SlideShare uma empresa Scribd logo
1 de 2
Baixar para ler offline
Geomembrane - Lined Applications
Products & Services
General Locations
LEAK DETECTION PROCESS
• Landfills
• Lakes
• Leach Pads
• Liquid Impoundments
• Reservoirs
• Ponds
• Storage Tanks
• Solid Waste Facilities
• Nuclear Power Plants
• Recycling Plants
• Surface Mines
• Mills
• Farms
• Oil Fields
• Golf Courses
Electrical leak detection methods implement a physical, real-world circuitry consisting of magnetic fields and
current density. The geomembrane, or liner, acts as an electrical insulator and emulates a current barrier.
Two temporary electrodes are required to energize the commercial application: a source electrode and a
return electrode. When the application is energized and saturated, localized ripple-effects of high current
density occurs only at the leaks. Measurements are collected and scans are made with leak detection probes
and equipment to pinpoint the exact location of the leaks.
PELM SYSTEM
The Permanent Electrical Leak Monitoring (PELM) System
can monitor the application for leaks on a daily, weekly, or
monthly basis. Permanent electrodes, or sensors, are installed
throughout single- or double-lined geomembrane systems.
Disconnect Junction (DJ) boxes and Control Panels allow
convenient access for Clients to collect data through a resistivity
meter. After collection, data is analyzed on a custom-made leak
detection software for locating suspect anomalies.
Isolation
Moisture
Electrical isolation is
required to increase leak
detection sensitivity.
Material above the geomembrane
must be saturated with water.
• Bare Geomembrane Survey
• PELM System Installation
• Tow Survey
• Soil Survey
• Consultation
• PELM Survey
• Wading Survey
• Plummet Survey
• Side - Slope Survey
• Preventative Maintenance
Qualifications
WHO WE ARE
About Us
CONTACT US
Address: 7336 Reindeer Trail
Leon Valley, Texas 78238
Phone : (210) 684 - 8886
Fax : (210) 684 - 8885
Email: info@beyondleakdetection.com
Web : www.beyondleakdetection.com
• 40-hour Hazardous Waste Operations and
• Emergency Response Training
• 8-hour Annual HAZWOPER Refresher
Seminar
• 24-hour New Miner Training
(compliant to MSHA Part 46)
• 8-hour Annual Surface Mine Training
(compliant to MSHA Part 46)
• 10-hour Occupational Safety and Health
Training Course
• 30-hour Occupational Safety and Health
Training Course
• Permit Required Confined Space Safety
Training
• Hydrogen Sulfide (H2S) Training
With the rapid technological advances, it is
BLD's goal to stay up-to-date and current with
each advancement. It is imperative to us to
keep improving our current state of the art
instruments to continue providing our customers
with the most accurate readings on
geomembranes such as, but not finite, HDPE,
LLDPE, PVC, XR-5, Hypalon, and
Polypropylene.
The members of BLD have been performing
leak detection for a combined total of
approximately 14 years. Each BLD
technician has completed the following:
Beyond Leak Detection (BLD) specializes
in electrical leak detection on geomembrane
liners. We provide surveys in locating leaks
in commercial applications and installation
services for leak monitoring systems
worldwide.
Beyond Leak Detection

Mais conteúdo relacionado

Mais procurados

Lucerodigitalintro
LucerodigitalintroLucerodigitalintro
Lucerodigitalintro
KarenSchultz
 
Eastern Line card PA
Eastern Line card PAEastern Line card PA
Eastern Line card PA
Mark Donato
 

Mais procurados (15)

IRJET-Canal Automation Using LabVIEW
IRJET-Canal Automation Using LabVIEWIRJET-Canal Automation Using LabVIEW
IRJET-Canal Automation Using LabVIEW
 
Terrat | Aug-15 | Off-grid Infrastructure Provision & Village Innitiatives
Terrat | Aug-15 | Off-grid Infrastructure Provision & Village InnitiativesTerrat | Aug-15 | Off-grid Infrastructure Provision & Village Innitiatives
Terrat | Aug-15 | Off-grid Infrastructure Provision & Village Innitiatives
 
OLC Services Story
OLC Services StoryOLC Services Story
OLC Services Story
 
GE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear InnovationGE Hitachi. Nuclear Innovation
GE Hitachi. Nuclear Innovation
 
Lucerodigitalintro
LucerodigitalintroLucerodigitalintro
Lucerodigitalintro
 
Eastern Line card PA
Eastern Line card PAEastern Line card PA
Eastern Line card PA
 
Data Centers - Pipe Joining Solutions
Data Centers - Pipe Joining SolutionsData Centers - Pipe Joining Solutions
Data Centers - Pipe Joining Solutions
 
Safety During Installation of Plant and Equipment | Gaurav Singh Rajput
Safety During Installation of Plant and Equipment | Gaurav Singh RajputSafety During Installation of Plant and Equipment | Gaurav Singh Rajput
Safety During Installation of Plant and Equipment | Gaurav Singh Rajput
 
TEVET-Line-Card
TEVET-Line-CardTEVET-Line-Card
TEVET-Line-Card
 
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine. General Informa...
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine. General Informa...SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine. General Informa...
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine. General Informa...
 
CI_SCS_Intro
CI_SCS_IntroCI_SCS_Intro
CI_SCS_Intro
 
Smart Sustainability Suite for Water and Wastewater Treatment plants
Smart Sustainability Suite for Water and Wastewater Treatment plantsSmart Sustainability Suite for Water and Wastewater Treatment plants
Smart Sustainability Suite for Water and Wastewater Treatment plants
 
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine
SMR-160. A Safe and Secure Nuclear Energy Future for UkraineSMR-160. A Safe and Secure Nuclear Energy Future for Ukraine
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine
 
Lightning detection - strategies for monitoring & integrating into a blade ma...
Lightning detection - strategies for monitoring & integrating into a blade ma...Lightning detection - strategies for monitoring & integrating into a blade ma...
Lightning detection - strategies for monitoring & integrating into a blade ma...
 
Automation of Eddy Current Processes for NDT
Automation of Eddy Current Processes for NDTAutomation of Eddy Current Processes for NDT
Automation of Eddy Current Processes for NDT
 

Semelhante a BLD brochure

Iain Palmer Resume 29012015
Iain Palmer Resume 29012015Iain Palmer Resume 29012015
Iain Palmer Resume 29012015
Iain Palmer
 
Global General Presentation 2011
Global General Presentation 2011Global General Presentation 2011
Global General Presentation 2011
vikings28
 
JARED MUTU C.V
JARED MUTU C.VJARED MUTU C.V
JARED MUTU C.V
Jared Mutu
 
Electrical Substations and Switchyard Design
Electrical Substations and Switchyard DesignElectrical Substations and Switchyard Design
Electrical Substations and Switchyard Design
Living Online
 
Wireless CCTV for Rail Applications
Wireless CCTV for Rail ApplicationsWireless CCTV for Rail Applications
Wireless CCTV for Rail Applications
Daniel Del Soldato
 
Emerging Hazards: Renewables and Microgrids, U.S. Department of Energy, Energ...
Emerging Hazards: Renewables and Microgrids, U.S. Department of Energy, Energ...Emerging Hazards: Renewables and Microgrids, U.S. Department of Energy, Energ...
Emerging Hazards: Renewables and Microgrids, U.S. Department of Energy, Energ...
AEI / Affiliated Engineers
 

Semelhante a BLD brochure (20)

Iain Palmer Resume 29012015
Iain Palmer Resume 29012015Iain Palmer Resume 29012015
Iain Palmer Resume 29012015
 
Global General Presentation 2011
Global General Presentation 2011Global General Presentation 2011
Global General Presentation 2011
 
AMETEK Drexelbrook Safety IntelliPoint SIL2.
AMETEK Drexelbrook Safety IntelliPoint SIL2.AMETEK Drexelbrook Safety IntelliPoint SIL2.
AMETEK Drexelbrook Safety IntelliPoint SIL2.
 
JARED MUTU C.V
JARED MUTU C.VJARED MUTU C.V
JARED MUTU C.V
 
NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure NERM Applications & Testing (PTY) Ltd - Brochure
NERM Applications & Testing (PTY) Ltd - Brochure
 
Qteq Cataloque
Qteq CataloqueQteq Cataloque
Qteq Cataloque
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
Lanes Group Plc
Lanes Group PlcLanes Group Plc
Lanes Group Plc
 
Oil pipiline stress monitoring
Oil pipiline  stress monitoringOil pipiline  stress monitoring
Oil pipiline stress monitoring
 
jaycv3.2
jaycv3.2jaycv3.2
jaycv3.2
 
Shell Subsea Control.pdf
Shell Subsea Control.pdfShell Subsea Control.pdf
Shell Subsea Control.pdf
 
Thamesgategroup
ThamesgategroupThamesgategroup
Thamesgategroup
 
About us-Thamesgate Group :www.Thamesgate.com
About us-Thamesgate Group :www.Thamesgate.comAbout us-Thamesgate Group :www.Thamesgate.com
About us-Thamesgate Group :www.Thamesgate.com
 
casestudy1indd
casestudy1inddcasestudy1indd
casestudy1indd
 
Thermal Imaging for Electrical Maintenance
Thermal Imaging for Electrical MaintenanceThermal Imaging for Electrical Maintenance
Thermal Imaging for Electrical Maintenance
 
Electrical Substations and Switchyard Design
Electrical Substations and Switchyard DesignElectrical Substations and Switchyard Design
Electrical Substations and Switchyard Design
 
10 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-1510 - Xylem River Water Monitoring WORLD BANK-Sep-15
10 - Xylem River Water Monitoring WORLD BANK-Sep-15
 
Wireless CCTV for Rail Applications
Wireless CCTV for Rail ApplicationsWireless CCTV for Rail Applications
Wireless CCTV for Rail Applications
 
Services Master
Services MasterServices Master
Services Master
 
Emerging Hazards: Renewables and Microgrids, U.S. Department of Energy, Energ...
Emerging Hazards: Renewables and Microgrids, U.S. Department of Energy, Energ...Emerging Hazards: Renewables and Microgrids, U.S. Department of Energy, Energ...
Emerging Hazards: Renewables and Microgrids, U.S. Department of Energy, Energ...
 

BLD brochure

  • 1. Geomembrane - Lined Applications Products & Services General Locations LEAK DETECTION PROCESS • Landfills • Lakes • Leach Pads • Liquid Impoundments • Reservoirs • Ponds • Storage Tanks • Solid Waste Facilities • Nuclear Power Plants • Recycling Plants • Surface Mines • Mills • Farms • Oil Fields • Golf Courses Electrical leak detection methods implement a physical, real-world circuitry consisting of magnetic fields and current density. The geomembrane, or liner, acts as an electrical insulator and emulates a current barrier. Two temporary electrodes are required to energize the commercial application: a source electrode and a return electrode. When the application is energized and saturated, localized ripple-effects of high current density occurs only at the leaks. Measurements are collected and scans are made with leak detection probes and equipment to pinpoint the exact location of the leaks. PELM SYSTEM The Permanent Electrical Leak Monitoring (PELM) System can monitor the application for leaks on a daily, weekly, or monthly basis. Permanent electrodes, or sensors, are installed throughout single- or double-lined geomembrane systems. Disconnect Junction (DJ) boxes and Control Panels allow convenient access for Clients to collect data through a resistivity meter. After collection, data is analyzed on a custom-made leak detection software for locating suspect anomalies. Isolation Moisture Electrical isolation is required to increase leak detection sensitivity. Material above the geomembrane must be saturated with water. • Bare Geomembrane Survey • PELM System Installation • Tow Survey • Soil Survey • Consultation • PELM Survey • Wading Survey • Plummet Survey • Side - Slope Survey • Preventative Maintenance
  • 2. Qualifications WHO WE ARE About Us CONTACT US Address: 7336 Reindeer Trail Leon Valley, Texas 78238 Phone : (210) 684 - 8886 Fax : (210) 684 - 8885 Email: info@beyondleakdetection.com Web : www.beyondleakdetection.com • 40-hour Hazardous Waste Operations and • Emergency Response Training • 8-hour Annual HAZWOPER Refresher Seminar • 24-hour New Miner Training (compliant to MSHA Part 46) • 8-hour Annual Surface Mine Training (compliant to MSHA Part 46) • 10-hour Occupational Safety and Health Training Course • 30-hour Occupational Safety and Health Training Course • Permit Required Confined Space Safety Training • Hydrogen Sulfide (H2S) Training With the rapid technological advances, it is BLD's goal to stay up-to-date and current with each advancement. It is imperative to us to keep improving our current state of the art instruments to continue providing our customers with the most accurate readings on geomembranes such as, but not finite, HDPE, LLDPE, PVC, XR-5, Hypalon, and Polypropylene. The members of BLD have been performing leak detection for a combined total of approximately 14 years. Each BLD technician has completed the following: Beyond Leak Detection (BLD) specializes in electrical leak detection on geomembrane liners. We provide surveys in locating leaks in commercial applications and installation services for leak monitoring systems worldwide. Beyond Leak Detection