SlideShare uma empresa Scribd logo
1 de 29
TRAINING REPORT ON 
PANIPAT THERMAL POWER STATION 
MOHIT VERMA 
EL/11/314
INTRODUCTION 
The plant has been constructed in five stages as 
given below: 
Stage 1: Unit-1 110 MW 
Unit-2 110 MW 
Stage 2:Unit-3 110MW 
Unit-4 110MW 
Stage 3:Unit-5 210MW 
Unit-6 210MW 
Stage 4:Unit-7 250MW 
Unit-8 250MW 
Total Generation Capacity 1360MW
Basic Idea of Electricity 
Generation 
Coal is unloaded by electric traction system at Coal Yard 
Coal is crushed to finer pieces of order 20 mm 
Pulverization of Coal 
Coal is send to furnace with the help of FD fan 
Steam is generated at 540°C and 135 kg/sq.m 
Steam is send to Super heater 
Superheated steam is send to turbine 
Production of Electricity by the generator coupled with
Elements Of Thermal Power 
Station 
 DM Plant 
 Deaerator 
 Boiler feed pump 
 Economizer 
 Air Pre-Heater 
 Boiler 
 Super heater 
 Turbine 
 Condenser
COAL FEEDING SYSTEM 
Conveyor Coal Hopper 
Coal is conveyed through rail wagon from out side of 
plant and through conveyor system collected in 
hopper and ground to a very fine powder by large 
metal spheres in the pulverised fuel mill. 
Wagon Tippler 
Pulverised Mill
COAL FEEDING SYSTEM 
Air Pre-heater Forced Draft Fan 
Then it is mixed with preheated air driven by the forced draught fan. The hot air-fuel 
mixture is forced at high pressure into the boiler.
BOILER 
A boiler or steam generator is a device used to 
create steam by applying heat energy to water. 
The steam generator or boiler is an integral component of a steam engine when 
considered as a prime mover; The boiler is a furnace on a side. Its walls are 
made of a web of high pressure steel tubes. 
Pulverized coal is air-blown into the furnace from fuel nozzles at the four corners 
and it rapidly burns, forming a large fireball at the center. The thermal radiation of 
the fireball heats the water that circulates through the boiler tubes near the boiler 
perimeter. The water circulation rate in the boiler is three to four times the 
throughput and is typically driven by pumps. As the water in the boiler circulates 
it absorbs heat and changes into steam at 700 °F (371 °C) and 3,200 psi . It is 
separated from the water inside a drum at the top of the furnace.
BOILER FEED PUMP 
NDE BEARING DE BEARING 
SLEEVE 
SOLE PLATE 
(BASE PLATE) 
KEY 
FOUNDATION BOLT 
9 PMI Revision 00 28 August 2014 
18
ASH HANDLING SYSTEM 
At the bottom of the furnace, there is a hopper for collection of bottom ash. This 
hopper is always filled with water to quench the ash and clinkers falling down 
from the furnace. Some arrangement is included to crush the clinkers and for 
conveying the crushed clinkers and bottom ash to a storage site.
SUPER HEATER 
Superheated steam is steam at a 
temperature higher than water's boiling 
point. If saturated stream is heated at 
constant pressure, it increases toward 
100% Dry Saturated Steam. Continued 
heat input will then generate 
superheated steam. This will occur if 
saturated steam contacts a surface with 
a higher temperature. The steam is then 
described as superheated by the number 
of degrees it has been heated above 
saturation temperature 
In a power plant, after the steam is conditioned by the drying equipment inside 
the steam drum, it is piped from the upper drum area into tubes inside an area of 
the furnace known as the super heater, which has an elaborate set up of tubing 
where the steam vapor picks up more energy from hot flue gases outside the 
tubing and its temperature is now superheated above the saturation temperature. 
The superheated steam is then piped through the main steam lines to the valves 
before the high pressure turbine.
STEAM TURBINE 
A steam turbine is a mechanical device 
that extracts thermal energy from 
pressurized steam, and converts it into 
rotary motion. 
The steam turbine is a form of heat 
engine that derives much of its 
improvement in thermodynamics 
efficiency through the use of multiple 
stages in the expansion of the steam. 
The hot reheat steam is conducted to the intermediate pressure turbine where it 
falls in both temperature and pressure and exits directly to the long-bladed low 
pressure turbines and finally exits to the condense
ROTORS
CONDENSER 
Water Cooled Condenser Air Cooled Condenser 
Condenser is a device or unit used to condense a substance from its gaseous to 
its liquid state, typically by cooling it. 
The exiting steam from steam turbine, now a little above its boiling point, is 
brought into thermal contact with cold water (pumped in from the cooling tower) 
in the condenser. where it condenses rapidly back into water, creating near 
vacuum-like conditions inside the condenser chest.
COOLING TOWER 
Natural Draft Cooling 
Tower 
Cooling towers are heat removal devices used to transfer process waste heat 
to the atmosphere. Cooling towers either use the evaporation of water to 
remove process heat and cool the working fluid or in the case of closed circuit 
dry cooling towers rely solely on air to cool the working fluid.
DE AREATOR 
De Areator 
A deaerator is a device that is widely 
used for the removal of air and other 
dissolved gases from the feed water to 
steam-generating boiler. 
The condensed water is then passed by a feed pump through a deaerater.
ECONOMISER 
Economiser 
Economizer are mechanical devices 
intended to reduce energy consumption, or to 
perform another useful function like 
preheating a fluid. 
Pre-warmed water first enter in a feed heater 
powered by steam drawn from the high 
pressure set, and then in the economiser 
Economizer is a flue gas to water heat exchanger. Usually it is located below the 
LPSH in the boiler and above Air pre heater. Outside surface of the economizer 
tubes are heated by flue gases leaving the superheater and reheater which 
subsequently transfer heat to feed water flowing inside the tubes. 
Advantages of Economizer include 
1) Fuel economy: – used to save fuel and increase overall efficiency of boiler 
plant. 
2) Reducing size of boiler: – as the feed water is preheated in the economizer and 
enter boiler tube at elevated temperature. The heat transfer area required for 
evaporation reduced considerably.
CHIMNEY 
A chimney is a structure for venting hot 
gases or smoke from a boiler, furnace or 
fireplace to the outside atmosphere. 
A chimney is a vertical structure for venting 
hot flue gases or smoke from a boiler to the 
outside atmosphere by means of the stack 
effect. The space inside a chimney is called 
aflue. The height of chimneys plays a role in 
their ability to transfer flue gases using 
stack effect. The dispersion of pollutants at 
higher altitude helps to ease down its 
influence on surroundings and reduces their 
concentrations in compliance with 
regulatory limits. 
Exhaust gas from electrostatic precipitator vented through the chimney tack.
SWITCHYARD 
A switch yard is a part of an electrical generation, transmission, 
system. Switchyard transform voltage from high to low, 
or the reverse, or perform any of several other important functions.
CONTROL ROOM 
A control room is a room serving as a centre where a large physical 
facility or physically dispersed service can be monitored and controlled.
Instrumentation In Thermal 
Power 
Plant 
When the balance is disturbed, all the process variables 
deviate 
from their normal values thus creating the necessity for the 
following:- 
i)Instruments : To measure and indicate the amount of 
deviation. 
ii)Automatic Control: To correct the deviation and bring 
back 
system to normal 
iii) Annunciation : To warn about the excessive 
deviations, if 
any. 
iv) Protection : To isolate the equipments process from 
dangerous operating conditions cause due to such 
excessive
Temperature 
The degree of hotness and coldness measured 
on the definite scale. 
 Methods of Temperature Measurement 
 Resistance Temperature Detector(R.T.D) 
 Thermocouple
Resistance Temperature 
Detector 
 Resistance of certain metals 
changes as the 
 temp. changes as per formula 
given below :- 
 Rt=Ro(1+wt) 
 Where Rt=Resistance at temp. to 
be measured. Ro=Resistance at 0 
degree C. 
 w=Temp. coefficient of res. 
Thermometer metal 
 t=Temp. to be measured. 
 Mainly three metals copper, nickel 
and platinum are used as RTD.
Thermocouple 
It consists of a pair of wire 
of different materials. 
Wires are joined at both 
ends one junction is 
kept at a high 
temp.called hot junction 
and the 
other is kept at a fixed at 
lower temp. called cold 
junction. Due to which 
emf is setup in the ckt 
known as Thermo emf.
Pressure 
Units for pressure 
measurement are 
Newton/m2 
, Kg/cm2, mm of water 
column & mm of 
mercury 
column. 
Devices for Pressure 
Measurement 
Bourden Tube Pressure 
Gauge 
Manometer
Control Valve
Furnace Starting Assembly
Thank you

Mais conteúdo relacionado

Mais procurados

Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
SHIVAJI CHOUDHURY
 
Coal power plant
Coal power plantCoal power plant
Coal power plant
Anum Mairaj
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
Manish Kumar
 

Mais procurados (20)

steam power plant
steam power plantsteam power plant
steam power plant
 
Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater control
 
Coal Power Plant
Coal Power PlantCoal Power Plant
Coal Power Plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
 
Thermal Power Plant
Thermal  Power  PlantThermal  Power  Plant
Thermal Power Plant
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Coal power plant
Coal power plantCoal power plant
Coal power plant
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 
Boilers Classifications and Cost per kWh
Boilers Classifications and Cost per kWh Boilers Classifications and Cost per kWh
Boilers Classifications and Cost per kWh
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
 
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSOVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
 
SUPER-CRITICAL THERMAL POWER PLANT by Tatyaso Kadam
SUPER-CRITICAL THERMAL POWER PLANT by Tatyaso KadamSUPER-CRITICAL THERMAL POWER PLANT by Tatyaso Kadam
SUPER-CRITICAL THERMAL POWER PLANT by Tatyaso Kadam
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 

Destaque

Boiler instrumentation-and-controls
Boiler instrumentation-and-controlsBoiler instrumentation-and-controls
Boiler instrumentation-and-controls
DARSHAN B S
 
Control valves for thermal power plants
Control valves for thermal power plantsControl valves for thermal power plants
Control valves for thermal power plants
SHIVAJI CHOUDHURY
 
Energy performance assessment of boilers
Energy performance assessment of boilersEnergy performance assessment of boilers
Energy performance assessment of boilers
Utsav Jain
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power Plant
SHIVAJI CHOUDHURY
 

Destaque (15)

Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTU
 
Thermal Power Plants
Thermal Power PlantsThermal Power Plants
Thermal Power Plants
 
Boiler instrumentation-and-controls
Boiler instrumentation-and-controlsBoiler instrumentation-and-controls
Boiler instrumentation-and-controls
 
Control valves for thermal power plants
Control valves for thermal power plantsControl valves for thermal power plants
Control valves for thermal power plants
 
Thermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementThermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency Improvement
 
Boiler Process Instrumentation and controls
Boiler Process Instrumentation and controlsBoiler Process Instrumentation and controls
Boiler Process Instrumentation and controls
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant
 
Energy performance assessment of boilers
Energy performance assessment of boilersEnergy performance assessment of boilers
Energy performance assessment of boilers
 
Boiler efficiency by loss Method
Boiler efficiency by loss MethodBoiler efficiency by loss Method
Boiler efficiency by loss Method
 
Thermal Power Plant Safety
Thermal Power Plant SafetyThermal Power Plant Safety
Thermal Power Plant Safety
 
Improving steam boiler operating efficiency
Improving steam boiler operating efficiencyImproving steam boiler operating efficiency
Improving steam boiler operating efficiency
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power Plant
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentation
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 

Semelhante a Panipat thermal power station training ppt

Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01
arvind singh rathore
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
arvind singh rathore
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
arvind singh rathore
 

Semelhante a Panipat thermal power station training ppt (20)

Paras ppt
Paras pptParas ppt
Paras ppt
 
THERMAL
THERMALTHERMAL
THERMAL
 
PANIPAT THERMAL POWER PLANT
PANIPAT THERMAL POWER PLANTPANIPAT THERMAL POWER PLANT
PANIPAT THERMAL POWER PLANT
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01
 
Sandeep verma ppt on kstps
Sandeep verma ppt on kstps   Sandeep verma ppt on kstps
Sandeep verma ppt on kstps
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power Plants
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
Coal Base Thermal Power Plant
Coal Base Thermal Power PlantCoal Base Thermal Power Plant
Coal Base Thermal Power Plant
 
thermal power plant
thermal power plantthermal power plant
thermal power plant
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Thermal power point
Thermal power pointThermal power point
Thermal power point
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
lecture on steam plant
 lecture on steam  plant lecture on steam  plant
lecture on steam plant
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
 

Último

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Último (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

Panipat thermal power station training ppt

  • 1. TRAINING REPORT ON PANIPAT THERMAL POWER STATION MOHIT VERMA EL/11/314
  • 2. INTRODUCTION The plant has been constructed in five stages as given below: Stage 1: Unit-1 110 MW Unit-2 110 MW Stage 2:Unit-3 110MW Unit-4 110MW Stage 3:Unit-5 210MW Unit-6 210MW Stage 4:Unit-7 250MW Unit-8 250MW Total Generation Capacity 1360MW
  • 3. Basic Idea of Electricity Generation Coal is unloaded by electric traction system at Coal Yard Coal is crushed to finer pieces of order 20 mm Pulverization of Coal Coal is send to furnace with the help of FD fan Steam is generated at 540°C and 135 kg/sq.m Steam is send to Super heater Superheated steam is send to turbine Production of Electricity by the generator coupled with
  • 4.
  • 5. Elements Of Thermal Power Station  DM Plant  Deaerator  Boiler feed pump  Economizer  Air Pre-Heater  Boiler  Super heater  Turbine  Condenser
  • 6. COAL FEEDING SYSTEM Conveyor Coal Hopper Coal is conveyed through rail wagon from out side of plant and through conveyor system collected in hopper and ground to a very fine powder by large metal spheres in the pulverised fuel mill. Wagon Tippler Pulverised Mill
  • 7. COAL FEEDING SYSTEM Air Pre-heater Forced Draft Fan Then it is mixed with preheated air driven by the forced draught fan. The hot air-fuel mixture is forced at high pressure into the boiler.
  • 8. BOILER A boiler or steam generator is a device used to create steam by applying heat energy to water. The steam generator or boiler is an integral component of a steam engine when considered as a prime mover; The boiler is a furnace on a side. Its walls are made of a web of high pressure steel tubes. Pulverized coal is air-blown into the furnace from fuel nozzles at the four corners and it rapidly burns, forming a large fireball at the center. The thermal radiation of the fireball heats the water that circulates through the boiler tubes near the boiler perimeter. The water circulation rate in the boiler is three to four times the throughput and is typically driven by pumps. As the water in the boiler circulates it absorbs heat and changes into steam at 700 °F (371 °C) and 3,200 psi . It is separated from the water inside a drum at the top of the furnace.
  • 9. BOILER FEED PUMP NDE BEARING DE BEARING SLEEVE SOLE PLATE (BASE PLATE) KEY FOUNDATION BOLT 9 PMI Revision 00 28 August 2014 18
  • 10. ASH HANDLING SYSTEM At the bottom of the furnace, there is a hopper for collection of bottom ash. This hopper is always filled with water to quench the ash and clinkers falling down from the furnace. Some arrangement is included to crush the clinkers and for conveying the crushed clinkers and bottom ash to a storage site.
  • 11. SUPER HEATER Superheated steam is steam at a temperature higher than water's boiling point. If saturated stream is heated at constant pressure, it increases toward 100% Dry Saturated Steam. Continued heat input will then generate superheated steam. This will occur if saturated steam contacts a surface with a higher temperature. The steam is then described as superheated by the number of degrees it has been heated above saturation temperature In a power plant, after the steam is conditioned by the drying equipment inside the steam drum, it is piped from the upper drum area into tubes inside an area of the furnace known as the super heater, which has an elaborate set up of tubing where the steam vapor picks up more energy from hot flue gases outside the tubing and its temperature is now superheated above the saturation temperature. The superheated steam is then piped through the main steam lines to the valves before the high pressure turbine.
  • 12. STEAM TURBINE A steam turbine is a mechanical device that extracts thermal energy from pressurized steam, and converts it into rotary motion. The steam turbine is a form of heat engine that derives much of its improvement in thermodynamics efficiency through the use of multiple stages in the expansion of the steam. The hot reheat steam is conducted to the intermediate pressure turbine where it falls in both temperature and pressure and exits directly to the long-bladed low pressure turbines and finally exits to the condense
  • 13.
  • 15. CONDENSER Water Cooled Condenser Air Cooled Condenser Condenser is a device or unit used to condense a substance from its gaseous to its liquid state, typically by cooling it. The exiting steam from steam turbine, now a little above its boiling point, is brought into thermal contact with cold water (pumped in from the cooling tower) in the condenser. where it condenses rapidly back into water, creating near vacuum-like conditions inside the condenser chest.
  • 16. COOLING TOWER Natural Draft Cooling Tower Cooling towers are heat removal devices used to transfer process waste heat to the atmosphere. Cooling towers either use the evaporation of water to remove process heat and cool the working fluid or in the case of closed circuit dry cooling towers rely solely on air to cool the working fluid.
  • 17. DE AREATOR De Areator A deaerator is a device that is widely used for the removal of air and other dissolved gases from the feed water to steam-generating boiler. The condensed water is then passed by a feed pump through a deaerater.
  • 18. ECONOMISER Economiser Economizer are mechanical devices intended to reduce energy consumption, or to perform another useful function like preheating a fluid. Pre-warmed water first enter in a feed heater powered by steam drawn from the high pressure set, and then in the economiser Economizer is a flue gas to water heat exchanger. Usually it is located below the LPSH in the boiler and above Air pre heater. Outside surface of the economizer tubes are heated by flue gases leaving the superheater and reheater which subsequently transfer heat to feed water flowing inside the tubes. Advantages of Economizer include 1) Fuel economy: – used to save fuel and increase overall efficiency of boiler plant. 2) Reducing size of boiler: – as the feed water is preheated in the economizer and enter boiler tube at elevated temperature. The heat transfer area required for evaporation reduced considerably.
  • 19. CHIMNEY A chimney is a structure for venting hot gases or smoke from a boiler, furnace or fireplace to the outside atmosphere. A chimney is a vertical structure for venting hot flue gases or smoke from a boiler to the outside atmosphere by means of the stack effect. The space inside a chimney is called aflue. The height of chimneys plays a role in their ability to transfer flue gases using stack effect. The dispersion of pollutants at higher altitude helps to ease down its influence on surroundings and reduces their concentrations in compliance with regulatory limits. Exhaust gas from electrostatic precipitator vented through the chimney tack.
  • 20. SWITCHYARD A switch yard is a part of an electrical generation, transmission, system. Switchyard transform voltage from high to low, or the reverse, or perform any of several other important functions.
  • 21. CONTROL ROOM A control room is a room serving as a centre where a large physical facility or physically dispersed service can be monitored and controlled.
  • 22. Instrumentation In Thermal Power Plant When the balance is disturbed, all the process variables deviate from their normal values thus creating the necessity for the following:- i)Instruments : To measure and indicate the amount of deviation. ii)Automatic Control: To correct the deviation and bring back system to normal iii) Annunciation : To warn about the excessive deviations, if any. iv) Protection : To isolate the equipments process from dangerous operating conditions cause due to such excessive
  • 23. Temperature The degree of hotness and coldness measured on the definite scale.  Methods of Temperature Measurement  Resistance Temperature Detector(R.T.D)  Thermocouple
  • 24. Resistance Temperature Detector  Resistance of certain metals changes as the  temp. changes as per formula given below :-  Rt=Ro(1+wt)  Where Rt=Resistance at temp. to be measured. Ro=Resistance at 0 degree C.  w=Temp. coefficient of res. Thermometer metal  t=Temp. to be measured.  Mainly three metals copper, nickel and platinum are used as RTD.
  • 25. Thermocouple It consists of a pair of wire of different materials. Wires are joined at both ends one junction is kept at a high temp.called hot junction and the other is kept at a fixed at lower temp. called cold junction. Due to which emf is setup in the ckt known as Thermo emf.
  • 26. Pressure Units for pressure measurement are Newton/m2 , Kg/cm2, mm of water column & mm of mercury column. Devices for Pressure Measurement Bourden Tube Pressure Gauge Manometer