Well B14 / Operator X
Mediterranean Sea / Operator X
Well B14
Schlumberger Well Integrity Team
Mohamed El-Sadek
Ahmed El-Gamal
Moustafa Rakha
1
Well B14 / Operator X
Agenda
 B14 Project Introduction
 Client Objectives
 Challenges
 Work Flow
 Conclusion& Recommendations
2
Well B14 / Operator X
Introduction
- Location: Mediterranean Sea, Egypt
- Well Name : B14
- Operator: X
- Well B14 was drilled with several drilling problems
A14 B14
Well A 14 Well B14
Gas Cap at 3702 ft. The well plan was
based on Well A14Reservoir X P = 1300 psia
Reservoir Y P = 2500 psia
Water level at 5000 ft.
3
Well B14 / Operator X
Intermediate Casing 9 5/8’’
 Total mud losses reported
 No open hole logs
 Liner was run with no
centralizers
 Cemented with 11.5 ppg
lead and 15.8 ppg tail
- Well Sktech
X
Y
B14 Well Schematic
2800 ft.
3702 ft.
1700 ft.
Gas Cap
5000 ft. Water
Liner Casing 7’’
Introduction
 Drilled with 16 ppg OBM
containing barite
 Cemented with 15.8 ppg
 Existing Fractures
4
Well B14 / Operator X
A. Cement evaluation for to the entire zone of interest to ensure:
1. Zonal isolation between reservoirs Y and X
2. Hydraulic isolation from water zone and gas cap
Client Objectives
B. Completion system design to support production using choke size
44/64 with flowing pressure 800 to 900 psi and sand production.
C. Plug and abandonment plan
5
Well B14 / Operator X
 Fractures in intermediate section
 Absence OH logs
 Liner ran without centralizers
 No Cement Execution Report
Challenges
- Well Sktech
X
Y
Well Schematic
2800 ft.
5000 ft.
6
Well B14 / Operator X
Work Flow
Data gathering Planning Execution
Results
&
recommendations
7
Well B14 / Operator X
TT=
15µs/cm
Zcement=
25.4×𝜌 𝑠𝑙𝑢𝑟𝑟𝑦
𝜌 𝑤𝑎𝑡𝑒𝑟
×𝑇𝑇
Zcement = 2.33 Mrayl
Planning phase
8
Well B14 / Operator X
2.3
USIT limitation
9
Well B14 / Operator X
Isolation Scanner
10
Well B14 / Operator X
Liquid
Light weight cement
SLG Map
11
Well B14 / Operator X
Identifying barite and
solid accumulations
Differentiate between light
weight cement & liquid
Assess hydraulic
isolation
Third interface
echoes “TIEs”
Other Applications
12
Well B14 / Operator X
Log header
13
Well B14 / Operator X
Execution phase
Gas cap
Water level
Perf X
Perf Y
14
Well B14 / Operator X
Gas cap- PerfX
15
Well B14 / Operator X
SLG Map
No Perforation at X
16
Well B14 / Operator X
X-Perf Y- Water zone
17
Well B14 / Operator X
SLG Map
Perforate at zone Y
18
Well B14 / Operator X
Completion program
• Single completion
• Quantum PerfPac
• Chock size
19
Well B14 / Operator X
Plug& Abandonment
 What if the well is dry?
- Well Sktech
X
Y
Well Schematic
1700 ft.
2800 ft. Depth selection criteria:
1. Good centricity
2. Free pipe
B14 Well Schematic
 Where to cut and retrieve?
Cut across the dual casing
20
Well B14 / Operator X
 Example of a bad point to cut the 9 5/8’’ casing
At depth 156 ft.
- Cement presence
- Contact points
Plug& Abandonment
 Depth Selection
21
Well B14 / Operator X
At interval 910 ft. to 960 ft.
- Solid presence
Plug& Abandonment
 Depth Selection
22
Well B14 / Operator X
At interval 410 ft. to 435
- No solid presence
- Good centralization
Plug& Abandonment
 Depth Selection
Looks good !
 Recommended Depths: 415 ft. / 420 / 425 ft. / 430 ft.
23
Well B14 / Operator X
1. No hydraulic isolation between gas cap and perforation X
2. Good hydraulic isolation between formation Y and both water zone and
formation X
3. Single completion and Quantum Perf Pac System
4. Recommended depths for P&A operastion are 415 ft. / 420 /
425 ft. / 430 ft.
Conclusion
24
Well B14 / Operator X
1. Consulting our Geomechanics team to investigate wellbore
stability issues.
2. Acquiring OH logs, and Imaging tools for fracture analysis and
correct cement calculations.
3. Centralizers are recommended in deviated wells for a good
cement job.
Recommendations
25
Well B14 / Operator X
Thank you
Any questions?
26

Mais conteúdo relacionado

Mais procurados

Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a WellFarida Ismayilova
 
1 hoisting system
1 hoisting system1 hoisting system
1 hoisting systemfianxxx
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)Dr. Arzu Javadova
 
Lab 7 measurement of gel strength of drilling mud sample by rheometer
Lab 7 measurement of gel strength of drilling mud sample by rheometerLab 7 measurement of gel strength of drilling mud sample by rheometer
Lab 7 measurement of gel strength of drilling mud sample by rheometerAwais Qureshi
 
Presentation 5 drilling mud
Presentation 5 drilling mudPresentation 5 drilling mud
Presentation 5 drilling mudAli Trichelli
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdfmmody4
 
Halliburton cementing presentation
Halliburton cementing presentationHalliburton cementing presentation
Halliburton cementing presentationBoubenia ali
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 
Bond log theory and interpretation
Bond log theory and interpretationBond log theory and interpretation
Bond log theory and interpretationBRIKAT Abdelghani
 
Well control and blowout preventer
Well control  and blowout preventerWell control  and blowout preventer
Well control and blowout preventerShamim Akram
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction iYalçın Dalgıç
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
Sand Problem in Oil Wells
Sand Problem in Oil WellsSand Problem in Oil Wells
Sand Problem in Oil Wellsthe_duke7
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well ControlM.T.H Group
 

Mais procurados (20)

Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
 
1 hoisting system
1 hoisting system1 hoisting system
1 hoisting system
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Lab 7 measurement of gel strength of drilling mud sample by rheometer
Lab 7 measurement of gel strength of drilling mud sample by rheometerLab 7 measurement of gel strength of drilling mud sample by rheometer
Lab 7 measurement of gel strength of drilling mud sample by rheometer
 
Rig types.
Rig types.Rig types.
Rig types.
 
Presentation 5 drilling mud
Presentation 5 drilling mudPresentation 5 drilling mud
Presentation 5 drilling mud
 
Drilling fluid
Drilling fluidDrilling fluid
Drilling fluid
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
Halliburton cementing presentation
Halliburton cementing presentationHalliburton cementing presentation
Halliburton cementing presentation
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Casing design
Casing designCasing design
Casing design
 
Bond log theory and interpretation
Bond log theory and interpretationBond log theory and interpretation
Bond log theory and interpretation
 
Well control and blowout preventer
Well control  and blowout preventerWell control  and blowout preventer
Well control and blowout preventer
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction i
 
Casing design
Casing designCasing design
Casing design
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Sand Problem in Oil Wells
Sand Problem in Oil WellsSand Problem in Oil Wells
Sand Problem in Oil Wells
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
 
Ssd spm
Ssd   spmSsd   spm
Ssd spm
 
well control (1)
 well control (1) well control (1)
well control (1)
 

Destaque

Pr 1047 well integrity maintenance
Pr 1047 well integrity maintenancePr 1047 well integrity maintenance
Pr 1047 well integrity maintenanceLawrence Kwende
 
Recommended guidelines for well intergity
Recommended guidelines for well intergity Recommended guidelines for well intergity
Recommended guidelines for well intergity HPHT Wells Summit
 
Cape Breton University Report: Shale Well Integrity
Cape Breton University Report: Shale Well IntegrityCape Breton University Report: Shale Well Integrity
Cape Breton University Report: Shale Well IntegrityMarcellus Drilling News
 
Lifecycle Well Integrity 3-day Course
Lifecycle Well Integrity 3-day CourseLifecycle Well Integrity 3-day Course
Lifecycle Well Integrity 3-day CourseChase van Noordwijk
 
Rails to trails mcph presentation
Rails to trails mcph presentationRails to trails mcph presentation
Rails to trails mcph presentationSue Guzek
 
Nov2008 Final Presentation
Nov2008 Final PresentationNov2008 Final Presentation
Nov2008 Final Presentationblipski
 
Pangtong Wellhead USA Inc.
Pangtong Wellhead USA Inc.Pangtong Wellhead USA Inc.
Pangtong Wellhead USA Inc.Leo Pang
 
Testing Speaking and Grammar.
Testing Speaking and Grammar.Testing Speaking and Grammar.
Testing Speaking and Grammar.Bercelis Ramirez
 
Schlumberger field engineer performance appraisal
Schlumberger field engineer performance appraisalSchlumberger field engineer performance appraisal
Schlumberger field engineer performance appraisalabbywakew
 
ENI Scholarship Letter
ENI Scholarship LetterENI Scholarship Letter
ENI Scholarship LetterPratik Rao
 
Wellhead services & technologies presentation
Wellhead  services & technologies presentationWellhead  services & technologies presentation
Wellhead services & technologies presentationSvetlana Tkacheva
 
Pratik Rao - Thesis Presentation FINAL
Pratik Rao - Thesis Presentation FINALPratik Rao - Thesis Presentation FINAL
Pratik Rao - Thesis Presentation FINALPratik Rao
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTpetroEDGE
 
Intelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field DevelopmentIntelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field Developmentfhmutairi
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT OperationsHPHT Wells Summit
 

Destaque (20)

Pr 1047 well integrity maintenance
Pr 1047 well integrity maintenancePr 1047 well integrity maintenance
Pr 1047 well integrity maintenance
 
Recommended guidelines for well intergity
Recommended guidelines for well intergity Recommended guidelines for well intergity
Recommended guidelines for well intergity
 
Cape Breton University Report: Shale Well Integrity
Cape Breton University Report: Shale Well IntegrityCape Breton University Report: Shale Well Integrity
Cape Breton University Report: Shale Well Integrity
 
Lifecycle Well Integrity 3-day Course
Lifecycle Well Integrity 3-day CourseLifecycle Well Integrity 3-day Course
Lifecycle Well Integrity 3-day Course
 
Rails to trails mcph presentation
Rails to trails mcph presentationRails to trails mcph presentation
Rails to trails mcph presentation
 
Nov2008 Final Presentation
Nov2008 Final PresentationNov2008 Final Presentation
Nov2008 Final Presentation
 
SOR-WellheadPressure
SOR-WellheadPressureSOR-WellheadPressure
SOR-WellheadPressure
 
Pangtong Wellhead USA Inc.
Pangtong Wellhead USA Inc.Pangtong Wellhead USA Inc.
Pangtong Wellhead USA Inc.
 
Well testing report
Well testing reportWell testing report
Well testing report
 
Testing Speaking and Grammar.
Testing Speaking and Grammar.Testing Speaking and Grammar.
Testing Speaking and Grammar.
 
Norsok d-010u4 2013.en.02
Norsok d-010u4 2013.en.02Norsok d-010u4 2013.en.02
Norsok d-010u4 2013.en.02
 
Schlumberger field engineer performance appraisal
Schlumberger field engineer performance appraisalSchlumberger field engineer performance appraisal
Schlumberger field engineer performance appraisal
 
Well test procedures manual
Well test procedures manualWell test procedures manual
Well test procedures manual
 
ENI Scholarship Letter
ENI Scholarship LetterENI Scholarship Letter
ENI Scholarship Letter
 
Wellhead services & technologies presentation
Wellhead  services & technologies presentationWellhead  services & technologies presentation
Wellhead services & technologies presentation
 
Pratik Rao - Thesis Presentation FINAL
Pratik Rao - Thesis Presentation FINALPratik Rao - Thesis Presentation FINAL
Pratik Rao - Thesis Presentation FINAL
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENT
 
Intelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field DevelopmentIntelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field Development
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
 
MSc group project presentation
MSc group project presentationMSc group project presentation
MSc group project presentation
 

Semelhante a SLB Well Integrity final

Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoJorge Cabaco
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...John Downs
 
2009. Barbara Prommegger. Hobas. CEE-Wirtschaftsforum 2009. Forum Velden.
2009. Barbara Prommegger. Hobas. CEE-Wirtschaftsforum 2009. Forum Velden.2009. Barbara Prommegger. Hobas. CEE-Wirtschaftsforum 2009. Forum Velden.
2009. Barbara Prommegger. Hobas. CEE-Wirtschaftsforum 2009. Forum Velden.Forum Velden
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentationtimothyrsmart
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentationtimothyrsmart
 
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSSRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSiQHub
 
Presentation basf feluy june 2010 eng
Presentation basf feluy june 2010 engPresentation basf feluy june 2010 eng
Presentation basf feluy june 2010 engvyceslav12
 
5th line project presentation
5th line project presentation5th line project presentation
5th line project presentationMicha Duman
 
Are you protecting the aquifer
Are you protecting the aquiferAre you protecting the aquifer
Are you protecting the aquiferKeith Carpenter Jr
 
Are you protecting the aquifer
Are you protecting the aquiferAre you protecting the aquifer
Are you protecting the aquiferDawnLong18
 
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRSUNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRSiQHub
 
Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07John Grover
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
Presentation basf feluy june 2010 eng
Presentation basf feluy june 2010 engPresentation basf feluy june 2010 eng
Presentation basf feluy june 2010 engvyceslav12
 
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORMCOMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORMiQHub
 
Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Robert Singleton
 

Semelhante a SLB Well Integrity final (20)

Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge Cabaco
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
 
2009. Barbara Prommegger. Hobas. CEE-Wirtschaftsforum 2009. Forum Velden.
2009. Barbara Prommegger. Hobas. CEE-Wirtschaftsforum 2009. Forum Velden.2009. Barbara Prommegger. Hobas. CEE-Wirtschaftsforum 2009. Forum Velden.
2009. Barbara Prommegger. Hobas. CEE-Wirtschaftsforum 2009. Forum Velden.
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentation
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentation
 
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSSRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
 
Presentation basf feluy june 2010 eng
Presentation basf feluy june 2010 engPresentation basf feluy june 2010 eng
Presentation basf feluy june 2010 eng
 
5th line project presentation
5th line project presentation5th line project presentation
5th line project presentation
 
Are you protecting the aquifer
Are you protecting the aquiferAre you protecting the aquifer
Are you protecting the aquifer
 
Are you protecting the aquifer
Are you protecting the aquiferAre you protecting the aquifer
Are you protecting the aquifer
 
Reformer Catalyst Report
Reformer Catalyst ReportReformer Catalyst Report
Reformer Catalyst Report
 
Recap final celeus 1
Recap final celeus 1Recap final celeus 1
Recap final celeus 1
 
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRSUNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
UNDERSTANDING THE REFRACTURING IN TIGHT OIL RESERVOIRS
 
Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Presentation basf feluy june 2010 eng
Presentation basf feluy june 2010 engPresentation basf feluy june 2010 eng
Presentation basf feluy june 2010 eng
 
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORMCOMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
 
Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)
 
fishbone-.pptx
fishbone-.pptxfishbone-.pptx
fishbone-.pptx
 
PClayton_accomplishments
PClayton_accomplishmentsPClayton_accomplishments
PClayton_accomplishments
 

SLB Well Integrity final

  • 1. Well B14 / Operator X Mediterranean Sea / Operator X Well B14 Schlumberger Well Integrity Team Mohamed El-Sadek Ahmed El-Gamal Moustafa Rakha 1
  • 2. Well B14 / Operator X Agenda  B14 Project Introduction  Client Objectives  Challenges  Work Flow  Conclusion& Recommendations 2
  • 3. Well B14 / Operator X Introduction - Location: Mediterranean Sea, Egypt - Well Name : B14 - Operator: X - Well B14 was drilled with several drilling problems A14 B14 Well A 14 Well B14 Gas Cap at 3702 ft. The well plan was based on Well A14Reservoir X P = 1300 psia Reservoir Y P = 2500 psia Water level at 5000 ft. 3
  • 4. Well B14 / Operator X Intermediate Casing 9 5/8’’  Total mud losses reported  No open hole logs  Liner was run with no centralizers  Cemented with 11.5 ppg lead and 15.8 ppg tail - Well Sktech X Y B14 Well Schematic 2800 ft. 3702 ft. 1700 ft. Gas Cap 5000 ft. Water Liner Casing 7’’ Introduction  Drilled with 16 ppg OBM containing barite  Cemented with 15.8 ppg  Existing Fractures 4
  • 5. Well B14 / Operator X A. Cement evaluation for to the entire zone of interest to ensure: 1. Zonal isolation between reservoirs Y and X 2. Hydraulic isolation from water zone and gas cap Client Objectives B. Completion system design to support production using choke size 44/64 with flowing pressure 800 to 900 psi and sand production. C. Plug and abandonment plan 5
  • 6. Well B14 / Operator X  Fractures in intermediate section  Absence OH logs  Liner ran without centralizers  No Cement Execution Report Challenges - Well Sktech X Y Well Schematic 2800 ft. 5000 ft. 6
  • 7. Well B14 / Operator X Work Flow Data gathering Planning Execution Results & recommendations 7
  • 8. Well B14 / Operator X TT= 15µs/cm Zcement= 25.4×𝜌 𝑠𝑙𝑢𝑟𝑟𝑦 𝜌 𝑤𝑎𝑡𝑒𝑟 ×𝑇𝑇 Zcement = 2.33 Mrayl Planning phase 8
  • 9. Well B14 / Operator X 2.3 USIT limitation 9
  • 10. Well B14 / Operator X Isolation Scanner 10
  • 11. Well B14 / Operator X Liquid Light weight cement SLG Map 11
  • 12. Well B14 / Operator X Identifying barite and solid accumulations Differentiate between light weight cement & liquid Assess hydraulic isolation Third interface echoes “TIEs” Other Applications 12
  • 13. Well B14 / Operator X Log header 13
  • 14. Well B14 / Operator X Execution phase Gas cap Water level Perf X Perf Y 14
  • 15. Well B14 / Operator X Gas cap- PerfX 15
  • 16. Well B14 / Operator X SLG Map No Perforation at X 16
  • 17. Well B14 / Operator X X-Perf Y- Water zone 17
  • 18. Well B14 / Operator X SLG Map Perforate at zone Y 18
  • 19. Well B14 / Operator X Completion program • Single completion • Quantum PerfPac • Chock size 19
  • 20. Well B14 / Operator X Plug& Abandonment  What if the well is dry? - Well Sktech X Y Well Schematic 1700 ft. 2800 ft. Depth selection criteria: 1. Good centricity 2. Free pipe B14 Well Schematic  Where to cut and retrieve? Cut across the dual casing 20
  • 21. Well B14 / Operator X  Example of a bad point to cut the 9 5/8’’ casing At depth 156 ft. - Cement presence - Contact points Plug& Abandonment  Depth Selection 21
  • 22. Well B14 / Operator X At interval 910 ft. to 960 ft. - Solid presence Plug& Abandonment  Depth Selection 22
  • 23. Well B14 / Operator X At interval 410 ft. to 435 - No solid presence - Good centralization Plug& Abandonment  Depth Selection Looks good !  Recommended Depths: 415 ft. / 420 / 425 ft. / 430 ft. 23
  • 24. Well B14 / Operator X 1. No hydraulic isolation between gas cap and perforation X 2. Good hydraulic isolation between formation Y and both water zone and formation X 3. Single completion and Quantum Perf Pac System 4. Recommended depths for P&A operastion are 415 ft. / 420 / 425 ft. / 430 ft. Conclusion 24
  • 25. Well B14 / Operator X 1. Consulting our Geomechanics team to investigate wellbore stability issues. 2. Acquiring OH logs, and Imaging tools for fracture analysis and correct cement calculations. 3. Centralizers are recommended in deviated wells for a good cement job. Recommendations 25
  • 26. Well B14 / Operator X Thank you Any questions? 26