Management of Change Process to Improve
Reliability, Reduce Maintenance Cost and
Better Risk Management
Serge Mathieu & Michel Cote
Agenda
Part 1:
• What is the Definition of a Change or Modification ?
• Why do Modifications ?• Why do Modifications ?
• Why is Management of Change so Important ?
• Consequences from Modifications ?
Part 2:
• Case Study in a Zinc Processing Plant
Definition of a Change
Source: The Collins dictionary
1. Change: to make or become different; alter.
2. Change: to replace with or exchange for another: to transform or
convert.
Definition of Modification
1. Modification: adjustment, alteration, change, mutation.
Source: The Collins THESAURUS
Why Do Modifications ?
• To reduce risk for safety or to comply with laws and
regulations.
• To reduce risk for the environment or to comply with laws
and regulations.and regulations.
• To increase equipment output and efficiency.
• To maintain operations with an equipment that has obsolete
components.
• To generate savings by reducing maintenance or operating
cost.
Consequences from Modifications
On SafetyOn Safety
• Standard operating procedures not updated.
• Possibility of by-passing a safety interlock.
• Lock-out, tag-out procedures not updated.• Lock-out, tag-out procedures not updated.
• Training documents not updated.
• Non-compliant installations resulting from a change
(lifting devices, pressure vessels, protective devices, etc.)
Consequences from Modifications
SummarySummary
Conclusion
A Management of Change Process will:
• Generate savings right out of the maintenance budget.
• Minimize impacts and risks for safety, environment and• Minimize impacts and risks for safety, environment and
equipment Reliability.
• Promote the modifications that have potential to support the
mill’s objectives: Safety & environmental compliance and
making profits!
Questions ?
Michel Cote: mcote@prosygma.ca
Serge Mathieu: smahieu@prosygma.ca
www.prosygma.ca
22

Mais conteúdo relacionado

Mais procurados

Contionus improvement case analysis
Contionus improvement case analysisContionus improvement case analysis
Contionus improvement case analysis1shruthika
 
How do you know bp improvements scqaa
How do you know  bp improvements scqaaHow do you know  bp improvements scqaa
How do you know bp improvements scqaaSujit Ghosh
 
7 Key Elements for Operation Quality Improvement
7 Key Elements for Operation Quality Improvement7 Key Elements for Operation Quality Improvement
7 Key Elements for Operation Quality ImprovementQuEST Forum
 
conroling slides by sohar bakhsh
conroling slides by sohar bakhshconroling slides by sohar bakhsh
conroling slides by sohar bakhshSohar Bakhsh
 
Continuous improvement strategies
Continuous improvement strategiesContinuous improvement strategies
Continuous improvement strategiesgarimatomar18
 
Chapter 7 Controlling
Chapter 7   ControllingChapter 7   Controlling
Chapter 7 ControllingLaura Law
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian KalacJulian Kalac P.Eng
 
What Makes a Quality Management Plan So Important
What Makes a Quality Management Plan So ImportantWhat Makes a Quality Management Plan So Important
What Makes a Quality Management Plan So Importantquality_management
 
Quality approaches
Quality approachesQuality approaches
Quality approachesPMC Mentor
 
Basic concept of quality final by DR.MUSHTAQ.A.KHOSA
Basic concept of quality final by DR.MUSHTAQ.A.KHOSABasic concept of quality final by DR.MUSHTAQ.A.KHOSA
Basic concept of quality final by DR.MUSHTAQ.A.KHOSAMushtaq Khosa
 
Process Excellence TQM
Process Excellence TQMProcess Excellence TQM
Process Excellence TQMMahzad Pakzad
 
Moc overview
Moc overviewMoc overview
Moc overviewpmallik
 
Internal audit and control system reviews
Internal audit and control system reviewsInternal audit and control system reviews
Internal audit and control system reviewsHLB Hamt
 
Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)083805154
 

Mais procurados (20)

Types of control
Types of controlTypes of control
Types of control
 
Contionus improvement case analysis
Contionus improvement case analysisContionus improvement case analysis
Contionus improvement case analysis
 
How do you know bp improvements scqaa
How do you know  bp improvements scqaaHow do you know  bp improvements scqaa
How do you know bp improvements scqaa
 
Walter Shewhart
Walter ShewhartWalter Shewhart
Walter Shewhart
 
7 Key Elements for Operation Quality Improvement
7 Key Elements for Operation Quality Improvement7 Key Elements for Operation Quality Improvement
7 Key Elements for Operation Quality Improvement
 
conroling slides by sohar bakhsh
conroling slides by sohar bakhshconroling slides by sohar bakhsh
conroling slides by sohar bakhsh
 
Kaizen
KaizenKaizen
Kaizen
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
 
Behavioral Safety Leadership in Oil & Gas construction
Behavioral Safety Leadership in Oil & Gas constructionBehavioral Safety Leadership in Oil & Gas construction
Behavioral Safety Leadership in Oil & Gas construction
 
Continuous improvement strategies
Continuous improvement strategiesContinuous improvement strategies
Continuous improvement strategies
 
Chapter 7 Controlling
Chapter 7   ControllingChapter 7   Controlling
Chapter 7 Controlling
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 
What Makes a Quality Management Plan So Important
What Makes a Quality Management Plan So ImportantWhat Makes a Quality Management Plan So Important
What Makes a Quality Management Plan So Important
 
Quality approaches
Quality approachesQuality approaches
Quality approaches
 
Basic concept of quality final by DR.MUSHTAQ.A.KHOSA
Basic concept of quality final by DR.MUSHTAQ.A.KHOSABasic concept of quality final by DR.MUSHTAQ.A.KHOSA
Basic concept of quality final by DR.MUSHTAQ.A.KHOSA
 
Process Excellence TQM
Process Excellence TQMProcess Excellence TQM
Process Excellence TQM
 
Moc overview
Moc overviewMoc overview
Moc overview
 
Internal audit and control system reviews
Internal audit and control system reviewsInternal audit and control system reviews
Internal audit and control system reviews
 
Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)
 

Destaque

What is Management of Change?
What is Management of Change?What is Management of Change?
What is Management of Change?timssubscription
 
Conduite du Changement et Gestion des Conflits
Conduite du Changement et Gestion des ConflitsConduite du Changement et Gestion des Conflits
Conduite du Changement et Gestion des ConflitsAgilbee (Patrice Petit)
 
Conduite du changement #collaboratif #Innovation
Conduite du changement   #collaboratif #InnovationConduite du changement   #collaboratif #Innovation
Conduite du changement #collaboratif #InnovationEric Herschkorn
 
Conduite du changement : Etude de Cas IBM
Conduite du changement : Etude de Cas IBMConduite du changement : Etude de Cas IBM
Conduite du changement : Etude de Cas IBMHELENE FRIEH
 
Leading Change
Leading ChangeLeading Change
Leading ChangeAdam Walz
 
Conduite du Changement: Guide Méthodologique
Conduite du Changement: Guide MéthodologiqueConduite du Changement: Guide Méthodologique
Conduite du Changement: Guide MéthodologiqueChristophe Lastennet
 

Destaque (8)

What is Management of Change?
What is Management of Change?What is Management of Change?
What is Management of Change?
 
Intro to reliability management
Intro to reliability managementIntro to reliability management
Intro to reliability management
 
Conduite du Changement et Gestion des Conflits
Conduite du Changement et Gestion des ConflitsConduite du Changement et Gestion des Conflits
Conduite du Changement et Gestion des Conflits
 
Conduite du changement #collaboratif #Innovation
Conduite du changement   #collaboratif #InnovationConduite du changement   #collaboratif #Innovation
Conduite du changement #collaboratif #Innovation
 
Conduite du changement : Etude de Cas IBM
Conduite du changement : Etude de Cas IBMConduite du changement : Etude de Cas IBM
Conduite du changement : Etude de Cas IBM
 
Leading change
Leading changeLeading change
Leading change
 
Leading Change
Leading ChangeLeading Change
Leading Change
 
Conduite du Changement: Guide Méthodologique
Conduite du Changement: Guide MéthodologiqueConduite du Changement: Guide Méthodologique
Conduite du Changement: Guide Méthodologique
 

Semelhante a Management of Change

Management of Change Process
Management of Change ProcessManagement of Change Process
Management of Change ProcessProsygma
 
Assisit with devlopment.pptx
Assisit with devlopment.pptxAssisit with devlopment.pptx
Assisit with devlopment.pptxTadeseBeyene
 
Change and Release Management_V1.pdf
Change and Release Management_V1.pdfChange and Release Management_V1.pdf
Change and Release Management_V1.pdfrane7815
 
Stream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike NiblettStream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike NiblettBecarAsset
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
I ChemE Presentation
I ChemE PresentationI ChemE Presentation
I ChemE PresentationTheonLtd
 
ITIL Change Management - Plan and deploy changes with confidence
ITIL Change Management - Plan and deploy changes with confidence ITIL Change Management - Plan and deploy changes with confidence
ITIL Change Management - Plan and deploy changes with confidence Freshservice
 
07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptxAkshayG52
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007jrd9234
 

Semelhante a Management of Change (20)

Moc for lcl
Moc for lclMoc for lcl
Moc for lcl
 
Moc for lcl
Moc for lclMoc for lcl
Moc for lcl
 
ITIL # Lecture 3
ITIL # Lecture 3ITIL # Lecture 3
ITIL # Lecture 3
 
Management of Change Process
Management of Change ProcessManagement of Change Process
Management of Change Process
 
management of change
management of changemanagement of change
management of change
 
Assisit with devlopment.pptx
Assisit with devlopment.pptxAssisit with devlopment.pptx
Assisit with devlopment.pptx
 
Change and Release Management_V1.pdf
Change and Release Management_V1.pdfChange and Release Management_V1.pdf
Change and Release Management_V1.pdf
 
Stream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike NiblettStream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike Niblett
 
Change control
Change controlChange control
Change control
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
Delivering Professional IT Services: Change, an Underestimated Value
Delivering Professional IT Services: Change, an Underestimated ValueDelivering Professional IT Services: Change, an Underestimated Value
Delivering Professional IT Services: Change, an Underestimated Value
 
I ChemE Presentation
I ChemE PresentationI ChemE Presentation
I ChemE Presentation
 
Requirements management
Requirements managementRequirements management
Requirements management
 
Quality 2.pptx
Quality 2.pptxQuality 2.pptx
Quality 2.pptx
 
ITIL Change Management - Plan and deploy changes with confidence
ITIL Change Management - Plan and deploy changes with confidence ITIL Change Management - Plan and deploy changes with confidence
ITIL Change Management - Plan and deploy changes with confidence
 
07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx
 
RCx
RCxRCx
RCx
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007
 
CLT ver1.00
CLT ver1.00CLT ver1.00
CLT ver1.00
 
CLT ver1.00
CLT ver1.00CLT ver1.00
CLT ver1.00
 

Último

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Último (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

Management of Change

  • 1. Management of Change Process to Improve Reliability, Reduce Maintenance Cost and Better Risk Management Serge Mathieu & Michel Cote
  • 2. Agenda Part 1: • What is the Definition of a Change or Modification ? • Why do Modifications ?• Why do Modifications ? • Why is Management of Change so Important ? • Consequences from Modifications ? Part 2: • Case Study in a Zinc Processing Plant
  • 3. Definition of a Change Source: The Collins dictionary 1. Change: to make or become different; alter. 2. Change: to replace with or exchange for another: to transform or convert. Definition of Modification 1. Modification: adjustment, alteration, change, mutation. Source: The Collins THESAURUS
  • 4. Why Do Modifications ? • To reduce risk for safety or to comply with laws and regulations. • To reduce risk for the environment or to comply with laws and regulations.and regulations. • To increase equipment output and efficiency. • To maintain operations with an equipment that has obsolete components. • To generate savings by reducing maintenance or operating cost.
  • 5. Consequences from Modifications On SafetyOn Safety • Standard operating procedures not updated. • Possibility of by-passing a safety interlock. • Lock-out, tag-out procedures not updated.• Lock-out, tag-out procedures not updated. • Training documents not updated. • Non-compliant installations resulting from a change (lifting devices, pressure vessels, protective devices, etc.)
  • 7. Conclusion A Management of Change Process will: • Generate savings right out of the maintenance budget. • Minimize impacts and risks for safety, environment and• Minimize impacts and risks for safety, environment and equipment Reliability. • Promote the modifications that have potential to support the mill’s objectives: Safety & environmental compliance and making profits!
  • 8. Questions ? Michel Cote: mcote@prosygma.ca Serge Mathieu: smahieu@prosygma.ca www.prosygma.ca 22