SlideShare uma empresa Scribd logo
1 de 11
Baixar para ler offline
Tester Portfolio in Testing Quality Assurance (TQA)
at
CELCOM Axiata Berhad
Mohamad Syafiq Bin Mohamad Saad
Associated Test Engineer
2015- Current
Job Description and Working Experience
Below is the details of job scope:-
1. Providing test plans and test scenarios to perform various testing activities such as
(System Integration Test / User Acceptance Test / System Testing / Operational
Readiness Test /Regression Testing / Load and Performance Testing).
System Integration Test (SIT)
User Acceptance Test (UAT)
System Testing (ST)
Regression Testing
N
O.
TEST DESCRIPTION PROCEDURE
EXPECTED
RESULT
MSISD
N
VALIDI
TY
BALA
NCE
BEFO
RE
BALA
NCE
AFTER
CHAR
GES
DURAT
ION
RES
ULT
REMARK
1 Reload USSD Able to reload
193625
540
22-
May-
15
1.64 31.64 P
*Reload RM30 via
credit transfer
2
Basic
services
Basic services
(call/sms/mm
s/data)
Make Voice
call - onnet
Voice Call
Charging
correctly
31.64 31.31 0.33 11s P
*Used Free 60
seconds Domestic
Voice
3 Video Call
Video Call
Charging
correctly
4
Make Voice
call - offnet
Voice Call
Charging
correctly
31.31 30.98 0.33 5s P
5
Make Sms
Onnet
Sms Charging
correctly
30.98 30.78 0.2 P
6
Make Sms
Offnet
Sms Charging
correctly
30.78 30.78 0 P
7 Make Mms
Mms Charging
correctly
30.78 30.28 0.5 P
8 Data Browsing
Data Charging
correctly
30.28 27.28 3 P
*Have active MI
Daily
9 FN Add to FN list
Send fav
<name>
Check FN list -
Send fav list to
1019
P
<number> to
1019
10
Credit
Expiry1
Credit expiry
Send EXP1 to
28882
Successful buy
credit expiry
37.28 7.28 P
11
Blackber
ry 50
Blackberry
services
Send BB 50 to
28882
Blackberry
active
7.28 6.78 0.5 P
12
Broadba
nd daily
Broadband
daily services
Buy
broadband
daily
Broadband
active
*Subscribed before
migration, MI still
active
13
Check
balance
via USSD P
14
via SMS -
Send BAL to
2888
P
15
Basic
Rating
Local 0192707421 Charging
correctly
6.78 6.45 0.33 11s P
*Used Free 60
seconds Domestic
Voice
16 IDD
001508457219
5
Charging
correctly
6.45 6.27 0.18 5s P
17
Special
Number 1919
Charging
correctly
6.27 6.27 7s P
18
IDD
SMS
+6282118951
605
Charging
correctly
6.27 6.12 0.15 P
*Used Free 1 SMS
Indonesia
19 IVR 1930 Change
Language Success
26s P
20 1990 Check balance Succes 13s P
21
Query
BSS Normal Query Success P
22 Pick A Pack Query *118# Success P
23 Pcare Normal Query Success P
24 SMAP Normal Query Success P
25
Usage
bonus
Free Minutes
Onnet
Check bonus
balance
Free Minutes
balance
deducted
P
26
Call Me
Tone
Send CMT
<code> to
22990
Success 6.12 4.62 1.5 P
27
Check
data
balance
Send MAX
STATUS to
28882
Received SMS
on data
balance
P
2. To prepare test plans and test scenarios to test every software / application components and indicates business conditions were be tested
and the results expected.
3. To provide feedback to the development team and make sure work is carried out accordingly with the schedule and quality requirements.
Item
No
BSS
Application
Description
CR
Type
Requester SIT TQA
PIC
Date TQA Remark
1
Batch
Auto Migration Messages for New SOX & New UOX
(Fix : Stop sending outbound files to /home/soausr instead
of app/Outbound)
Dependency: None
Fix
Maria Alen
Biju
No
Approval by Apps Team is sufficient
to proceed
2
Batch
Escape for New InfiWiFi Registrations
(Fix : Stop sending outbound files to /home/soausr instead
of app/Outbound)
Dependency: None
Fix
Maria Alen
Biju
No
Approval by Apps Team is sufficient
to proceed
3
ATG
Current Scenario: For Secondary Plan Page, system sending wrong
MasterAccountId for its secondary plan Billing Account details.
Changes: Code fix to change the logic to send the correct
MasterAccountId during Create Billing Account for Secondary Plan.
Dependency: N/A
Fix Azmirrul.izzat Yes
Saiful 27/7/2015
4
WebCenter
Portal
Current Scenario: Unable to key in full RGW IMEI for InfiWiFi onsite
installation.
Changes: Code fix to increase the RGW IMEI length.
Dependency: N/A
Fix Chee Hao Yes
Syafiq27/7/2015
5
Siebel
Description: CTT Audit Trail shows Owner Id instead of Owner login.
Enhancement: Update Administration – Audit Trail field to map the
audit field to the Owner Login instead of Owner Id.
Configuration Change/Code Fix: Update CTT Business Component
and Audit trail Administration screen.
Dependency: N/A
Fix Gilbert.a.m.ayuban Yes
Saiful 27/7/2015
6
WebCenter
Portal
Current Scenario: Unable to fully print SO Accepted page.
Changes: Code fix to remove blocking white layer during printing
Dependency: N/A
Fix
Hendy
Thambunanto
Yes
Syafiq27/7/2015
Approval by
Apps Team is
sufficient to proceed
7 RSIM
o Defect Fix:
o Issue: StockType of new consignment stocks (value: 3) are not
configured in RSIM causing the stock transfer during approval of new
device stocks are not successful.
o Fix: to configure the new stock type of the new device in SAP039 to
allow approval of stock transfer of device via Centouch
Fix Norafiza.zawawi
Saiful 28/7/2015
4. To log and report defects during the test execution phase manually or using MANTIS defect tools (under maintenance).
5. To prioritize test requirements and organized test cases accordingly refer by TFD (Technical Functional Design) provide by developer.
6. To write and prepare TQA Closure Memo as tasks report.

Mais conteúdo relacionado

Semelhante a Tester Portfolio in Testing Quality Assurance MS

Oman – Sonic, Oracle VAT & Integration & Reporting Implementation Projects St...
Oman – Sonic, Oracle VAT & Integration & Reporting Implementation Projects St...Oman – Sonic, Oracle VAT & Integration & Reporting Implementation Projects St...
Oman – Sonic, Oracle VAT & Integration & Reporting Implementation Projects St...
AbdulBaig12
 
LSS_ Project Green Belt -Dheeraj Mehta
LSS_ Project Green Belt -Dheeraj MehtaLSS_ Project Green Belt -Dheeraj Mehta
LSS_ Project Green Belt -Dheeraj Mehta
Dheeraj Mehta
 
Aziz_Khan_Resume_DEC15
Aziz_Khan_Resume_DEC15Aziz_Khan_Resume_DEC15
Aziz_Khan_Resume_DEC15
Aziz Khan
 
Cmsc 1215 ensuring a quality order management (3)
Cmsc 1215  ensuring a quality order management  (3)Cmsc 1215  ensuring a quality order management  (3)
Cmsc 1215 ensuring a quality order management (3)
Perficient, Inc.
 
Test Guide Final SMS 2022_06 Test Guide Final SMS 2022
Test Guide Final SMS 2022_06 Test Guide Final SMS 2022Test Guide Final SMS 2022_06 Test Guide Final SMS 2022
Test Guide Final SMS 2022_06 Test Guide Final SMS 2022
kumaraperumal
 

Semelhante a Tester Portfolio in Testing Quality Assurance MS (20)

Oman – Sonic, Oracle VAT & Integration & Reporting Implementation Projects St...
Oman – Sonic, Oracle VAT & Integration & Reporting Implementation Projects St...Oman – Sonic, Oracle VAT & Integration & Reporting Implementation Projects St...
Oman – Sonic, Oracle VAT & Integration & Reporting Implementation Projects St...
 
LSS_ Project Green Belt -Dheeraj Mehta
LSS_ Project Green Belt -Dheeraj MehtaLSS_ Project Green Belt -Dheeraj Mehta
LSS_ Project Green Belt -Dheeraj Mehta
 
Plex Supply Chain Community Conference
Plex Supply Chain Community Conference Plex Supply Chain Community Conference
Plex Supply Chain Community Conference
 
IO SM Manco Report_April 2017.pptx
IO SM Manco Report_April 2017.pptxIO SM Manco Report_April 2017.pptx
IO SM Manco Report_April 2017.pptx
 
Aziz_Khan_Resume_DEC15
Aziz_Khan_Resume_DEC15Aziz_Khan_Resume_DEC15
Aziz_Khan_Resume_DEC15
 
Ensuring a Quality Order Management Implementation
Ensuring a Quality Order Management ImplementationEnsuring a Quality Order Management Implementation
Ensuring a Quality Order Management Implementation
 
Cmsc 1215 ensuring a quality order management (3)
Cmsc 1215  ensuring a quality order management  (3)Cmsc 1215  ensuring a quality order management  (3)
Cmsc 1215 ensuring a quality order management (3)
 
Work Plan 2023 Final @ 14-03-2023.pptx
Work Plan 2023 Final @ 14-03-2023.pptxWork Plan 2023 Final @ 14-03-2023.pptx
Work Plan 2023 Final @ 14-03-2023.pptx
 
Test Guide Final SMS 2022_06 Test Guide Final SMS 2022
Test Guide Final SMS 2022_06 Test Guide Final SMS 2022Test Guide Final SMS 2022_06 Test Guide Final SMS 2022
Test Guide Final SMS 2022_06 Test Guide Final SMS 2022
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
 
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
 
Revenue Recognition Webinar-May 19th, 2015
Revenue Recognition Webinar-May 19th, 2015Revenue Recognition Webinar-May 19th, 2015
Revenue Recognition Webinar-May 19th, 2015
 
Six Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational StepsSix Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational Steps
 
Sdl software
Sdl softwareSdl software
Sdl software
 
IMS12 ims performance tools
IMS12   ims performance toolsIMS12   ims performance tools
IMS12 ims performance tools
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Rovi bit dashboard
Rovi bit dashboard Rovi bit dashboard
Rovi bit dashboard
 
Sales Connect @ Videocon
Sales Connect @ VideoconSales Connect @ Videocon
Sales Connect @ Videocon
 
1 eg s4hana1909_bpd_en_mx
1 eg s4hana1909_bpd_en_mx1 eg s4hana1909_bpd_en_mx
1 eg s4hana1909_bpd_en_mx
 

Tester Portfolio in Testing Quality Assurance MS

  • 1. Tester Portfolio in Testing Quality Assurance (TQA) at CELCOM Axiata Berhad Mohamad Syafiq Bin Mohamad Saad Associated Test Engineer 2015- Current
  • 2. Job Description and Working Experience Below is the details of job scope:- 1. Providing test plans and test scenarios to perform various testing activities such as (System Integration Test / User Acceptance Test / System Testing / Operational Readiness Test /Regression Testing / Load and Performance Testing). System Integration Test (SIT) User Acceptance Test (UAT)
  • 4. Regression Testing N O. TEST DESCRIPTION PROCEDURE EXPECTED RESULT MSISD N VALIDI TY BALA NCE BEFO RE BALA NCE AFTER CHAR GES DURAT ION RES ULT REMARK 1 Reload USSD Able to reload 193625 540 22- May- 15 1.64 31.64 P *Reload RM30 via credit transfer 2 Basic services Basic services (call/sms/mm s/data) Make Voice call - onnet Voice Call Charging correctly 31.64 31.31 0.33 11s P *Used Free 60 seconds Domestic Voice 3 Video Call Video Call Charging correctly 4 Make Voice call - offnet Voice Call Charging correctly 31.31 30.98 0.33 5s P 5 Make Sms Onnet Sms Charging correctly 30.98 30.78 0.2 P 6 Make Sms Offnet Sms Charging correctly 30.78 30.78 0 P 7 Make Mms Mms Charging correctly 30.78 30.28 0.5 P 8 Data Browsing Data Charging correctly 30.28 27.28 3 P *Have active MI Daily 9 FN Add to FN list Send fav <name> Check FN list - Send fav list to 1019 P
  • 5. <number> to 1019 10 Credit Expiry1 Credit expiry Send EXP1 to 28882 Successful buy credit expiry 37.28 7.28 P 11 Blackber ry 50 Blackberry services Send BB 50 to 28882 Blackberry active 7.28 6.78 0.5 P 12 Broadba nd daily Broadband daily services Buy broadband daily Broadband active *Subscribed before migration, MI still active 13 Check balance via USSD P 14 via SMS - Send BAL to 2888 P 15 Basic Rating Local 0192707421 Charging correctly 6.78 6.45 0.33 11s P *Used Free 60 seconds Domestic Voice 16 IDD 001508457219 5 Charging correctly 6.45 6.27 0.18 5s P 17 Special Number 1919 Charging correctly 6.27 6.27 7s P 18 IDD SMS +6282118951 605 Charging correctly 6.27 6.12 0.15 P *Used Free 1 SMS Indonesia 19 IVR 1930 Change Language Success 26s P 20 1990 Check balance Succes 13s P 21 Query BSS Normal Query Success P 22 Pick A Pack Query *118# Success P 23 Pcare Normal Query Success P 24 SMAP Normal Query Success P
  • 6. 25 Usage bonus Free Minutes Onnet Check bonus balance Free Minutes balance deducted P 26 Call Me Tone Send CMT <code> to 22990 Success 6.12 4.62 1.5 P 27 Check data balance Send MAX STATUS to 28882 Received SMS on data balance P 2. To prepare test plans and test scenarios to test every software / application components and indicates business conditions were be tested and the results expected.
  • 7. 3. To provide feedback to the development team and make sure work is carried out accordingly with the schedule and quality requirements. Item No BSS Application Description CR Type Requester SIT TQA PIC Date TQA Remark 1 Batch Auto Migration Messages for New SOX & New UOX (Fix : Stop sending outbound files to /home/soausr instead of app/Outbound) Dependency: None Fix Maria Alen Biju No Approval by Apps Team is sufficient to proceed 2 Batch Escape for New InfiWiFi Registrations (Fix : Stop sending outbound files to /home/soausr instead of app/Outbound) Dependency: None Fix Maria Alen Biju No Approval by Apps Team is sufficient to proceed
  • 8. 3 ATG Current Scenario: For Secondary Plan Page, system sending wrong MasterAccountId for its secondary plan Billing Account details. Changes: Code fix to change the logic to send the correct MasterAccountId during Create Billing Account for Secondary Plan. Dependency: N/A Fix Azmirrul.izzat Yes Saiful 27/7/2015 4 WebCenter Portal Current Scenario: Unable to key in full RGW IMEI for InfiWiFi onsite installation. Changes: Code fix to increase the RGW IMEI length. Dependency: N/A Fix Chee Hao Yes Syafiq27/7/2015 5 Siebel Description: CTT Audit Trail shows Owner Id instead of Owner login. Enhancement: Update Administration – Audit Trail field to map the audit field to the Owner Login instead of Owner Id. Configuration Change/Code Fix: Update CTT Business Component and Audit trail Administration screen. Dependency: N/A Fix Gilbert.a.m.ayuban Yes Saiful 27/7/2015 6 WebCenter Portal Current Scenario: Unable to fully print SO Accepted page. Changes: Code fix to remove blocking white layer during printing Dependency: N/A Fix Hendy Thambunanto Yes Syafiq27/7/2015 Approval by Apps Team is sufficient to proceed
  • 9. 7 RSIM o Defect Fix: o Issue: StockType of new consignment stocks (value: 3) are not configured in RSIM causing the stock transfer during approval of new device stocks are not successful. o Fix: to configure the new stock type of the new device in SAP039 to allow approval of stock transfer of device via Centouch Fix Norafiza.zawawi Saiful 28/7/2015
  • 10. 4. To log and report defects during the test execution phase manually or using MANTIS defect tools (under maintenance). 5. To prioritize test requirements and organized test cases accordingly refer by TFD (Technical Functional Design) provide by developer.
  • 11. 6. To write and prepare TQA Closure Memo as tasks report.