Annual Review 2012
Deliverable Description                                   Date: 13 February, 2012


        Purpose/Description of the Target Annual Progress Report for 2012
        An annual project progress report should be prepared toward the end of each
        year to document the performance of each project and communicate it to
        appropriate stakeholders. This review will focus on the extent to which
        progress is being made towards production of deliverables required to
        generate output and identification of project issues and their solutions.

        Format:

        Any standard appearance to which the Deliverable must conform:

        Annual Project Progress Report Atlas


        Derivation/Inputs:
        Annual Progress Report receives inputs from:
         Deliverable Descriptions
         Quality Log
         Issues Log
         Risks Log

        Quality Control Method:

        Project Assurance will review the Annual Progress Report and ensure that
        progress is properly documented including % progress towards deliverables,
        risks and issues.

        Accountabilities:

        Accountabilities for producing the Annual Review Report:
          Project Manager




                                            1 of 6
Annual Review 2012
Deliverable Description                                             Date: 13 February, 2012

Annual Report 2012

DATE:
Award ID: 00044225
Description: Annual Review Report of Strengthening the Ministry of Social Solidarity
Implementing Partner: Ministry of Social Solidarity, MoSS is divided into 2 ministries
                     (Ministry of Supply and Internal Trade &
                      Ministry of Insurance and Social Affairs)

Period Covered: 2012
1. Project Issues:


Updated Project Risks:                                 Updated Project Risk Management

   1. MoSS has a weak infrastructure mainly                 1. The Project hired a Senior Accounting
      in its financial reporting capacity due to               Manager, with strong financial
      the lack of international experience with                background, to ensure the proper
      donors.                                                  financial management of the project
                                                               resources in accordance with rules and
                                                               regulations.

   2. The capacity of the MoSS staff to adapt               2. The Project has supported and
      and absorb changes introduced by the                     expanded all types of training programs
      project is limited.                                      of MoSS staff, in order to ensure
                                                               adoption of introduced reforms by
                                                               MoSS’ staff.

   3. Mainstreaming and inclusion of the                    3. The Project management ensured that
      Project Management Unit (PMU). The                       all contracted Senior Advisors,
      PMU operates in seclusion of the                         Consultants, and Specialists are
      remainder of the Ministry and is not yet                 assigned to interact and work directly
      fully integrated with MoSS.                              with MoSS’ senior and middle level
                                                               staff, in order to ensure transfer of
                                                               Knowledge & expertise.

   4. The newly formed ministry MoSS’s                      4. Extensive efforts are underway to
      complex and changing mandate has                         formulate and broadcast MoSS’ reform
      made it difficult for both Ministry staff                mandate and its vision of reform to both
      and other government counterparts to                     its staff and to the public. A broad
      interpret its role and activities.                       communication message will be
                                                               launched in 2009.

   5. Expected changes in both the Egyptian                 5. The Project/UNDP has advocated a
      NGO law and social policy pertaining to                  participatory approach towards both
      subsidies might result in increased                      change processes in order to
      social pressures.                                        incorporate inputs and perspective from
                                                               a wide variety of stakeholders, including
                                                               the set-up of various internal and
                                                               external NGO Policy Review
                                                               Committees.
                                                   2 of 6
Annual Review 2012
Deliverable Description                                      Date: 13 February, 2012


Project Expected Outputs:

OUTPUT 1: MOSS TAU Established
Project ID: 00044225
Description: To support MOSS in recruiting outside expertise to assist it carry out the project’s
targets.

YYYY target: 2012
   1. Set-up and organized regular senior staff meetings with regard to presenting the various
      projects of MoSS to all Consultants, with the purpose of facilitating communication and
      cooperation among all project staff, Consultants and various task managers.



OUTPUT 2: MOSS NEW STRUCTURE
Project ID:  00044225
Description: To developing Moss’ mission & vision to respond to its new mandate.

YYYY Target: 2012
   1. Central Agency for Reconstruction projects:
      Follow-up establishment of (80) projects to be implementing as follow:
           Establishment of (62) projects.
           Development of (18) projects.
   2. Educational Buildings Authority projects:
      Follow-up establishment of (21) projects to be implementing by the holder as follow:
           Establishment of (10) projects.
           Development of (9) projects.
           Raising the efficiency of (2) projects.
   3. Housing Directorates Projects in Governorates:
      Follow-up establishment of (15) projects being implemented by housing directorates in
      Governorates.
   4. Court building project for the new ministry building in Agouza:
      Follow up the implementation of the project, being implemented by the Military Works
      Department of Armed Forces and planned to be completed in 31/12/2011 to be outfitted
      with fiscal year plan 2012/2013.
   5. Raise the efficiency of social units project:
      Follow-up the upgrading of (33) units, Social Directorates in Governorates were approved
      to raise the efficiency of social units according to fiscal year plan 2010/2011 &
      2011/2012.
   6. Ratification to start establishment of (13) new social services centers and development of
      (15) social units in addition to equipped (103) service projects in many Governorates
      according to fiscal year plan 2012/2013.
   7. Investment Plan for the fiscal year 2011/2012:
      Monitor the implementation of the investment plan for Social Affairs Sector and Supply
      Sector, (25.7 million L.E. allocated from Social Affairs Sector and 9.19 million L.E.
      allocated from Supply Sector of an item of non-residential buildings) to complete
      implementation the projects.

                                              3 of 6
Annual Review 2012
Deliverable Description                                    Date: 13 February, 2012

OUTPUT 3: MOSS CAPACITY DEVELOPMENT
Project ID: 00044225
Description: To develop capacity building for MOSS and NGO’s.

YYYY target: 2012

   1. Family Database System:
       Finalize rollout of the system for all Governorates.
       Interface with Smart Card Companies via web services.
       Interface with Social Insurance Organization via web services.
       Hosting Family Database at Social Insurance Organization Information Center.
   2. GIS System:
       Produce GIS reports for targeting system.
       Integration with Ministry of State for Administrative Development systems
         (E. Government).
   3. Establishing the Ministry of Insurance and Social Affairs IT infrastructure:
       Finalize outsourcing Hosting of Data Center at Social Insurance Organization
         Information Center.
       Finalize setting up a Disaster Recovery Center for Ministry of Supply and Internal
         Trade.
   4. NGOs System:
       Develop the system to meet all the requirements of Central Department of NGO’s of
        Ministry of Insurance and Social Affairs.
       Complete the design of the required reports (Statistics - detailed data).

   5. Pilgrimage System :
       Enhancement for running Hajj Program.
       Design a new set of report.
   6. MOSS Website:
      Develop the website of the 2 ministries (Ministry of Supply and Internal Trade & Ministry
      of Insurance and Social Affairs) through:
       Coordinating with Project IT Team, the ministry's IT department and Media Consultant
           to gather information about the current MoSS web site and the needs to be met in the
           new web site.
       Analysis of the current web site, and identifying the restructuring needed and
           the information and services to be included on the new website.
       Developing the new website information structure.
       Selecting and evaluating the platform to be used in the development of the new
           website.
       Preparing the development environment.
       Creating the design of the new web site, and implementing sample homepage and an
           internal page.
   7. Call Center Project :
       Implement new services and updates.
       Rollout of MoSS new updates, services and requirements.
       Integration of Call Center Database and Complains Database on Website.

                                             4 of 6
Annual Review 2012
Deliverable Description                                     Date: 13 February, 2012

   8. ERP System:
       Keep the project on track.


   9. Training Component:

    A- Ministry of Supply and Internal Trade :
       Training (60) directors and managers of the sectors (Senior Management).
       Training (80) employees of Citizens Service Department (Executive Management).
       Training (45) employees of Public Relations and Media Department (Executive
         Management).
       Training (125) inspectors of Central Department for Inspection (Middle Management).
       Training (80) employees of Supply Departments and Offices (Middle Management).
       Training (80) employees of Internal Trade Sector (Middle Management).

    B- Ministry of Insurance and Social Affairs :
       Conversion Training (160) of Social Units secretarial employees to work as assistant
        social specialist (Executive Management).
       Training (80) social specialists to develop skills and increase functional capacity
         (Middle Management).
       Training (160) social specialists for data entry of Family Database System (Middle
        Management).
       Establish 3 workshops for )400) of social specialist on the New Social Protection Law
        (Middle Management).
       Training (20) of Senior Managers on Total Quality Management TQM.
       Training (20) of employees on the Computer Skills (Executive Management).
       Training (20) of employees on English language (Middle Management).




OUTPUT 4: Accredit & Eligibility System for NGO

Project ID:  00044225
Description: To create an accreditation & eligibility system for NGO in Egypt

YYYY Target: 2012

   1. Establishing the Audit Committee, and implementing of its role and responsibilities.
   2. Training Governorates relevant staff on the application of the eligibility criteria forms.
   3. Evaluation and analysis the criteria application results on waves of NGOs.
   4. Arrange for tailored training courses to cover the main weakness elements in the majority
      of NGOs based on the analysis of the criteria evaluation results.
   5. Drafting the NGOs guiding report.




                                              5 of 6
Annual Review 2012
Deliverable Description                                     Date: 13 February, 2012

OUTPUT 5: New Social Protection System

Project ID:   00044225
Description: To Review & Improve targeting

YYYY target: 2012

   1. Smart Cards:
        Rollout of smart cards for Solidarity Pension Service throughout all Governorates.
        Develop and implement interface with wholesale companies.

   2. Social Solidarity Pensions from Post Offices:
        Study payment from more than one post office for each social service center.
        Finalize issuing Social Solidarity Pension from Post Offices by family smart card.




OUTPUT 6: Improving Nasser Social Bank

Project ID: 00044225
Description: To assess Nasser Social Bank and prepare it for restructuring.

YYYY target: 2012
   1. Finalize prepared revised set of regulations for NSB Investment, “Takaful”,
      “Takeraats/Akarats” and Legal divisions.
   2. Continue to:
      Connect central departments to newly commissioned NSB’s digital network.
      Investigate means to modernize archiving capabilities.
      Introduce ATM services to NSB clients and employees.
      Redefine branches’ performance criteria to match NSB’s philosophies/mission.
      Develop NSB website.
      Develop NSB intranet site (for internal use).
      Develop a preliminary concept for a revamped main branch at 35 Kasr El Nil-Cairo.
      Implement Year 2012 NBE training program.
      Continue monitoring progress of 3 new branches: Nasr City, 6 Oct., and Zakazeek.
      Prepare a human development program for NSB staff.
      Monitor progress of the new Human Capital Development Centre (HCDC).
   3. Evaluate 6 branches of NSB and “Zakaat” committees in Southern Egypt.
   4. Connect central departments to NSB’s newly commissioned digital network.
   5. Issue the Strategy Formulation Process with NSB’s Executives.
   6. Initiate contact with Engineering Authority of Armed Forces to revamp upper Egypt
      branches, and Initiate a study to formulate functionalities and roles to introduce new NSB
      access points.
   7. Revamped, completely, the Bank’s Database Center, and Establish the Bank’s Call
      Center and documenting all operational regulations.
   8. Revamped, completely, 10 Information Center of NSB Branches, and connecting them
      with the NSB Database Center.


                                              6 of 6

Mais conteúdo relacionado

Semelhante a Annual Work Plan 2012 Final

UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012
MoheebSattar
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
AbramMartino96
 
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_100419743761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
Manideep Yellanki
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
Hugh Shults
 
FIN320 – Gallaher – Prep for Exam 3 – Computational Questions1.docx
FIN320 – Gallaher – Prep for Exam 3 – Computational Questions1.docxFIN320 – Gallaher – Prep for Exam 3 – Computational Questions1.docx
FIN320 – Gallaher – Prep for Exam 3 – Computational Questions1.docx
mydrynan
 

Semelhante a Annual Work Plan 2012 Final (20)

UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012UNDP MoSS Project Board Meeting 30062012
UNDP MoSS Project Board Meeting 30062012
 
Consortium program of work and budget 2013 october 2012
Consortium program of work and budget 2013 october 2012Consortium program of work and budget 2013 october 2012
Consortium program of work and budget 2013 october 2012
 
VALUE ASSURANCE GOV NAO.docx
VALUE ASSURANCE GOV NAO.docxVALUE ASSURANCE GOV NAO.docx
VALUE ASSURANCE GOV NAO.docx
 
Selma_CV1
Selma_CV1Selma_CV1
Selma_CV1
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introduction
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
Maintenance operational-plan
Maintenance operational-planMaintenance operational-plan
Maintenance operational-plan
 
UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment UCISA Toolkit - Establishing a PMO in an HE Environment
UCISA Toolkit - Establishing a PMO in an HE Environment
 
Human Resources Strategy for 2022–25.pdf
Human Resources Strategy for 2022–25.pdfHuman Resources Strategy for 2022–25.pdf
Human Resources Strategy for 2022–25.pdf
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
 
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_100419743761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
 
PROPOSAL WRITING TRAINING. Presentationt
PROPOSAL WRITING TRAINING. PresentationtPROPOSAL WRITING TRAINING. Presentationt
PROPOSAL WRITING TRAINING. Presentationt
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
 
FIN320 – Gallaher – Prep for Exam 3 – Computational Questions1.docx
FIN320 – Gallaher – Prep for Exam 3 – Computational Questions1.docxFIN320 – Gallaher – Prep for Exam 3 – Computational Questions1.docx
FIN320 – Gallaher – Prep for Exam 3 – Computational Questions1.docx
 
Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.
 
Detailed Programme Case Study
Detailed Programme Case StudyDetailed Programme Case Study
Detailed Programme Case Study
 
2004
20042004
2004
 
case study.pdf
case study.pdfcase study.pdf
case study.pdf
 
DPE guidelines on CSR for CPSE 2010
DPE guidelines on CSR for CPSE 2010DPE guidelines on CSR for CPSE 2010
DPE guidelines on CSR for CPSE 2010
 
project design
project designproject design
project design
 

Annual Work Plan 2012 Final

  • 1. Annual Review 2012 Deliverable Description Date: 13 February, 2012 Purpose/Description of the Target Annual Progress Report for 2012 An annual project progress report should be prepared toward the end of each year to document the performance of each project and communicate it to appropriate stakeholders. This review will focus on the extent to which progress is being made towards production of deliverables required to generate output and identification of project issues and their solutions. Format: Any standard appearance to which the Deliverable must conform: Annual Project Progress Report Atlas Derivation/Inputs: Annual Progress Report receives inputs from:  Deliverable Descriptions  Quality Log  Issues Log  Risks Log Quality Control Method: Project Assurance will review the Annual Progress Report and ensure that progress is properly documented including % progress towards deliverables, risks and issues. Accountabilities: Accountabilities for producing the Annual Review Report:  Project Manager 1 of 6
  • 2. Annual Review 2012 Deliverable Description Date: 13 February, 2012 Annual Report 2012 DATE: Award ID: 00044225 Description: Annual Review Report of Strengthening the Ministry of Social Solidarity Implementing Partner: Ministry of Social Solidarity, MoSS is divided into 2 ministries (Ministry of Supply and Internal Trade & Ministry of Insurance and Social Affairs) Period Covered: 2012 1. Project Issues: Updated Project Risks: Updated Project Risk Management 1. MoSS has a weak infrastructure mainly 1. The Project hired a Senior Accounting in its financial reporting capacity due to Manager, with strong financial the lack of international experience with background, to ensure the proper donors. financial management of the project resources in accordance with rules and regulations. 2. The capacity of the MoSS staff to adapt 2. The Project has supported and and absorb changes introduced by the expanded all types of training programs project is limited. of MoSS staff, in order to ensure adoption of introduced reforms by MoSS’ staff. 3. Mainstreaming and inclusion of the 3. The Project management ensured that Project Management Unit (PMU). The all contracted Senior Advisors, PMU operates in seclusion of the Consultants, and Specialists are remainder of the Ministry and is not yet assigned to interact and work directly fully integrated with MoSS. with MoSS’ senior and middle level staff, in order to ensure transfer of Knowledge & expertise. 4. The newly formed ministry MoSS’s 4. Extensive efforts are underway to complex and changing mandate has formulate and broadcast MoSS’ reform made it difficult for both Ministry staff mandate and its vision of reform to both and other government counterparts to its staff and to the public. A broad interpret its role and activities. communication message will be launched in 2009. 5. Expected changes in both the Egyptian 5. The Project/UNDP has advocated a NGO law and social policy pertaining to participatory approach towards both subsidies might result in increased change processes in order to social pressures. incorporate inputs and perspective from a wide variety of stakeholders, including the set-up of various internal and external NGO Policy Review Committees. 2 of 6
  • 3. Annual Review 2012 Deliverable Description Date: 13 February, 2012 Project Expected Outputs: OUTPUT 1: MOSS TAU Established Project ID: 00044225 Description: To support MOSS in recruiting outside expertise to assist it carry out the project’s targets. YYYY target: 2012 1. Set-up and organized regular senior staff meetings with regard to presenting the various projects of MoSS to all Consultants, with the purpose of facilitating communication and cooperation among all project staff, Consultants and various task managers. OUTPUT 2: MOSS NEW STRUCTURE Project ID: 00044225 Description: To developing Moss’ mission & vision to respond to its new mandate. YYYY Target: 2012 1. Central Agency for Reconstruction projects: Follow-up establishment of (80) projects to be implementing as follow:  Establishment of (62) projects.  Development of (18) projects. 2. Educational Buildings Authority projects: Follow-up establishment of (21) projects to be implementing by the holder as follow:  Establishment of (10) projects.  Development of (9) projects.  Raising the efficiency of (2) projects. 3. Housing Directorates Projects in Governorates: Follow-up establishment of (15) projects being implemented by housing directorates in Governorates. 4. Court building project for the new ministry building in Agouza: Follow up the implementation of the project, being implemented by the Military Works Department of Armed Forces and planned to be completed in 31/12/2011 to be outfitted with fiscal year plan 2012/2013. 5. Raise the efficiency of social units project: Follow-up the upgrading of (33) units, Social Directorates in Governorates were approved to raise the efficiency of social units according to fiscal year plan 2010/2011 & 2011/2012. 6. Ratification to start establishment of (13) new social services centers and development of (15) social units in addition to equipped (103) service projects in many Governorates according to fiscal year plan 2012/2013. 7. Investment Plan for the fiscal year 2011/2012: Monitor the implementation of the investment plan for Social Affairs Sector and Supply Sector, (25.7 million L.E. allocated from Social Affairs Sector and 9.19 million L.E. allocated from Supply Sector of an item of non-residential buildings) to complete implementation the projects. 3 of 6
  • 4. Annual Review 2012 Deliverable Description Date: 13 February, 2012 OUTPUT 3: MOSS CAPACITY DEVELOPMENT Project ID: 00044225 Description: To develop capacity building for MOSS and NGO’s. YYYY target: 2012 1. Family Database System:  Finalize rollout of the system for all Governorates.  Interface with Smart Card Companies via web services.  Interface with Social Insurance Organization via web services.  Hosting Family Database at Social Insurance Organization Information Center. 2. GIS System:  Produce GIS reports for targeting system.  Integration with Ministry of State for Administrative Development systems (E. Government). 3. Establishing the Ministry of Insurance and Social Affairs IT infrastructure:  Finalize outsourcing Hosting of Data Center at Social Insurance Organization Information Center.  Finalize setting up a Disaster Recovery Center for Ministry of Supply and Internal Trade. 4. NGOs System:  Develop the system to meet all the requirements of Central Department of NGO’s of Ministry of Insurance and Social Affairs.  Complete the design of the required reports (Statistics - detailed data). 5. Pilgrimage System :  Enhancement for running Hajj Program.  Design a new set of report. 6. MOSS Website: Develop the website of the 2 ministries (Ministry of Supply and Internal Trade & Ministry of Insurance and Social Affairs) through:  Coordinating with Project IT Team, the ministry's IT department and Media Consultant to gather information about the current MoSS web site and the needs to be met in the new web site.  Analysis of the current web site, and identifying the restructuring needed and the information and services to be included on the new website.  Developing the new website information structure.  Selecting and evaluating the platform to be used in the development of the new website.  Preparing the development environment.  Creating the design of the new web site, and implementing sample homepage and an internal page. 7. Call Center Project :  Implement new services and updates.  Rollout of MoSS new updates, services and requirements.  Integration of Call Center Database and Complains Database on Website. 4 of 6
  • 5. Annual Review 2012 Deliverable Description Date: 13 February, 2012 8. ERP System:  Keep the project on track. 9. Training Component: A- Ministry of Supply and Internal Trade :  Training (60) directors and managers of the sectors (Senior Management).  Training (80) employees of Citizens Service Department (Executive Management).  Training (45) employees of Public Relations and Media Department (Executive Management).  Training (125) inspectors of Central Department for Inspection (Middle Management).  Training (80) employees of Supply Departments and Offices (Middle Management).  Training (80) employees of Internal Trade Sector (Middle Management). B- Ministry of Insurance and Social Affairs :  Conversion Training (160) of Social Units secretarial employees to work as assistant social specialist (Executive Management).  Training (80) social specialists to develop skills and increase functional capacity (Middle Management).  Training (160) social specialists for data entry of Family Database System (Middle Management).  Establish 3 workshops for )400) of social specialist on the New Social Protection Law (Middle Management).  Training (20) of Senior Managers on Total Quality Management TQM.  Training (20) of employees on the Computer Skills (Executive Management).  Training (20) of employees on English language (Middle Management). OUTPUT 4: Accredit & Eligibility System for NGO Project ID: 00044225 Description: To create an accreditation & eligibility system for NGO in Egypt YYYY Target: 2012 1. Establishing the Audit Committee, and implementing of its role and responsibilities. 2. Training Governorates relevant staff on the application of the eligibility criteria forms. 3. Evaluation and analysis the criteria application results on waves of NGOs. 4. Arrange for tailored training courses to cover the main weakness elements in the majority of NGOs based on the analysis of the criteria evaluation results. 5. Drafting the NGOs guiding report. 5 of 6
  • 6. Annual Review 2012 Deliverable Description Date: 13 February, 2012 OUTPUT 5: New Social Protection System Project ID: 00044225 Description: To Review & Improve targeting YYYY target: 2012 1. Smart Cards:  Rollout of smart cards for Solidarity Pension Service throughout all Governorates.  Develop and implement interface with wholesale companies. 2. Social Solidarity Pensions from Post Offices:  Study payment from more than one post office for each social service center.  Finalize issuing Social Solidarity Pension from Post Offices by family smart card. OUTPUT 6: Improving Nasser Social Bank Project ID: 00044225 Description: To assess Nasser Social Bank and prepare it for restructuring. YYYY target: 2012 1. Finalize prepared revised set of regulations for NSB Investment, “Takaful”, “Takeraats/Akarats” and Legal divisions. 2. Continue to:  Connect central departments to newly commissioned NSB’s digital network.  Investigate means to modernize archiving capabilities.  Introduce ATM services to NSB clients and employees.  Redefine branches’ performance criteria to match NSB’s philosophies/mission.  Develop NSB website.  Develop NSB intranet site (for internal use).  Develop a preliminary concept for a revamped main branch at 35 Kasr El Nil-Cairo.  Implement Year 2012 NBE training program.  Continue monitoring progress of 3 new branches: Nasr City, 6 Oct., and Zakazeek.  Prepare a human development program for NSB staff.  Monitor progress of the new Human Capital Development Centre (HCDC). 3. Evaluate 6 branches of NSB and “Zakaat” committees in Southern Egypt. 4. Connect central departments to NSB’s newly commissioned digital network. 5. Issue the Strategy Formulation Process with NSB’s Executives. 6. Initiate contact with Engineering Authority of Armed Forces to revamp upper Egypt branches, and Initiate a study to formulate functionalities and roles to introduce new NSB access points. 7. Revamped, completely, the Bank’s Database Center, and Establish the Bank’s Call Center and documenting all operational regulations. 8. Revamped, completely, 10 Information Center of NSB Branches, and connecting them with the NSB Database Center. 6 of 6