Annual Review Third Quarter Report for 2011
Deliverable Description                                                 Date: 5 December 2011

Purpose/Description of the Target Annual Progress Report for 2011:
    An annual project progress report should be prepared toward the end of
    each year to document the performance of each project and communicate
    it to appropriate stakeholders. This review will focus on the extent to which
    progress is being made towards production of deliverables required to
    generate output and identification of project issues and their solutions.

Format:

Any standard appearance to which the Deliverable must conform:

Annual Project Progress Report Atlas


Derivation/Inputs:
Annual Progress Report receives inputs from:
    Deliverable Descriptions
    Quality Log
    Issues Log
    Risks Log

Quality Control Method:

Project Assurance will review the Annual Progress Report and ensure that
progress is properly documented including % progress towards deliverables,
risks and issues.

Accountabilities:

Accountabilities for producing the Annual Review Report:
    Project Manager




                                            1 of 16
Annual Review Third Quarter Report for 2011
         Deliverable Description                                                 Date: 5 December 2011

Annual Report


DATE:
Award ID: 00044225
Description: Annual Review Report of Strengthening the Ministry of Social Solidarity
Implementing Partner: Ministry of Social Solidarity
Period Covered: 2011
Project Issues:


Updated Project Risks:                                         Updated Project Risk Management

   1. MoSS has a weak infrastructure mainly in its                1. The Project hired a Senior Accounting
      financial reporting capacity due to the lack of                Manager, with strong financial
      international experience with donors.                          background, to ensure the proper
                                                                     financial management of the project
                                                                     resources in accordance with rules
                                                                     and regulations.
   2. The capacity of the MoSS staff to adapt and
      absorb changes introduced by the project is                 2. The Project has supported and
      limited.                                                       expanded all types of training
                                                                     programs of MoSS staff, in order to
                                                                     ensure adoption of introduced
                                                                     reforms by MoSS’ staff.

   3. Mainstreaming and inclusion of the Project                  3. The Project management ensured
      Management Unit (PMU). The PMU                                 that all contracted Senior Advisors,
      operates in seclusion of the remainder of the                  Consultants, and Specialists are
      Ministry and is not yet fully integrated with                  assigned to interact and work directly
      MoSS.                                                          with MoSS’ senior and middle level
                                                                     staff, in order to ensure transfer of
                                                                     Knowledge & expertise.

   4. The newly formed ministry MoSS’s complex                    4. Extensive efforts are underway to
      and changing mandate has made it difficult                     formulate and broadcast MoSS’
      for both Ministry staff and other government                   reform mandate and its vision of
      counterparts to interpret its role and                         reform to both its staff and to the
      activities.                                                    public. A broad communication
                                                                     message will be launched in 2009.


   5. Expected changes in both the Egyptian NGO                   5. The Project/UNDP has advocated a
      law and social policy pertaining to subsidies                  participatory approach towards both
      might result in increased social pressures.                    change processes in order to
                                                                     incorporate inputs and perspective
                                                                     from a wide variety of stakeholders,
                                                                     including the set-up of various internal
                                                                     and external NGO Policy Review
                                                                     Committees.


                                                     2 of 16
Annual Review Third Quarter Report for 2011
         Deliverable Description                                                 Date: 5 December 2011

   6- Project Performance


OUTPUT 1: MOSS TAU ESTABLISHED

ID: 00044225
Description: To support MOSS in recruiting outside expertise to assist it carry out the project ()


YYYY target:

   1. Set-up and organized regular senior staff meetings with regard to presenting the various
      projects of MoSS to all Consultants, with the purpose of facilitating communication and
      cooperation among all project staff, Consultants and various task managers.


YYYY Achievement:

   1. Contract with 7 support staff and assigned them to various tasks within MoSS’ departments




OUTPUT 2: MOSS NEW STRUCTURE
Project ID:  00044225
Description: To developing Moss’ mission & vision in order to respond to its new mandate

YYYY Target:

   1. Projects of the Central Agency for Reconstruction:
      Completed the follow-up of a number (80) implemented the project datum to the device as
      follows:
           Structure of (62) project.
           Development of (18) projects.
   2. Educational Buildings Authority projects:
      Completed and follow-up of a number (21) project implementation to the Holder as follows:
           Structure of (10) project.
           Development of (9) projects.
           Raising the efficiency of (2) project.
   3. Directorates in the governorates of housing projects:
      Follow-up completion of the count (15) project being implemented by directorates housing.
   4. Court building project for the new the Ministry of Agouza:
      Follow up the implementation of the project, which is implemented by the Department of
      Military Works armed forces and planned to be completed in 31/12/2011 to be outfitted with
      a plan of the fiscal year 2012/2013.
   5. Projects raise the efficiency of social units:
      Follow-up to the completion of the upgrading of a number (33) and unit 13, the Directorate
      was approved to raise the efficiency plan and budget of 2010/2011.


                                                     3 of 16
Annual Review Third Quarter Report for 2011
       Deliverable Description                                                 Date: 5 December 2011


  6. Investment plan for the fiscal year 2011/2012:
     Monitor the implementation of the investment plan for the sectors of Social Affairs and
     Supply and the amount allocated 25.7 million pounds of affairs and the amount of 9.19
     million pounds for the supply of an item of non-residential buildings to complete the projects
     under implementation.


YYYY Achievement:

  1. Projects of the Central Agency for Reconstruction (Completed):
         Establishment of 13 draft (from a total of 62 draft).
         Development of 9 project (from a total of 62 draft).

  2. Educational Buildings Authority projects (Been completed):
          Establishment of 4 project (out of 10 total projects).
          Development of 6 Draft (out of 9 total project).
          Raising the efficiency of project (out of 2 total project).
  3. Directorates in the governorates of housing projects:
     Follow-up completion of the count (15) project being implemented by directorates housing.
  4. Court building project for the new the Ministry of Agouza:
     Been ratified by the Ministry of Planning and International Cooperation, the transfer of $ 4
     million pounds of building allocations General Board (16 million pounds) down payment for
     the Department of Military Works armed forces.
     The availability of $ 4 million in the first quarter and the second for the payment of extracts
     and payable.
  5. Projects raise the efficiency of social units:
     Was the completion of the upgrading of a number (7) and the social unit of the total 33 units
     planned to boost the efficiency.




                                                   4 of 16
Annual Review Third Quarter Report for 2011
        Deliverable Description                                                 Date: 5 December 2011

OUTPUT 3: MOSS CAPACITY DEVELOPMENT
ID: 00044225
Description: To develop capacity building for MOSS (and NGOs).

YYYY target:

YYYY Achievement:

   First : Information Technology Activities:

    1. Smart Cards:
        Defined the rules of matching the input data for the ration cards with the exchange
         data and sent it to the S.C companies.
        The smart card companies designed programs necessary to the matching.
        Testing the matching programs in some Gov. Such as Port Said - Aswan.
    2. Family Database System:
        Finalize rollout of the system in 27 governorates
        Technical support for Family Database
    3. Targeting:
        Technical support for Targeting Program
        Exporting Targeting data for the completed governorates in a format that easy for
           SPSS statistics
    4. Social Solidarity Pensions from Post Offices
        Following up the monthly implantation circulation of Social Solidarity Pensions from
          Post Offices.
        Transferring Social Solidarity Pensions of El-Monofeya , Kafr El Shiekh and El-
          Gharbya from the Insurances to Family Profile Program.
        Co-operating with the governorates and social administrative offices with the
          Information Center to solve all the networks and technical problems of the project.
    5. NGOs Application
        The current screens have been updated in accordance with the requirements of the
         central department of NGOs.
        Implementation of the new screens include (training programs - Membership and
         Contributions - Committees – Members of the Board of Directors- Meetings of the
         Board of Directors - Members of the Assembly - the Assembly meetings - volunteers -
         NGO problems - research experience - revenues and expenses - budget).
        Completion the design of the required reports (Statistics - detailed data).

    6. Pilgrimage System :
        The program is divided into:
        A- Electronic lottery program:
             Hajj applications for members of NGOs' directorates - ministry staff.
             Implementation of all required amendments to the electronic lottery program.
        B- Hajj Information System:


                                                    5 of 16
Annual Review Third Quarter Report for 2011
    Deliverable Description                                                 Date: 5 December 2011

         Includes data for the winners of the Hajj, supervisors data, financial receipts, hotel,
            hotel accommodation, flights, reports.
         The current screens have been updated to increase the level of performance.
         Design a new set of report.
         Enhancement for running Hajj Program.
         Adding and redesign some of the Hajj program features.
         Implementation a program to print the identity cards of the pilgrims and
            supervisors includes all of their data and their personal photos.
         Providing technical support for Hajj Program users'.

7. Call Center Project:
           Finalize system updates, which include the following:
             o Adding new services (Botagaz – Productive Families – Customer services).
             o Create new complaint forms for the new services.
             o Changing the mandatory/optional filed according to our business need.
             o Customizing the Citizen form, which will include:
                a. Divide Citizen Name into 4 fields and not 1 field
                b. Add Address Structure (Governorates – Police Station – Area)
                   - Governorates (Pick list field that lists all governorates in Egypt)
                   - Police Station (Pick list field filtered according to governorate
                        selected value)
                   - Area or Village (Lookup field)
                c. Delete Governorate Values (10th Ramadan and Others) value
                d. Make all Address information mandatory fields
             o Editing the Validation rules, by customizing Duplicate detection feature
                which will be used to check the pre-existence of the Citizen Record by
                using :
                a. National ID (National ID to accept not less and not more than 14
                   numeric values (0-9) and validation shall be with respect to the National
                   ID structure)
                b. Phone Number (Phone & Fax numbers to accept not less than 7 and
                   not more than 10 numeric values (no special separators will be
                   accepted like -,+, ( , ) …etc)
                c. Mobile Number(Mobile Number to accept not less and not more than 11
                   numeric values (0-9).
      Finalize training for new users, as follows:
         o 5 trainees from Follow up Department in Tamween Sector.
         o 3 trainees from Follow up Department in Sheoon Sector.
      Prepared Proposal to improve the project performance.
      Keep the project on track, by continually monitoring the departments’ performance
         through monthly reports.

8. ERP Project:
   A. Regarding (Payroll and HR applications for Sheoon sector):
         Finalizing the register employees records process (1600 record) and update
            their information which include:
               o General information (name, birth date, ID, Graduation information,
                    employee rank, promotions).
               o Basic salaries.


                                                6 of 16
Annual Review Third Quarter Report for 2011
    Deliverable Description                                                 Date: 5 December 2011

                o Training courses.
                o Motivation bounce.
                o Yearly bounce.
                o Vacations.
          Running the audit process of reviewing the employee’s payroll data, and
            becoming ready to getting electronic payroll lists.
   B. Regarding (Accounting, budgeting applications for Sheoon, and Tamween sectors):
          The employees work on day to day basis, and they deliver the Application
            Output every month, as required.
   C. Regarding (Inventory, and purchasing applications for Sheoon, and Tamween
      sectors):
          The employees register departments, and keep it updated.


9. GIS System:
   GIS work includes three main billers, each has its status according to its scopes needs
   and details, these billers are:
    A. GIS Web Portal
        GIS Webpage linked to Ministry main web site:
         - Updating the GIS portal through linking the current GIS database with the
             updated version of family database (Automatically updated link) on the three
             aggregation levels (Governorates, Districts, Sub districts).
         - Adding more web functions (zoom in/out – info) to facilitate the usage of the
             portal.
         - Working on customizing more technical function such print layouts function
             using VB studio ver. 10
    B. Mapping Supply services
        Goal: Creating GIS maps for the current supply services on the street level detailed
                maps (scale 1:5000) covers all Egypt governorates.
        Participants:
                Department of central planning (Genral Aymen El Tokhy )
                Al Massryen Company
                CAPMAS
                GIS unit in MOSS
        Roles and responsibilities :
               CAPMAS : Based on verbal agreement between the Minster and General
                  Abu-Bakr Al Gindy (head of CAPMAS), CAPMAS will provide the GIS unit
                  in the ministry with the complete set of GIS vector data on street level
                  (1:5000) for all Egypt governorates , these maps will be used to locate the
                  supply services starting by Subsidized bakeries with its linked outlets .
               GIS unit in MOSS: receiving maps from CAPMAS then prepare the paper
                  layouts and print each sub district separated in map size A0.
               Department of central planning receive the paper print outs maps to be
                  disseminated to different other departments responsible for Bakeries and
                  Outlets distribution.
               Al Massreyn Company is responsible for mapping the bakeries and outlets,
                  in addition to submit all details related to the bakeries such as ( Name,
                  Type, quota, separated or not, Address..etc)


                                                7 of 16
Annual Review Third Quarter Report for 2011
 Deliverable Description                                                  Date: 5 December 2011

            Then all data to be back again to GIS unit in MOSS to do the following
              actions:
                  o Build complete Access database contains the gathered data related
                     to each bakery and attached its outlets.
                  o Locate both Bakeries and outlets on the Maps which enable the
                     decision makers to judge the equality of their distribution over certain
                     location.
Work status:
    After many periodical visits to CAPMAS; a complete detailed digital maps for 8
       governorates had been delivered to the MOSS GIS unit. these governorates are:
(Giza, Cairo, Qaluobia, Helwan, October, Gharbia, Sharkia, Behira)
    The project starts with mapping bakeries and outlets on the governorate of Greater
       Cairo (Cairo, Giza, Helwan, and Qaluobia).
    The work achievements % shown in the following table:

                    % work
Governorate                                                    Remarks
                 Achievements

   Cairo              80 %

    Giza               40%

  Helwan               10%

                                       Due to that maps had been lost either in Masreen
  October                  0%
                                       company or in the department of central planning.



Note: All finished and revised maps original copies are kept in GIS unit.


  C. Mapping Target Project results:
    - Goal: Creating GIS printouts highlight the result of targeting project with
      co-operation of institute of social study (Dr Ibtsam Al Gafarawy).
    - Work status :
          GIS unit was responsible for receiving the targeting data and them
             preparing the layouts which shows the result of targeting project to be
             printed on the complete report, starting by -Al Behira- governorate with its
             district.
          All the work in this phase has been done and sent it Dr Ibtsam.
          A sample of the map produced showed as




                                              8 of 16
Annual Review Third Quarter Report for 2011
Deliverable Description                                                 Date: 5 December 2011




D. GIS Handover
    Starting from 15 September 2011; The GIS unit had been delivered completely to
      a committee of MSS information center.
    The GIS handover includes the flowing :
       - GIS Hardware :
             3 units - original Dell Pc
             1 unit - Plotter
             1 unit - A4 Black& white laser printer
            1 unit - A4 Colour printer
            1 unit - Scanner

         -   GIS Software:
             Handover 3 Original GIS licenses (2 ARCGIS Editor – and 1 ARC Server)
             and Installation packages needed for plotter and printers and Scanner.

         -   GIS Work situation :
             Detailed hand over notes and delivery reports had been submitted to the
             information center committee , in addition to give them 13 days on job
             training to let them be able to complete the needed whole GIS work on time.




                                            9 of 16
Annual Review Third Quarter Report for 2011
    Deliverable Description                                                 Date: 5 December 2011


10. Redesign & development of MoSS Website:

       Coordinating with Project IT Team, the ministry's IT department and Media
        Consultant to gather information about the current MSS web site and the needs to be
        met in the new web site.
       Analysis of the current web site, and identifying the restructuring needed and the
        information and services to be included on the new website.
       Developing the new website information structure.
       Selecting and evaluating the platform to be used in the development of the new
        website.
       Preparing the development environment.
       Creating the design of the new web site, and implementing sample homepage and
        an internal page.

Secondly : Training Activities:

   1. Transformative training for secretarial staff units and centers of social work assistants
       social workers (250 were trained ).
   2. Training of social workers and managers and heads of units and centers on the
       development of social skills and functional capabilities (30 were trained ).
   3. Training departments of social workers to incorporate social data (none .)
   4. Development of skills for Social Workers Public Relations, Media department and
       directorates (38 were trained ).
   5. Development of specialist skills to the public service directorates (40 were trained ).
   6. Development of specialist skills and training coordinators at directorates (35 were
       trained ).
   7. Develop the skills of specialist training to behavior modification directorates (29 were
       trained ).
   8. Family education program for employees and their families in the ministry at the Emiri
       year and directorates (120 were trained ).
   9. Evaluating the performance of teams to build capacity and central directorates (205
       were trained ).
   10. Meetings and review and make a difference to help build capacity directorates (269
       were trained ).
   11. Training of personnel in the English language (32 were trained ).
   12. Senior management training on topics of modern management and implemented by
       IBM Corporation ( none).
   13. Senior management training program on the leaders of change ( none).
   14. Computer training (80 were trained ).

Third : Research & Development:
Activities of the short term National Consultants:
     Scientific Coordinator with World Food Program.
     Prepare memos to the minister regarding Economic and management issues.
     Participate in the Minster’s meetings that related to economic issues.
     Finalize the Review Egyptian country strategy for the World Food Program 2012 to
         2016.


                                                10 of 16
Annual Review Third Quarter Report for 2011
    Deliverable Description                                                 Date: 5 December 2011

     Finalize participate in the preparation of the draft of “the National Body of Food
      Subsidy” law.
    Finalize prepare the “General Structure of MEGA Bakeries and merging of Small
      Bakeries.
    Finalize Present the final result of the “Supply Chain Study” to the Minister.
    Finalize Conduct study of “Measuring of the Balady Bread Production Cost” through
      field survey on 5 bakeries.
    Finalize present the “LPG reform Strategy” at Center of Social and Criminal” .
    Finalize prepare the TOR of “Build and design a new efficient and effective system for
      Balady Bread through removing government intervention from initial stages of the
      Balady Bread Supply Chain to its last stage.
 Ongoing conduct in collaboration with WFP and international experts:
    Build and design a new efficient and effective system foe Balady bread.
    Draw structured implementation plan for the new Balady Bread system.
    Design a pilot project for the first phase of the implementation of the new enhanced
      and efficient Balady Bread system.

Responsible of the following dossiers :
    World Bank: meetings on behalf of his Excellency the minister; drafts & executive
    summaries of MSS&SJ vision & strategies.
    Islamic Bank for Development: meetings with his Excellency, drafts & executive
    summaries of MSS&SJ vision & strategies, proposed plan of collaboration.
    NGO: work follow‐up & reviewing of proposed new NGO, follow‐up of successful
    experiences all over the world to acquire experience in targeting the poorest ,
    developing Egyptian NGO map ( geographic distribution, activities, no of
      beneficiaries, etc…).
    UN World Food Programme: executive summary of monthly reports related to
      work in Egypt (FFT).

Executive summaries of studies & reports:
    Evaluating the performance of help & social development sector in MSS&SJ.
    The disaster fund.
    Targeting the most vulnerable groups.
    Evaluating the national module to reduce poverty.
    The role of NGO in promoting human development.
    Aya company for consultancy & development.
    Attending conferences & briefing on behalf of his Excellency:
    Conference Nebni Masr Sept 2011, Sawi wheel,
    Soufi conference, Sept 2011, Azhar conference hall,
    Conference of Curing & Preventing Addiction, June 2011, Nasr City.




                                                11 of 16
Annual Review Third Quarter Report for 2011
       Deliverable Description                                                 Date: 5 December 2011

OUTPUT 4: ACCREDIT & ELIGIBILITY SYSTEM FOR NGO

Project ID:  00044225
Description: To create an accreditation & eligibility system for NGO in Egypt ()

2011 Targets:

   1. Demonstrate and train governorates relevant staff on application of the eligibility criteria
      form.
   2. Evaluation and analysis of results of the application of the criteria on waves of NGO’s.
   3. Establishing the Audit Committee, and implementation of its role and responsibilities
   4. Application of the grant "struggle and success" for disabled persons and relevant NGO’s.
   5. Application for the data base for disability and the standards for NGO’s working in
      disability.


YYYY Achievement:

1. NGO’s Eligibility System

   A. Gathering more information and data to be included in the NGO’s report/guiding book, It
      is supposed to cover regulations and directives aspects, criteria, statistics, challenges,
      examples of promising and successful NGO’s, granting parties, kinds and conditions of
      support, large networking groups and valuable partnerships projects, volunteers roles,
      regional NGO’s, ministry's targeted social solidarity activities, recommendations, etc …
   B. Following with the NGO’s department the implementation of the NGO’s eligibility criteria,
      The number of NGO’s evaluated by this form has increased to up to 150 central NGO’s,
      Results of the evaluation form have been analysed and registered.
   C. Drafting proposals to act positively towards loses deriving after the 25/1/2011 actions as:
        Recommending urgent audit missions focusing on large NGO’s and related to ex-
          regime.
        Proposing activities to NGO’s to play a constructive role towards the revolutionary
          action.
        Propose a project to Collect optional donation from the ministry staff to be directed to
          feed the account opened in Nasr Social Bank to reimburse harmed and injured
          people .
        Proposals conveyed through the minister s office to relevant departments for
          consideration.
   D. Follow up with the NGO’s department the remarks and recommendations related to audit
      findings and NGO’s activities.
   E. Respect the other projects that were proposed for 2011, Please note the following:
        As for establishing an Audit Committee to supervise the nationwide annual audit
          activities on NGO’s and implementing the risk based audit methodology, The
          proposal was conveyed by the minister's office to the head of the NGO’s department
          for consideration, we are following them to discuss the issue and to provide their
          comments.
        As for organizing a Seminar to demonstrate the eligibility criteria to the governorates,
          the NGO’s, and the granting parties, The head of NGO’s department mentioned that
          due to the current circumstances it will be postponed.


                                                   12 of 16
Annual Review Third Quarter Report for 2011
            Deliverable Description                                                 Date: 5 December 2011

              As for tailored Training Courses to cover main weakness elements in a majority of
               NGO’s, will be done upon the application of the criteria form on most of NGO’s.
      F.   Preparing power point presentation for the NGO’s eligibility criteria to be demonstrated at
           the seminar and workshop targeted to declare the eligibility criteria and explain its
           application form to relevant participants from governorates, NGO’s, and stake holders.
           The NGO’s department is proceeding to arrange for this seminar to be held on December
           2011 after the arrangements related to the Pilgrimage season.
      G.   Following with the NGO’s department the implementation of the NGO’s eligibility criteria,
           The number of NGO’s evaluated by this form has increased to 180 central NGO’s,
           Results of the evaluation form have been analysed and registered. As for the Tailored
           Training Courses to cover main weakness elements in a majority of NGO’s, will be done
           upon the application of the criteria form on a larger number of NGO’s.
      H.   Discuss with head of NGO’s department the proposal of establishing audit committee to
           supervise the nationwide audit activities on NGO’s and implement risk based
           methodology, preliminary positive consideration was reached, we are following to
           provide us comments.
      I.   Follow with relevant departments the proposals to act positively towards loses deriving
           after the 25/1/2011 revolution.

2. Disability:

      A. Following with the rehabilitation department to provide the approval of the governorates
         on the proposed components of the database form respect NGO’s working in fields of
         disability and the disabled persons dealing with them.

      B. Following with the rehabilitation department the implementation of the additional criteria
         (standards) respect NGO’s working in fields of disability and to provide us copy of their
         visit reports respect assessing the implementation of these standards in a sample of
         NGO’s, and clarifying challenges, comments and recommendations.

      C. The implementation of the grant "struggle & success" for challenging disabled persons
         and their supporting NGO’s, is under review in coordination with the head of rehabilitation
         department.

      D. Received from the rehabilitation department application of 8 Governorates that already
         fulfilled the components of the disability database form respect 42 NGO’s working in
         fields of disability and the disabled persons dealing with them.
         Reviewing the contents to present recommendations in order to extend application, and
         add components of the disability database form to the new electronic NGO’s database,
         It will enable to start a stone detailed database on disabled persons dealing with NGO’s
         working in field of disability, which can help in providing objective views and decisions,
         Following the rehabilitation department to provide fulfilled forms from remaining
         governorates.
      E. Received from the rehabilitation department reports from 4 Governorates respect the
         implementation of the additional criteria (standards) in NGO’s working in fields of
         disability, they mentioned some obstacles specially in old NGO’s, as for new ones it is
         fulfilled. Reviewing these reports to identify challenges, comments and recommendations.
      F. The implementation of the grant "struggle & success" for challenging disabled persons
         and their supporting NGO’s, is postponed due to insufficient funding for the time being.



                                                        13 of 16
Annual Review Third Quarter Report for 2011
       Deliverable Description                                                 Date: 5 December 2011

OUTPUT 5: NEW SOCIAL PROTECTION SYSTEM

Project ID:   00044225
Description: To Review & Improve targeting
YYYY target:

YYYY Achievement:
   1. Smart Cards:
       Defined the rules of matching the input data for the ration cards with the exchange
          data and sent it to the smart card companies.
       The smart card companies designed programs necessary to the matching.
       Testing the matching programs in some Governorates such as Port Said and Aswan.
   2. Targeting:
       Technical support for Targeting Program.
       Exporting Targeting data for the completed governorates ina format that easy for
          SPSS statistics analysis.

   3. Social Solidarity Pensions from Post Offices
       Following up the monthly implantation circulation of Social Solidarity Pensions from
         Post Offices.
       Transferring Social Solidarity Pensions of El-Monofeya , Kafr El Shiekh and El-
          Gharbya from the Insurances to Family Profile Program.
       Co-operating with the Governorates and social administrative offices with the
          Information Center to solve all the networks and technical problems of the project.


OUTPUT 6: IMPROVING NASSER SOCIAL BANK

Project ID: 00044225
Description: To assess Nasser Social Bank and prepare it for restructuring.

YYYY target:
   1. Prepare revised set of regulations for NSB Investment, “Takaful”, “Takeraats/Akarats” and
      Legal divisions.
   2. Continue to:
       Connect central departments to newly commissioned NSB’s digital network.
       Investigate means to modernize archiving capabilities.
       Introduce ATM services to NSB clients and employees.
       Redefine branches’ performance criteria to match NSB’s philosophies/mission.
       Beta testing of the new NSB website.
       Beta testing of the new NSB intranet site (for internal use).
       Develop a preliminary concept for a revamped main branch at 35 Kasr El Nil-Cairo.


                                                   14 of 16
Annual Review Third Quarter Report for 2011
       Deliverable Description                                                 Date: 5 December 2011

          Review and revise training regulations and prepare the 2010 training program.
          Monitor progress at the three new branches: Nasr City, 6 Oct, and Zakazeek.
          Prepare a human development program for NSB staff.
          Monitor progress to establish a new Human Capital Development Centre (HCDC).
          Prepare NSB legal division’s reform memo.
   3. Visit to six NSB branches and a number of “Zakaat” committees in Southern Egypt.
   4. Finalize revised regulations for Investment, “Takaful”, “Takeraats/Akarats” and Legal
       divisions.
   5. Connect central departments to NSB’s newly commissioned digital network.
   6. Began the strategy formulation process with NSB’s executives.
   7. Initiate contact with Army core of engineers to revamp upper Egypt branches, and
   8. Initiate a study to formulate functionalities and roles to introduce new NSB access points.
   9. Recruited 120 new staff member, which have been internally trained on all NSB services.
   10. Revamped, completely, the bank’s database centre, and
       Established the bank’s Call Centre, and documenting all operational regulations.

YYYY Achievement:

   1. Conduct a third round of negotiations with the African Development Bank (AFDB).
   2. Assign the revamping of five NSB’s branches in upper Egypt to the Military Works
      Department.
   3. Enable NSB’s main branch to use a single point of contact for all services except cashier
      services.
   4. Officially open the new Zakazeek branch
   5. Continue to:
       Work on the automation project.
       Plan for the “Takafull” day to be held in Q4 2011.
       Investigate the feasibility to implement the first social business project in Sohag.
       Prepare an NSB aggressive Human Capital Development program.

NSB’s Reforms Pilot Project has been completed successfully.
Phase1 of the Reforms Project begins on November 1st, 2010. It focuses on preparing,
publishing, and implementing NSB strategies for the next three years including: full automation
of services, executing an aggressive human capital development plan, and physically revamping
all NSB branches.
   1. Conduct a third round of negotiations with the African Development Bank (AFDB) in Tunisia.
   2. Conduct a fourth round of negotiations with the AFDB in Cairo.
   3. Initialized the loan and grant agreement with the AFDB.
   4. Prepare memos required to increase take-home pay of NSB employees.
   5. Successfully selecting, nominating, and qualifying two NSB staff members to attend a two
      month training courses in India sponsored by the African Asian Rural Development
      Organization (AARDO).
   6. Continued to:
         Work on a comprehensive automation project.
         Investigate the feasibility to implement the first social business project in Sohag.
         Prepare an NSB aggressive Human Capital Development program.



                                                   15 of 16
Annual Review Third Quarter Report for 2011
        Deliverable Description                                                 Date: 5 December 2011


Conclusion

NSB’s Reforms Pilot Project has been completed successfully.

Phase1 of the NSB Reforms Project began on November 1st, 2010. It focuses on preparing,
publishing, and implementing NSB strategies for the next three years including: full automation
of services, executing an aggressive human capital development plan, and revamping all of
NSB ninety branches.
In November, 2010, NSB finished its Reforms Pilot Project and began Phase 1 of its Reforms
Project.

The Reforms Pilot Project included: revamping the current data center at NSB head office to
enable the operation of a newly developed state-of-the-art digital network, established an NSB
human capital development center (HCDC), developed new/revised bank regulations,
developed a model for the look-and-feel of rebranded bank branches, hired well over 400 new
employees based on predefined set of selection criteria, and opened 3 new branches
conforming to the new rebranded branch model.

NSB automation project will fully automate all NSB services and connect all of its 90 branches
through a sophisticated/secured network. It will also ensure that the bank uses state-of-the-art
technologies and information systems. The project will incorporate an efficient business
continuity solution to ensure data integrity and around the clock availability of services. In
addition, the project will enable the bank to provide a set of services that it is not currently
possible due to the nature of its legacy/outdated information systems and technologies.

The bank is undertaking an aggressive human capital development initiative and succession
plan. The initiative will begin with a massive human capital assessment and gap analysis phase
followed by a customized human capital development program that targets employees across
the organization to change/improve its culture while drastically improving on its human capital
assets.

The bank has developed a three-year plan to revamp its ninety branches across Egypt. In 2010,
NSB managed to develop a model for the newly branded branches and revamped three
branches. Now the processes, consulting offices, and implementation contractors are on board
and the bank has a plan to revamp 10-15 branches in 2011 and the remaining branches in the
following two years.




                                                    16 of 16

Mais conteúdo relacionado

Semelhante a Q3 2011 Progress Report MoSS

UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012
MoheebSattar
 
Business Plan Evaluation
Business Plan EvaluationBusiness Plan Evaluation
Business Plan Evaluation
Noel Hatch
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
Hugh Shults
 
4 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 04 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 0
Ly Smith
 
Pots pan steering group meeting minutes 29.05.12
Pots pan steering group meeting minutes 29.05.12Pots pan steering group meeting minutes 29.05.12
Pots pan steering group meeting minutes 29.05.12
Tony Toole
 

Semelhante a Q3 2011 Progress Report MoSS (20)

UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012
 
Business Plan Evaluation
Business Plan EvaluationBusiness Plan Evaluation
Business Plan Evaluation
 
Selma_CV1
Selma_CV1Selma_CV1
Selma_CV1
 
Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)Jisc fe and skills project (csg briefing paper 1)
Jisc fe and skills project (csg briefing paper 1)
 
VALUE ASSURANCE GOV NAO.docx
VALUE ASSURANCE GOV NAO.docxVALUE ASSURANCE GOV NAO.docx
VALUE ASSURANCE GOV NAO.docx
 
FinalreportELS
FinalreportELSFinalreportELS
FinalreportELS
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
Sample project management
Sample project managementSample project management
Sample project management
 
Sample project management
Sample project managementSample project management
Sample project management
 
Sample project management
Sample project managementSample project management
Sample project management
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment
 
NAO Guide Initiating_Successful_Projects
NAO Guide Initiating_Successful_ProjectsNAO Guide Initiating_Successful_Projects
NAO Guide Initiating_Successful_Projects
 
4 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 04 t12 project feasibility study guideline v4 0
4 t12 project feasibility study guideline v4 0
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
 
Prioritisation and selection of public investment projects - James BALLINGALL...
Prioritisation and selection of public investment projects - James BALLINGALL...Prioritisation and selection of public investment projects - James BALLINGALL...
Prioritisation and selection of public investment projects - James BALLINGALL...
 
Consortium program of work and budget 2013 october 2012
Consortium program of work and budget 2013 october 2012Consortium program of work and budget 2013 october 2012
Consortium program of work and budget 2013 october 2012
 
Human Resources Strategy for 2022–25.pdf
Human Resources Strategy for 2022–25.pdfHuman Resources Strategy for 2022–25.pdf
Human Resources Strategy for 2022–25.pdf
 
Maintenance operational-plan
Maintenance operational-planMaintenance operational-plan
Maintenance operational-plan
 
Pots pan steering group meeting minutes 29.05.12
Pots pan steering group meeting minutes 29.05.12Pots pan steering group meeting minutes 29.05.12
Pots pan steering group meeting minutes 29.05.12
 

Q3 2011 Progress Report MoSS

  • 1. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 Purpose/Description of the Target Annual Progress Report for 2011: An annual project progress report should be prepared toward the end of each year to document the performance of each project and communicate it to appropriate stakeholders. This review will focus on the extent to which progress is being made towards production of deliverables required to generate output and identification of project issues and their solutions. Format: Any standard appearance to which the Deliverable must conform: Annual Project Progress Report Atlas Derivation/Inputs: Annual Progress Report receives inputs from:  Deliverable Descriptions  Quality Log  Issues Log  Risks Log Quality Control Method: Project Assurance will review the Annual Progress Report and ensure that progress is properly documented including % progress towards deliverables, risks and issues. Accountabilities: Accountabilities for producing the Annual Review Report:  Project Manager 1 of 16
  • 2. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 Annual Report DATE: Award ID: 00044225 Description: Annual Review Report of Strengthening the Ministry of Social Solidarity Implementing Partner: Ministry of Social Solidarity Period Covered: 2011 Project Issues: Updated Project Risks: Updated Project Risk Management 1. MoSS has a weak infrastructure mainly in its 1. The Project hired a Senior Accounting financial reporting capacity due to the lack of Manager, with strong financial international experience with donors. background, to ensure the proper financial management of the project resources in accordance with rules and regulations. 2. The capacity of the MoSS staff to adapt and absorb changes introduced by the project is 2. The Project has supported and limited. expanded all types of training programs of MoSS staff, in order to ensure adoption of introduced reforms by MoSS’ staff. 3. Mainstreaming and inclusion of the Project 3. The Project management ensured Management Unit (PMU). The PMU that all contracted Senior Advisors, operates in seclusion of the remainder of the Consultants, and Specialists are Ministry and is not yet fully integrated with assigned to interact and work directly MoSS. with MoSS’ senior and middle level staff, in order to ensure transfer of Knowledge & expertise. 4. The newly formed ministry MoSS’s complex 4. Extensive efforts are underway to and changing mandate has made it difficult formulate and broadcast MoSS’ for both Ministry staff and other government reform mandate and its vision of counterparts to interpret its role and reform to both its staff and to the activities. public. A broad communication message will be launched in 2009. 5. Expected changes in both the Egyptian NGO 5. The Project/UNDP has advocated a law and social policy pertaining to subsidies participatory approach towards both might result in increased social pressures. change processes in order to incorporate inputs and perspective from a wide variety of stakeholders, including the set-up of various internal and external NGO Policy Review Committees. 2 of 16
  • 3. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 6- Project Performance OUTPUT 1: MOSS TAU ESTABLISHED ID: 00044225 Description: To support MOSS in recruiting outside expertise to assist it carry out the project () YYYY target: 1. Set-up and organized regular senior staff meetings with regard to presenting the various projects of MoSS to all Consultants, with the purpose of facilitating communication and cooperation among all project staff, Consultants and various task managers. YYYY Achievement: 1. Contract with 7 support staff and assigned them to various tasks within MoSS’ departments OUTPUT 2: MOSS NEW STRUCTURE Project ID: 00044225 Description: To developing Moss’ mission & vision in order to respond to its new mandate YYYY Target: 1. Projects of the Central Agency for Reconstruction: Completed the follow-up of a number (80) implemented the project datum to the device as follows:  Structure of (62) project.  Development of (18) projects. 2. Educational Buildings Authority projects: Completed and follow-up of a number (21) project implementation to the Holder as follows:  Structure of (10) project.  Development of (9) projects.  Raising the efficiency of (2) project. 3. Directorates in the governorates of housing projects: Follow-up completion of the count (15) project being implemented by directorates housing. 4. Court building project for the new the Ministry of Agouza: Follow up the implementation of the project, which is implemented by the Department of Military Works armed forces and planned to be completed in 31/12/2011 to be outfitted with a plan of the fiscal year 2012/2013. 5. Projects raise the efficiency of social units: Follow-up to the completion of the upgrading of a number (33) and unit 13, the Directorate was approved to raise the efficiency plan and budget of 2010/2011. 3 of 16
  • 4. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 6. Investment plan for the fiscal year 2011/2012: Monitor the implementation of the investment plan for the sectors of Social Affairs and Supply and the amount allocated 25.7 million pounds of affairs and the amount of 9.19 million pounds for the supply of an item of non-residential buildings to complete the projects under implementation. YYYY Achievement: 1. Projects of the Central Agency for Reconstruction (Completed):  Establishment of 13 draft (from a total of 62 draft).  Development of 9 project (from a total of 62 draft). 2. Educational Buildings Authority projects (Been completed):  Establishment of 4 project (out of 10 total projects).  Development of 6 Draft (out of 9 total project).  Raising the efficiency of project (out of 2 total project). 3. Directorates in the governorates of housing projects: Follow-up completion of the count (15) project being implemented by directorates housing. 4. Court building project for the new the Ministry of Agouza: Been ratified by the Ministry of Planning and International Cooperation, the transfer of $ 4 million pounds of building allocations General Board (16 million pounds) down payment for the Department of Military Works armed forces. The availability of $ 4 million in the first quarter and the second for the payment of extracts and payable. 5. Projects raise the efficiency of social units: Was the completion of the upgrading of a number (7) and the social unit of the total 33 units planned to boost the efficiency. 4 of 16
  • 5. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 OUTPUT 3: MOSS CAPACITY DEVELOPMENT ID: 00044225 Description: To develop capacity building for MOSS (and NGOs). YYYY target: YYYY Achievement: First : Information Technology Activities: 1. Smart Cards:  Defined the rules of matching the input data for the ration cards with the exchange data and sent it to the S.C companies.  The smart card companies designed programs necessary to the matching.  Testing the matching programs in some Gov. Such as Port Said - Aswan. 2. Family Database System:  Finalize rollout of the system in 27 governorates  Technical support for Family Database 3. Targeting:  Technical support for Targeting Program  Exporting Targeting data for the completed governorates in a format that easy for SPSS statistics 4. Social Solidarity Pensions from Post Offices  Following up the monthly implantation circulation of Social Solidarity Pensions from Post Offices.  Transferring Social Solidarity Pensions of El-Monofeya , Kafr El Shiekh and El- Gharbya from the Insurances to Family Profile Program.  Co-operating with the governorates and social administrative offices with the Information Center to solve all the networks and technical problems of the project. 5. NGOs Application  The current screens have been updated in accordance with the requirements of the central department of NGOs.  Implementation of the new screens include (training programs - Membership and Contributions - Committees – Members of the Board of Directors- Meetings of the Board of Directors - Members of the Assembly - the Assembly meetings - volunteers - NGO problems - research experience - revenues and expenses - budget).  Completion the design of the required reports (Statistics - detailed data). 6. Pilgrimage System : The program is divided into: A- Electronic lottery program:  Hajj applications for members of NGOs' directorates - ministry staff.  Implementation of all required amendments to the electronic lottery program. B- Hajj Information System: 5 of 16
  • 6. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011  Includes data for the winners of the Hajj, supervisors data, financial receipts, hotel, hotel accommodation, flights, reports.  The current screens have been updated to increase the level of performance.  Design a new set of report.  Enhancement for running Hajj Program.  Adding and redesign some of the Hajj program features.  Implementation a program to print the identity cards of the pilgrims and supervisors includes all of their data and their personal photos.  Providing technical support for Hajj Program users'. 7. Call Center Project:  Finalize system updates, which include the following: o Adding new services (Botagaz – Productive Families – Customer services). o Create new complaint forms for the new services. o Changing the mandatory/optional filed according to our business need. o Customizing the Citizen form, which will include: a. Divide Citizen Name into 4 fields and not 1 field b. Add Address Structure (Governorates – Police Station – Area) - Governorates (Pick list field that lists all governorates in Egypt) - Police Station (Pick list field filtered according to governorate selected value) - Area or Village (Lookup field) c. Delete Governorate Values (10th Ramadan and Others) value d. Make all Address information mandatory fields o Editing the Validation rules, by customizing Duplicate detection feature which will be used to check the pre-existence of the Citizen Record by using : a. National ID (National ID to accept not less and not more than 14 numeric values (0-9) and validation shall be with respect to the National ID structure) b. Phone Number (Phone & Fax numbers to accept not less than 7 and not more than 10 numeric values (no special separators will be accepted like -,+, ( , ) …etc) c. Mobile Number(Mobile Number to accept not less and not more than 11 numeric values (0-9).  Finalize training for new users, as follows: o 5 trainees from Follow up Department in Tamween Sector. o 3 trainees from Follow up Department in Sheoon Sector.  Prepared Proposal to improve the project performance.  Keep the project on track, by continually monitoring the departments’ performance through monthly reports. 8. ERP Project: A. Regarding (Payroll and HR applications for Sheoon sector):  Finalizing the register employees records process (1600 record) and update their information which include: o General information (name, birth date, ID, Graduation information, employee rank, promotions). o Basic salaries. 6 of 16
  • 7. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 o Training courses. o Motivation bounce. o Yearly bounce. o Vacations.  Running the audit process of reviewing the employee’s payroll data, and becoming ready to getting electronic payroll lists. B. Regarding (Accounting, budgeting applications for Sheoon, and Tamween sectors):  The employees work on day to day basis, and they deliver the Application Output every month, as required. C. Regarding (Inventory, and purchasing applications for Sheoon, and Tamween sectors):  The employees register departments, and keep it updated. 9. GIS System: GIS work includes three main billers, each has its status according to its scopes needs and details, these billers are: A. GIS Web Portal GIS Webpage linked to Ministry main web site: - Updating the GIS portal through linking the current GIS database with the updated version of family database (Automatically updated link) on the three aggregation levels (Governorates, Districts, Sub districts). - Adding more web functions (zoom in/out – info) to facilitate the usage of the portal. - Working on customizing more technical function such print layouts function using VB studio ver. 10 B. Mapping Supply services Goal: Creating GIS maps for the current supply services on the street level detailed maps (scale 1:5000) covers all Egypt governorates. Participants:  Department of central planning (Genral Aymen El Tokhy )  Al Massryen Company  CAPMAS  GIS unit in MOSS Roles and responsibilities :  CAPMAS : Based on verbal agreement between the Minster and General Abu-Bakr Al Gindy (head of CAPMAS), CAPMAS will provide the GIS unit in the ministry with the complete set of GIS vector data on street level (1:5000) for all Egypt governorates , these maps will be used to locate the supply services starting by Subsidized bakeries with its linked outlets .  GIS unit in MOSS: receiving maps from CAPMAS then prepare the paper layouts and print each sub district separated in map size A0.  Department of central planning receive the paper print outs maps to be disseminated to different other departments responsible for Bakeries and Outlets distribution.  Al Massreyn Company is responsible for mapping the bakeries and outlets, in addition to submit all details related to the bakeries such as ( Name, Type, quota, separated or not, Address..etc) 7 of 16
  • 8. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011  Then all data to be back again to GIS unit in MOSS to do the following actions: o Build complete Access database contains the gathered data related to each bakery and attached its outlets. o Locate both Bakeries and outlets on the Maps which enable the decision makers to judge the equality of their distribution over certain location. Work status:  After many periodical visits to CAPMAS; a complete detailed digital maps for 8 governorates had been delivered to the MOSS GIS unit. these governorates are: (Giza, Cairo, Qaluobia, Helwan, October, Gharbia, Sharkia, Behira)  The project starts with mapping bakeries and outlets on the governorate of Greater Cairo (Cairo, Giza, Helwan, and Qaluobia).  The work achievements % shown in the following table: % work Governorate Remarks Achievements Cairo 80 % Giza 40% Helwan 10% Due to that maps had been lost either in Masreen October 0% company or in the department of central planning. Note: All finished and revised maps original copies are kept in GIS unit. C. Mapping Target Project results: - Goal: Creating GIS printouts highlight the result of targeting project with co-operation of institute of social study (Dr Ibtsam Al Gafarawy). - Work status :  GIS unit was responsible for receiving the targeting data and them preparing the layouts which shows the result of targeting project to be printed on the complete report, starting by -Al Behira- governorate with its district.  All the work in this phase has been done and sent it Dr Ibtsam.  A sample of the map produced showed as 8 of 16
  • 9. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 D. GIS Handover  Starting from 15 September 2011; The GIS unit had been delivered completely to a committee of MSS information center.  The GIS handover includes the flowing : - GIS Hardware : 3 units - original Dell Pc 1 unit - Plotter 1 unit - A4 Black& white laser printer 1 unit - A4 Colour printer 1 unit - Scanner - GIS Software: Handover 3 Original GIS licenses (2 ARCGIS Editor – and 1 ARC Server) and Installation packages needed for plotter and printers and Scanner. - GIS Work situation : Detailed hand over notes and delivery reports had been submitted to the information center committee , in addition to give them 13 days on job training to let them be able to complete the needed whole GIS work on time. 9 of 16
  • 10. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 10. Redesign & development of MoSS Website:  Coordinating with Project IT Team, the ministry's IT department and Media Consultant to gather information about the current MSS web site and the needs to be met in the new web site.  Analysis of the current web site, and identifying the restructuring needed and the information and services to be included on the new website.  Developing the new website information structure.  Selecting and evaluating the platform to be used in the development of the new website.  Preparing the development environment.  Creating the design of the new web site, and implementing sample homepage and an internal page. Secondly : Training Activities: 1. Transformative training for secretarial staff units and centers of social work assistants social workers (250 were trained ). 2. Training of social workers and managers and heads of units and centers on the development of social skills and functional capabilities (30 were trained ). 3. Training departments of social workers to incorporate social data (none .) 4. Development of skills for Social Workers Public Relations, Media department and directorates (38 were trained ). 5. Development of specialist skills to the public service directorates (40 were trained ). 6. Development of specialist skills and training coordinators at directorates (35 were trained ). 7. Develop the skills of specialist training to behavior modification directorates (29 were trained ). 8. Family education program for employees and their families in the ministry at the Emiri year and directorates (120 were trained ). 9. Evaluating the performance of teams to build capacity and central directorates (205 were trained ). 10. Meetings and review and make a difference to help build capacity directorates (269 were trained ). 11. Training of personnel in the English language (32 were trained ). 12. Senior management training on topics of modern management and implemented by IBM Corporation ( none). 13. Senior management training program on the leaders of change ( none). 14. Computer training (80 were trained ). Third : Research & Development: Activities of the short term National Consultants:  Scientific Coordinator with World Food Program.  Prepare memos to the minister regarding Economic and management issues.  Participate in the Minster’s meetings that related to economic issues.  Finalize the Review Egyptian country strategy for the World Food Program 2012 to 2016. 10 of 16
  • 11. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011  Finalize participate in the preparation of the draft of “the National Body of Food Subsidy” law.  Finalize prepare the “General Structure of MEGA Bakeries and merging of Small Bakeries.  Finalize Present the final result of the “Supply Chain Study” to the Minister.  Finalize Conduct study of “Measuring of the Balady Bread Production Cost” through field survey on 5 bakeries.  Finalize present the “LPG reform Strategy” at Center of Social and Criminal” .  Finalize prepare the TOR of “Build and design a new efficient and effective system for Balady Bread through removing government intervention from initial stages of the Balady Bread Supply Chain to its last stage. Ongoing conduct in collaboration with WFP and international experts:  Build and design a new efficient and effective system foe Balady bread.  Draw structured implementation plan for the new Balady Bread system.  Design a pilot project for the first phase of the implementation of the new enhanced and efficient Balady Bread system. Responsible of the following dossiers :  World Bank: meetings on behalf of his Excellency the minister; drafts & executive  summaries of MSS&SJ vision & strategies.  Islamic Bank for Development: meetings with his Excellency, drafts & executive  summaries of MSS&SJ vision & strategies, proposed plan of collaboration.  NGO: work follow‐up & reviewing of proposed new NGO, follow‐up of successful  experiences all over the world to acquire experience in targeting the poorest ,  developing Egyptian NGO map ( geographic distribution, activities, no of beneficiaries, etc…).  UN World Food Programme: executive summary of monthly reports related to work in Egypt (FFT). Executive summaries of studies & reports:  Evaluating the performance of help & social development sector in MSS&SJ.  The disaster fund.  Targeting the most vulnerable groups.  Evaluating the national module to reduce poverty.  The role of NGO in promoting human development.  Aya company for consultancy & development.  Attending conferences & briefing on behalf of his Excellency:  Conference Nebni Masr Sept 2011, Sawi wheel,  Soufi conference, Sept 2011, Azhar conference hall,  Conference of Curing & Preventing Addiction, June 2011, Nasr City. 11 of 16
  • 12. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 OUTPUT 4: ACCREDIT & ELIGIBILITY SYSTEM FOR NGO Project ID: 00044225 Description: To create an accreditation & eligibility system for NGO in Egypt () 2011 Targets: 1. Demonstrate and train governorates relevant staff on application of the eligibility criteria form. 2. Evaluation and analysis of results of the application of the criteria on waves of NGO’s. 3. Establishing the Audit Committee, and implementation of its role and responsibilities 4. Application of the grant "struggle and success" for disabled persons and relevant NGO’s. 5. Application for the data base for disability and the standards for NGO’s working in disability. YYYY Achievement: 1. NGO’s Eligibility System A. Gathering more information and data to be included in the NGO’s report/guiding book, It is supposed to cover regulations and directives aspects, criteria, statistics, challenges, examples of promising and successful NGO’s, granting parties, kinds and conditions of support, large networking groups and valuable partnerships projects, volunteers roles, regional NGO’s, ministry's targeted social solidarity activities, recommendations, etc … B. Following with the NGO’s department the implementation of the NGO’s eligibility criteria, The number of NGO’s evaluated by this form has increased to up to 150 central NGO’s, Results of the evaluation form have been analysed and registered. C. Drafting proposals to act positively towards loses deriving after the 25/1/2011 actions as:  Recommending urgent audit missions focusing on large NGO’s and related to ex- regime.  Proposing activities to NGO’s to play a constructive role towards the revolutionary action.  Propose a project to Collect optional donation from the ministry staff to be directed to feed the account opened in Nasr Social Bank to reimburse harmed and injured people .  Proposals conveyed through the minister s office to relevant departments for consideration. D. Follow up with the NGO’s department the remarks and recommendations related to audit findings and NGO’s activities. E. Respect the other projects that were proposed for 2011, Please note the following:  As for establishing an Audit Committee to supervise the nationwide annual audit activities on NGO’s and implementing the risk based audit methodology, The proposal was conveyed by the minister's office to the head of the NGO’s department for consideration, we are following them to discuss the issue and to provide their comments.  As for organizing a Seminar to demonstrate the eligibility criteria to the governorates, the NGO’s, and the granting parties, The head of NGO’s department mentioned that due to the current circumstances it will be postponed. 12 of 16
  • 13. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011  As for tailored Training Courses to cover main weakness elements in a majority of NGO’s, will be done upon the application of the criteria form on most of NGO’s. F. Preparing power point presentation for the NGO’s eligibility criteria to be demonstrated at the seminar and workshop targeted to declare the eligibility criteria and explain its application form to relevant participants from governorates, NGO’s, and stake holders. The NGO’s department is proceeding to arrange for this seminar to be held on December 2011 after the arrangements related to the Pilgrimage season. G. Following with the NGO’s department the implementation of the NGO’s eligibility criteria, The number of NGO’s evaluated by this form has increased to 180 central NGO’s, Results of the evaluation form have been analysed and registered. As for the Tailored Training Courses to cover main weakness elements in a majority of NGO’s, will be done upon the application of the criteria form on a larger number of NGO’s. H. Discuss with head of NGO’s department the proposal of establishing audit committee to supervise the nationwide audit activities on NGO’s and implement risk based methodology, preliminary positive consideration was reached, we are following to provide us comments. I. Follow with relevant departments the proposals to act positively towards loses deriving after the 25/1/2011 revolution. 2. Disability: A. Following with the rehabilitation department to provide the approval of the governorates on the proposed components of the database form respect NGO’s working in fields of disability and the disabled persons dealing with them. B. Following with the rehabilitation department the implementation of the additional criteria (standards) respect NGO’s working in fields of disability and to provide us copy of their visit reports respect assessing the implementation of these standards in a sample of NGO’s, and clarifying challenges, comments and recommendations. C. The implementation of the grant "struggle & success" for challenging disabled persons and their supporting NGO’s, is under review in coordination with the head of rehabilitation department. D. Received from the rehabilitation department application of 8 Governorates that already fulfilled the components of the disability database form respect 42 NGO’s working in fields of disability and the disabled persons dealing with them. Reviewing the contents to present recommendations in order to extend application, and add components of the disability database form to the new electronic NGO’s database, It will enable to start a stone detailed database on disabled persons dealing with NGO’s working in field of disability, which can help in providing objective views and decisions, Following the rehabilitation department to provide fulfilled forms from remaining governorates. E. Received from the rehabilitation department reports from 4 Governorates respect the implementation of the additional criteria (standards) in NGO’s working in fields of disability, they mentioned some obstacles specially in old NGO’s, as for new ones it is fulfilled. Reviewing these reports to identify challenges, comments and recommendations. F. The implementation of the grant "struggle & success" for challenging disabled persons and their supporting NGO’s, is postponed due to insufficient funding for the time being. 13 of 16
  • 14. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 OUTPUT 5: NEW SOCIAL PROTECTION SYSTEM Project ID: 00044225 Description: To Review & Improve targeting YYYY target: YYYY Achievement: 1. Smart Cards:  Defined the rules of matching the input data for the ration cards with the exchange data and sent it to the smart card companies.  The smart card companies designed programs necessary to the matching.  Testing the matching programs in some Governorates such as Port Said and Aswan. 2. Targeting:  Technical support for Targeting Program.  Exporting Targeting data for the completed governorates ina format that easy for SPSS statistics analysis. 3. Social Solidarity Pensions from Post Offices  Following up the monthly implantation circulation of Social Solidarity Pensions from Post Offices.  Transferring Social Solidarity Pensions of El-Monofeya , Kafr El Shiekh and El- Gharbya from the Insurances to Family Profile Program.  Co-operating with the Governorates and social administrative offices with the Information Center to solve all the networks and technical problems of the project. OUTPUT 6: IMPROVING NASSER SOCIAL BANK Project ID: 00044225 Description: To assess Nasser Social Bank and prepare it for restructuring. YYYY target: 1. Prepare revised set of regulations for NSB Investment, “Takaful”, “Takeraats/Akarats” and Legal divisions. 2. Continue to:  Connect central departments to newly commissioned NSB’s digital network.  Investigate means to modernize archiving capabilities.  Introduce ATM services to NSB clients and employees.  Redefine branches’ performance criteria to match NSB’s philosophies/mission.  Beta testing of the new NSB website.  Beta testing of the new NSB intranet site (for internal use).  Develop a preliminary concept for a revamped main branch at 35 Kasr El Nil-Cairo. 14 of 16
  • 15. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011  Review and revise training regulations and prepare the 2010 training program.  Monitor progress at the three new branches: Nasr City, 6 Oct, and Zakazeek.  Prepare a human development program for NSB staff.  Monitor progress to establish a new Human Capital Development Centre (HCDC).  Prepare NSB legal division’s reform memo. 3. Visit to six NSB branches and a number of “Zakaat” committees in Southern Egypt. 4. Finalize revised regulations for Investment, “Takaful”, “Takeraats/Akarats” and Legal divisions. 5. Connect central departments to NSB’s newly commissioned digital network. 6. Began the strategy formulation process with NSB’s executives. 7. Initiate contact with Army core of engineers to revamp upper Egypt branches, and 8. Initiate a study to formulate functionalities and roles to introduce new NSB access points. 9. Recruited 120 new staff member, which have been internally trained on all NSB services. 10. Revamped, completely, the bank’s database centre, and Established the bank’s Call Centre, and documenting all operational regulations. YYYY Achievement: 1. Conduct a third round of negotiations with the African Development Bank (AFDB). 2. Assign the revamping of five NSB’s branches in upper Egypt to the Military Works Department. 3. Enable NSB’s main branch to use a single point of contact for all services except cashier services. 4. Officially open the new Zakazeek branch 5. Continue to:  Work on the automation project.  Plan for the “Takafull” day to be held in Q4 2011.  Investigate the feasibility to implement the first social business project in Sohag.  Prepare an NSB aggressive Human Capital Development program. NSB’s Reforms Pilot Project has been completed successfully. Phase1 of the Reforms Project begins on November 1st, 2010. It focuses on preparing, publishing, and implementing NSB strategies for the next three years including: full automation of services, executing an aggressive human capital development plan, and physically revamping all NSB branches. 1. Conduct a third round of negotiations with the African Development Bank (AFDB) in Tunisia. 2. Conduct a fourth round of negotiations with the AFDB in Cairo. 3. Initialized the loan and grant agreement with the AFDB. 4. Prepare memos required to increase take-home pay of NSB employees. 5. Successfully selecting, nominating, and qualifying two NSB staff members to attend a two month training courses in India sponsored by the African Asian Rural Development Organization (AARDO). 6. Continued to:  Work on a comprehensive automation project.  Investigate the feasibility to implement the first social business project in Sohag.  Prepare an NSB aggressive Human Capital Development program. 15 of 16
  • 16. Annual Review Third Quarter Report for 2011 Deliverable Description Date: 5 December 2011 Conclusion NSB’s Reforms Pilot Project has been completed successfully. Phase1 of the NSB Reforms Project began on November 1st, 2010. It focuses on preparing, publishing, and implementing NSB strategies for the next three years including: full automation of services, executing an aggressive human capital development plan, and revamping all of NSB ninety branches. In November, 2010, NSB finished its Reforms Pilot Project and began Phase 1 of its Reforms Project. The Reforms Pilot Project included: revamping the current data center at NSB head office to enable the operation of a newly developed state-of-the-art digital network, established an NSB human capital development center (HCDC), developed new/revised bank regulations, developed a model for the look-and-feel of rebranded bank branches, hired well over 400 new employees based on predefined set of selection criteria, and opened 3 new branches conforming to the new rebranded branch model. NSB automation project will fully automate all NSB services and connect all of its 90 branches through a sophisticated/secured network. It will also ensure that the bank uses state-of-the-art technologies and information systems. The project will incorporate an efficient business continuity solution to ensure data integrity and around the clock availability of services. In addition, the project will enable the bank to provide a set of services that it is not currently possible due to the nature of its legacy/outdated information systems and technologies. The bank is undertaking an aggressive human capital development initiative and succession plan. The initiative will begin with a massive human capital assessment and gap analysis phase followed by a customized human capital development program that targets employees across the organization to change/improve its culture while drastically improving on its human capital assets. The bank has developed a three-year plan to revamp its ninety branches across Egypt. In 2010, NSB managed to develop a model for the newly branded branches and revamped three branches. Now the processes, consulting offices, and implementation contractors are on board and the bank has a plan to revamp 10-15 branches in 2011 and the remaining branches in the following two years. 16 of 16