges: An Archbridge can stay clearof huge shiptrafficbuta span of Gulf Corinthwill require 4timesbigger than anyarch bridge builtbefore.Thisdesignwastoorisky Suspension Bridges: A suspensionbridge canbe of longest distances,butsuspensionbridgesare tooexpensive.Greece couldn'taffordto buildone.
  • 7. 6 | P a g e Cable Stayed Bridges: Thisleftonlyone possibleoption,A Cable StayedBridge.Inthisdesignthere are noexpensive main cables(unlike SuspensionBridges), insteadthe smallercablesare directlylinkedtothe towers.Itwill be able to fulfill the demandsof thisBridge. Main Bridge Concepts: Pylons For challengeslike theseBridge made of 3 central spans, 560 m inlengthand2 side spans,286 m longwasselected. The correspondingfourpylonsreston large concrete substructure foundations, 90m in diameter,65mhigh,whichdistribute all the forcesto the soil.Below thissubstructure, the bearingcapacity of the heterogeneous and weaksoil wasimprovedbymeansof inclusions, whichconsistof 20mmthick steel pipes,25 to 30 m longand 2m in diameter, drivenata regularspacingof 7 or 8m. The piersare not buriedintothe seabed,but rather reston a bedof gravel whichwas meticulouslyleveledtoanevensurface (adifficultendeavoratthisdepth).Duringanearthquake,the piersshouldbe allowedtomove laterallyonthe seabedwiththe gravelbedabsorbingthe energy.
  • 8. 7 | P a g e Initially,aconcrete blockwhichacts as the base of 4 concrete legs convergingatthe top of the pylons and givingthemthe appropriate rigiditywassupported bythese huge foundationsthroughoctagonal pylonshafts,pyramidal capitals andasophisticatedsetof bearingdevices, post-tensionedtendonsand springdampers. Thiswasabsolutely necessarysince eachpylonsupporteda symmetricalcantilever510 m longand eachcantileverwasconnectedtothe adjacentone or tothe approachesbya simply supporteddeckgirder50m long.Careful analysesof the behaviorof the reinforcedsoil and improvementsof thisinnovative conceptledto givingupthe initial staticscheme of the mainbridge and to adopta muchmore efficientstructure withacontinuouspylon (fromseabedtopylonhead) anda continuousfullysuspendeddeck isolatedasmuchas possible fromthe pylons. Thisallowedthe depthof the deckand therefore alsothe windeffectsonthe bridge tobe reduced.
  • 9. 8 | P a g e Deck The deck isa composite steel-concretestructure, 20m wide,consistingof a concrete slab,25 to 35 cm thick,connected totwinlongitudinal steel I girders, 2,20m high,braced every4m by transverse cross beams. Itis continuousoveritstotal lengthof 2252 m, withexpansionjointsatboth ends,andisfully suspendedby8setsof 23 pairsof cables.Inthe longitudinaldirectionthe deckisfree toaccommodate all movementsdue tothermal and seismicactionsandthe jointsare designed toaccommodate 2,5m displacements underservice conditionsand movementsof upto 5,0m in an extreme seismicevent. In the transverse directionitisconnected toeachpylonwith4 hydraulicdampersof 3500 KN capacity each and a horizontal metallicstrutof 10 000KN capacity. The stay cablesare arranged intwoinclined planes ina semi-fanconfiguration. Theyare made of 43 to 73 parallel galvanizedstrandsindividuallyprotected by an HDPE sheath. Construction and Completion The leadarchitectwas Berdj Mikaelian.Site preparationanddredgingbeganinJuly1998, and constructionof the massive supportingpylonsin 2000. With these complete in2003, workbeganon the trafficdecksand supportingcables.OnMay21, 2004, the mainconstructionwascompleted;only equipment(sidewalks,railings,etc.) andwaterproofingremainedtobe installed. The bridge wasfinally inauguratedonAugust7, 2004, a weekbefore the openingof the 2004 SummerOlympics inAthens.The total cost of the bridge wasabout€ 630,000,000, funded byGreekstate funds.
  • 10. 9 | P a g e Trouble with cable links On 28 January2005, six monthsafterthe openingof the bridge,one of the cable linksof the bridge snappedfromthe top of the M3 pylonandcame crashing downonthe deck.Traffic wasimmediately halted.The firstinvestigationclaimedthata fire hadbrokenouton the top of the M3 pylon,aftera lightningstrike inone of the cables.The cable wasimmediatelyrestoredandthe bridge re-opened. Monitoring System A structural Healthmonitoringsystemwasinstalledduringconstructiononthe bridge.Itisstill inplace todayand providesa24/7 surveillance of the structure.The systemhasmore than100 sensors, including  3D accelerometersonthe deck,pylons,staycables,andonthe groundto characterize wind movementsandseismictremors  Straingaugesand loadcellsonthe stay cablesandtheirgussets  Displacementsensorsonthe expansionjointstomeasure the thermal expansionof the deck  Water-levelsensorsonthe pylonbasestodetectinfiltration  Temperature sensorsinthe decktodetectfreezingconditions  Linearvariable differentialtransducer(LVDT) sensorsonthe staycablesto measure movement  Load cellsonthe restrainersforrecalibrationinthe eventof anearthquake  Two weatherstationstomeasure windintensity,direction,airtemperature,andrelative humidity One specificelementof the systemis the abilitytodetectandspecificallytreatEarthquake events.
  • 11. 10 | P a g e Records ThisBridge enteredthe recordbooks:  It isthe longestcable stayedsuspensionbridgeinthe world.  It has longestfullysuspendedcontinousdecki.e.2200 meters.  It has the world’s largestbridge foundationsandthe deepest,sitting60 metersunderthe sea. Innovative engineeringallowsthe RioAntirioBridgetosurvive wherethe otherdesignswouldfail.It standsas one of the world’smegabridges. A beautifulview at night
  • 12. 11 | P a g e Conclusion The Rio-Antirio Bridge is a major and impressive link when compared to other major cable-stayed bridges such as the second Severn Bridge and even to the Normandy Bridge. The design and construction of this $ 750 million project undertaken under a private BOT (build-operate-transfer) scheme could overcome an exceptional combination of adverse environmental conditions thanks to the choice of an appropriate concept and seismic design philosophy. The pylons are founded directly on a gravel layer placed on the sea bed allowing them to undergo controlled displacements under the most severe earthquake and, based on an innovative concept, the top 20 m of soil located under the large diameter bases (90 m) of the pylons are reinforced by means of steel inclusions to resist high soil-structure interaction loads. The 2252 m long deck of the cable-stayed bridge is continuous, fully suspended and therefore isolated as much as possible from the worst seismic motions.
  • 13. 12 | P a g e Bibliography:  Wikipedia  National Geographic Documentary  Google Images  http://www.iabse.gr/support/LargeProjectsGreece/Bridges/Rio-Antirrio/