• Value added
• An activity is value added if and only if three
  conditions are met
1. The customer must be willing to pay for the
   activity
2. The activity must change the product, making it
   closer to the end product that the customer
   wants and will pay
3. The activity must be done right the first time.
• A value added activity is one that either
 (1) directly adds value to the final product or
   (2) directly satisfies the customer
• Just-in-Time rests on two pillars:
• • Value Adding Manufacturing/ lean manufacturing
• • Kaizen/continious improvement
• Value Adding Manufacturing (VAM): a management philosophy of
  continual improvement, through the identification and the
  progressive elimination of all wastes (MUDA in Japanese) in
  manufacturing related activities, i.e. non-value adding activities. A
  value adding activity is:
• • An activity that transforms the product (transformation,
  processing)
• • An activity or a feature of the product that the client is willing to
  pay for
• The technical definition of Lean manufacturing is “A systematic
  approach to identifying and eliminating waste (non-value-added
  activities) through continuous improvement by flowing the product
  at the pull of the customer in pursuit of perfection.”
• Non-value-added activities are activities that
  do NOT change the form, fit, or function of the
  part and activities the customer does not
  want to pay for.
• Value-added activities are activities that
  change the form, fit, or function of the part
  and the customer is willing to pay for them.
• LEAN Manufacturing is applicable to companies ranging
  from the small job shop to large manufacturing enterprises.
  It teaches a systematic approach to eliminating wastes and
  creating flow throughout the enterprise
• Lean manufacturing or lean production, which is often
  known simply as "Lean", is a production practice that
  considers the expenditure of resources for any goal other
  than the creation of value for the end customer to be
  wasteful, and thus a target for elimination. Working from
  the perspective of the customer who consumes a product
  or service, "value" is defined as any action or process that a
  customer would be willing to pay for. Basically, lean is
  centered around creating more value with less work.
• The four goals of Lean manufacturing systems are to:
• Improve quality: To stay competitive in today’s
  marketplace, a company must understand its
  customers' wants and needs and design processes to
  meet their expectations and requirements.
• Reduce time: Reducing the time it takes to finish an
  activity from start to finish is one of the most effective
  ways to eliminate waste and lower costs.
• Reduce total costs: To minimize cost, a company must
  produce only to customer demand. Overproduction
  increases a company’s inventory costs because of
  storage needs.
• Eliminate waste: Waste is any activity that consumes time,
  resources, or space but does not add any value to the product or
  service. There are seven types of waste:
•
• 1). Overproduction (occurs when production should have stopped)
• 2). Waiting (periods of inactivity)
• 3). Transport (unnecessary movement of materials)
• 4). Extra Processing (rework and reprocessing)
• 5). Inventory (excess inventory not directly required for current
  orders)
• 6). Motion (extra steps taken by employees because of inefficient
  layout)
• 7). Defects (do not conform to specifications or expectations)
•   Steps to achieve lean systems
•   The following steps should be implemented to create the ideal lean manufacturing
    system:
•
•    1. Design a simple manufacturing system
•    2. Recognize that there is always room for improvement
•    3. Continuously improve the lean manufacturing system design
•
•   Design a simple manufacturing system
•   A fundamental principle of lean manufacturing is demand-based flow
    manufacturing. In this type of production setting, inventory is only pulled through
    each production center when it is needed to meet a customer’s order. The benefits
    of this goal include:
•   Decreased cycle time
•   Less inventory
•   Increased productivity
•   Increased capital equipment utilization
• There is always room for improvement
• The core of lean is founded on the concept of continuous product and
  process improvement and the elimination of non-value added activities.
  “The value adding activities are simply only those things the customer is
  willing to pay for, everything else is waste, and should be eliminated,
  simplified, reduced, or integrated”. Improving the flow of material through
  new ideal system layouts at the customer's required rate would reduce
  waste in material movement and inventory.
•
• Continuously improve
• A continuous improvement mindset is essential to reach a company's
  goals. The term "continuous improvement" means incremental
  improvement of products, processes, or services over time, with the goal
  of reducing waste to improve workplace functionality, customer service, or
  product performance.
• but is not restricted solely to manufacturing activities and instead
  can be easily applied to the whole organisation’s administrative
  functions as well as to the service sector too. Lean can be and often
  is extended beyond the organisation’s boundary to encompass the
  supply chain.
• The Five Simple Principles for Lean Manufacturing
• 1. Identify and understand what creates value for the customer
•
• By accepting that only a fraction of the total time and effort
  expended in the organisation actually adds value for the customer;
  understanding what the customer wants is the first step towards
  identifying all the non-value added activities or waste within the
  organisation.
• 2. Identify, understand and map all the process
  steps required to fulfil the customer
•
• By documenting the entire set of activities across
  all parts of the organisation involved in delivering
  products or services to the customer allows for
  an understanding how value is delivered to the
  customer in the current state makes it possible to
  identify the wasteful activities that can then be
  targeted for elimination.
• 3. Make the value-added actions within processes flow
•
• Flow is about creating value for the customer with the minimum number
  of process steps with the minimum number of delays between those
  process steps and the minimum number diversions along the way. The
  value stream is used to identify wasteful activities to be eliminated; flow
  concerns the rethinking or reorganisation of the remaining activities to
  further eliminate waste.
• 4. Only make what the customer wants or Pull
•
• If one objective for creating flow within processes is to minimize their
  throughput time. A clear second is to ensure that processes are only
  initiated when customer demand requires it. Essentially, this may mean
  only making products or delivering services at the point the customer
  demands; just-in-time. As such as many process steps in the value stream
  should be triggered when there is a firm customer requirement.
• 5. Pursue Perfection through Continuous Improvement
•
• Creating flow and pull begins with often radical changes to
  individual process steps, but the gains delivered by Lean
  principles really become significant as they are applied with
  increasing scrutiny. As this happens more and more layers
  of waste become visible and the cycle continues towards a
  theoretical end point of perfection; where every asset and
  every action adds value for the customer. Through
  continuous improvement the organisation should strive for
  incremental improvements in the value stream every single
  day. Go here for more information on Continuous
  Improvement
• In applying the five principles of Lean your organization will
  encourage a culture of continuous improvement; it will
  become “the way things are done” instead of “that’s the
  way we've always done it”. You will be ensuring that every
  asset and activity are driving towards the overall
  organisational strategy through constant review of
  processes and the targeted elimination of waste to ensure
  that they constantly and consistently deliver value to the
  customer.
• But what does that mean?
• Lean allows the organisation to maintain high levels of
  customer service whilst being able to grow and flex with a
  changing environment and it does this through
  implementing sustainable change.
• Consider the following definitions for each of the key
  words:
•
• Value: that which the customer is willing to pay for. For
  instance, in manufacturing this will typically be the
  processes that convert raw materials into products;
  while in administrative functions it may concern the
  unnecessary paperwork.
•
• Value Stream: the sequence of processes that deliver
  value to the customer. The complete value stream
  flows through the complete supply chain.
•
• Flow: movement between value adding processes
  without delay or interruption.
•
• Pull: activating a process when the customer wants to
  receive, not when the supplier wants to provide.
• What are the Benefits of Lean?
•
• Lean essentially aims to compress time required to
  deliver value to the customer.
•
• Typically, if you quarter lead-times, you will double
  productivity and reduce costs by 20%.
•
• This is known as the ¼:2:20 rule. Typical results are as
  follows:
• Halving of lead-times; doubling of stock turnover
• 30% to 50% reduction in floor space requirements
• 20% to 40% increase in Overall Equipment
  Effectiveness (OEE)
• 20% to 25% labour productivity gains
• Reduction in administration and co-ordination roles
• Kaizen: Kai (to change); Zen (for the better). A
  Kaizen is an approach consisting of creating a
  multi-task group
• of persons (including workers) to improve an
  existing process by small, quick and inexpensive
  changes,
• without major investment. Since the workers
  are involved, they are not bent on returning to
  the production floor
• with the intention of proving that the consultant
  or management is wrong.
Continuous Improvement


 Represents continual improvement of
  all processes
 Involves all operations and work
  centers including suppliers and
  customers
   People, Equipment, Materials,
    Procedures
• Continuous Improvement
• Definition
• Continuous -- 1 : marked by uninterrupted
  extension in space, time, or sequence
• Improvement -- 1 : the act or process of Improving
 a : the state of being improved; especially
  :enhanced value or excellence
b : an instance of such improvement : something
  that enhances value or excellence
• Continuous improvement is a management
  philosophy based on employees’ suggestions. It
  was developed in the United States at the end of
  the nineteenth century.
• Nevertheless, some of the most important
  improvements took place when this idea or
  philosophy arrived in Japan.
• Japan was already using tools such as quality
  circles, so when Japanese managers combined
  these two ideas, kaizen was born.
• Continuous Improvement is often referred to
  by the Japanese word ‘Kaizen’
• Kaizen is the Japanese term for an
  organizations commitment to continuous
  improvement.
• Continuous Improvement (CI):continuous
  incremental improvements in manufacturing
  and other processes.
• The Basic Principles of Kaizen
The principles of Kaizen that must be understand
   are:
1. People are the most important asset. Teamwork
   provides results and gives everyone a feeling of
   accomplishment. A dozen heads are better than
   one.
2. Everyone must be open to change and
   improvements. Ideas from workers,
   management, suppliers, and customers can lead
   to new, better and easier ways of doing things.
3. Gradual changes are easier to accept than
  complete overhauls and employees are more
  likely to accept gradual change. Small changes
  will demonstrate how a tiny improvement can
  provide real results.
4. Old ways of doing things may be comfortable,
  but not very efficient. Everyone in a company
  has to accept Change is Good and necessary
  for company survival.
5. Making excuses is unacceptable if it is We
 have always done it this way and don’t see
 why we have to change now. Keeping the old
 ways may result in a company not being able
 to survive the competition.
6. If the job is right the first time, waste will be
  reduced. Waste accounts for as much as 35%
  or higher of manufactured product. By
  eliminating waste, profits increase.
7. Correct process errors immediately or they
  become larger. Equipment breakdowns and
  failures are a result of letting a minor problem
  become a major headache.
• Kaizen’s Event Purpose
• The purpose for holding a Kaizen event is
  basically to identify waste in a manufacturing
  process and to eliminate it, thereby improving
  production.
• A Kaizen event is Team Oriented, as it gathers
  the managers, operators, and owners of a
  process in a specific place to analyze, and map
  out the existing methods of the operation.
It is also a forum for developing, discussing, and allowing
    changes to be made to improve the process. Usually
    there are four stages that a Kaizen Team undertakes.
 Step One: Analyze and map the current processes of a
    specific area of the plant
 Step Two: Identify the problems and the
    opportunities for improvement.
 Step Three: Implement changes to the process that
    allow for improved workflow.
 Step Four: Evaluate the changes made and follow up,
    with adjustments as required.
• Kaizen’s Key Personnel
• The Team Leader who is respected by both
  the workers and the company’s managers.
  The ideal leader will have some experience
  with Kaizen principles and events. The Team
  Coordinator’s role is to ensure that all of the
  components of the event are well planned,
  scheduled, implemented and reviewed. The
  coordinator acts as the events facilitator and
  guide, to help team members.
• Continuous Improvement starts with management and
  under their leadership works down through the
  organization.
• The underlying theme is that everyone is responsible
  and has a part to play in making improvements.
• All employees must work together to identify the steps
  needed to improve working practices.
• Planning meetings help teams to focus on satisfying
  customer needs. Visual management techniques, such
  as flow charts and wall charts make clear what
  resources are necessary and who is responsible for
  each part in the process.
• Any deviation from the standard value of a variable
  (quality and
• production rate) presents a problem. It is necessary to
  know what thevariable objective is (desired standard)
  and what the starting situation
• (present situation) is in order to propose a realistic
  objective. There are
• three main factors that production managers fear
  most: (1) poor quality, (2) an increase in production
  cost, and (3) an increase in lead time.
• These three factors are signs of poor production
  management.
Figure 1.2. Continuous change can offset the expense and time required for radical changes   .
• The next key group is Upper Management whose
  duty is to choose the Event Coordinator and to
  support that person with whatever resources
  may be required.
• After the Event Once the event has been
  completed, it is the team leader’s responsibility
  to put the hard copy of the final presentation
  together and to circulate it to team members,
  management, and anyone else who requires a
  copy.
• • The follow-up to the event is also the team leader’s
  responsibility. He or she should
• organize a meeting where all team members and other
  concerned parties may review the
• results of the Kaizen and discuss further changes that can
  improve a future Kaizen blitz.
• • The team leader must prepare a personal report,
  outlining his or her experiences for the
• Kaizen including successes and failures.
• • This report should be made available to any future Kaizen
  Team Leaders for review
• before they embark on Kaizen journey
• Lean manufacturing, sometimes called Lean
  Production, is a business philosophy that was
• originally developed at Toyota Motor
  Company, where it was called Toyota
  Production System
• (TPS). The objectives are to eliminate all forms
  of waste in production process. The Japanese
• term for waste is muda.

Mais conteúdo relacionado

Mais procurados

History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
Sumon Kumar Kundu
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
Pratibha Khemchandani
 

Mais procurados (20)

Lean principles
Lean principlesLean principles
Lean principles
 
Lean basics
Lean basicsLean basics
Lean basics
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
Kanban
KanbanKanban
Kanban
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
Line balancing
Line balancingLine balancing
Line balancing
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Ppc
PpcPpc
Ppc
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
Lean and agile manufacturing system
Lean and agile manufacturing systemLean and agile manufacturing system
Lean and agile manufacturing system
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 

Semelhante a value added manufacturing

Semelhante a value added manufacturing (20)

lean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptxlean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptx
 
lean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptxlean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptx
 
Lean Production
Lean ProductionLean Production
Lean Production
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Revised lean
Revised leanRevised lean
Revised lean
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
lean accounting , abc accounting , cvp analysis
lean accounting , abc accounting , cvp analysislean accounting , abc accounting , cvp analysis
lean accounting , abc accounting , cvp analysis
 
operation Performance & Operation stategy
operation Performance & Operation stategyoperation Performance & Operation stategy
operation Performance & Operation stategy
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Productivity enhancement using lean
Productivity enhancement using leanProductivity enhancement using lean
Productivity enhancement using lean
 
EngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptxEngManagement - Lecture 8.pptx
EngManagement - Lecture 8.pptx
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean manufacturing system (lms) 19-march-sgd
Lean manufacturing system (lms) 19-march-sgdLean manufacturing system (lms) 19-march-sgd
Lean manufacturing system (lms) 19-march-sgd
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEAN
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations management
 
The power of lean manufacturing
The power of lean manufacturingThe power of lean manufacturing
The power of lean manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean In Manufacturing
Lean In ManufacturingLean In Manufacturing
Lean In Manufacturing
 

value added manufacturing

  • 1. • Value added • An activity is value added if and only if three conditions are met 1. The customer must be willing to pay for the activity 2. The activity must change the product, making it closer to the end product that the customer wants and will pay 3. The activity must be done right the first time.
  • 2. • A value added activity is one that either (1) directly adds value to the final product or (2) directly satisfies the customer
  • 3. • Just-in-Time rests on two pillars: • • Value Adding Manufacturing/ lean manufacturing • • Kaizen/continious improvement • Value Adding Manufacturing (VAM): a management philosophy of continual improvement, through the identification and the progressive elimination of all wastes (MUDA in Japanese) in manufacturing related activities, i.e. non-value adding activities. A value adding activity is: • • An activity that transforms the product (transformation, processing) • • An activity or a feature of the product that the client is willing to pay for • The technical definition of Lean manufacturing is “A systematic approach to identifying and eliminating waste (non-value-added activities) through continuous improvement by flowing the product at the pull of the customer in pursuit of perfection.”
  • 4. • Non-value-added activities are activities that do NOT change the form, fit, or function of the part and activities the customer does not want to pay for. • Value-added activities are activities that change the form, fit, or function of the part and the customer is willing to pay for them.
  • 5. • LEAN Manufacturing is applicable to companies ranging from the small job shop to large manufacturing enterprises. It teaches a systematic approach to eliminating wastes and creating flow throughout the enterprise • Lean manufacturing or lean production, which is often known simply as "Lean", is a production practice that considers the expenditure of resources for any goal other than the creation of value for the end customer to be wasteful, and thus a target for elimination. Working from the perspective of the customer who consumes a product or service, "value" is defined as any action or process that a customer would be willing to pay for. Basically, lean is centered around creating more value with less work.
  • 6. • The four goals of Lean manufacturing systems are to: • Improve quality: To stay competitive in today’s marketplace, a company must understand its customers' wants and needs and design processes to meet their expectations and requirements. • Reduce time: Reducing the time it takes to finish an activity from start to finish is one of the most effective ways to eliminate waste and lower costs. • Reduce total costs: To minimize cost, a company must produce only to customer demand. Overproduction increases a company’s inventory costs because of storage needs.
  • 7. • Eliminate waste: Waste is any activity that consumes time, resources, or space but does not add any value to the product or service. There are seven types of waste: • • 1). Overproduction (occurs when production should have stopped) • 2). Waiting (periods of inactivity) • 3). Transport (unnecessary movement of materials) • 4). Extra Processing (rework and reprocessing) • 5). Inventory (excess inventory not directly required for current orders) • 6). Motion (extra steps taken by employees because of inefficient layout) • 7). Defects (do not conform to specifications or expectations)
  • 8. Steps to achieve lean systems • The following steps should be implemented to create the ideal lean manufacturing system: • • 1. Design a simple manufacturing system • 2. Recognize that there is always room for improvement • 3. Continuously improve the lean manufacturing system design • • Design a simple manufacturing system • A fundamental principle of lean manufacturing is demand-based flow manufacturing. In this type of production setting, inventory is only pulled through each production center when it is needed to meet a customer’s order. The benefits of this goal include: • Decreased cycle time • Less inventory • Increased productivity • Increased capital equipment utilization
  • 9. • There is always room for improvement • The core of lean is founded on the concept of continuous product and process improvement and the elimination of non-value added activities. “The value adding activities are simply only those things the customer is willing to pay for, everything else is waste, and should be eliminated, simplified, reduced, or integrated”. Improving the flow of material through new ideal system layouts at the customer's required rate would reduce waste in material movement and inventory. • • Continuously improve • A continuous improvement mindset is essential to reach a company's goals. The term "continuous improvement" means incremental improvement of products, processes, or services over time, with the goal of reducing waste to improve workplace functionality, customer service, or product performance.
  • 10. • but is not restricted solely to manufacturing activities and instead can be easily applied to the whole organisation’s administrative functions as well as to the service sector too. Lean can be and often is extended beyond the organisation’s boundary to encompass the supply chain. • The Five Simple Principles for Lean Manufacturing • 1. Identify and understand what creates value for the customer • • By accepting that only a fraction of the total time and effort expended in the organisation actually adds value for the customer; understanding what the customer wants is the first step towards identifying all the non-value added activities or waste within the organisation.
  • 11. • 2. Identify, understand and map all the process steps required to fulfil the customer • • By documenting the entire set of activities across all parts of the organisation involved in delivering products or services to the customer allows for an understanding how value is delivered to the customer in the current state makes it possible to identify the wasteful activities that can then be targeted for elimination.
  • 12. • 3. Make the value-added actions within processes flow • • Flow is about creating value for the customer with the minimum number of process steps with the minimum number of delays between those process steps and the minimum number diversions along the way. The value stream is used to identify wasteful activities to be eliminated; flow concerns the rethinking or reorganisation of the remaining activities to further eliminate waste. • 4. Only make what the customer wants or Pull • • If one objective for creating flow within processes is to minimize their throughput time. A clear second is to ensure that processes are only initiated when customer demand requires it. Essentially, this may mean only making products or delivering services at the point the customer demands; just-in-time. As such as many process steps in the value stream should be triggered when there is a firm customer requirement.
  • 13. • 5. Pursue Perfection through Continuous Improvement • • Creating flow and pull begins with often radical changes to individual process steps, but the gains delivered by Lean principles really become significant as they are applied with increasing scrutiny. As this happens more and more layers of waste become visible and the cycle continues towards a theoretical end point of perfection; where every asset and every action adds value for the customer. Through continuous improvement the organisation should strive for incremental improvements in the value stream every single day. Go here for more information on Continuous Improvement
  • 14. • In applying the five principles of Lean your organization will encourage a culture of continuous improvement; it will become “the way things are done” instead of “that’s the way we've always done it”. You will be ensuring that every asset and activity are driving towards the overall organisational strategy through constant review of processes and the targeted elimination of waste to ensure that they constantly and consistently deliver value to the customer. • But what does that mean? • Lean allows the organisation to maintain high levels of customer service whilst being able to grow and flex with a changing environment and it does this through implementing sustainable change.
  • 15. • Consider the following definitions for each of the key words: • • Value: that which the customer is willing to pay for. For instance, in manufacturing this will typically be the processes that convert raw materials into products; while in administrative functions it may concern the unnecessary paperwork. • • Value Stream: the sequence of processes that deliver value to the customer. The complete value stream flows through the complete supply chain.
  • 16. • • Flow: movement between value adding processes without delay or interruption. • • Pull: activating a process when the customer wants to receive, not when the supplier wants to provide. • What are the Benefits of Lean? • • Lean essentially aims to compress time required to deliver value to the customer. •
  • 17. • Typically, if you quarter lead-times, you will double productivity and reduce costs by 20%. • • This is known as the ¼:2:20 rule. Typical results are as follows: • Halving of lead-times; doubling of stock turnover • 30% to 50% reduction in floor space requirements • 20% to 40% increase in Overall Equipment Effectiveness (OEE) • 20% to 25% labour productivity gains • Reduction in administration and co-ordination roles
  • 18. • Kaizen: Kai (to change); Zen (for the better). A Kaizen is an approach consisting of creating a multi-task group • of persons (including workers) to improve an existing process by small, quick and inexpensive changes, • without major investment. Since the workers are involved, they are not bent on returning to the production floor • with the intention of proving that the consultant or management is wrong.
  • 19. Continuous Improvement  Represents continual improvement of all processes  Involves all operations and work centers including suppliers and customers People, Equipment, Materials, Procedures
  • 20. • Continuous Improvement • Definition • Continuous -- 1 : marked by uninterrupted extension in space, time, or sequence • Improvement -- 1 : the act or process of Improving  a : the state of being improved; especially :enhanced value or excellence b : an instance of such improvement : something that enhances value or excellence
  • 21. • Continuous improvement is a management philosophy based on employees’ suggestions. It was developed in the United States at the end of the nineteenth century. • Nevertheless, some of the most important improvements took place when this idea or philosophy arrived in Japan. • Japan was already using tools such as quality circles, so when Japanese managers combined these two ideas, kaizen was born.
  • 22. • Continuous Improvement is often referred to by the Japanese word ‘Kaizen’ • Kaizen is the Japanese term for an organizations commitment to continuous improvement. • Continuous Improvement (CI):continuous incremental improvements in manufacturing and other processes.
  • 23. • The Basic Principles of Kaizen The principles of Kaizen that must be understand are: 1. People are the most important asset. Teamwork provides results and gives everyone a feeling of accomplishment. A dozen heads are better than one. 2. Everyone must be open to change and improvements. Ideas from workers, management, suppliers, and customers can lead to new, better and easier ways of doing things.
  • 24. 3. Gradual changes are easier to accept than complete overhauls and employees are more likely to accept gradual change. Small changes will demonstrate how a tiny improvement can provide real results. 4. Old ways of doing things may be comfortable, but not very efficient. Everyone in a company has to accept Change is Good and necessary for company survival.
  • 25. 5. Making excuses is unacceptable if it is We have always done it this way and don’t see why we have to change now. Keeping the old ways may result in a company not being able to survive the competition.
  • 26. 6. If the job is right the first time, waste will be reduced. Waste accounts for as much as 35% or higher of manufactured product. By eliminating waste, profits increase. 7. Correct process errors immediately or they become larger. Equipment breakdowns and failures are a result of letting a minor problem become a major headache.
  • 27. • Kaizen’s Event Purpose • The purpose for holding a Kaizen event is basically to identify waste in a manufacturing process and to eliminate it, thereby improving production. • A Kaizen event is Team Oriented, as it gathers the managers, operators, and owners of a process in a specific place to analyze, and map out the existing methods of the operation.
  • 28. It is also a forum for developing, discussing, and allowing changes to be made to improve the process. Usually there are four stages that a Kaizen Team undertakes.  Step One: Analyze and map the current processes of a specific area of the plant  Step Two: Identify the problems and the opportunities for improvement.  Step Three: Implement changes to the process that allow for improved workflow.  Step Four: Evaluate the changes made and follow up, with adjustments as required.
  • 29. • Kaizen’s Key Personnel • The Team Leader who is respected by both the workers and the company’s managers. The ideal leader will have some experience with Kaizen principles and events. The Team Coordinator’s role is to ensure that all of the components of the event are well planned, scheduled, implemented and reviewed. The coordinator acts as the events facilitator and guide, to help team members.
  • 30. • Continuous Improvement starts with management and under their leadership works down through the organization. • The underlying theme is that everyone is responsible and has a part to play in making improvements. • All employees must work together to identify the steps needed to improve working practices. • Planning meetings help teams to focus on satisfying customer needs. Visual management techniques, such as flow charts and wall charts make clear what resources are necessary and who is responsible for each part in the process.
  • 31. • Any deviation from the standard value of a variable (quality and • production rate) presents a problem. It is necessary to know what thevariable objective is (desired standard) and what the starting situation • (present situation) is in order to propose a realistic objective. There are • three main factors that production managers fear most: (1) poor quality, (2) an increase in production cost, and (3) an increase in lead time. • These three factors are signs of poor production management.
  • 32. Figure 1.2. Continuous change can offset the expense and time required for radical changes .
  • 33. • The next key group is Upper Management whose duty is to choose the Event Coordinator and to support that person with whatever resources may be required. • After the Event Once the event has been completed, it is the team leader’s responsibility to put the hard copy of the final presentation together and to circulate it to team members, management, and anyone else who requires a copy.
  • 34. • • The follow-up to the event is also the team leader’s responsibility. He or she should • organize a meeting where all team members and other concerned parties may review the • results of the Kaizen and discuss further changes that can improve a future Kaizen blitz. • • The team leader must prepare a personal report, outlining his or her experiences for the • Kaizen including successes and failures. • • This report should be made available to any future Kaizen Team Leaders for review • before they embark on Kaizen journey
  • 35. • Lean manufacturing, sometimes called Lean Production, is a business philosophy that was • originally developed at Toyota Motor Company, where it was called Toyota Production System • (TPS). The objectives are to eliminate all forms of waste in production process. The Japanese • term for waste is muda.