Design   Cost Comparison

           2B                       without beams &

                                 with beams.


         Group members:
GHULAM MUSTAFA VIRA - 136
MUHAMMAD ISMAIL YAR - 154
      FARHAN JAMEEL - 101
     JAMHOOR ALAM - 158
        NAJEEBULLAH - 194
         TARIQ AMIN - 173   Civil Engineering Dept.
                                2009 BATCH
 INTRODUCTION
 EARTHQUAKE REVIEW
BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
Concrete          STRUCTURES
  are CHEAPER AND HEAVIER than others


   but SELECTING AN   ECONOMICAL
Lateral-Force-Resisting System

 is                     difficult!
& not with
    STRUCTURAL SYSTEMS



GOOD ENGINEERING =   SAFE/SOUND
       +                   Design
To develop Models



Of an



Advantages:
          Reduces Design Time & Iterations
          Direct Cost Savings
Importance Factors (P                                  ORTLAND                 CEMENT ASSOCIATION)

                                       Importance
        Cost Effectiveness                                                                                          4.53

        Construction Time                                                                                    4.13

      Material Availability                                                                            3.95

        Design Flexibility                                                                            3.89

   Material Delivery Time                                                                         3.83

           Fire Resistance                                                                       3.78

            Seismic Loads                                                                      3.66

               Wind Loads                                                                    3.65

   Contractor Availability                                                              3.46

                Design Tie                                                            3.36

               Appearance                                                            3.31

           Ease of Design                                                       3.17

   Return on Design Fees                                                 2.87

Available Design Software                                    2.53

              Publications                                  2.48

                              0      0.5   1     1.5    2          2.5           3             3.5             4       4.5   5

                                  Mean Rating (1 = not important at all, 5 = very important)
 INTRODUCTION
 EARTHQUAKE REVIEW
BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
FACTORS AFFECTING SHAKING INTENSITY
SEISMICITY IN KARACHI
HAZARD MAP OF PAKISTAN




GSHAP Hazard map (1999)       Revised Hazard map (2006)

                          KARACHI IS ASSIGNED ZONE 2B
LOAD PATH
                                    Horizontal
Diaphragm (Floor and Roof slabs )   Elements


                                    Vertical
      Shear Walls / Frames          Elements



           Foundation


              Soil
LATERAL-FORCE-RESISTING SYSTEMS

                Moment Resisting
                                     Frames
                 Frame System


Resistance to    Building Frame
                                   Shear Wall
Lateral Loads        System

                                     Frames
                                   (25% Lateral
                                      Load)
                  Dual System

                                   Shear Wall
 INTRODUCTION
 EARTHQUAKE REVIEW
 BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
20 Stories

11 Residential   6 Podium      3 Basements
   Stories         Stories

                    Indoor
                                   Retail
                    Games

                   4 Parking     2 Parking
                    Stories       Stories


                    Lobby
Length = 121‟-4”

Width = 120‟-2”



4 Shear Walls
40 Columns
DUAL SYSTEM without Beams




Drop Panel
BUILDING FRAME SYSTEM with Beams




        Beam
Typical Beam Size                   Shear Wall Thickness

                                    18” (Story 1 to 8)
                 24”                15” (Story 9 to 14)
                                    12” (Story 15 to Roof)
        10”
                       Concrete Compressive Strength (f„c )
     Story
                       Beam/Slab        Column/Shear Wall
 Story 1 to 6             5 ksi                 7 ksi
 Story 7 to 11            4.5 ksi               6 ksi
 Story 12 to 16           4 ksi                 5 ksi
 Story 17 to Roof         3 ksi                 4 ksi
RAFT FOUNDATION (f’c = 5 ksi)


   Dual System              Building Frame
  without Beams           System with Beams



Thickness   Area offset   Thickness   Area offset

  72”          18”          72”          24”
 INTRODUCTION
 EARTHQUAKE REVIEW
 BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
ETABS modelling of
   Dual System without Beams

1st Model
Shear Walls and Columns take lateral loads
                          USED TO DESIGN SHEAR WALL


2nd Model
Shear Walls are replaced by Columns
& 25% Earthquake Load is induced
            COLUMNS ARE DESIGNED USING BOTH MODELS
ETABS modelling of
 Building Frame System with Beams


1st Model
We use compatibility combos
                        USED TO DESIGN COLUMNS


2nd Model
Frames are assigned moment of inertia = 0.01
Shear walls resist all the lateral load
                      USED TO DESIGN SHEAR WALLS
LIVE LOADS (UBC 97)
 Retail         50psf
 Parking        50psf
 Lobby          40psf
 Indoor Games   40psf
 Residential    40psf
 Roof           20psf
Seismic Factors (from UBC 97)
Ct   (Concrete Structure)                           0.03

Overstrength Factor “R” (Dual system)               6.5

Overstrength Factor “R” (Building Frame system)     5.5
Soil Profile Type (Very Dense Soil and Soft Rock)   Sc

Seismic Zone Factor “Z”     (2B)                    0.20

Importance Factor “I”                               1

Omega Factor (System Overstrength Factor) “ΩO”      2.8

Seismic Coefficient “Ca”                            0.24

Seismic Coefficient “Cv”                            0.32

Dead load Multiplier (0.5   x Ca x I)               0.12
 INTRODUCTION
 EARTHQUAKE REVIEW
 BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
Cost Percentage of Dual System without Beams
            Shear wall
             14.1%


   Column
   15.6%
                                    Slabs
                                   55.4%

   Foundation
    10.5%
              Beams
               4.4%
Cost Percentage of Building Frame System with Beams
                                  Slabs
      Shear wall                  12.7%
       25.9%



                                          Beams
                                          24.5%
     Column
    11.8%
                     Foundation
                      25.1%
Cost Comparison of Different Elements


                            70

                            60
Cost (Rupees in millions)




                            50

                            40

                            30

                            20

                            10

                             0
                                 Slabs & Beams   Foundation      Columns      Shear walls
                             Dual System without beams   Building Frame System with beams
Cost Comparison of Systems

                            120


                            100
Cost (Rupees in millions)




                             80


                             60
                                               109

                             40                                           80


                             20


                              0
                                  Dual System without Beams   Building Frame System with Beams
Cost Comparison of all six Systems
                            140


                            120
                                                             Moment Resisting System
                                                             with Beams
Cost (Rupees in millions)




                            100                              Building Frame System
                                                             with Beams
                             80                              Dual System with Beams

                                                             Moment Resisting System
                             60                              without Beams
                                                             Dual System without
                             40                              Beams
                                                             Building Frame System
                                                             without Beams
                             20


                              0
Comparison in Ratio of all six Systems


                                           1.79
                                    1.69
                                                  Moment Resisting System
                                                  with Beams
                             1.37                 Building Frame System
                      1.32
               1.24                               with Beams
                                                  Dual System with Beams
         1
Ratios




                                                  Moment Resisting System
                                                  without Beams
                                                  Dual System without
                                                  Beams
                                                  Building Frame System
                                                  without Beams
Final Year Project Presentation

Mais conteúdo relacionado

Mais procurados

Self compacting concrete report
Self compacting concrete reportSelf compacting concrete report
Self compacting concrete report
BudhramKamait1
 

Mais procurados (20)

Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)
 
project final year civil
project final year civilproject final year civil
project final year civil
 
Self compacting concrete report
Self compacting concrete reportSelf compacting concrete report
Self compacting concrete report
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
A report on use of waste plastic in concrete
A report on use of waste plastic in concreteA report on use of waste plastic in concrete
A report on use of waste plastic in concrete
 
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
ANALYSIS AND DESIGN OF MULTI STOREY (G+5) COMMERCIAL BUILDING BY STAAD PRO AN...
 
Analysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingAnalysis of g+3 rcc storied building
Analysis of g+3 rcc storied building
 
Project
ProjectProject
Project
 
Design and Analysis of Building using Etabs
Design and Analysis of Building using EtabsDesign and Analysis of Building using Etabs
Design and Analysis of Building using Etabs
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro. Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro.
 
residential buliding by stadd pro
residential buliding by stadd proresidential buliding by stadd pro
residential buliding by stadd pro
 
Staad.Pro Training Report or Summer Internship
Staad.Pro Training Report or Summer Internship  Staad.Pro Training Report or Summer Internship
Staad.Pro Training Report or Summer Internship
 
Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building
 
Artificial intelligence in civil engineering
Artificial intelligence in civil engineering Artificial intelligence in civil engineering
Artificial intelligence in civil engineering
 
Recycled Aggregate Concrete
Recycled Aggregate Concrete  Recycled Aggregate Concrete
Recycled Aggregate Concrete
 
Plastic roads report
Plastic roads report Plastic roads report
Plastic roads report
 
Design project
Design projectDesign project
Design project
 
Seismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water TankSeismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water Tank
 

Destaque

Final ppt of project
Final ppt of projectFinal ppt of project
Final ppt of project
Ruchi Gulati
 
Presentation on project report
Presentation on project reportPresentation on project report
Presentation on project report
ramesh_x
 
How to Run a Board Meeting: Sample Slide Deck
How to Run a Board Meeting: Sample Slide DeckHow to Run a Board Meeting: Sample Slide Deck
How to Run a Board Meeting: Sample Slide Deck
Jesus Rodriguez
 
Board of Directors Presentation
Board of Directors PresentationBoard of Directors Presentation
Board of Directors Presentation
Dwight Darby
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management ppt
Andreea Usatenco
 
Software engineering presentation
Software engineering presentationSoftware engineering presentation
Software engineering presentation
MJ Ferdous
 

Destaque (20)

Final Year Project Presentation
Final Year Project PresentationFinal Year Project Presentation
Final Year Project Presentation
 
Final ppt of project
Final ppt of projectFinal ppt of project
Final ppt of project
 
Final Year Project Presentation
Final Year Project PresentationFinal Year Project Presentation
Final Year Project Presentation
 
Presentation on project report
Presentation on project reportPresentation on project report
Presentation on project report
 
Final Year Project
Final Year ProjectFinal Year Project
Final Year Project
 
Board reporting template
Board reporting templateBoard reporting template
Board reporting template
 
How to Run a Board Meeting: Sample Slide Deck
How to Run a Board Meeting: Sample Slide DeckHow to Run a Board Meeting: Sample Slide Deck
How to Run a Board Meeting: Sample Slide Deck
 
2010 sample board presentation
2010 sample board presentation2010 sample board presentation
2010 sample board presentation
 
Encryption
EncryptionEncryption
Encryption
 
Automatic Toll Collection
Automatic Toll Collection Automatic Toll Collection
Automatic Toll Collection
 
Project ppt presentation (1)
Project ppt presentation (1)Project ppt presentation (1)
Project ppt presentation (1)
 
Fyp
FypFyp
Fyp
 
Project of Solar ppt
Project of Solar pptProject of Solar ppt
Project of Solar ppt
 
Final Year Project Presentation
Final Year Project Presentation Final Year Project Presentation
Final Year Project Presentation
 
Final year project proposal
Final year project proposalFinal year project proposal
Final year project proposal
 
Board of Directors Presentation
Board of Directors PresentationBoard of Directors Presentation
Board of Directors Presentation
 
Introduction To Software Engineering
Introduction To Software EngineeringIntroduction To Software Engineering
Introduction To Software Engineering
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management ppt
 
Software engineering presentation
Software engineering presentationSoftware engineering presentation
Software engineering presentation
 
Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013
Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013
Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013
 

Semelhante a Final Year Project Presentation

Structural Robustness against Accidents
Structural Robustness against AccidentsStructural Robustness against Accidents
Structural Robustness against Accidents
Franco Bontempi Org Didattica
 
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
Roshni Ramakrishnan
 

Semelhante a Final Year Project Presentation (20)

Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed AnwarCost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
 
Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...
Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...
Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...
 
Động lực học công trình
Động lực học công trìnhĐộng lực học công trình
Động lực học công trình
 
Changes in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdfChanges in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdf
 
COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...
COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...
COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...
 
Direct displacement design_methodology_for_woodframe_buildings_
Direct displacement design_methodology_for_woodframe_buildings_Direct displacement design_methodology_for_woodframe_buildings_
Direct displacement design_methodology_for_woodframe_buildings_
 
Structural Robustness against Accidents
Structural Robustness against AccidentsStructural Robustness against Accidents
Structural Robustness against Accidents
 
Reliability Analysis of Reinforced Concrete Shallow Footings Designed Using B...
Reliability Analysis of Reinforced Concrete Shallow Footings Designed Using B...Reliability Analysis of Reinforced Concrete Shallow Footings Designed Using B...
Reliability Analysis of Reinforced Concrete Shallow Footings Designed Using B...
 
Introduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsIntroduction to Pavement Design Concepts
Introduction to Pavement Design Concepts
 
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
 
Progressive collapse
Progressive collapseProgressive collapse
Progressive collapse
 
Seismic Performance of Flat Slab Structures Under Static and Dynamic Loads
Seismic Performance of Flat Slab Structures Under Static and Dynamic LoadsSeismic Performance of Flat Slab Structures Under Static and Dynamic Loads
Seismic Performance of Flat Slab Structures Under Static and Dynamic Loads
 
Structural design including disaster (wind & cyclone land slide_eq_ resistan...
Structural design including disaster (wind & cyclone  land slide_eq_ resistan...Structural design including disaster (wind & cyclone  land slide_eq_ resistan...
Structural design including disaster (wind & cyclone land slide_eq_ resistan...
 
Geotechnical risk on large scale infrastructure projects
Geotechnical risk on large scale infrastructure projectsGeotechnical risk on large scale infrastructure projects
Geotechnical risk on large scale infrastructure projects
 
Sr. Larbi Sennour
Sr. Larbi SennourSr. Larbi Sennour
Sr. Larbi Sennour
 
Ap24275280
Ap24275280Ap24275280
Ap24275280
 
3D printing technology in building construction
3D printing technology in building construction3D printing technology in building construction
3D printing technology in building construction
 
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
 
W04408116121
W04408116121W04408116121
W04408116121
 
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
 

Último

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 

Último (20)

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 

Final Year Project Presentation

  • 1. Design Cost Comparison 2B without beams & with beams. Group members: GHULAM MUSTAFA VIRA - 136 MUHAMMAD ISMAIL YAR - 154 FARHAN JAMEEL - 101 JAMHOOR ALAM - 158 NAJEEBULLAH - 194 TARIQ AMIN - 173 Civil Engineering Dept. 2009 BATCH
  • 2.
  • 3.  INTRODUCTION  EARTHQUAKE REVIEW BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 4. Concrete STRUCTURES are CHEAPER AND HEAVIER than others but SELECTING AN ECONOMICAL Lateral-Force-Resisting System is difficult!
  • 5. & not with STRUCTURAL SYSTEMS GOOD ENGINEERING = SAFE/SOUND + Design
  • 6. To develop Models Of an Advantages:  Reduces Design Time & Iterations  Direct Cost Savings
  • 7. Importance Factors (P ORTLAND CEMENT ASSOCIATION) Importance Cost Effectiveness 4.53 Construction Time 4.13 Material Availability 3.95 Design Flexibility 3.89 Material Delivery Time 3.83 Fire Resistance 3.78 Seismic Loads 3.66 Wind Loads 3.65 Contractor Availability 3.46 Design Tie 3.36 Appearance 3.31 Ease of Design 3.17 Return on Design Fees 2.87 Available Design Software 2.53 Publications 2.48 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 Mean Rating (1 = not important at all, 5 = very important)
  • 8.  INTRODUCTION  EARTHQUAKE REVIEW BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 11. HAZARD MAP OF PAKISTAN GSHAP Hazard map (1999) Revised Hazard map (2006) KARACHI IS ASSIGNED ZONE 2B
  • 12. LOAD PATH Horizontal Diaphragm (Floor and Roof slabs ) Elements Vertical Shear Walls / Frames Elements Foundation Soil
  • 13. LATERAL-FORCE-RESISTING SYSTEMS Moment Resisting Frames Frame System Resistance to Building Frame Shear Wall Lateral Loads System Frames (25% Lateral Load) Dual System Shear Wall
  • 14.  INTRODUCTION  EARTHQUAKE REVIEW  BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 15. 20 Stories 11 Residential 6 Podium 3 Basements Stories Stories Indoor Retail Games 4 Parking 2 Parking Stories Stories Lobby
  • 16. Length = 121‟-4” Width = 120‟-2” 4 Shear Walls 40 Columns
  • 17. DUAL SYSTEM without Beams Drop Panel
  • 18. BUILDING FRAME SYSTEM with Beams Beam
  • 19. Typical Beam Size Shear Wall Thickness 18” (Story 1 to 8) 24” 15” (Story 9 to 14) 12” (Story 15 to Roof) 10” Concrete Compressive Strength (f„c ) Story Beam/Slab Column/Shear Wall Story 1 to 6 5 ksi 7 ksi Story 7 to 11 4.5 ksi 6 ksi Story 12 to 16 4 ksi 5 ksi Story 17 to Roof 3 ksi 4 ksi
  • 20. RAFT FOUNDATION (f’c = 5 ksi) Dual System Building Frame without Beams System with Beams Thickness Area offset Thickness Area offset 72” 18” 72” 24”
  • 21.  INTRODUCTION  EARTHQUAKE REVIEW  BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 22. ETABS modelling of Dual System without Beams 1st Model Shear Walls and Columns take lateral loads USED TO DESIGN SHEAR WALL 2nd Model Shear Walls are replaced by Columns & 25% Earthquake Load is induced COLUMNS ARE DESIGNED USING BOTH MODELS
  • 23. ETABS modelling of Building Frame System with Beams 1st Model We use compatibility combos USED TO DESIGN COLUMNS 2nd Model Frames are assigned moment of inertia = 0.01 Shear walls resist all the lateral load USED TO DESIGN SHEAR WALLS
  • 24. LIVE LOADS (UBC 97) Retail 50psf Parking 50psf Lobby 40psf Indoor Games 40psf Residential 40psf Roof 20psf
  • 25. Seismic Factors (from UBC 97) Ct (Concrete Structure) 0.03 Overstrength Factor “R” (Dual system) 6.5 Overstrength Factor “R” (Building Frame system) 5.5 Soil Profile Type (Very Dense Soil and Soft Rock) Sc Seismic Zone Factor “Z” (2B) 0.20 Importance Factor “I” 1 Omega Factor (System Overstrength Factor) “ΩO” 2.8 Seismic Coefficient “Ca” 0.24 Seismic Coefficient “Cv” 0.32 Dead load Multiplier (0.5 x Ca x I) 0.12
  • 26.  INTRODUCTION  EARTHQUAKE REVIEW  BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 27. Cost Percentage of Dual System without Beams Shear wall 14.1% Column 15.6% Slabs 55.4% Foundation 10.5% Beams 4.4%
  • 28. Cost Percentage of Building Frame System with Beams Slabs Shear wall 12.7% 25.9% Beams 24.5% Column 11.8% Foundation 25.1%
  • 29. Cost Comparison of Different Elements 70 60 Cost (Rupees in millions) 50 40 30 20 10 0 Slabs & Beams Foundation Columns Shear walls Dual System without beams Building Frame System with beams
  • 30. Cost Comparison of Systems 120 100 Cost (Rupees in millions) 80 60 109 40 80 20 0 Dual System without Beams Building Frame System with Beams
  • 31.
  • 32. Cost Comparison of all six Systems 140 120 Moment Resisting System with Beams Cost (Rupees in millions) 100 Building Frame System with Beams 80 Dual System with Beams Moment Resisting System 60 without Beams Dual System without 40 Beams Building Frame System without Beams 20 0
  • 33. Comparison in Ratio of all six Systems 1.79 1.69 Moment Resisting System with Beams 1.37 Building Frame System 1.32 1.24 with Beams Dual System with Beams 1 Ratios Moment Resisting System without Beams Dual System without Beams Building Frame System without Beams