2. Learning objectives
What is an organization and how it works?
Overall structure of the organization.
Fields of work being done over there.
Details of work.
3. Organization
PAC (Pakistan Aeronautical Complex) is situated in KAMRA, Attock.
One of the most developed and advanced working Industry of Pakistan
Manufacturing, maintenance and rebuilding of Aircrafts is being done over here.
4. Structure
The overall structure can be depicted through this diagram: -
PACKAMRA
ARF
APF
AMF
MRF
BASEComesunder Ministryof defence
PAF
5. ARF (AIRCRAFT REBILD FACTORY)
The working sequence is as given below:-
Acceptance Disassemble Depainting
Structurerepair
Assembly
Final Assembly
Flight TestPaint
Ferryout
6.
7. APF (Avionic Production Factory)
Electronics used in the aircrafts
Three main features are: -
1. GPL (Generic Production Line)
2. GTL (Generic Testing Line)
3. ESS (Environment Stress Screening)
8.
9. AMF (Aircraft Manufacturing Factory)
AMF Light MISHAK
AMF Heavy JF-Thunder
Control system includes
Up-down, right left & rolling / inversion
Final Assembly and FTS includes: -
Fuel, pneumatic and hydraulic system
A.C system
Electric Power “ON” check
Flight control test + Landing gear
Avionic Test
Flight Test (by electric signal)
10.
11. MRF (Mirage Rebuilt Factory)
Originated in France in 1953. Pakistan made an agreement in 1962.
Mirage Single Seater Jet Fighter
Mirage Double Seater Training Purposes
Pakistan made a renovation in Mirage by up introducing Radar systems & Steering
systems etc. and named them as Mirage PA 3 & Mirage PA 5.
Specifications: -
Length = 51.05 ft.
Span = 26.97 ft.
Height = 14.76 ft.
Weight = 14990 lb (without fuel)
Take off Weight = 21150-29707 lb
12.
13. It is composed of 38 frames connected together by Ribs & Spars and material of
which body is made of is A24G Aluminium.
System in Mirage includes: -
Hydraulic System, A.C System, Fuel System, Hydromechanics + Hydroelectric System,
Control System, Gear System & Cooling System.
Operating Detail: -
Operate on Brayton Cycle.
Compressor Combustion Chamber Turbine
Fuel: - JP 4
Inspection: -
1. Pre-flight Inspection
2. Through Flight Inspection
3. Post Flight Inspection
16. Flow Chart of ERP
Cleaning
NDT/ Insp
Pre-Machining Metal work
Q
Plating Plasma Welding
Q
Post. Machinhg
Cleaning
NDT/ Insp
Post / Insp
PASS
PASS
FAIL
FAIL
17. Flow Chart of Crack/ Scratch Repair
Cleaning
NDT/ Insp
Heat Treatment
Cleaning Q Metal Work
Welding
Machining Q Metal Work
NDT
Q
HT
Cleaning
NDT
Final Insp
Fail
Fail
Pass
Pass
Pass
18. NDT and Cleaning Facility
NDT Facility Cleaning Facility
Visual/ Optical Testing Chemical Mechanical
Penetrant Testing Chemical removal Dry blasting
Magnetic Testing Oxidation removal Wet blasting
Eddy Current Testing Paint striping Stream blasting
Radiographic Testing Vapour degreasing Ultrasonic blasting
Ultrasonic Testing
19. Quality Assurance
AS (Aerospace Standard)certified
PDCA cycle i.e. Planning, Do, Check, Act
4 main Terminologies are Shall, Should, May, Can
Quality Management Principles
Customer Focus
Leadership
Engagement of people
Process approach
Improvement
Evidence
Relationship Management.
ISO-9000 (International Organization for Standardization)
20. Quality Management Principles
Clauses: -
1. Context of Organization
2. Leadership
3. Quality Shop
4. Planning
5. Support
6. Environment
7. Monitoring Measurement
Deign and Development
Design _____ Prototype ______ CMM Production
22. Quality Policy
“Our Aim is to Overhaul Mirage, Aircraft, Aero Engines, Components/
Accessories and manufacturing of commercial desirable products as per laid
down procedures and regulations to meet all the requirement with
endeavour to continually improve the quality management system by setting
and resetting the quality objectives with employ participation”.
ISO 9001:2015, AS 9100D, ISO 17025 Certified