SlideShare uma empresa Scribd logo
1 de 18
Baixar para ler offline
mjlarchitect/fluwelenburgwal/1g/2511ch/denhaag/06.24.71.64.62/m.j.lucas@live.nl
m i c h a e l j a m e s l u c a s
        
"Matrouska"
GSPublisherEngine 0.75.100.100
fluwelen burgwal 1g / 2511 ch / den haag / nederland
+31.6.24.71.64.62. / m.j.lucas@live.nl
m i c h a e l j a m e s l u c a s
A R C H I T E C T
MV
CV
renvooi bouwkundig
metselwerk - bestaand
renvooi bouwkundig
valt buiten aanvraag
kozijn / deur - bestaand 30°, nieuw 90°
meterkast gas / water / electraM.K.
WM/D opstelplaats wasmachine / droger
koelkast / ovenKK / O
mechanische ventilatie-unit v.v. WTW
HR-combiketel (HR 107)
kooktoestel gas / inductie
houtenvloer
drijfsteen
isolatie
HWA hemelwaterafvoer
kalkzandsteen
houten balklaag met steengaasplafond
FG/E
mechanische afzuigpunt - plafond
CV afvoer rookgas / toevoer lucht (NEN 1087)CV
perceelsgrens
niet ioniserende rookmelder (NEN 2555)
- Peil = 20mm-NAP, is bovenkant afgewerkte begane grond vloer
- materialen en kleuren volgens kleur- en materiaalstaat
- veiligheidsbeglazing: glazen afscheidingen voorzien van
doorvalveilig glas; beglazing tot aan vloer: aan binnenzijde
uitvoeren conform letselbeperkende eisen van NEN 3569.
mechanische inblaaspunt - plafond
lichte scheidingswand
beton
beton prefab
tegelwerk: badkamer tot 2,000+; keuken tot 600+
aanrecht; wc tot 1,500+
p geïsoleerde sandwichpaneel U≤0,8 m2
K/W
mechanische afzuigpunt - wand
mechanische inblaaspunt - wand
1:50
tekeningnummer
datum
fase
gewijzigd
schaal
01-10-2015
Omgevingsvergunning
OMV-122
06-12-2015 (B)
werknr. / werk / locatie 1507 / HK43 / Den Haag
formaat
A3
onderwerp
Gevels Nieuw -
C O N C E P T
alle maatvoering door de aannemer voor uitvoering te controleren in het werk
1 2
6.000
nieuwe hardhouten kozijnen in kleur
nieuwe hardhouten kozijnen in kleur
mat glas
p
glas v.v. niet doorzichtig folie
p p
p p
2 1
6.000
plaatmateriaal in kleur
betonnen trede conform bestaand
nieuwe hardhouten kozijnen in kleur
v.v. drie-dubbel glas
bestaande borstwering
nieuwe hardhouten kozijnen in kleur v.v. drie-dubbel glas
p
0
Begane grond
2.800
1e verdieping
5.800
Nok
Voorgevel - ongewijzigd 01 ZW Achtergevel 02 ZW
Is it possible to make a typical Dutch 1960's terrace house, a
'doorzonwoning' energy neutral?
This project investigates the potential for energy savings in
the masses of post WWII houses built throughout the
country. By upgrading the whole building envelope,
introducing mechanical ventilating with heat recovery and
installing a heat pump and pv solar panels the limits of what
is possible are being pushed.
Ths project is being followed by the Dutch television channel
RTL4 program "Ons Huis Verdient Het".
'Prototype' / Energy Neutral Renovation
The Hague / NL / 2015 / In Progress
mjlarchitect/fluwelenburgwal/1g/2511ch/denhaag/06.24.71.64.62/m.j.lucas@live.nl
‘Matrouska’ / Appartment Interior
Amsterdam / NL / 2014 / Design
Designed for a new build project on the edge of central
Amsterdam, this apartment was for a mother close to
retirement and her daughter living overseas who wanted a
pied-a-terre in The Netherlands.
The apartment was to work as a single space that could,
when required, be divided into two independent living units.
The long lines of the apartment were accentuated by placing
a hall along the facade and another in the middle of the plan
creating a circular routing. The entrance hall doubles as a
gallery for a collection of graphic art.
N
1401 SA2.1
Analyse / Concept 02
1:243,90
9-3-2014
a r c h i t e c t
75%
50%
25%
0%
100%
APPARTEMENT
STUDIO
ENTREE
zichtlijnen
appartement
daglicht toetreding
(diepte daglichtzone =
+/- 2x hoogte raam)
uitzicht servicezone woonruimtes circulatie opzet
25%
A young couple had bought a large town house and were
not sure what was possible with it.
With this quick feasability study the building was analysed
and 3 proposals were made:
1) Live in the whole house with living room at rear
2) Live in the whole house with dining room at rear
3) Create a groud floor appartment for expats and live on
the upper floors
'What now?' / Potential Analysis
The Hague / NL / 2013 / Study
Why is it that the best room of a party is always the kitchen?
The owners of this house loved their neighbourhood, but not
their isolated little kitchen. Rather than move house they
decided to go for a radical renovation of the ground floor.
By mirroring the plan, the kitchen and dining room combined
to create a large space for social gatherings. Not wanting to
cut off the living room, a glass cabinet (displaying family
heirlooms) sits between the two rooms allowing light and
sight lines to flow back and forth. A conservatory enlarges
the living room while embracing the garden.
'Heirlooms' / Ground floor renovation
Leiden / NL / 2013 / Realised
‘Silent Disco’ / Student Union
The Hague / NL / 2011 / Realised
In early 2011, Student Union “Pallas Athene” had the
opportunity to rent a former restaurant as their society.
With all building work carried out by students, a simple
design was conceived that was also very durable. A complete
acoustic cage was built in the space, allowing parties to be
held without disturbing the upstairs neighbours.
To counter the effect of a long, narrow space, the rear wall
was covered with bold horizontal lines in the colours of all
the clubs. Bar tables can be folded out from the paneling.
‘Love Thy Neighbour’ / Roof Terrace
The Hague / NL / 2011 / Realised
The apartment is situated on the upper three floors of a
townhouse above the storage rooms of the local bakery.
In order to completely cover the roof with the terrace
permission was necessary from all 10 neighbours.
In order to protect the privacy of both user and neighbours,
the terrace is surrounded by planters that act both as
balustrades and green privacy screens. In this way, when
the bamboo is matured, the terrace will be surrounded by a
2m high hedge.
alle maatvoering door de aannemer voor uitvoering te controleren in het werk
26-05-2013
B1:10
tekening
datum
werk
rev. datum
versieschaal
detail
01-06-2011
1011
01
OA-DET
OS185 - 's-Gravenhage
m i c h a e l j a m e s l u c a s
        
26-05-13
+3.100
+3.550
VL +700
VL +1.600
220 50 96
+3.470
+3.550
hardhouten vlonders 20 x 145
perliet / potgrond
hardhouten regel
40 x 40 h.o.h. 140mm
hardhouten vlonders 30 x 140
houtenbalk 219 x 96
volgens constructeur
hardhouten regel 40 x 40
Bestaande Dak:
EPDM (nieuw)
underlayment
multiplex
balklaag op afschot 16mm/m
isolatie
dampremmende folie
rachels 22x50mm
plafondplaat
thermisch verzinkt staalconstructie
afsteunen op huidige constructie
volgens constructeur
kitvoeg met rugvulling
bestaande metselwerk
perceelsgrens
hardhouten regel 40 x 40
hardhouten regel 40 x 40
hardhouten regel
40 x 40 h.o.h. 140mm
bamboe max. 1,000mm hoog
hardhouten raster
openingen tot 1,000+VL
120 x 50mm
daarboven 120 x 120mm
1
obrechtstraat 191
obrechtstraat187
obrechtstraat185
obrechtstraat 187
alle maatvoering door de aannemer voor uitvoering te controleren in het werk
26-05-2013
B1:10
tekening
datum
werk
rev. datum
versieschaal
detail
01-06-2011
1011
04
OA-DET
OS185 - 's-Gravenhage
m i c h a e l j a m e s l u c a s
        
13
+3.100
+3.550
+4.015
+4.570
1103096
vlonders 30 x 140
Bestaande Dak:
EPDM (nieuw)
underlayment
multiplex
balklaag op afschot 16mm/m
isolatie
dampremmende folie
rachels 22x50mm
plafondplaat
kitvoeg met rugvulling
bestaande metselwerk
parceelsgrens
houten randbalk 219 x 96
bevestigen aan hoeklijn
lood
hoeklijn 150x150
hardhouten vlonders 20 x 145
hardhouten regel
40 x 40 h.o.h. 140mm
hardhouten regel 40 x 40
hardhouten vlonders 20 x 145
hardhouten vlonders 20 x 145
4
reinkenstraat 56
obrechtstraat187obrechtstraat185
reinkenstraat 54
‘Right & Wrong’ / Kitchen & Bathroom Renovation
The Hague / NL / 2010 / Realised
When a young family bought this house, they found all the right things were in the
wrong places. A previous renovation had created an efficient but introverted kitchen,
and a bathroom that was only accessible through the main bedroom.
By turning the toilet on the 1st floor by 90°, otherwise wasted hall space could be
used to create a niche in the kitchen to house the family sized fridge and oven. Social
interaction between the kitchen and the rest of the living spaces was realised by
opening up the kitchen and placing a bar that hides the mess from the dining space.
In the bathroom, all elements were placed against one wall to create an open,
spacious and efficient space.
N
1012 CS46A
1e verdieping bestaande
1:50
23-2-2011
origineel formaat A3, tek: VO-PLG 01 BST
a r c h i t e c t
14
15
16
17
18
02
4.320 110 2.590 220 1.400
1402.250220
6.510110
5401.280460
1.8001.280570
800 2.090 1.190 700
2.1702.170
60 220 1.500
1.320
110940180
140 1.180
hier ergens
standleiding
N
1012 CS46A
1e verdieping nieuw
1:100
23-2-2011
origineel formaat A3, tek: VO-PLG 01 NWE
a r c h i t e c t
14
15
16
17
18
A
02
6.510
2203.9001402.250220
1.030 2.550 300
3.880
55079070790600
140 800
160
70 850 2.000
600 780 400 1.200 900
1.230160
1.390
150600600900
1.380 1.600
600 600 200
600
6.290
+3.800
stalen balk
indicatiefoverspanning
ngen
wc
wanden (min 70mm met isolatie)
/ elektra
van sanitair, fontein en tegelwerk (ntb)
1:50
10
11
12
13
14
15
A
02
2203.9501402.200220
1.300 110 2.470
1.040
1.180 110 2.450
180 100 900 280
140 3.880 220
100 3.740
600 700
.460
5101.200540
2.450 1.000 1.930
890(?)1.310
890110950
610690900
1.950
6.290
2.200
250
+7.200
hier ergens
standleiding
CEPT
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
2.000250
5101.200540
940110980220
2.250
1.200 440 440 1.000 800
3.880
+7.200
inbouwkast, indeling ntb
‘Hidden potential’ / House Renovation
The Hague / NL / 2010 / Realised
An family with two teenage children bought this monumental
18th century house that had previously been renovated for
a childless couple.
With only two bedrooms & fragmented ground floor, it was
not practical for a family looking to entertain while also
having their own spaces to retreat into. This study showed
the potential for the house to be renovated so that the social
spaces on the ground floor became united & both children
would have their own bedroom. By removing the false ceiling
on the 2nd floor, both bedrooms became lofts.N
1009 GW131
AXO Zolder
1:71,43
1009-43
16-3-2011
N
1009 GW131
bestaande plattegrond begane
grond
1:100 (A4)
27-3-2011
a r c h i t e c t
1009-BST-PLG-00
1803.810180
2.480701.260
1803.040100850
2.000 70 1.160
70
1.350
70
710
70
930 70 3.250 180 1.150 3.110 180 2.660 1.650
930703.320
1.050
1804.320180
B
C
A
vestibule
2,2 m²
voorkamer
12,6 m²
eetkamer
15,8 m²
atrium
11,7 m²
kast
1,1 m²
hal
3,6 m²
keuken
17,0 m²
kast
1,5 m²
hal
1,5 m²
kast
1,5 m²
D E F G
Voorkamer
Wand tussen hal en voorkamer slopen
Trap verwijderen
Sloop Werkzaamheden
Eetkamer
Kozijn tussen eetkamer en atrium verwijderen.
Metselwerk verwijderen tot vloer niveau
Kkeuken
Kozijn tussen keuken en atrium verwijderen.
Metselwerk verwijderen tot vloer niveau
Bestaande keuken incl. tegels verwijderen
Kast Slopen
N
1009 GW131
bestaande plattegrond 2e
verdieping
1:100 (A4)
27-3-2011
a r c h i t e c t
1009-BST-PLG-02
B
C
A
D E F G
3.050 70 1.130 70 2.110 70 3.250
1.9707085070850
1803.810180
3.000
3.310
180 9.750 180 8.750 180
3.560
18.680
badkamer
11,6 m² cv
0,4 m²
kast
5,4 m²
wc
1,0 m²
slaapkamer
13,0 m²
hal
2,8 m²
terras
26,7 m²
Badkamer
Bestaande badkamer incl. tegels verwijderen
Bestaande plafond verwijderen
Sloop Werkzaamheden
Slaapkamer
Deur tussen slaapkamer en hal verwijderen
Slaapkamer
Deur tussen slaapkamer en hal verwijderen
Bestaande plafond verwijderen
N
1009 GW131
nieuwe plattegrond begane grond
1:100 (A4)
27-3-2011
a r c h i t e c t
1009-NWE-PLG-00
4.910 70 3.770 1.000
2.1801001.530
B
C
A
vestibule
2,2 m²
voorkamer
11,7 m²
eetkamer
12,8 m²
atrium
11,7 m²
wc
1,1 m²
hal
4,7 m²
keuken
18,6 m²
hal
4,0 m²
kast
1,8 m²
D E F G
Voorkamer
Licht scheidingswand aanbrenden met in het
wand schuifdeur
Werkzaamheden
Eetkamer
Trap naar 1e verdieping maken
Kozijn met glazen schuifdeur voor het wand
maken bij trap
WC
WC maken in kast, leidingen zijn aanwezig
Algemeen
Alle stukwerk skimmen.
N
1009 GW131
nieuwe plattegrond 2e verdieping
1:100 (A4)
27-3-2011
a r c h i t e c t
1009-NWE-PLG-02
B
C
A
D E F G
3.050 70 3.310 100 3.2201.9401001.770
slaapkamer
11,6 m²
cv
0,5 m²
badkamer
5,4 m²
wc
1,0 m²
slaapkamer
6,3 m²
hal
8,6 m²
terras
26,7 m²
Voor Slaapkamer
Balkenlaag van zolders deels verwijderen
Spiltrap maken naar mezzanine vloer
Werkzaamheden
Badkamer
Aanbrengen van een nieuwe vloer
Aanbrengen van electrische vloerverwarming
Stukken & Tegelwerk (alleen douche hoog)
Aanbrengen van mechanische ventilatie
Verplatsen van CV
Achter Slaapkamer
Balkenlaak deels verwijderen
Nieuwe light scheidingswand met deur maken
Ladder naar mezzanine vloer maken
Algemeen
Alle stukwerk skimmen.
+0
+2
existing
new
existing
new
bedroom lofts
1 2 3
4.055 3.185
7.240
C B
3.620 3.620
A
31 2
7.240
4.055 3.185
±0 peil
+2.400 bk vloer
+6.000 nok
+6.600 bk schoorsteen
C
B
A
1 2 3
3.6203.620
4.055 3.185
7.240
7.240
balklaag 8/18
10/18
10/18
C
B
A
+4.800
1.500
2.200
+2.400
1e verdieping
+6.600
dakaanzicht
zuidoostgevel 01 zuidwestgevel 02
A1
1 2 3
4.055 3.185
7.240
C B
3.620 3.620
A
1 2 3
4.055 3.185
7.240
01
GVL-01
1 2 3
01
GVL-01
4.055 3.185
7.240
bestaande keramische p
bestaande dakb
rekje over mu
bestaande t
bestaande gording 80x1
waterwerende dampdoorlatend
vogelschroot
2L baanvormig dakbedekking
underlayment
multiplex
balklaag op afschot 16mm/m
hoogwaardige isolatie
rachels 22x50mm
dampremmende folie
plafondplaat
2L baanvormig dakbedekking
underlayment
multiplex
balklaag op afschot 16mm/m
hoogwaardige isolatie
rachels 22x50mm
dampremmende folie
plafondplaat
aluminium daktrim
±0 peil
+2.400 bk vloer
+6.000 nok
+6.600 bk schoorsteen
zuidoostgevel 01 zuidwestgevel 02
plattegrond begane grond plattegrond 1e verdieping
2 3
3.185
7.240
3 2 1
3.185 4.055
C B
3.620 3.620
A
32
7.240
3.185
±0 peil
+2.400 bk vloer
+6.000 nok
+6.600 bk schoorsteen
C
B
A
3.6203.620
4.055 3.185
7.240
7.240
balklaag 8/18
10/18
10/18
C
B
A
gordin
+4.800
1.500
2.200
+2.400
1e verdieping
+6.600
dakaanzicht
01 noordwestgevelzuidwestgevel 02
A1
3 2 1
3.185 4.055
C B
3.620 3.620
A
±0 peil
+2.400 bk vloer
+6.000 nok
+6.600 bk schoorsteen
C
B
A
1 2 3
3.6203.620
4.055 3.185
7.240
7.240
balklaag 8/18
10/18
10/18
C
B
A
1 2 3
gordingen en nok 8/18
+2.400
1e verdieping
+6.600
dakaanzicht
01 noordwestgevel 03zuidwestgevel 02
A1
2 3
3.185
7.240
3 2 1
3.185 4.055
C B
3.620 3.620
A
2 3
3.185
40
1 2 3
01
GVL-01
4.055 3.185
7.240
1 2 3
01
GVL-01
bestaande keramische pannen
bestaande dakbeschot
rekje over multiplex
bestaande tengels
bestaande gording 80x180mm
waterwerende dampdoorlatende folie
vogelschroot profiel
2L baanvormig dakbedekking
underlayment
multiplex
balklaag op afschot 16mm/m
hoogwaardige isolatie
rachels 22x50mm
dampremmende folie
plafondplaat
2L baanvormig dakbedekking
underlayment
multiplex
balklaag op afschot 16mm/m
hoogwaardige isolatie
rachels 22x50mm
dampremmende folie
plafondplaat
aluminium daktrim
±0 peil
+2.400 bk vloer
+6.000 nok
+6.600 bk schoorsteen
01 noordwestgevelzuidwestgevel 02
plattegrond begane grond plattegrond 1e verdieping
3 2 1
3.185 4.055
C B
3.620 3.620
A
1 2 3
01
GVL-01
4.055 3.185
7.240
1 2 3
01
GVL-01
bestaande keramische pannen
bestaande dakbeschot
rekje over multiplex
bestaande tengels
bestaande gording 80x180mm
waterwerende dampdoorlatende folie
vogelschroot profiel
2L baanvormig dakbedekking
underlayment
multiplex
balklaag op afschot 16mm/m
hoogwaardige isolatie
rachels 22x50mm
dampremmende folie
plafondplaat
2L baanvormig dakbedekking
underlayment
multiplex
balklaag op afschot 16mm/m
hoogwaardige isolatie
rachels 22x50mm
dampremmende folie
plafondplaat
aluminium daktrim
±0 peil
+2.400 bk vloer
+6.000 nok
+6.600 bk schoorsteen
01 noordwestgevel 03zuidwestgevel 02
d begane grond plattegrond 1e verdieping dakaanzicht
2 3
3.185
7.240
3 2 1
3.185 4.055
C B
3.620 3.620
A
VL +2.200
+4.625 ok balklaag
minerale wol
dampremmende laag
rachel
gipsplaat
bestaande keramische pannen
bestaande dakbeschot
rekje over multiplex
bestaande tengels
bestaande gording 80x180mm
waterwerende dampdoorlatende folie
vogelschroot profiel
multiplex
raveelbalk
2L baanvormig dakbedekking
underlayment
multiplex
balklaag op afschot 16mm/m
hoogwaardige isolatie
rachels 22x50mm
dampremmende folie
plafondplaat
VL +2.200
+4.625 bk kozijn / ok balklaag
250
HR++ beglazing
kierdichting
2L baanvormig dakbedekking
underlayment
multiplex
balklaag op afschot 16mm/m
hoogwaardige isolatie
rachels 22x50mm
dampremmende folie
plafondplaat
multiplex
geventileerd
aluminium daktrim
rabatdelen
waterdichte laag
90 x 114
2 3
7.240
3.185
±0 peil
+2.400 bk vloer
+6.000 nok
+6.600 bk schoorsteen
3
01
+6.000 nok
el 01 noordwestgevelzuidwestgevel 02
plattegrond begane grond plattegrond 1e verdieping
0302
A1
‘Standing Room Only’ / Bungalow Extension
Noordwijkerhout / NL / 2010 / Realised
Located in the Sollasi holiday park, this bungalow was bought by
a family looking for a sea-side getaway.
In order to increase the amount of usable floor space in the main
bedroom, a dormer window was added that mirrored the original
dormer window.
With only half the dormer situated in the bedroom, the window in
the other half allowed light to penetrate deep into the bungalow
via the double height living room.
Editie Datum Getekend
A
B
C
D
E
F
Werknummer
Bladnummer
Schaal
Behoort bij
Omschrijving
Fase
alle maatvoering door de aannemer voor uitvoering te controleren in het werk
01-08-2010 mjl
BA
1001
Duinschooten 12.B73
Noordwijkerhout
bouwaanvraag
dakkapel
CONCEPT
1:200
‘Clean Slate’ / House Renovation
The Hague / NL / 2009 / Realised
Located in the desirable Statenkwartier neighbourhood,
this house had been rented out as three apartments
since the 1980’s. Tired, worn out and not taken care of,
it was time for a new beginning.
As one of the few houses in the neighbourhood missing
essentially all original interior details, it allowed ideas to
develop from a clean slate. Only the exterior walls would
remain unchanged.
On the ground floor the kitchen becomes the beating
heart of the home, with all spaces visually connected to
it. The first floor becomes an oasis of tranquility for the
owners, with their master bedroom connecting through
to the bathroom via a walk through wardrobe. A guest
room / library / study is created along with a hobby room.
The upper floor becomes the domain of the children, with
two bedrooms, a large play space flooded with daylight
and a bathroom.
As a response to a predominately shady rear garden, a
large roof terrace is created with panoramic views over
the sea and the city.
+2+1+01:200
KKVW
WM
‘Just a Tweak’ / House Renovation
Voorschoten / NL / 2009 / Realised
Sometimes large interventions are needed in order to make a house work in the 21st century - but not
always. This 1930’s house, that had not been adjusted since being built, needed just a few small tweaks
in order to bring it up to date for a conservative client.
On the ground floor, the living spaces and kitchen were expanded by 2,5m in order to create a usable
kitchen and a larger living space. These spaces are treated as an invisible addition to the house, avoiding
the typical Dutch ‘greenhouse’ conservatory addition and giving the feel that they always belonged to
the house. The bathroom on the first floor, nothing more than a sink, was moved to a larger room on the
street side of the house. This gave the owner a baby room overlooking the 35m deep garden.
The most important intervention is the removal of the original staircase and the creation of a new staircase
to the attic. This created not only larger rooms on the first floor, but allowed the attic to become much
more functional. A guest room, study, bathroom and laundry are flooded with light via new roof lights in
the 4.5m high space.1:200 +2
+1
+0
‘1+1=1’ / Double Apartment Conversion
Amsterdam / NL / 2007 / Realised
This apartment is located in the Staatsliedenbuurt, an up and coming
neighbourhood west of the centre. The client, a young musical couple wanted
to convert two apartments into a single home that provided a large social
space, while also creating a sound proof rehearsal space.
By placing all services on the left side of the floor plan, in line with the access
to above apartments, a maximum amount of floor space was cleared for living
space. On the ground floor, the rehearsal room (1) is placed next to the front
door in order to minimise the distance that instruments have to be carried.
To the rear, a bedroom (2) and study / future bedroom (3) open onto a small
courtyard.
On the upper floor, a long living space (4) is created spanning from front to rear
facade, with double doors opening onto a balcony overlooking the courtyard.
+1
1:200
existing / new
+0
1
2
3
4
‘Growing Up’ / Ground Floor Renovation
Voorschoten / NL / 2007 / Study
The client, a family with two teenage sons, had out
grown the social spaces of their 1930’s home. As they
had no desire to move out of the neighbourhood, they
decided to adapt their house to their needs.
Extending by 2.5m to the rear of the house allowed
a more balanced layout of space and a re-routing of
circulation without applying for building permission.
Access to the balcony space above the extension is
retained, while a skylight strip lights the kitchen & dining
area. The same flooring stretches from front facade to
rear terrace, creating one long living space that becomes
part of the garden when the rear facade is folded away.
1:200
new
existing
‘Out of the Shell’ / Ground Floor Renovation
Almere / NL / 2007 / Study
Almere is a satellite town of Amsterdam, founded in the late 1970’s. While originally conceived as a
polynuclear city, it is now a continuous urban conglomeration and the fastest growing town in The
Netherlands. This house is situated in one of the new developments that filled the gaps in the 1990’s.
The client, a young family, wanted to optimise the ground floor of their home and create more interaction
between the front and rear spaces. By moving the kitchen to the front of the house, this allowed the
heavy core that split the space to be eroded.
The kitchen was made more social by facing it towards the living and dining spaces. Windows between
the kitchen and entrance hall brought daylight into this previously dark space. By breaking open the space
under the stairs, a visual link from front to back was created, while also providing a central workspace for
the family computer.
The door to the garden was moved in order to concentrate circulation spaces to one side of the room.
1:200 newexisting socialintroverted
‘Graduation Studios’ / Conversion of a Student House
Leiden / NL / 2005 / Realised
Leiden is home of the oldest university in The Netherlands and has a huge
student population. While there is always a shortage of room for students,
the situation for recent graduates is even worse.
As a response to this situation, the client decided to convert a monumental
student house into independent studios for recent graduates. Each room is
fitted out with a small kitchen block, toilet & shower.
Due to the height of the ceilings, the rooms on the ground and first floor
have a built in mezzanine sleeping area. In this way the volume of the room
is utilised to its maximum potential, freeing up precious floor space.
On the upper floor the former dropped ceiling has been removed in order
to expose the beams of the saddle roof.
+2
+1
1:200
existing / new
45m2 18m2
23m2 23m2
14m2
17m2 17m2
20m2
24m2 21m2
27m2 25m2
29m2 27m2
19m2
23m2
19m2
+0
‘The Triangle and The Rectangle’ / House renovation
Rijswijk / NL / 2005 / Realised
This house is located in a 1920’s neighbourhood with, for Dutch standards, large terrace housing. Being the
last house on the row, it deviates from the standard Dutch ‘front room / back room’ typology due to the
addition of a parasitic triangle. This triangle (a result of the urban situation) creates a spatial tension.
The client, a young family with two daughters, desired a home that would allow for entertaining, while also
allowing each family member to retreat into their own private space. The possibility to provide space for a
future home based physiotherapy practice was also required.
On the ground floor, the kitchen (1) and living spaces (2) are joined by a wide full height opening that allows
not only sunlight to enter the kitchen, but connects the kitchen an spatially to the living zones.
On the first floor, a new bathroom (3) occupies the intersection of the triangle and rectangle. In the master
bedroom (4) a small en-suite bathroom fits under the stair to the upper floor. A study / practice room (5)
occupies the corner of the triangle
On the second floor, the dropped ceiling was removed and a mezzanine sleeping area created. In order to
create two bedrooms of equal size, the smaller room (6) has a large mezzanine that extends over the hall.+2
+1
1:200 +0
existing new
1
2
3
5
6
4
1:200
‘I See the Light’ / Crossroads International Church Ministry Centre
Amstelveen / NL / 2003 / Realised
Brief: 8 work stations (1) / music rehearsal studio (2) / conference room (3) / multi usage
space (4) / kitchen (5) / counselling space with a separate entrance (6).
With the main entrance bringing visitors into a central hall, a glass wall was created to
bring daylight into this previously artificially lit space. The program was split so that the
more social functions were placed on the upper floor, with the majority of the office space
and the counselling placed on the lower level. In this way, the counselling space could
make use of the existing entrance on the lower level. A bookshelf wall spans the lower
level in order to make the space feel wider.
On the upper floor the rehearsal studio was placed near the entrance in order to minimise
both the distance musicians have to carry their equipment, and the distraction to other
users. The multi usage space is linked to the conference room by a folding wall. In this
way, the space can be combined when catering for larger social activities.
1
1
2
3
4
5
1
1
6
upper floor existing lower floor existing
upper floor new lower floor new

Mais conteúdo relacionado

Destaque

KOVO스포츠토토●◎●babo.com◎●◎K리그배팅 메이저리그토토
KOVO스포츠토토●◎●babo.com◎●◎K리그배팅 메이저리그토토KOVO스포츠토토●◎●babo.com◎●◎K리그배팅 메이저리그토토
KOVO스포츠토토●◎●babo.com◎●◎K리그배팅 메이저리그토토thfdnagjh
 
Presentatie Afstudeeronderzoek
Presentatie AfstudeeronderzoekPresentatie Afstudeeronderzoek
Presentatie Afstudeeronderzoeknljvleugels
 
Juli Burris resume
Juli Burris resumeJuli Burris resume
Juli Burris resumeJuli Burris
 
Time powerpoint
Time powerpointTime powerpoint
Time powerpointLaura6145
 
מבוא, שער ראשון - אוריינות יהודית
מבוא, שער ראשון - אוריינות יהודיתמבוא, שער ראשון - אוריינות יהודית
מבוא, שער ראשון - אוריינות יהודיתtarbutisrael
 
Нужна зубов вам красота
Нужна зубов вам красотаНужна зубов вам красота
Нужна зубов вам красотаKasper_WPS
 
Academische erfgoed 20140515_u_antwerpen_noordermeer
Academische erfgoed 20140515_u_antwerpen_noordermeerAcademische erfgoed 20140515_u_antwerpen_noordermeer
Academische erfgoed 20140515_u_antwerpen_noordermeerAcademischErfgoed
 
Corporate Social Responsibility
Corporate Social ResponsibilityCorporate Social Responsibility
Corporate Social ResponsibilityAditi Upadhyay
 
Social Media Marketing for the Architectural Industry
Social Media Marketing for the Architectural IndustrySocial Media Marketing for the Architectural Industry
Social Media Marketing for the Architectural IndustryIngrid Ricks
 
Skyville 8 @ Old Klang Road
Skyville 8 @ Old Klang RoadSkyville 8 @ Old Klang Road
Skyville 8 @ Old Klang RoadCk Chong
 

Destaque (16)

KOVO스포츠토토●◎●babo.com◎●◎K리그배팅 메이저리그토토
KOVO스포츠토토●◎●babo.com◎●◎K리그배팅 메이저리그토토KOVO스포츠토토●◎●babo.com◎●◎K리그배팅 메이저리그토토
KOVO스포츠토토●◎●babo.com◎●◎K리그배팅 메이저리그토토
 
Presentatie Afstudeeronderzoek
Presentatie AfstudeeronderzoekPresentatie Afstudeeronderzoek
Presentatie Afstudeeronderzoek
 
Cuarto año básico
Cuarto año básicoCuarto año básico
Cuarto año básico
 
Juli Burris resume
Juli Burris resumeJuli Burris resume
Juli Burris resume
 
Casi una niña,celina
Casi una niña,celinaCasi una niña,celina
Casi una niña,celina
 
Investing is simple
Investing is simpleInvesting is simple
Investing is simple
 
Time powerpoint
Time powerpointTime powerpoint
Time powerpoint
 
Shalat malam
Shalat malamShalat malam
Shalat malam
 
La redacción
La redacciónLa redacción
La redacción
 
I testi
I testiI testi
I testi
 
מבוא, שער ראשון - אוריינות יהודית
מבוא, שער ראשון - אוריינות יהודיתמבוא, שער ראשון - אוריינות יהודית
מבוא, שער ראשון - אוריינות יהודית
 
Нужна зубов вам красота
Нужна зубов вам красотаНужна зубов вам красота
Нужна зубов вам красота
 
Academische erfgoed 20140515_u_antwerpen_noordermeer
Academische erfgoed 20140515_u_antwerpen_noordermeerAcademische erfgoed 20140515_u_antwerpen_noordermeer
Academische erfgoed 20140515_u_antwerpen_noordermeer
 
Corporate Social Responsibility
Corporate Social ResponsibilityCorporate Social Responsibility
Corporate Social Responsibility
 
Social Media Marketing for the Architectural Industry
Social Media Marketing for the Architectural IndustrySocial Media Marketing for the Architectural Industry
Social Media Marketing for the Architectural Industry
 
Skyville 8 @ Old Klang Road
Skyville 8 @ Old Klang RoadSkyville 8 @ Old Klang Road
Skyville 8 @ Old Klang Road
 

Semelhante a Michael James Lucas Architect Portfolio

Mellé-en
Mellé-enMellé-en
Mellé-enlibnam
 
Leaders Study Program, Paris 2019 -Nanterre en_v2
Leaders Study Program, Paris 2019 -Nanterre en_v2Leaders Study Program, Paris 2019 -Nanterre en_v2
Leaders Study Program, Paris 2019 -Nanterre en_v2www.theurbanvision.com
 
NPR Masterprijs Afstudeerboek herontwikkeling julianakerk 5
NPR Masterprijs Afstudeerboek herontwikkeling julianakerk 5NPR Masterprijs Afstudeerboek herontwikkeling julianakerk 5
NPR Masterprijs Afstudeerboek herontwikkeling julianakerk 5NRP
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2Tej Raj Upreti
 
RenovActive - presented at Clima2016
RenovActive - presented at Clima2016RenovActive - presented at Clima2016
RenovActive - presented at Clima2016Peter Foldbjerg
 
Architecture case study presentation
Architecture case study presentationArchitecture case study presentation
Architecture case study presentationWriters Per Hour
 
OVALLE roberto - portfolio English
OVALLE roberto - portfolio EnglishOVALLE roberto - portfolio English
OVALLE roberto - portfolio EnglishRoberto Ovalle
 
REALIZATIONS WASSERFALLEN English LOW RES FILES
REALIZATIONS WASSERFALLEN English LOW RES FILESREALIZATIONS WASSERFALLEN English LOW RES FILES
REALIZATIONS WASSERFALLEN English LOW RES FILESAntoine Wasserfallen
 
Maison neuve holiday cottage-en
Maison neuve holiday cottage-enMaison neuve holiday cottage-en
Maison neuve holiday cottage-enlibnam
 
Noah Gardiner Portfolio Sample
Noah Gardiner Portfolio SampleNoah Gardiner Portfolio Sample
Noah Gardiner Portfolio SampleNoah Gardiner
 
Penn Road Presentation compressed
Penn Road Presentation compressedPenn Road Presentation compressed
Penn Road Presentation compressedchris milczanowski
 
Education center le picaou en
Education center le picaou   enEducation center le picaou   en
Education center le picaou enlibnam
 
MartaMarescalchi PORTFOLIO2016
MartaMarescalchi PORTFOLIO2016MartaMarescalchi PORTFOLIO2016
MartaMarescalchi PORTFOLIO2016Marta Marescalchi
 
Minegu-en
Minegu-enMinegu-en
Minegu-enlibnam
 

Semelhante a Michael James Lucas Architect Portfolio (20)

Mellé-en
Mellé-enMellé-en
Mellé-en
 
Leaders Study Program, Paris 2019 -Nanterre en_v2
Leaders Study Program, Paris 2019 -Nanterre en_v2Leaders Study Program, Paris 2019 -Nanterre en_v2
Leaders Study Program, Paris 2019 -Nanterre en_v2
 
NPR Masterprijs Afstudeerboek herontwikkeling julianakerk 5
NPR Masterprijs Afstudeerboek herontwikkeling julianakerk 5NPR Masterprijs Afstudeerboek herontwikkeling julianakerk 5
NPR Masterprijs Afstudeerboek herontwikkeling julianakerk 5
 
Full PORTFOLIO 5
Full PORTFOLIO 5Full PORTFOLIO 5
Full PORTFOLIO 5
 
Sb05
Sb05Sb05
Sb05
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
RenovActive - presented at Clima2016
RenovActive - presented at Clima2016RenovActive - presented at Clima2016
RenovActive - presented at Clima2016
 
all sheets
all sheetsall sheets
all sheets
 
Architecture case study presentation
Architecture case study presentationArchitecture case study presentation
Architecture case study presentation
 
Real Estate in Berlin
Real Estate in BerlinReal Estate in Berlin
Real Estate in Berlin
 
OVALLE roberto - portfolio English
OVALLE roberto - portfolio EnglishOVALLE roberto - portfolio English
OVALLE roberto - portfolio English
 
REALIZATIONS WASSERFALLEN English LOW RES FILES
REALIZATIONS WASSERFALLEN English LOW RES FILESREALIZATIONS WASSERFALLEN English LOW RES FILES
REALIZATIONS WASSERFALLEN English LOW RES FILES
 
Maison neuve holiday cottage-en
Maison neuve holiday cottage-enMaison neuve holiday cottage-en
Maison neuve holiday cottage-en
 
Noah Gardiner Portfolio Sample
Noah Gardiner Portfolio SampleNoah Gardiner Portfolio Sample
Noah Gardiner Portfolio Sample
 
Passive house buildings
Passive house buildingsPassive house buildings
Passive house buildings
 
Penn Road Presentation compressed
Penn Road Presentation compressedPenn Road Presentation compressed
Penn Road Presentation compressed
 
Education center le picaou en
Education center le picaou   enEducation center le picaou   en
Education center le picaou en
 
Sorja
SorjaSorja
Sorja
 
MartaMarescalchi PORTFOLIO2016
MartaMarescalchi PORTFOLIO2016MartaMarescalchi PORTFOLIO2016
MartaMarescalchi PORTFOLIO2016
 
Minegu-en
Minegu-enMinegu-en
Minegu-en
 

Último

High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Nitya salvi
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...HyderabadDolls
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyIsadora Agency
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfOffice Furniture Plus - Irving
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024Ilham Brata
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证eeanqy
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...gajnagarg
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideDesign Studio UI UX
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxtrose8
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证eeanqy
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Nitya salvi
 
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...samsungultra782445
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证wpkuukw
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxbalqisyamutia
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfamanda2495
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...gargpaaro
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证ehyxf
 

Último (20)

High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptx
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
 
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 

Michael James Lucas Architect Portfolio

  • 1. mjlarchitect/fluwelenburgwal/1g/2511ch/denhaag/06.24.71.64.62/m.j.lucas@live.nl m i c h a e l j a m e s l u c a s          "Matrouska"
  • 2. GSPublisherEngine 0.75.100.100 fluwelen burgwal 1g / 2511 ch / den haag / nederland +31.6.24.71.64.62. / m.j.lucas@live.nl m i c h a e l j a m e s l u c a s A R C H I T E C T MV CV renvooi bouwkundig metselwerk - bestaand renvooi bouwkundig valt buiten aanvraag kozijn / deur - bestaand 30°, nieuw 90° meterkast gas / water / electraM.K. WM/D opstelplaats wasmachine / droger koelkast / ovenKK / O mechanische ventilatie-unit v.v. WTW HR-combiketel (HR 107) kooktoestel gas / inductie houtenvloer drijfsteen isolatie HWA hemelwaterafvoer kalkzandsteen houten balklaag met steengaasplafond FG/E mechanische afzuigpunt - plafond CV afvoer rookgas / toevoer lucht (NEN 1087)CV perceelsgrens niet ioniserende rookmelder (NEN 2555) - Peil = 20mm-NAP, is bovenkant afgewerkte begane grond vloer - materialen en kleuren volgens kleur- en materiaalstaat - veiligheidsbeglazing: glazen afscheidingen voorzien van doorvalveilig glas; beglazing tot aan vloer: aan binnenzijde uitvoeren conform letselbeperkende eisen van NEN 3569. mechanische inblaaspunt - plafond lichte scheidingswand beton beton prefab tegelwerk: badkamer tot 2,000+; keuken tot 600+ aanrecht; wc tot 1,500+ p geïsoleerde sandwichpaneel U≤0,8 m2 K/W mechanische afzuigpunt - wand mechanische inblaaspunt - wand 1:50 tekeningnummer datum fase gewijzigd schaal 01-10-2015 Omgevingsvergunning OMV-122 06-12-2015 (B) werknr. / werk / locatie 1507 / HK43 / Den Haag formaat A3 onderwerp Gevels Nieuw - C O N C E P T alle maatvoering door de aannemer voor uitvoering te controleren in het werk 1 2 6.000 nieuwe hardhouten kozijnen in kleur nieuwe hardhouten kozijnen in kleur mat glas p glas v.v. niet doorzichtig folie p p p p 2 1 6.000 plaatmateriaal in kleur betonnen trede conform bestaand nieuwe hardhouten kozijnen in kleur v.v. drie-dubbel glas bestaande borstwering nieuwe hardhouten kozijnen in kleur v.v. drie-dubbel glas p 0 Begane grond 2.800 1e verdieping 5.800 Nok Voorgevel - ongewijzigd 01 ZW Achtergevel 02 ZW Is it possible to make a typical Dutch 1960's terrace house, a 'doorzonwoning' energy neutral? This project investigates the potential for energy savings in the masses of post WWII houses built throughout the country. By upgrading the whole building envelope, introducing mechanical ventilating with heat recovery and installing a heat pump and pv solar panels the limits of what is possible are being pushed. Ths project is being followed by the Dutch television channel RTL4 program "Ons Huis Verdient Het". 'Prototype' / Energy Neutral Renovation The Hague / NL / 2015 / In Progress
  • 3. mjlarchitect/fluwelenburgwal/1g/2511ch/denhaag/06.24.71.64.62/m.j.lucas@live.nl ‘Matrouska’ / Appartment Interior Amsterdam / NL / 2014 / Design Designed for a new build project on the edge of central Amsterdam, this apartment was for a mother close to retirement and her daughter living overseas who wanted a pied-a-terre in The Netherlands. The apartment was to work as a single space that could, when required, be divided into two independent living units. The long lines of the apartment were accentuated by placing a hall along the facade and another in the middle of the plan creating a circular routing. The entrance hall doubles as a gallery for a collection of graphic art. N 1401 SA2.1 Analyse / Concept 02 1:243,90 9-3-2014 a r c h i t e c t 75% 50% 25% 0% 100% APPARTEMENT STUDIO ENTREE zichtlijnen appartement daglicht toetreding (diepte daglichtzone = +/- 2x hoogte raam) uitzicht servicezone woonruimtes circulatie opzet 25%
  • 4. A young couple had bought a large town house and were not sure what was possible with it. With this quick feasability study the building was analysed and 3 proposals were made: 1) Live in the whole house with living room at rear 2) Live in the whole house with dining room at rear 3) Create a groud floor appartment for expats and live on the upper floors 'What now?' / Potential Analysis The Hague / NL / 2013 / Study
  • 5. Why is it that the best room of a party is always the kitchen? The owners of this house loved their neighbourhood, but not their isolated little kitchen. Rather than move house they decided to go for a radical renovation of the ground floor. By mirroring the plan, the kitchen and dining room combined to create a large space for social gatherings. Not wanting to cut off the living room, a glass cabinet (displaying family heirlooms) sits between the two rooms allowing light and sight lines to flow back and forth. A conservatory enlarges the living room while embracing the garden. 'Heirlooms' / Ground floor renovation Leiden / NL / 2013 / Realised
  • 6. ‘Silent Disco’ / Student Union The Hague / NL / 2011 / Realised In early 2011, Student Union “Pallas Athene” had the opportunity to rent a former restaurant as their society. With all building work carried out by students, a simple design was conceived that was also very durable. A complete acoustic cage was built in the space, allowing parties to be held without disturbing the upstairs neighbours. To counter the effect of a long, narrow space, the rear wall was covered with bold horizontal lines in the colours of all the clubs. Bar tables can be folded out from the paneling.
  • 7. ‘Love Thy Neighbour’ / Roof Terrace The Hague / NL / 2011 / Realised The apartment is situated on the upper three floors of a townhouse above the storage rooms of the local bakery. In order to completely cover the roof with the terrace permission was necessary from all 10 neighbours. In order to protect the privacy of both user and neighbours, the terrace is surrounded by planters that act both as balustrades and green privacy screens. In this way, when the bamboo is matured, the terrace will be surrounded by a 2m high hedge. alle maatvoering door de aannemer voor uitvoering te controleren in het werk 26-05-2013 B1:10 tekening datum werk rev. datum versieschaal detail 01-06-2011 1011 01 OA-DET OS185 - 's-Gravenhage m i c h a e l j a m e s l u c a s          26-05-13 +3.100 +3.550 VL +700 VL +1.600 220 50 96 +3.470 +3.550 hardhouten vlonders 20 x 145 perliet / potgrond hardhouten regel 40 x 40 h.o.h. 140mm hardhouten vlonders 30 x 140 houtenbalk 219 x 96 volgens constructeur hardhouten regel 40 x 40 Bestaande Dak: EPDM (nieuw) underlayment multiplex balklaag op afschot 16mm/m isolatie dampremmende folie rachels 22x50mm plafondplaat thermisch verzinkt staalconstructie afsteunen op huidige constructie volgens constructeur kitvoeg met rugvulling bestaande metselwerk perceelsgrens hardhouten regel 40 x 40 hardhouten regel 40 x 40 hardhouten regel 40 x 40 h.o.h. 140mm bamboe max. 1,000mm hoog hardhouten raster openingen tot 1,000+VL 120 x 50mm daarboven 120 x 120mm 1 obrechtstraat 191 obrechtstraat187 obrechtstraat185 obrechtstraat 187 alle maatvoering door de aannemer voor uitvoering te controleren in het werk 26-05-2013 B1:10 tekening datum werk rev. datum versieschaal detail 01-06-2011 1011 04 OA-DET OS185 - 's-Gravenhage m i c h a e l j a m e s l u c a s          13 +3.100 +3.550 +4.015 +4.570 1103096 vlonders 30 x 140 Bestaande Dak: EPDM (nieuw) underlayment multiplex balklaag op afschot 16mm/m isolatie dampremmende folie rachels 22x50mm plafondplaat kitvoeg met rugvulling bestaande metselwerk parceelsgrens houten randbalk 219 x 96 bevestigen aan hoeklijn lood hoeklijn 150x150 hardhouten vlonders 20 x 145 hardhouten regel 40 x 40 h.o.h. 140mm hardhouten regel 40 x 40 hardhouten vlonders 20 x 145 hardhouten vlonders 20 x 145 4 reinkenstraat 56 obrechtstraat187obrechtstraat185 reinkenstraat 54
  • 8. ‘Right & Wrong’ / Kitchen & Bathroom Renovation The Hague / NL / 2010 / Realised When a young family bought this house, they found all the right things were in the wrong places. A previous renovation had created an efficient but introverted kitchen, and a bathroom that was only accessible through the main bedroom. By turning the toilet on the 1st floor by 90°, otherwise wasted hall space could be used to create a niche in the kitchen to house the family sized fridge and oven. Social interaction between the kitchen and the rest of the living spaces was realised by opening up the kitchen and placing a bar that hides the mess from the dining space. In the bathroom, all elements were placed against one wall to create an open, spacious and efficient space. N 1012 CS46A 1e verdieping bestaande 1:50 23-2-2011 origineel formaat A3, tek: VO-PLG 01 BST a r c h i t e c t 14 15 16 17 18 02 4.320 110 2.590 220 1.400 1402.250220 6.510110 5401.280460 1.8001.280570 800 2.090 1.190 700 2.1702.170 60 220 1.500 1.320 110940180 140 1.180 hier ergens standleiding N 1012 CS46A 1e verdieping nieuw 1:100 23-2-2011 origineel formaat A3, tek: VO-PLG 01 NWE a r c h i t e c t 14 15 16 17 18 A 02 6.510 2203.9001402.250220 1.030 2.550 300 3.880 55079070790600 140 800 160 70 850 2.000 600 780 400 1.200 900 1.230160 1.390 150600600900 1.380 1.600 600 600 200 600 6.290 +3.800 stalen balk indicatiefoverspanning ngen wc wanden (min 70mm met isolatie) / elektra van sanitair, fontein en tegelwerk (ntb) 1:50 10 11 12 13 14 15 A 02 2203.9501402.200220 1.300 110 2.470 1.040 1.180 110 2.450 180 100 900 280 140 3.880 220 100 3.740 600 700 .460 5101.200540 2.450 1.000 1.930 890(?)1.310 890110950 610690900 1.950 6.290 2.200 250 +7.200 hier ergens standleiding CEPT 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 2.000250 5101.200540 940110980220 2.250 1.200 440 440 1.000 800 3.880 +7.200 inbouwkast, indeling ntb
  • 9. ‘Hidden potential’ / House Renovation The Hague / NL / 2010 / Realised An family with two teenage children bought this monumental 18th century house that had previously been renovated for a childless couple. With only two bedrooms & fragmented ground floor, it was not practical for a family looking to entertain while also having their own spaces to retreat into. This study showed the potential for the house to be renovated so that the social spaces on the ground floor became united & both children would have their own bedroom. By removing the false ceiling on the 2nd floor, both bedrooms became lofts.N 1009 GW131 AXO Zolder 1:71,43 1009-43 16-3-2011 N 1009 GW131 bestaande plattegrond begane grond 1:100 (A4) 27-3-2011 a r c h i t e c t 1009-BST-PLG-00 1803.810180 2.480701.260 1803.040100850 2.000 70 1.160 70 1.350 70 710 70 930 70 3.250 180 1.150 3.110 180 2.660 1.650 930703.320 1.050 1804.320180 B C A vestibule 2,2 m² voorkamer 12,6 m² eetkamer 15,8 m² atrium 11,7 m² kast 1,1 m² hal 3,6 m² keuken 17,0 m² kast 1,5 m² hal 1,5 m² kast 1,5 m² D E F G Voorkamer Wand tussen hal en voorkamer slopen Trap verwijderen Sloop Werkzaamheden Eetkamer Kozijn tussen eetkamer en atrium verwijderen. Metselwerk verwijderen tot vloer niveau Kkeuken Kozijn tussen keuken en atrium verwijderen. Metselwerk verwijderen tot vloer niveau Bestaande keuken incl. tegels verwijderen Kast Slopen N 1009 GW131 bestaande plattegrond 2e verdieping 1:100 (A4) 27-3-2011 a r c h i t e c t 1009-BST-PLG-02 B C A D E F G 3.050 70 1.130 70 2.110 70 3.250 1.9707085070850 1803.810180 3.000 3.310 180 9.750 180 8.750 180 3.560 18.680 badkamer 11,6 m² cv 0,4 m² kast 5,4 m² wc 1,0 m² slaapkamer 13,0 m² hal 2,8 m² terras 26,7 m² Badkamer Bestaande badkamer incl. tegels verwijderen Bestaande plafond verwijderen Sloop Werkzaamheden Slaapkamer Deur tussen slaapkamer en hal verwijderen Slaapkamer Deur tussen slaapkamer en hal verwijderen Bestaande plafond verwijderen N 1009 GW131 nieuwe plattegrond begane grond 1:100 (A4) 27-3-2011 a r c h i t e c t 1009-NWE-PLG-00 4.910 70 3.770 1.000 2.1801001.530 B C A vestibule 2,2 m² voorkamer 11,7 m² eetkamer 12,8 m² atrium 11,7 m² wc 1,1 m² hal 4,7 m² keuken 18,6 m² hal 4,0 m² kast 1,8 m² D E F G Voorkamer Licht scheidingswand aanbrenden met in het wand schuifdeur Werkzaamheden Eetkamer Trap naar 1e verdieping maken Kozijn met glazen schuifdeur voor het wand maken bij trap WC WC maken in kast, leidingen zijn aanwezig Algemeen Alle stukwerk skimmen. N 1009 GW131 nieuwe plattegrond 2e verdieping 1:100 (A4) 27-3-2011 a r c h i t e c t 1009-NWE-PLG-02 B C A D E F G 3.050 70 3.310 100 3.2201.9401001.770 slaapkamer 11,6 m² cv 0,5 m² badkamer 5,4 m² wc 1,0 m² slaapkamer 6,3 m² hal 8,6 m² terras 26,7 m² Voor Slaapkamer Balkenlaag van zolders deels verwijderen Spiltrap maken naar mezzanine vloer Werkzaamheden Badkamer Aanbrengen van een nieuwe vloer Aanbrengen van electrische vloerverwarming Stukken & Tegelwerk (alleen douche hoog) Aanbrengen van mechanische ventilatie Verplatsen van CV Achter Slaapkamer Balkenlaak deels verwijderen Nieuwe light scheidingswand met deur maken Ladder naar mezzanine vloer maken Algemeen Alle stukwerk skimmen. +0 +2 existing new existing new bedroom lofts
  • 10. 1 2 3 4.055 3.185 7.240 C B 3.620 3.620 A 31 2 7.240 4.055 3.185 ±0 peil +2.400 bk vloer +6.000 nok +6.600 bk schoorsteen C B A 1 2 3 3.6203.620 4.055 3.185 7.240 7.240 balklaag 8/18 10/18 10/18 C B A +4.800 1.500 2.200 +2.400 1e verdieping +6.600 dakaanzicht zuidoostgevel 01 zuidwestgevel 02 A1 1 2 3 4.055 3.185 7.240 C B 3.620 3.620 A 1 2 3 4.055 3.185 7.240 01 GVL-01 1 2 3 01 GVL-01 4.055 3.185 7.240 bestaande keramische p bestaande dakb rekje over mu bestaande t bestaande gording 80x1 waterwerende dampdoorlatend vogelschroot 2L baanvormig dakbedekking underlayment multiplex balklaag op afschot 16mm/m hoogwaardige isolatie rachels 22x50mm dampremmende folie plafondplaat 2L baanvormig dakbedekking underlayment multiplex balklaag op afschot 16mm/m hoogwaardige isolatie rachels 22x50mm dampremmende folie plafondplaat aluminium daktrim ±0 peil +2.400 bk vloer +6.000 nok +6.600 bk schoorsteen zuidoostgevel 01 zuidwestgevel 02 plattegrond begane grond plattegrond 1e verdieping 2 3 3.185 7.240 3 2 1 3.185 4.055 C B 3.620 3.620 A 32 7.240 3.185 ±0 peil +2.400 bk vloer +6.000 nok +6.600 bk schoorsteen C B A 3.6203.620 4.055 3.185 7.240 7.240 balklaag 8/18 10/18 10/18 C B A gordin +4.800 1.500 2.200 +2.400 1e verdieping +6.600 dakaanzicht 01 noordwestgevelzuidwestgevel 02 A1 3 2 1 3.185 4.055 C B 3.620 3.620 A ±0 peil +2.400 bk vloer +6.000 nok +6.600 bk schoorsteen C B A 1 2 3 3.6203.620 4.055 3.185 7.240 7.240 balklaag 8/18 10/18 10/18 C B A 1 2 3 gordingen en nok 8/18 +2.400 1e verdieping +6.600 dakaanzicht 01 noordwestgevel 03zuidwestgevel 02 A1 2 3 3.185 7.240 3 2 1 3.185 4.055 C B 3.620 3.620 A 2 3 3.185 40 1 2 3 01 GVL-01 4.055 3.185 7.240 1 2 3 01 GVL-01 bestaande keramische pannen bestaande dakbeschot rekje over multiplex bestaande tengels bestaande gording 80x180mm waterwerende dampdoorlatende folie vogelschroot profiel 2L baanvormig dakbedekking underlayment multiplex balklaag op afschot 16mm/m hoogwaardige isolatie rachels 22x50mm dampremmende folie plafondplaat 2L baanvormig dakbedekking underlayment multiplex balklaag op afschot 16mm/m hoogwaardige isolatie rachels 22x50mm dampremmende folie plafondplaat aluminium daktrim ±0 peil +2.400 bk vloer +6.000 nok +6.600 bk schoorsteen 01 noordwestgevelzuidwestgevel 02 plattegrond begane grond plattegrond 1e verdieping 3 2 1 3.185 4.055 C B 3.620 3.620 A 1 2 3 01 GVL-01 4.055 3.185 7.240 1 2 3 01 GVL-01 bestaande keramische pannen bestaande dakbeschot rekje over multiplex bestaande tengels bestaande gording 80x180mm waterwerende dampdoorlatende folie vogelschroot profiel 2L baanvormig dakbedekking underlayment multiplex balklaag op afschot 16mm/m hoogwaardige isolatie rachels 22x50mm dampremmende folie plafondplaat 2L baanvormig dakbedekking underlayment multiplex balklaag op afschot 16mm/m hoogwaardige isolatie rachels 22x50mm dampremmende folie plafondplaat aluminium daktrim ±0 peil +2.400 bk vloer +6.000 nok +6.600 bk schoorsteen 01 noordwestgevel 03zuidwestgevel 02 d begane grond plattegrond 1e verdieping dakaanzicht 2 3 3.185 7.240 3 2 1 3.185 4.055 C B 3.620 3.620 A VL +2.200 +4.625 ok balklaag minerale wol dampremmende laag rachel gipsplaat bestaande keramische pannen bestaande dakbeschot rekje over multiplex bestaande tengels bestaande gording 80x180mm waterwerende dampdoorlatende folie vogelschroot profiel multiplex raveelbalk 2L baanvormig dakbedekking underlayment multiplex balklaag op afschot 16mm/m hoogwaardige isolatie rachels 22x50mm dampremmende folie plafondplaat VL +2.200 +4.625 bk kozijn / ok balklaag 250 HR++ beglazing kierdichting 2L baanvormig dakbedekking underlayment multiplex balklaag op afschot 16mm/m hoogwaardige isolatie rachels 22x50mm dampremmende folie plafondplaat multiplex geventileerd aluminium daktrim rabatdelen waterdichte laag 90 x 114 2 3 7.240 3.185 ±0 peil +2.400 bk vloer +6.000 nok +6.600 bk schoorsteen 3 01 +6.000 nok el 01 noordwestgevelzuidwestgevel 02 plattegrond begane grond plattegrond 1e verdieping 0302 A1 ‘Standing Room Only’ / Bungalow Extension Noordwijkerhout / NL / 2010 / Realised Located in the Sollasi holiday park, this bungalow was bought by a family looking for a sea-side getaway. In order to increase the amount of usable floor space in the main bedroom, a dormer window was added that mirrored the original dormer window. With only half the dormer situated in the bedroom, the window in the other half allowed light to penetrate deep into the bungalow via the double height living room. Editie Datum Getekend A B C D E F Werknummer Bladnummer Schaal Behoort bij Omschrijving Fase alle maatvoering door de aannemer voor uitvoering te controleren in het werk 01-08-2010 mjl BA 1001 Duinschooten 12.B73 Noordwijkerhout bouwaanvraag dakkapel CONCEPT 1:200
  • 11. ‘Clean Slate’ / House Renovation The Hague / NL / 2009 / Realised Located in the desirable Statenkwartier neighbourhood, this house had been rented out as three apartments since the 1980’s. Tired, worn out and not taken care of, it was time for a new beginning. As one of the few houses in the neighbourhood missing essentially all original interior details, it allowed ideas to develop from a clean slate. Only the exterior walls would remain unchanged. On the ground floor the kitchen becomes the beating heart of the home, with all spaces visually connected to it. The first floor becomes an oasis of tranquility for the owners, with their master bedroom connecting through to the bathroom via a walk through wardrobe. A guest room / library / study is created along with a hobby room. The upper floor becomes the domain of the children, with two bedrooms, a large play space flooded with daylight and a bathroom. As a response to a predominately shady rear garden, a large roof terrace is created with panoramic views over the sea and the city. +2+1+01:200
  • 12. KKVW WM ‘Just a Tweak’ / House Renovation Voorschoten / NL / 2009 / Realised Sometimes large interventions are needed in order to make a house work in the 21st century - but not always. This 1930’s house, that had not been adjusted since being built, needed just a few small tweaks in order to bring it up to date for a conservative client. On the ground floor, the living spaces and kitchen were expanded by 2,5m in order to create a usable kitchen and a larger living space. These spaces are treated as an invisible addition to the house, avoiding the typical Dutch ‘greenhouse’ conservatory addition and giving the feel that they always belonged to the house. The bathroom on the first floor, nothing more than a sink, was moved to a larger room on the street side of the house. This gave the owner a baby room overlooking the 35m deep garden. The most important intervention is the removal of the original staircase and the creation of a new staircase to the attic. This created not only larger rooms on the first floor, but allowed the attic to become much more functional. A guest room, study, bathroom and laundry are flooded with light via new roof lights in the 4.5m high space.1:200 +2 +1 +0
  • 13. ‘1+1=1’ / Double Apartment Conversion Amsterdam / NL / 2007 / Realised This apartment is located in the Staatsliedenbuurt, an up and coming neighbourhood west of the centre. The client, a young musical couple wanted to convert two apartments into a single home that provided a large social space, while also creating a sound proof rehearsal space. By placing all services on the left side of the floor plan, in line with the access to above apartments, a maximum amount of floor space was cleared for living space. On the ground floor, the rehearsal room (1) is placed next to the front door in order to minimise the distance that instruments have to be carried. To the rear, a bedroom (2) and study / future bedroom (3) open onto a small courtyard. On the upper floor, a long living space (4) is created spanning from front to rear facade, with double doors opening onto a balcony overlooking the courtyard. +1 1:200 existing / new +0 1 2 3 4
  • 14. ‘Growing Up’ / Ground Floor Renovation Voorschoten / NL / 2007 / Study The client, a family with two teenage sons, had out grown the social spaces of their 1930’s home. As they had no desire to move out of the neighbourhood, they decided to adapt their house to their needs. Extending by 2.5m to the rear of the house allowed a more balanced layout of space and a re-routing of circulation without applying for building permission. Access to the balcony space above the extension is retained, while a skylight strip lights the kitchen & dining area. The same flooring stretches from front facade to rear terrace, creating one long living space that becomes part of the garden when the rear facade is folded away. 1:200 new existing
  • 15. ‘Out of the Shell’ / Ground Floor Renovation Almere / NL / 2007 / Study Almere is a satellite town of Amsterdam, founded in the late 1970’s. While originally conceived as a polynuclear city, it is now a continuous urban conglomeration and the fastest growing town in The Netherlands. This house is situated in one of the new developments that filled the gaps in the 1990’s. The client, a young family, wanted to optimise the ground floor of their home and create more interaction between the front and rear spaces. By moving the kitchen to the front of the house, this allowed the heavy core that split the space to be eroded. The kitchen was made more social by facing it towards the living and dining spaces. Windows between the kitchen and entrance hall brought daylight into this previously dark space. By breaking open the space under the stairs, a visual link from front to back was created, while also providing a central workspace for the family computer. The door to the garden was moved in order to concentrate circulation spaces to one side of the room. 1:200 newexisting socialintroverted
  • 16. ‘Graduation Studios’ / Conversion of a Student House Leiden / NL / 2005 / Realised Leiden is home of the oldest university in The Netherlands and has a huge student population. While there is always a shortage of room for students, the situation for recent graduates is even worse. As a response to this situation, the client decided to convert a monumental student house into independent studios for recent graduates. Each room is fitted out with a small kitchen block, toilet & shower. Due to the height of the ceilings, the rooms on the ground and first floor have a built in mezzanine sleeping area. In this way the volume of the room is utilised to its maximum potential, freeing up precious floor space. On the upper floor the former dropped ceiling has been removed in order to expose the beams of the saddle roof. +2 +1 1:200 existing / new 45m2 18m2 23m2 23m2 14m2 17m2 17m2 20m2 24m2 21m2 27m2 25m2 29m2 27m2 19m2 23m2 19m2 +0
  • 17. ‘The Triangle and The Rectangle’ / House renovation Rijswijk / NL / 2005 / Realised This house is located in a 1920’s neighbourhood with, for Dutch standards, large terrace housing. Being the last house on the row, it deviates from the standard Dutch ‘front room / back room’ typology due to the addition of a parasitic triangle. This triangle (a result of the urban situation) creates a spatial tension. The client, a young family with two daughters, desired a home that would allow for entertaining, while also allowing each family member to retreat into their own private space. The possibility to provide space for a future home based physiotherapy practice was also required. On the ground floor, the kitchen (1) and living spaces (2) are joined by a wide full height opening that allows not only sunlight to enter the kitchen, but connects the kitchen an spatially to the living zones. On the first floor, a new bathroom (3) occupies the intersection of the triangle and rectangle. In the master bedroom (4) a small en-suite bathroom fits under the stair to the upper floor. A study / practice room (5) occupies the corner of the triangle On the second floor, the dropped ceiling was removed and a mezzanine sleeping area created. In order to create two bedrooms of equal size, the smaller room (6) has a large mezzanine that extends over the hall.+2 +1 1:200 +0 existing new 1 2 3 5 6 4
  • 18. 1:200 ‘I See the Light’ / Crossroads International Church Ministry Centre Amstelveen / NL / 2003 / Realised Brief: 8 work stations (1) / music rehearsal studio (2) / conference room (3) / multi usage space (4) / kitchen (5) / counselling space with a separate entrance (6). With the main entrance bringing visitors into a central hall, a glass wall was created to bring daylight into this previously artificially lit space. The program was split so that the more social functions were placed on the upper floor, with the majority of the office space and the counselling placed on the lower level. In this way, the counselling space could make use of the existing entrance on the lower level. A bookshelf wall spans the lower level in order to make the space feel wider. On the upper floor the rehearsal studio was placed near the entrance in order to minimise both the distance musicians have to carry their equipment, and the distraction to other users. The multi usage space is linked to the conference room by a folding wall. In this way, the space can be combined when catering for larger social activities. 1 1 2 3 4 5 1 1 6 upper floor existing lower floor existing upper floor new lower floor new