2. The First foundation of KOC GROUP
COMPANY combining almost 50
years professional experience with its
futuristic investments and reinforcing
its highly qualified proficiency level with
its staff was initiated in 1969 under
the name of UNLIMITED POWER
COMPANY in Istanbul . Since the
year 2018, KOC GROUP joined with
KOC GROUP COMPAN has fortified
its sectoral effects and has been
successful with its prospective planning
process, effective management
systems, and technological
development and is still operating
under a highly qualified and motivated
environment in both national and
international businesses.
In this competitive working
environment, we are aiming to meet
each requirements of our customers
as well as overcome our limits with
each experiences with our high-tech
engineering and knowledge, capacity
and experiences accumulated over the
years , our customer-oriented working
style, flexible administrative approach
and proven management procedures
as well as our flawless experience
constructed with idea of highly-
qualified performance.
Koc Group Company as pioneer
creating a value in the sector is
designing its business with an
intention of using the natural resources
productively, protecting and respecting
the environment as our duty, pioneering
the embracement of these values
by the next generations , managing
the environmental effects caused
by the sector after their detection
and complying with the work safety,
environment and quality policies in
our projects in line with the national
and international laws, legislations and
regulations.
Koc Group Company takes care of
and embracing your projects as its
own by realizing Turnkey Construction,
Mechanical and Electrical system
applications successfully within lost
of qualified international and national
projects including in our major
activities. We are aiming to be the one
and only undertaking company in
turnkey construction projects. We are
planning to support your achievement
together hand in hand.
ABOUT OUR
COMPANY
AIMING LONG
TERM BUSINESS
PARTNERSHIP
WE ARE HERE
TO ACQUIRE THE
BEST IN FUTURE
OUR AIM IS
NOT ONLY MEET
REQUIREMENTS
BUT GO BEYOND
3. FOUNDED IN
1969
AN
EXPERIENCE
OVER
50YEARS
IN MEP
CONTRACTING
IN 3 CONTINENTS &
10 COUNTRIES
PERFORMS IN
MEP CONTRACTING
AND 5 OTHER
SEGMENTS
Project Management Renewable Energy Recycling
Turn-Key Construction
Low Voltage Panel Production
Electrical & Mechanical
Contracting
Operation &
Maintenance
4. k More than 50 Years of Experience
k Over 200 Completed Projects
k 15 Hotels & 2 Int’l Hospital, Subways Tunnels
experience with more than 1 mn sqm
k More than 10 years in Asia
k Approximately 1,000+ Direct Employees,
k Total Workforce Between 1000-1500 with labour
Supply
k US$178.5 mn 2018 FY revenue
k The goal is to become a contractor at ENR
international Top 250
k Experience in LEED and BREEAM Certified Projects
k ISO 9001, ISO 14001, Certified
TÜRKIYE
CEZAYİR
ÖZBEKISTAN
UGANDA
RUSYA
KENYA
LIBYA
UKRAYNA
UAE
TÜRKMENİSTAN
Ongoing Projects
Turkey, Turkmenistan, Uzbekistan, Iran (Trade)
Completed Projects
Turkey, Turkmenistan, Uzbekistan, Libya, Algeria, Russia
5. 2
1,8
1,6
1,4
1,2
1
0,8
0,6
0,4
0,2
0 2016
$112.000.000
The Revenue belongs to Koc Group Company Revenues - USD
$121.000.000
$178.500.000
$127.000.000
$170.000.000
2017 2018 2019 2020 2021
170.000.000
USD
400.000.000
USD
250.000.000
USD
127.000.000
USD
2020 2022 TARGET
2021
2019
$250.000.000
KOC
CONSTRUCTION IN
NUMBERS
6. EXPERIENCED TEAM IN HOUSING, SHOPPING MALL,
RESIDENCE, OFFICE, HOTEL, HOSPITAL, MARINA,
POWER PLANT, RENEWABLE ENERGY SYSTEMS,
PUBLIC BUILDINGS, CITY LIGHTING AND
SIGNALIZATION WORKS, AND MORE...
MORE
THAN 200
PROJETS
14. METRO
PLAZA
BUSINESS
CENTRE
LOYIHA MAYDONI............................................ 12.121m2
SAVDO MAYDONI (1.QAVAT)............................ 4.445m2
OFIS MAYDONI (2-20.QAVATLAR).................... 58.398m2
TEXNIK MAYDONLAR - SIRKULATSIYA............ 5.316m2
AVTOTURARGAH............................................. 19.200m2
AVTOTURARGAH MASHINA SONI..................... 651 ta
UMUMIY QURILISH MAYDONI........................... 87.359m2
16. LOT 2 E
BLOCK
CATEGORY: BUSINESS CENTER
PROJECT YEAR: 2021-2022
MAIN CONTRATOR: LOTUS GAS INVEST
PROJECT LOCATION: TASHKENT/UZBEKISTAN
PROJECT AREA: 211.000 M2
SERVICE GIVEN: TURNKEY
17. 5 XONALI 180 m2
TERAS 105.1 m2
JAMI 285.1 m2
5 XONALI 180 m2
TERAS 105.1 m2
JAMI 285.1 m2
5 XONALI 161 m2
TERAS 105.1 m2
JAMI 266.1 m2
5 XONALI 158 m2
TERAS 105.1 m2
JAMI 263.1 m2
PENTHOUSE QAVAT 3D TASVIR
2. QAVAT (YIGILISH) 3D TASVIR
20. CATEGORY: BUSINESS CENTER
PROJECT YEAR: 2022-….
MAIN CONTRATOR: …..
PROJECT LOCATION: TASHKENT/UZBEKISTAN
PROJECT AREA: 211.080 M2
SERVICE GIVEN: TURNKEY
DARXAN
BUSINESS
CENTER
21. CATEGORY: TRADE CENTER
PROJECT YEAR: 2021-2022
MAIN CONTRATOR: MIMAR GROUP
PROJECT LOCATION: TASHKENT/UZBEKISTAN
PROJECT AREA: 1.000.000 M2
SERVICE GIVEN: TURNKEY
SERGILI
INDEX
28. SHYMKENT
TOWER
CATEGORY: BUSINESS & TRADE CENTER
PROJECT YEAR: 2022-2024
MAIN CONTRATOR: SOUTH OIL
PROJECT LOCATION: SHYMKENT/KAZAKHISTAN
PROJECT AREA: 108.699 M2
SERVICE GIVEN: TURNKEY
30. HILTON
TASHKENT
CATEGORY: HOTEL & CONGRESS CENTER
PROJECT YEAR: 2018-2019
MAIN CONTRACTOR: AKFA DREAM WORLD LLC
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 160.000 M²
32. PIRAMIT
TOWER& MALL
CATEGORY: SHOPPING MALL AND BUSINESS CENTER
PROJECT YEAR: 2021-2024
MAIN CONTRACTOR: PIRAMIT GLOBAL
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 160.000 M²
ТИП ЗДАНИЯ: БИЗНЕС ЦЕНТР И ТРЦ
ПРОЕКТНЫЙ ПЕРИОД: 2021-2024
ГЕНПОДРЯДНАЯ ОРГАНИЗАЦИЯ: PIRAMIT GLOBAL
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ /
УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 160.000 м²
33. TASHKENT CITY LOT 3
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2019-2020
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАЙПЕР ПАРТНЕР
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 228.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: SHOPPING MALL
PROJECT YEAR: 2019-2020
MAIN CONTRACTOR: HYPER PARTNER
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 228.000 M²
SERVICES GIVEN: CONSTRUCTION
TASHKENT CITY LOT 7
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2019-2020
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АКФА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ
ПРОЕКТА: 85.000 m³ / 227.000 m²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: RESIDENTIAL BUILDINGS
PROJECT YEAR: 2019-2020
MAIN CONTRACTOR: AKFA
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 85.000 M³ / 227.000 M²
SERVICES GIVEN: CONSTRUCTION
34. MODERA
TOWERS
CATEGORY: SHOPPING MALL AND RESIDANCE
PROJECT YEAR: 2021-2023
MAIN CONTRACTOR: TAKO SALES
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 72.000 M²
SERVICES GIVEN: CONSTRUCTION
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР И РЕЗИДЕНЦИЯ
ПРОЕКТНЫЙ ПЕРИОД: 2021-2023
КОМПАНИЯ -РАБОТОДАТЕЛЬ: TAKO SALES
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ /
УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 72.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
35. SEOL BOULEVARD
ТИП ЗДАНИЯ: УМНЫЙ ГОРОД
ПРОЕКТНЫЙ ПЕРИОД: 2020-продолжается
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ООО АКФА ДРИМ ВОРЛД
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 42.550 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: SMART CITY
PROJECT YEAR: 2020-ONGOING
MAIN CONTRACTOR: AKFA DREAM WORLD LLC PROJECT
LOCATION: TASHKENT/ UZBEKISTAN
PROJECT AREA: 42.550 M²
SERVICES GIVEN: CONSTRUCTION WORKS
TASHKENT CITY LOT 2
ТИП ЗДАНИЯ: ПРОЕКТ СМЕШАННОГО ТИПА
ПРОЕКТНЫЙ ПЕРИОД: 2019-2020
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЛОТУС ГАЗ ИНВЕСТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 220.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
ЖИЛЫХ ЗДАНИЙ БЛОКИ А,Б,С, ОТЕЛЬ РАДИССОН БЛОК Д
CATEGORY: MIXED USED PROJECT
PROJECT YEAR: 2019-2020
MAIN CONTRACTOR: LOTUS GAZ INVEST
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 220.000 M²
SERVICES GIVEN: CONSTRUCTION OF RESIDENTIAL BUILDINGS
BLOCKS A,B,C, SHOPPING MALL BLOCK D
36. LOT-1 SOCIAL FACILITY
ТИП ЗДАНИЯ: СОЦИАЛЬНЫЙ ОБЪЕКТ
ПРОЕКТНЫЙ ПЕРИОД: 2020-2021
КОМПАНИЯ -РАБОТОДАТЕЛЬ: DISCOVER INVEST
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 2000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ПОД КЛЮЧ
CATEGORY: SOCIAL FACILITY
PROJECT YEAR: 2020-2021
MAIN CONTRACTOR: DISCOVER INVEST
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 2000 M²
SERVICES GIVEN: TURNKEY
TEMIR BUSINESS CENTER
ТИП ЗДАНИЯ : БИЗНЕС ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД : 2021-2022
КОМПАНИЯ -РАБОТОДАТЕЛЬ: IMP NEW PAY
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 25.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ : ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: BUSINESS CENTER
PROJECT YEAR: 2021-2022
MAIN CONTRACTOR: IMP NEW PAY
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 25.000 M²
SERVICES GIVEN: CONSTRUCTION
37. BUKHARA GOVERNORSHIP’S HOTEL
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2018-2019
КОМПАНИЯ-РАБОТОДАТЕЛЬ: УПРАВЛЕНИЕ СТРОИТЕЛЬСТВА
ОБЛАСТИ БУХАРА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: БУХАРА / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 1500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2018-2019
MAIN CONTRACTOR: BUKHARA REGION CONSTRUCTION
DIRECTORATE
PROJECT LOCATION: BUKHARA / UZBEKISTAN
PROJECT AREA: 1500 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
MEGA BUKHARA SHOPPING MALL
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2019
КОМПАНИЯ -РАБОТОДАТЕЛЬ: МУСТАХКАМ КУРИЛИШ
ДЕВЕЛОПМЕНТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: БУХАРА / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 100.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: SHOPPING MALL
PROJECT YEAR: 2019
MAIN CONTRACTOR: MUSTAHKAM QURILISH DEVELOPMENT
PROJECT LOCATION: BUKHARA / UZBEKİSTAN
PROJECT AREA: 100.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
38. PRESIDENT SCHOOL
ТИП ЗДАНИЯ: ШКОЛА
ПРОЕКТНЫЙ ПЕРИОД: 2021-2021
КОМПАНИЯ -РАБОТОДАТЕЛЬ: DISCOVER INVEST
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 9000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: SCHOOL
PROJECT YEAR: 2021-2021
MAIN CONTRACTOR: DISCOVER INVEST
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 9000 M²
SERVICES GIVEN: CONSTRUCTION
HUAWEI OFFICE
ТИП ЗДАНИЯ: РЕНОВАЦИЯ
ПРОЕКТНЫЙ ПЕРИОД: 2020 -
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАЙПЕР ПАРТНЕР
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 1600 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: RENOVATION
PROJECT YEAR: 2020 -
MAIN CONTRACTOR: HUAWEİ
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 1600 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
39. ALAKA VAZIRLIGI VILLAS
ТИП ЗДАНИЯ : ВИЛЛЫ
ПРОЕКТНЫЙ ПЕРИОД : 2021-2021
КОМПАНИЯ -РАБОТОДАТЕЛЬ: DISCOVER
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 17.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ : ПОД КЛЮЧ
CATEGORY: VILLAS
PROJECT YEAR: 2021-2021
MAIN CONTRACTOR: DISCOVER
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 17.000 M²
SERVICES GIVEN: TURNKEY
UNIVERSITY PROJECT
ТИП ЗДАНИЯ: УНИВЕРСИТЕТ
ПРОЕКТНЫЙ ПЕРИОД: 2021-2022
КОМПАНИЯ -РАБОТОДАТЕЛЬ: MIMAR DEVELOPMENT
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТАШКЕНТ / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 250.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: UNIVERSITY
PROJECT YEAR: 2021-2022
MAIN CONTRACTOR: MIMAR DEVELOPMENT
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 250.000 M²
SERVICES GIVEN: CONSTRUCTION
40. HAMPTON BY HILTON
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2020 -
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АКФА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: TASHKENT / UZBEKİSTAN
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 12.000 м2
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2020 -
MAIN CONTRACTOR: AKFA
PROJECT LOCATION: TASHKENT / UZBEKİSTAN
PROJECT AREA: 12.000 M2
SERVICES GIVEN: TURNKEY CONSTRUCTION
BUKHARA WYNDHAM HOTEL
ТИП ЗДАНИЯ: WYNDHAM ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2020-продолжается
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ООО АКФА ДРИМ ВОРЛД
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: БУХАРА / УЗБЕКИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 33.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: WYNDHAM HOTEL
PROJECT YEAR: 2020-ONGOING
MAIN CONTRACTOR: AKFA DREAM WORLD LLC PROJECT
PROJECT LOCATION: BUKHARA / UZBEKISTAN
PROJECT AREA: 33.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
41. MASLAK 1453 SHERATON HOTEL
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АГАОГЛУ / АКДЕНИЗ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: САРЫЕР / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 800.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2018-2020
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДОРУК ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 75.000 м2
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2015
MAIN CONTRACTOR: AĞAOĞLU / AKDENİZ CONSTRUSTİON
PROJECT LOCATION: SARIYER / İSTANBUL / TURKEY
PROJECT AREA: 800.000 M²
SERVICES GIVEN: CONSTRUCTION WORKS
CATEGORY: HOTEL
PROJECT YEAR: 2018-2020
MAIN CONTRACTOR: DORUK CONSTRUCTION
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 75.000 M2
SERVICES GIVEN: CONSTRUCTION
42. NUROL LIFE TOWER SINPAS BOSPHORUS CITY
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2011-2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ИЛЬХАН ЙИЛДИРИМ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ, ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 220.000 м2
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2009
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ / СИНПАШ
ГРУПП
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 46.000 м2
ВЫПОЛНЕННЫЕ РАБОТЫ: ЖЕЛЕЗОБЕТОННЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2011-2014
MAIN CONTRACTOR: ILHAN YILDIRIM INSAAT
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 220.000 M2
SERVICES GIVEN: CONSTRUCTION
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2009
MAIN CONTRACTOR: CİHAN CONSTRUCTİON/ SINPAS GYO
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 46.000 M2
SERVICES GIVEN: CONSTRUCTION
43. ARZUW HOTEL PUBLIC PROJECT
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 50.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОБЩЕСТВЕННЫЙ ПРОЕКТ
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 6400 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2010
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 50.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: PUBLIC PROJECT
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 6400 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
44. SOWDA CENTER SHOPPING MALL 48 RESIDENTIAL BUILDING
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 2500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 16.400 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY : SHOPPING MALL
PROJECT YEAR : 2017
MAIN CONTRACTOR : POLAT CONSTRUCTION
PROJECT LOCATION :TURKMENISTAN
PROJECT AREA : 2500 M²
SERVICES GIVEN : TURNKEY CONSTRUCTİON
CATEGORY: RESIDENTIAL BUILDING
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 16.400 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
45. NURSERY PROJECT BUSINESS CENTER ONE PROJECT
ТИП ЗДАНИЯ: ОБЩЕСТВЕННЫЙ ПРОЕКТ
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 3600 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ТОРГОВЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 3450 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: PUBLIC PROJECT
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 3600 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
CATEGORY: BUSINESS CENTRE
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 3450 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
46. 72 RESIDENTIAL BUILDING VILLA PROJECT
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 20.800 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 1600 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: RESIDENTIAL BUILDING
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 20.800 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
CATEGORY: RESIDENTIAL BUILDING
PROJECT YEAR: 2017
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION:TURKMENISTAN
PROJECT AREA: 1600 M²
SERVICES GIVEN: TURNKEY CONSTRUCTİON
47. KUWWAT HOTEL KERWEN HOTEL
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2011
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 30.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2012
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 35.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2011
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 30.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: HOTEL
PROJECT YEAR: 2012
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 35.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
48. WATANCY HOTEL ICE MANSION SPORT CENTER
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 40.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 40.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 40.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 40.000 M’
SERVICES GIVEN: TURNKEY CONSTRUCTION
49. PRESIDENT PALACE CHECKPOINT CENTER AKAYLA STATION
ТИП ЗДАНИЯ: АДМИНИСТРАТИВНОЕ ЗДАНИЕ
ПРОЕКТНЫЙ ПЕРИОД: 2009
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 7000 М²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: КОНТРОЛЬНО ПРОПУСКНОЙ ПУНКТ
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.063 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: ADMINISTRATIVE BUILDING
PROJECT YEAR: 2009
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 7000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: CHECKPOINT
PROJECT YEAR: 2014
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.063 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
50. MILITARY ACADEMY HOTEL OGUZKENT
ТИП ЗДАНИЯ: ОБЩЕСТВЕННОЕ ЗДАНИЕ
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 5000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2009
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 40.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: PUBLIC BUILDING
PROJECT YEAR: 2010
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 5000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: HOTEL
PROJECT YEAR: 2009
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 40.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
51. ASHGABAT CITY RESIDENTIAL BUILDING AWAZA SOWHUN COTTAGES
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ПОЛАТ СТРОЙ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 16.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: RESIDENTIAL BUILDING
PROJECT YEAR: 2013
MAIN CONTRACTOR: POLAT CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 16.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
52. TURKMENBASHI 420 STUDENTS
SCHOOL AND NURSERY
ТИП ЗДАНИЯ: ШКОЛА И ДЕТСКИЙ САД
ПРОЕКТНЫЙ ПЕРИОД: 2011
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 11.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: СТРОИТЕЛЬСТВО ПОД КЛЮЧ
CATEGORY: SCHOOL / NURSERY
PROJECT YEAR: 2011
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 11.000 M²
SERVICES GIVEN: TURNKEY CONSTRUCTION
CHEKMEKOY STATE HOSPITAL
ТИП ЗДАНИЯ: БОЛЬНИЦА
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: МИНЗДРАВ ТУРЦИИ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 48.896,92 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: HOSPITAL
PROJECT YEAR: 2015
MAIN CONTRACTOR: MINISTRY OF HEALTH OF TURKEY
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 48.896,92 M²
53. GURPINAR FISHERIES CENTER IFF AROMA FACTORY
ТИП ЗДАНИЯ: ЦЕНТР МОРЕПРОДУКТОВ
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: НАС ИНШААТ / НУХОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ГЮРПЫНАР / СТАМБУЛ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 85.703 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ПРОМЫШЛЕННЫЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ИФФ АРОМА ЭСАНС
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ГЕБЗЕ / КОДЖАЭЛИ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 21.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: FISHERIES ESTATE
PROJECT YEAR: 2015
MAIN CONTRACTOR: NAS CONSTRUCT’ON
NUHOGLU CONSTRUCTION
PROJECT LOCATION: GURPINAR / ISTANBUL / TURKEY
PROJECT AREA: 85.703 M²
CATEGORY: INDUSTRIAL FACILITY
PROJECT YEAR: 2014
MAIN CONTRACTOR: IFF AROMA ESANS
PROJECT LOCATION: GEBZE / KOCAELI / TURKEY
PROJECT AREA: 21.000 M²
54. ISTANBUL PALACES SULTANGAZI SCHOOL
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ / СИНПАШ ГРУП
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ХАЛКАЛЫ / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 125.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ШКОЛА
ПРОЕКТНЫЙ ПЕРИОД: 2016
КОМПАНИЯ -РАБОТОДАТЕЛЬ: БИСКОН ЯПЫ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 16.734 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESIDENTIAL BUILDINGS
PROJECT YEAR: 2013
MAIN CONTRACTOR: CIHAN CONSTRUCTION/SINPAS GYO
PROJECT LOCATION: HALKALI / ISTANBUL / TURKEY
PROJECT AREA: 125.000 M²
CATEGORY: SCHOOL
PROJECT YEAR: 2016
MAIN CONTRACTOR: BISCON YAPI
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 16.734 M²
55. SANKO HOLDING STORAGE AND
ADMINISTRATIVE BUILDING
SULTANGAZI CULTURAL CENTER
ТИП ЗДАНИЯ: БИЗНЕС ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2007
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 42.500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: КУЛЬТУРНЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: НАС ИНШ / ТАШЯПЫ ИНШ / НУХОГЛУ
ИНШ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СУЛТАНГАЗИ / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 46.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: BUSINESS CENTER
PROJECT YEAR: 2007
MAIN CONTRACTOR: HATIPOGLU CONSTRUCTION
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 42.500 M²
CATEGORY: CULTURAL CENTER
PROJECT YEAR: 2014
MAIN CONTRACTOR: NAS CONSTRUCTION/TASYAPI
CONSTRUCTION / NUHOGLU CONSTRUCTION
PROJECT LOCATION: SULTANGAZI / ISTANBUL / TURKEY
PROJECT AREA: 46.000 M²
56. DAP IST MARINA VIAPORT VENEZIA
ТИП ЗДАНИЯ: ЖИЛЫЕ ДОМА / ТРЦ / ПРИСТАНЬ
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДАП ЯПЫ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 480.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС / ТРЦ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ФЕРЯПЫ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ЕНИБОСНА / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 210.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS / SHOPPİNG MALL / MARİNA
PROJECT YEAR: 2015
MAIN CONTRACTOR: DAP YAPI
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 480.000 M²
CATEGORY: RESİDENTİAL BUİLDİNGS / SHOPPING MALL
PROJECT YEAR: 2013
MAIN CONTRACTOR: FERYAPI
PROJECT LOCATION: YENIBOSNA / İSTANBUL / TURKEY
PROJECT AREA: 210.000 M²
57. ISTWEST EGE VALLEY
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС / ТРЦ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ФЕРЯПЫ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ЕНИБОСНА / СТАМБУЛ /
ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 210.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017-2018
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СИНПАШ ГЙО
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: АНКАРА / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 171.500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS / SHOPPING MALL
PROJECT YEAR: 2013
MAIN CONTRACTOR: FERYAPI
PROJECT LOCATION: YENIBOSNA / İSTANBUL / TURKEY
PROJECT AREA: 210.000 M²
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2017-2018
MAIN CONTRACTOR: SINPAS GYO
PROJECT LOCATION: ANKARA / TURKEY
PROJECT AREA: 171.500 M²
58. KUYUMCU KENT SINPAS BOSPHORUS CITY
ТИП ЗДАНИЯ: ОФИС
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 82.400 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2009
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ДЖИХАН ИНШААТ / СИНПАШ ГРУПП
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 46.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: OFFICE
PROJECT YEAR: 2010
MAIN CONTRACTOR: CIHAN CONSTRUCTION
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 82.400 M²
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2009
MAIN CONTRACTOR: CİHAN CONSTRUCTİON/ SINPAS GYO
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 46.000 M²
59. MASLAK 1453 ARÇELIK TV FACTORY
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АГАОГЛУ / АКДЕНИЗ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: САРЫЕР / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 800.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ТВ ФАБРИКА
ПРОЕКТНЫЙ ПЕРИОД: 2017-2018
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АРК КОНСТРАКШН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТЕКИРДАГ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 76.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2015
MAIN CONTRACTOR: AĞAOĞLU / AKDENİZ CONSTRUSTİON
PROJECT LOCATION: SARIYER / İSTANBUL / TURKEY
PROJECT AREA: 800.000 M²
CATEGORY: TV FACTORY
PROJECT YEAR: 2017-2018
MAIN CONTRACTOR: ARK CONSTRUCTION
PROJECT LOCATION: TEKIRDAG / TURKEY
PROJECT AREA: 76.000 M²
60. TURK TRACTOR FACTORY TUZLA VIAPORT MARINA
ТИП ЗДАНИЯ: ПРОМЫШЛЕННЫЙ ОБЪЕКТ
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АРК КОНСТРАКШН / КОЧ ХОЛДИНГ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: САКАРЯ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 110.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ПРИСТАНЬ ДЛЯ ЯХТ / ОТЕЛЬ / ТЦ/
ТЕМАТИЧЕСКИЙ ПАРК
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: БАЙРАКТАР А..Ш.
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ/ ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 600.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: İNDUSTRIAL FACILITY
PROJECT YEAR: 2014
MAIN CONTRACTOR: ARK CONSTRUCTION / KOÇ HOLDING
PROJECT LOCATION: SAKARYA / TURKEY
PROJECT AREA: 110.000 M²
CATEGORY: MARİNA / HOTEL / SHOPPİNG MALL / THEMEPARK
PROJECT YEAR: 2015
MAIN CONTRACTOR: BAYRAKTAR INC.
PROJECT LOCATION: İSTANBUL / TURKEY
PROJECT AREA: 600.000 M²
61. EGE SIDE MURATBEY CUSTOM
ТИП ЗДАНИЯ: ЖИЛОЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2017-2018
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СИНПАШ ГЙО
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: АНКАРА / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 171.500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ТАМОЖЕННЫЙ ТЕРМИНАЛ
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ИНТЕС А.Ш.
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ЧАТАЛДЖА / СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 200.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: RESİDENTİAL BUİLDİNGS
PROJECT YEAR: 2017-2018
MAIN CONTRACTOR: SINPAS GYO
PROJECT LOCATION: ANKARA / TURKEY
PROJECT AREA: 171.500 M²
CATEGORY: CUSTOMS DIRECTORATE
PROJECT YEAR: 2014
MAIN CONTRACTOR: INTEL INC.
PROJECT LOCATION: CHATALDJA / ISTANBUL / TURKEY
PROJECT AREA: 200.000 M²
62. MARMARAY HIGH SPEED TRAIN STATIONS TURKMENISTAN INTERNATIONAL SEAPORT
ТИП ЗДАНИЯ: ВЫСОКОСКОРОСТНЫЕ ЖЕЛЕЗНОДОРОЖНЫЕ СТАНЦИИ
ПРОЕКТНЫЙ ПЕРИОД: 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ОХЛ КОНСТРАКШН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: СТАМБУЛ / ТУРЦИЯ
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 23.500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ И
ИНЖЕНЕРНЫЕ СИСТЕМЫ
ТИП ЗДАНИЯ: МЕЖДУНАРОДНЫЙ ПОРТ
ПРОЕКТНЫЙ ПЕРИОД: 2017
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНБАШИ / БАЛКАН / ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: НАРУЖНОЕ ОСВЕЩЕНИЕ ПОРТА, ЗДАНИЕ ЛОТА4
И ЛОТА5 РАБОТЫ НВ И СН
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: HIGH SPEED TRAIN STATION
PROJECT YEAR: 2014
MAIN CONTRACTOR: OHL CONSTRUCTION
PROJECT LOCATION: ISTANBUL / TURKEY
PROJECT AREA: 23.500 M²
SERVICES GIVEN: ELECTROMECHANICAL WORKS
CATEGORY: INTERNATIONAL PORT
PROJECT YEAR: 2017
MAIN CONTRACTOR: GAP CONSTRUCTION
PROJECT LOCATION: TURKMENBASHI / BALKANABAD / TURKMENISTAN
PROJECT AREA: PORT LIGHTNING SYSTEM AND LOT 4, LOT 5 M.V./L.V.
SYSTEMS
63. ASHGABAT SHOPPING MALL FANTAN
ТИП ЗДАНИЯ : ТРЦ
ПРОЕКТНЫЙ ПЕРИОД : 2014
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГУДЖУРЛУ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : АШГАБАТ / ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 180.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ : ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ : ДЕКОРАТИВНЫЙ БАССЕЙН
ПРОЕКТНЫЙ ПЕРИОД : 2011-2012
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : АШГАБАТ / ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 20.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ : ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: SHOPPING MALL
PROJECT YEAR: 2014
MAIN CONTRACTOR: GUJURLU
PROJECT LOCATION: ASHGABAT / TURKMENISTAN
PROJECT AREA: 180.000 M²
CATEGORY: DECORATIVE POOL
PROJECT YEAR: 2011-2012
PROJECT LOCATION: ASHGABAT / TURKMENISTAN
PROJECT AREA: 20.000 M2
64. DASOGUZ HOTEL BALKAN HOTEL
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТЕМА ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.200 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: HOTEL
PROJECT YEAR: 2010
MAIN CONTRACTOR: ALPARSLAN CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.000 M²
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: TEMA CONSTRUCTİON
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.200 M²
65. AWAZA HOTEL LEBAP AWAZA HOTEL MARY
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: КАЙЫ КОНСТРАКШН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 18.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЧАКЫР ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 17.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: KAYI CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 18.000 M²
CATEGORY: HOTEL
PROJECT YEAR: 2013
MAIN CONTRACTOR: CAKIR CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 17.000 M²
66. IZGANT SPOR CENTER DASOGUZ CULTURAL CENTER
ТИП ЗДАНИЯ: СПОРТИВНЫЙ КОМПЛЕКС
ПРОЕКТНЫЙ ПЕРИОД: 2012
КОМПАНИЯ -РАБОТОДАТЕЛЬ: МЕРВ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 6000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: КУЛЬТУРНЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2013
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТУРКМЕН БИНА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 8500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: SPORT CENTER
PROJECT YEAR: 2012
MAIN CONTRACTOR: MERV CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 6000 M²
CATEGORY: CULTURAL CENTER
PROJECT YEAR: 2013
MAIN CONTRACTOR: TURKMEN BINA
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 8500 M²
67. BALKANABAD NEBITDAG MUSEUM IZGANT CULTURAL CENTER
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2011
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТЕМА ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 9000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: КУЛЬТУРНЫЙ ЦЕНТР
ПРОЕКТНЫЙ ПЕРИОД: 2010
КОМПАНИЯ -РАБОТОДАТЕЛЬ: МЕРВ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 8500 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
CATEGORY: MUSEUM
PROJECT YEAR: 2011
MAIN CONTRACTOR: TEMA CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 9000 M²
CATEGORY: CULTURAL CENTER
PROJECT YEAR: 2010
MAIN CONTRACTOR: MERV CONSTRUCTION
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 8500 M²
68. HOTEL ARCHABIL HOTEL BALKAN
ТИП ЗДАНИЯ: ОТЕЛЬ
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ТАЗЕДЖАЙ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: АШГАБАТ / ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 33.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: ЭЛЕКТРОМОНТАЖНЫЕ РАБОТЫ
ТИП ЗДАНИЯ: АДМИНИСТРАТИВНОЕ ЗДАНИЕ
ПРОЕКТНЫЙ ПЕРИОД: 2015
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГЛАВНОЕ УПРАВЛЕНИЕ
АВТОМОБИЛЬНЫХ ДОРОГ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОБЩАЯ ПЛОЩАДЬ ПРОЕКТА: 58.000 м²
ВЫПОЛНЕННЫЕ РАБОТЫ: РАБОТЫ ПО ИНЖЕНЕРНЫМ СИСТЕМАМ
CATEGORY: HOTEL
PROJECT YEAR: 2015
MAIN CONTRACTOR: TAZE JAY CONSTRUCTION
PROJECT LOCATION: ASHGABAT / TURKMENISTAN
PROJECT AREA: 33.000 M²
CATEGORY: ADMINISTRATIVE BUILDING
PROJECT YEAR: 2015
MAIN CONTRACTOR: GENERAL DIRECTORATE OF HIGHWAYS
PROJECT LOCATION: TURKMENISTAN
PROJECT AREA: 58.000 M²
SERVICES GIVEN: MECHANICAL WORKS
75. DISTRIBUTION SUBSTATIONS OF THE
TASHKENT CITY PROJECT
TURKMENBASHI INTERNATIONAL
SEAPORT 2 CIRCUIT 100 KV POWER
TRANSMISSION LINE
ТИП ПРОЕКТА: РАСПРЕДЕЛИТЕЛНЫЕ ПОДСТАНЦИИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АКФА
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: УЗБЕКИСТАН
ОПИСАНИЕ ПРОЕКТА: ДВА ТРАНСФОРМАТОРНЫХ И
ДВА РАСПРЕДЕЛИТЕЛЬНЫХ ПОДСТАНЦИЙ
ТИП ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2-Х ЦЕПНАЯ ЛИНИЯ
ЭЛЕКТРОПЕРЕДАЧИ 100 КВ
CATEGORY: DISTRIBUTION SUBSTATIONS
MAIN CONTRACTOR: AKFA
PROJECT LOCATION: UZBEKISTAN
PROJECT EXPLANATION: TWO TRANSFORMER AND
TWO DISTRIBUTION SUBSTATIONS
CATEGORY: POWER TRANSMISSION LINE
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2 CIRCUIT POWER TRANSMISSION LINE
100 KV
76. TURKMENBASHI 110 KV OPEN
SWITCHYARD
TURKMENBASHI INTERNATIONAL
SEAPORT GIS CENTER
ТИП ПРОЕКТА: ОТКРЫТАЯ РАСПРЕДЕЛИТЕЛНАЯ
ПОДСТАНЦИЯ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: ОТКРЫТАЯ РАСПРЕДЕЛИТЕЛЬНАЯ
ПОДСТАНЦИЯ 110 кВ
ТИП ПРОЕКТА: ГАЗОПОРШНЕВАЯ УСТАНОВКА
КОМПАНИЯ -РАБОТОДАТЕЛЬ: АББ ФИНЛЯНДИЯ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 110/35/10 (2*40mVA) УСТАНОВКА И
ПУСКОНАЛАДКА ГПУ
CATEGORY: OPEN SWITCHYARD
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 110KV OPEN SWICHYARD
CATEGORY: GAS INSULATED SWITCHGEAR
MAIN CONTRACTOR: ABB FINLAND
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION 110/35/10 (2*40MVA) GIS MONTAGE
AND COMMISSIONG
77. TURKMENBASI TRANSFORMER
SUBSTATIONS
AWAZA ROAD LIGHTING AND
TRAFFIC SIGNALIZATION SYSTEM
ТИП ПРОЕКТА: ЭЛЕКТРИЧЕСКАЯ ИНФРАСТРУКТУРА
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СТРОИТЕЛЬНЫЙ ОТДЕЛ
ДУЮПЛУ / РАЙОНА БАЛКАН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 35-10 КВ ТРАНСФОРМАТОРНЫЕ
ПОДСТАНЦИИ 2 ШТ.
ТИП ПРОЕКТА: ДОРОЖНОЕ ОСВЕЩЕНИЕ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ХАТИПОГЛУ ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 34 km РАБОТЫ ПО ДОРОЖНОМУ
ОСВЕЩЕНИЮ И СИГНАЛИЗАЦИИ
CATEGORY: ELECTRICAL INFRASTRUCTURE
MAIN CONTRACTOR: CONSTRUCTION DEPARTMENT OF
DUYUPLU/BALKAN DISTRICT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION 2 PCS 35-10KV TRANSFORMER
SUBSTATIONS
CATEGORY: ROAD LIGHTING SYSTEM
MAIN CONTRACTOR: HATIPOGLU
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 34 KM ROADS LIGHTING AND TRAFFIC
SIGNALLING WORKS
78. AWAZA OPEN SWITCHYARD AND
POWER TRANSMISSION LINE
AWAZA 110 KV POWER
TRANSMISSION LINE
ТИП ПРОЕКТА: ОТКРЫТАЯ РАСПРЕДЕЛИТЕЛЬНАЯ
ПОДСТАНЦИЯ И ЛИНИЯ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2-х цепная линия ЭЛЕКТРОПЕРЕДАЧИ
220/110 КВ
ТИП ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2-х цепная линия ВЛ-110кв ЛAН-1 и ЛAН-
2 от «Аваза ДЭС» до подстанции «Новруз» 110/10кВ
CATEGORY: OPEN SWITCHYARD AND POWER TRANSMISSION
LINE
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2 CIRCUIT TRANSMISSION LINE 220/110
KV
CATEGORY: POWER TRANSMISSION LINES
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2 CIRCUIT TRANSMISSION LINE - 110KV
LAN-1 AND LAN-2 FROM AVAZA DES TO THE 110/10 KV
NOVRUZ SUBSTATION
79. GARABOGAZ FERTILIZER
FACTORY GIS CENTER
GARABOGAZ FERTILIZER FACTORY
POWER TRANSMISSION LINE
ТИП ПРОЕКТА: ГАЗОПОРШНЕВЫЕ УСТАНОВКИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 110 KV ГПУ С ТРАНСФОРМАТОРАМИ 110/11KV
2X25 MVA
ТИП ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ГАП ИНШААТ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ 110 КВ
CATEGORY: GAS INSULATED SWITCHGEAR
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 110 KV GIS WITH 110/11KV 2X25 MVA
TRANSFORMERS
CATEGORY: POWER TRANSMISSION LINE
MAIN CONTRACTOR: GAP INSHAAT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 110 KV TRANSMISSION LINE
80. TURKMENBASHI TRANSFORMER
SUBSTATIONS
BEKTAS TRANSFORMER
SUBSTATIONS
ТИП ПРОЕКТА: ТРАНСФОРМАТОРНЫЕ ПОДСТАНЦИИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СТРОИТЕЛЬНЫЙ ОТДЕЛ
ДУЮПЛУ / РАЙОНА БАЛКАН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2Х630 КВА 6/0,4КВ КТП 8 ШТ.
ТИП ПРОЕКТА: ТРАНСФОРМАТОРНЫЕ ПОДСТАНЦИИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: СТРОИТЕЛЬНЫЙ ОТДЕЛ
ДУЮПЛУ / РАЙОНА БАЛКАН
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 2Х630 КВА 10/0,4КВ КТП 15 ШТ.
CATEGORY: TRANSFORMER SUBSTATIONS
MAIN CONTRACTOR: CONSTRUCTION DEPARTMENT OF
DUYUPLU/BALKAN DISTRICT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2X630 KVA 6/0,4KV TRANSFORMER
SUBSTATIONS 8 PCS.
CATEGORY: TRANSFORMER SUBSTATIONS
MAIN CONTRACTOR: CONSTRUCTION DEPARTMENT OF
DUYUPLU/BALKAN DISTRICT
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 2X630 KVA 10/0,4KV TRANSFORMER
SUBSTATIONS 15 PCS
81. BALKAN 35 KV CLOSED
SWITCHGEAR
500 KV DOUBLE CIRCUIT POWER
TRANSMISSION LINE
ТИП ПРОЕКТА: ЗАКРЫТОЕ РАСПРЕДЕЛИТЕЛЬНОЕ
УСТРОЙСТВО 35 КВ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЛОТУС ЭНЕРДЖИ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА : ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: Распределительный центр с
трансформатором 2x6,3 кВА 35/6 кВ. Ячейки 35 кВ 11 шт., ячейки 6 кВ
22 шт., сервисные трансформаторы, аккумулятор и выпрямительная
группа, НВ и панели управления, кабели управления и питания
ТИП ПРОЕКТА: ВОЗДУШНЫЕ ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ
КОМПАНИЯ -РАБОТОДАТЕЛЬ: ЛОТУС ЭНЕРДЖИ
МЕСТОНАХОЖДЕНИЕ ПРОЕКТА: ТУРКМЕНИСТАН
ОПИСАНИЕ ПРОЕКТА: 90 КМ ЛИНИИ ЭЛЕКТРОПЕРЕДАЧИ 500 КВ
CATEGORY: 35 KV CLOSED SWITCHGEAR
MAIN CONTRACTOR: TEMA ENGINEERING
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: ENERGY DISTRIBUTION CENTER WITH
2X6,3KVA 35 / 6KV TRANSFORMER. 35KV CELLS 11 UNITS, 6KV
CELLS 22 UNITS, SERVICE TRANSFORMERS, BATTERY AND
RECTIFIER GROUP, LV AND CONTROL PANELS, CONTROL AND
POWER CABLES
CATEGORY: POWER TRANSMISSION LINE
MAIN CONTRACTOR: LOTUS ENERGY
PROJECT LOCATION: TURKMENISTAN
PROJECT EXPLANATION: 90 KM 500 KV TRANSMISSION LINE